HomeMy WebLinkAbout20181609 Ver 1_More info received_20190412Dewberry Dewberry Engineers Inc.. 551 Piney Forest Road Danville, VA 24540-3353 434.797.4497 434.797.4341 fax www.dewberry.com April 12, 2019 Mr. David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RE: Request for Additional Information: City of Eden Waterline to SoVA Megasite, Rockingham Co., SAW -2018-02188 Dear Mr. Bailey: On February 20, 2019, Dewberry Engineers Inc. (Dewberry) received a request for additional information related to the Eden Waterline to SoVA Megasite project. On behalf of the City of Eden, Dewberry's submits the following response. In regards to your response about the rip -rap placement detail on Sheet C22 statement "ROCK DUMPED IN PLACE." The correction has been made to reflect the stream bed line extending across the top of the rip -rap and added the statement, "Rock to be keyed or pushed into bank." Attached are the most recent design plans. Further, in regards to your response about the insufficient information to justify directional drill or jack and bore methods are not practicable for the six (6) proposed stream crossings, Dewberry has revised its plans to jack and bore all tributary stream crossings, and directional drilling Cascade Creek, with the exception of impact site #6. Any unavoidable temporary impact to this stream crossing is necessary as the North Carolina Department of Transportation (NCDOT) will not allow a bore pit with the close proximity to US 311/NC770. The email from Jason Julian of North Carolina Department of Transportation is attached. The open cut request is located at stream SC associated with impact site #6. It is in Dewberry's professional opinion that stream SC does not present suitable habitat for the James spineymussel or the Roanoke logperch. The stream appears to be intermittent with little to no flow. Attached are photographs of the stream in question. Mr. David E. Bailey, PWS US Army Corps of Engineers April 12, 2019 Page 2 of 3 On March 5, 2019, Dewberry received an email from Sue Homewood with North Carolina Division of Water Resources (NCDWR). The NCDWR comments are provided below in italics, followed by Dewberry's response. The stream impact lengths shown in the most recent table appear to be sufficientfor the trench activities but do not seem to include temporary impacts for dewatering activities that are required. Would you please review whether all construction activities can take place within the permanent impacts shown on the table or provide an updated table that includes temporary dewatering impacts. The impact tables have been revised to reflect the updated plans. The City of Eden proposes to jack and bore all tributary stream crossings and directional drill Cascade Creek, with the exception of stream SC. Temporary dewatering impacts will occur in stream SC. With the revised plan, the stream impacts would be temporary and the attached impact table will reflect that change. Condition I.2. of GC4133 (attached) states that utility corridors must be Io' from the top of bank when it runs parallel to a stream. It appears that Impact Site *7 (Stream C is now associated with Impact Site 6) will not meet this condition. Please provide a justification statementfor why the installation cannot be shifted to avoid this impact. If the Division agrees with the justification we will require that Stream SC be dewatered during construction activities within lofeet of the streambank. Please call this out on the plans and identify the length of temporary dewatering impact on the impact table. In regards to impact site 6 on sheet C14, we request a variance to open cut this stream- we are able to fit and bore pit in for proper execution at the rest of the stream crossings. There are some concerns at this location for the following reasons: • There is a high concentration of existing utilities at this locations (2 additional waterlines, telephone, sewer) and there is only room for the bore pit on the east side. • At this location, the bore pit will need to be 20' deep and directly against the road. There is a risk pf undermining the road to perform this work, which would require significant repair and shut down of NC 770. • Directional drill is not an option due to the many utilities located in the vicinity. • The City of Eden would like to keep the utilities within the existing easement. Temporary dewatering has been referenced on the updated plans on sheet C22 and the impact table has been revised to reflect these changes. On March 5, 2019, Dewberry personnel conducted a survey for the federally endangered smooth coneflower in the proposed project area. Based on the results of the survey, Dewberry made the determination that the biological conclusion for the project "May effect, not likely to adversely affect" the smooth coneflower. Attached is the letter sent to U.S Fish and Wildlife Service (USFWS). " Dewberry® Mr. David E. Bailey, PWS US Army Corps of Engineers April 12, 2019 Page 3 of 3 If you have any questions regarding the above responses, please do not hesitate to contact me at 434-549-8510• Sincerely, Dewberry Engineers Inc. Katherine J. Shumaker Staff Environmental Scientist Troy A. Shelton, PWS Environmental Department Manager cc: Terry Shelton, City of Eden Sue Homewood, NC DEQ KJS/tas/kjs Attachments: Updated Plans, Correspondence with NCDOT, Site Photographs, Impact Tables, Letter to USFWS P:\50102913\Adm\Comment Responses\2019.412 USACE Response\2019.4.12 - USACE Response.docx 1 Dewberry® Dewberry® April 9, 2019 U.S. Fish and Wildlife Service Raleigh ES Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 ATTN: Kathy Matthews Dewberry Engineers Inc. 919.881.9939 2610 Wycliff Road, Suite 410 919.881.9923 fax Raleigh, NC 27607 www.dewberry.com Subject: Smooth coneflower surveys for the proposed City of Eden Waterline extension to SoVA Mega Park- Rockingham County, NC Reference: U.S. Fish and Wildlife Service Letter to US Army Corp of Engineers dated December 20, 2018 Dear Ms. Matthews, This letter is responding the U.S. Fish and Wildlife Service (Service) letter dated December 20, 2018 requesting surveys for the federally endangered smooth coneflower. Based on the recommendation in the referenced letter, Dewberry Engineers Inc. (Dewberry) contacted the Service to discuss the options regarding surveys for the smooth coneflower outside the optimal survey window. The Service recommended visiting a known smooth coneflower location population. Two sites were visited, (The North Carolina Botanical Gardens and a roadside population) and multiple plants were located with stems and flower heads present, with and without seeds. Surveys were conducted by Biologists from Dewberry, Anne Burroughs and Brett Feulner, on March 5, 2019 in the proposed project area. Surveys were conducted throughout the entire project area and no specimens of the smooth coneflower, or any plants resembling the smooth coneflower were observed within the project area. Based on the results of the surveys, Dewberry makes the determination that the biological conclusion for the project is "May effect, not likely to adversely affect" the smooth coneflower and seeks the concurrence from the Service. Please contact me with any questions or comments at bfeulner@dewberry.com or (919) 746- 9583• Sincerely, Brett Feulner Senior Environmental Scientist cc: David Bailey, USACE From: Julian, Jason R [maijto"LuIian@nccIot.f v] Sent: Thursday, March 21,JO194:SOPM To: Barksdale, Leslie Cc: Adamnu,Hassane Collins, Martin Fnu|ks, David C; Ehrhardt, Scott Subject: RE: [External] RE: SOVA Mega Site at Berry Hill — Phase I NC Water - Plans for Review This message originated from outside your organization Leslie, During our review of the plans, we have noticed that you are proposing to bore the creek on sheet C14. With the close proximity to US 311/NC770 with your bore pit, we are not going to allow this. Please review this and submit another sheet C14 with your proposal for us to review. Jason Julian District Engineer Department of Transportation 336 520 6060 office 336 634 5638 fax 122GN.Scales St. Reidsville, NC 27320 POBox 131O Reidsville, NC 27320 Emad toaw(j Iroly) to the WOTUS Impact Table Impact Detail Temporary Impacts Detail Sheet Number Site Sheet WOTUS Map ID Latitude Longitude (including Length Width Area WD 36.5367077° -079.6370762° 209.32 (Zone) 4 dewatering) PEM Number Number 2645.07 0.061 LF LF LF SF AC 6 C14 R4 SC 36.3147065° -079.4036233° 90 90 3 270 0.006 TOTAL: 90 90 3 270 0.006 Rip -rap impacts assume 3' depth x3' height keyed into bottom, and 2' depth x (length of bank) height shown on drawings, multiplied by total width of impact. Refer to rip -rap placement detail on Sheet C22. Wetland Impact Table Impact Site Number Detail Sheet Number Wetland Type Map ID (Zone) Latitude Longitude Total Temporary Impacts Square Feet Acres 1 C5 PEM WD 36.5367077° -079.6370762° 209.32 0.005 4 C8 PEM WB 36.5316528° -079.6513517° 2645.07 0.061 TOTAL: 2854.39 0.066 10 Dewberry`'' P:\50102913\Adm\Comment Responses\2019.4.11 USACE Response\Impacts Tables.docx 1 1 2 1 3 14 5 Drawing E C 0 0 Index General MWC DRAWN BY T1 COVER SHEET RSE T2 LEGEND ABBREVIATIONS AND GENERAL NOTES Civil CHECKED BY C1 EROSION AND SEDIMENTATION CONTROL PLAN C1.1 TRAFFIC MANAGEMENT PLAN C2 OVERALL WATERLINE LAYOUT C2.1 NC MASTER METER AND CONTROL VALVE VAULT C3 WATERLINE PLAN AND PROFILE C3 WATERLINE PLAN AND PROFILE C4 WATERLINE PLAN AND PROFILE C5 WATERLINE PLAN AND PROFILE C6 WATERLINE PLAN AND PROFILE C7 WATERLINE PLAN AND PROFILE C8 WATERLINE PLAN AND PROFILE C9 WATERLINE PLAN AND PROFILE C10 WATERLINE PLAN AND PROFILE C11 WATERLINE PLAN AND PROFILE C12 WATERLINE PLAN AND PROFILE C13 WATERLINE PLAN AND PROFILE C14 WATERLINE PLAN AND PROFILE C15 WATERLINE PLAN AND PROFILE C16 WATERLINE PLAN AND PROFILE C17 WATERLINE PLAN AND PROFILE C18 WATERLINE DETAILS C19 WATERLINE AND EROSION & SEDIMENT CONTROL DETAILS C20 EROSION AND SEDIMENT CONTROL DETAILS C21 EROSION AND SEDIMENT CONTROL DETAILS C22 STREAM AND WETLAND DETAILS Electrical E1 ELECTRICAL LEGEND, GENERAL NOTES, & SITE PLAN E2 ELECTRICAL VALVE VAULT PLAN, DIAGRAMS, & SCHEDULES E3 ELECTRICAL STANDARDS DETAILS ■ City of Eden Rockingham County NC SOVA Mega. �r, III At Ite NC / .Iudeyed Mtn' r o .Z �� a p V Ai rp- _ (3 Trtirty rapes_ 20" NC WFreedom' den Park Tank � f roe a Vicinity Map SCALE: N.T.S. Contacts: OWNER: City of Eden Director of Environmental Services Terry Shelton P.O. Box 70 Eden, NC 27289-0070 PH. (336) 623-2110 FAX (336) 623-4041 TSHELTON@EDENNC.US ENGINEER: Dewberry Leslie Barksdale E.I.T. 551 Piney Forest Road Danville, Virginia 24540 PH. (434) 549-8504 FAX (434) 797-4341 Ibarksdale@dewberry.com SUBMITTAL ❑ PRELIMINARY ❑ APPROVAL BIDDING ❑ CONSTRUCTION ❑ REVISION ❑ RECORD SET NUMBER EDA Project #: 04-01-07214 DENR: H-SRP-D-17-0015WIF-1927 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL 0•4060000000, ����.••��� CAROL••.,,. SEAL l 17502 '•.�`�' FNGINE��'�Q�.' .,•,,c0TT EHR�P••,. ................ KEY PLAN SCALE AS NOTED No. DATE I BY I Description REVISIONS 111140 COVER SHEET PROJECT NO. 50046462 / 50102913 SHEET NO. T1 OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 111140 COVER SHEET PROJECT NO. 50046462 / 50102913 SHEET NO. T1 OF Irm C C W. m 1 9 q A LEGEND- EXISTING PROPOSED 0 00 -00- DESCRIP TION BUILDING CONTOURS CURB & GUTTER CONCRETE WALK OR SLAB PAVEMENT UNIMPROVED OR GRAVEL TREE LINE O TREE OR SHRUB -X* FENCE & GATE DITCH OR SWALE CREEK / WATERS EDGE ':1' : lmlIM CENTERLINE - R/W- - - STREET RIGHT-OF-WAY EXISTING ABBREVIATIONS- LIMITS OF DISTURBANCE W A STORM STRUCTURE & LINE Cl CAST IRON FLARED END SECTION ABUT ABUTMENT ENDWALL EXISTING ABBREVIATIONS- DESCRIPTION W A AIR Cl CAST IRON DR ABUT ABUTMENT CB CATCH BASIN DUCTILE IRON PIPE ADD ADDITIONAL CEM CEMENT DWL ADJ ADJUSTABLE CL CENTERLINE PRESSURE PIPE & FITTINGS AGGR AGGREGATE CO CLEAN OUT EL ALT ALTERNATE CONC CONCRETE ELEVATION ALUM ALUMINUM CONN CONNECTION EQUIP ASTM AMERICAN STANDARD FOR CONT CONTINUOUS ❑HE OHE TESTING & MATERIALS uGE UGE UNDERGROUND ELECTRIC LINE OHT OHr CMP CORRUGATED METAL PIPE STANDARD AWWA AMERICAN WATER WORKS POLE, GUY, & ANCHOR ❑T Q ASSOCIATION CF CUBIC FEET FIBER OPTIC CABLE ASSY ASSEMBLY CFM CUBIC FEET PER MINUTE UGu APPROX APPROXIMATE CFS CUBIC FEET PER SECOND BOC BACK OF CURB CU IN CUBIC INCH SUBSURFACE BORING BSMT BASEMENT CULV CULVERT BO BLOW OFF CV CHECK VALVE BRG BEARING C & G CURB & GUTTER ` BM BENCH MARK CY CUBIC YARD B BEND DEPT DEPARTMENT BOTT BOTTOM GEN GENERATOR BOB BOTTOM OF BANK GOVT GOVERNMENT BRZ BRONZE DET DETAIL BLDG BUILDING DIA DIAMETER EXISTING PROPOSED DESCRIPTION W W WATERLINE YH YH DR DRIVE DI YARD HYDRANT Wm DUCTILE IRON PIPE WATER METER DROP MANHOLE D FIRE HYDRANT ASSEMBLY DWL DWELLING VALVE ASSEMBLY EACH EF PRESSURE PIPE & FITTINGS EW ARV AIR RELEASE VALVE -SS S EL SAN. SEWER M.H. & LINE ELEC ELECTRICAL, ELECTRIC FORCEMAIN ELEVATION C.O. C.O. ENTR ENTRANCE EQUIP CLEANOUT EX, EXIST. EXISTING G GASLINE ❑HE OHE OVERHEAD ELECTRIC LINE uGE UGE UNDERGROUND ELECTRIC LINE OHT OHr OVERHEAD UTILITY LINE STD STANDARD THK THICK POLE, GUY, & ANCHOR ❑T Q TELEPHONE PEDESTAL FO FO FIBER OPTIC CABLE uGT UGT UNDERGOUND TELEPHONE uGu UGu UNDERGOUND UTILITY ZSURVEY TRAVERSE POINTS SUBSURFACE BORING DIM DIMENSION DIST DISTANCE DN DOWN DWG DRAWING DR DRIVE DI DROP INLET DIP DUCTILE IRON PIPE DMH DROP MANHOLE D DRAIN DWL DWELLING EA EACH EF EACH FACE EW EACH WAY, END WALL EOP EDGE OF PAVEMENT EL ELBOW ELEC ELECTRICAL, ELECTRIC ELEV ELEVATION ENGR ENGINEER ENTR ENTRANCE EQUIP EQUIPMENT EX, EXIST. EXISTING EJ EXPANSION JOINT EXT EXTERIOR FOC FACE OF CURB FT FEET FES FLARED END SECTION FIG FIGURE FIN FINISH FH FIRE HYDRANT FLEX FLEXIBLE FL FLOOR FD FLOOR DRAIN FLOUR FLOURESCENT FM FORCE MAIN FLG FLANGE GPM GALLONS PER MINUTE GALV GALVANIZED GV GATE VALVE GRD GRADE GA GAUGE GPDW GYPSUM DRYWALL HTR HEATER HVAC HEATING VENTILATION MISC & AIR CONDITIONING HT HEIGHT HWY HIGHWAY HOR HORIZONTAL HP HORSEPOWER, HIGH POINT IN INCH ID INSIDE DIAMETER EXISTING PROPOSED DESCRIPTION ROAD SIGN MAILBOX GROUND LIGHTS LIGHT POLE O GUARD PIPE POST 0 x 100.00 X100.00 SPOT ELEVATION xx SF SILT FENCE CHECK DAM DV DIVERSION CE CONSTRUCTION ENTRANCE ® CIP CULVERT INLET PROTECTION O ® OP OUTLET PROTECTION O ® IP INLET PROTECTION O PS PERMANENT SEEDING TS TEMPORARY SEEDING LS LEVEL SPREADER ORECPO ROLLED EROSION CONTROL PRODUCT USC UTILITY STREAM CROSSING ID INSIDE DIAMETER BENCHMARK INSULATION INT REVISION NUMBER INV a CABLE (TELEVISION OR JUNCTION BOX LB FIBER OPTIC) LG ® WELL LINEAR FEET ® MONUMENT ROAD SIGN MAILBOX GROUND LIGHTS LIGHT POLE O GUARD PIPE POST 0 x 100.00 X100.00 SPOT ELEVATION xx SF SILT FENCE CHECK DAM DV DIVERSION CE CONSTRUCTION ENTRANCE ® CIP CULVERT INLET PROTECTION O ® OP OUTLET PROTECTION O ® IP INLET PROTECTION O PS PERMANENT SEEDING TS TEMPORARY SEEDING LS LEVEL SPREADER ORECPO ROLLED EROSION CONTROL PRODUCT USC UTILITY STREAM CROSSING ID INSIDE DIAMETER INSUL INSULATION INT INTERIOR INV INVERT JB JUNCTION BOX LB POUND LG LENGTH OR LONG LF LINEAR FEET LP LOW POINT LT LEFT MB MAILBOX MH MANHOLE MFR MANUFACTURER MATL MATERIAL MAX MAXIMUM MJ MECHANICAL JOINT MGD MILLION GALLONS PER DAY MIN MINIMUM MISC MISCELLANEOUS ML MIXED LIQUOR NEMA NATIONAL ELECTRIC PP MANUFACTURERS ASSOCIATION NPW NON POTABLE WATER NPR NON POTABLE REUSE WATER NATL NATIONAL N NEW NCDOT NORTH CAROLINA DEPARTMENT RAS OF TRANSPORTATION NIC NOT IN CONTRACT NTS NOT TO SCALE NO NUMBER OC ON CENTER OD OUTSIDE DIAMETER OSHA OCCUPATIONAL SAFETY & SCH HEALTH ACT PB PAPER BOX PVC POLYVINYL CHLORIDE PRV PRESSURE RELIEF VALVE, SHT PRESSURE REDUCING VALVE PL PROPERTY LINE PED PEDESTAL PVMT PAVEMENT PERF PERFORATED PC POINT OF CURVATURE PCC POINT OF COMPOUND PI CURVATURE POINT OF INTERSECTION PP POWER POLE PRC POINT OF REVERSE CURVE PT POINT OF TANGENCY POVC POINT OF VERTICAL CURVE PVI POINT OF VERTICAL INTERSECTION GENERAL NOTES 1. VERTICAL CONTROL FOR THIS PROJECT IS REFERENCED TO VIRGINIA STATE PLANE GRID COORDINATES (SOUTH ZONE) US SURVEY FEET. HORIZONTAL: NAD83 (CORS) BLKV,DOBS,ASUB VERTICAL: NAVD88 AVERAGE COMBINED FACTOR: GROUND TO GRID 0.999987 2. THE CONTRACTOR SHALL COORDINATE ANY CONSTRUCTION ACTIVITY WITH NCDOT AND THE CITY OF EDEN. 3. "IF ARCHEOLOGICAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROCEDURES CODIFIED AT 33 CFR 800.13(B) WILL APPLY AND EDA, THE NORTH CAROLINA STATE HISTORIC PRESERVATION OFFICE, AND THE CATAWBA INDIAN NATION SHALL BE CONTACTED IMMEDIATELY. ARCHEOLOGICAL MATERIALS CONSIST OF ANY ITEMS, FIFTY YEARS OR OLDER WHICH WERE MADE OR USED BY MAN. THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO, STONE PROJECTILE POINTS (ARROWHEADS), CERAMIC SHERDS, BRICKS, WORKED WOOD, BONE AND STONE, METAL AND GLASS OBJECTS, AND HUMAN SKELETAL REMAINS." 4. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 5. CONTRACTOR SHALL UTILIZE MODIFIED PUMP AROUND SETUP IF DEWATERING UTILITY TRENCH IN WETLAND IS REQUIRED. CONTRACTOR SHALL UTILIZE SUMP PUMP, INTAKE HOSE WITH SCREEN, AND APPROVED DEWATERING DEVICE (SILT BAG) TO CHECK DAM. REFERENCE TEMPORARY PUMP AROUND DETAIL SHEET C22 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK. 7. ALL PIPING SHALL HAVE 36" MINIMUM COVER (TYP.) UNLESS OTHERWISE NOTED. 8. CONTRACTOR SHALL FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL CONTACT NC -1 -CALL (1-800-632-4949) 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. 9. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY LOCATION OF AND PREVENT DISTURBANCE OF ANY EXISTING UTILITIES IN WORK AREA, AND PROVIDE IMMEDIATE TEMPORARY SERVICE TO ANY DAMAGED UTILITIES AT THE EXPENSE OF THE CONTRACTOR. ANY EXISTING UTILITIES NOT LOCATED PRIOR TO BEGINNING CONSTRUCTION THAT ARE DAMAGED DURING CONSTRUCTION OR WHICH CONFLICT WITH PROPOSED CONSTRUCTION SHALL BE REPAIRED OR RELOCATED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. 10. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 11. CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING OUTSIDE THE CONSTRUCTION LIMITS. CONTRACTOR SHALL USE EXTREME CAUTION TO PREVENT DISTURBANCE TO THE TREES, SHRUBS, ETC., WHICH ARE IN THE CONSTRUCTION LIMITS AND NOTED TO REMAIN. 12. THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RESIDENT OFFICE (336-634-5644) PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR MUST PROVIDE ALL TRAFFIC SAFETY CONTROLS NECESSARY WHEN WORKING IN OR NEAR NCDOT RIGHT-OF-WAY PER MUTCD & NCDOT ROADWAY STANDARD DRAWINGS LATEST EDITION FOR TRAFFIC CONTROL. 13. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL & VEHICULAR ACCESS TO & FROM ALL DWELLINGS & BUSINESSES DURING CONSTRUCTION. 14. EROSION AND SEDIMENT CONTROL NOTES: A. ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM TO THE LATEST EDITIONS OF THE NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. B. CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONSTRUCTION ENTRANCES AT POINTS OF INGRESS AND EGRESS TO PUBLIC RIGHT-OF-WAY, STABILIZE DISTURBED AREAS, AND PROVIDE OTHER MEASURES REQUIRED AS SHOWN ON THE DRAWINGS AND SPECIFIED. C. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT TRACKING ON EXISTING PAVEMENTS. D. CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD STABILIZATION OF ADEQUATE AREA TO ACCOMMODATE CONSTRUCTION VEHICLE PARKING, MATERIAL STORAGE, ETC. AT A LOCATION CONVENIENT TO THE INDIVIDUAL CONSTRUCTION AREAS AND CONSISTENT WITH THE CONSTRUCTION SEQUENCES. E. ANY DISTURBANCE TO EROSION AND SEDIMENTATION CONTROL MEASURES BY OTHER CONTRACTOR(S) SHALL BE REPAIRED AND/OR REPLACED BY THE RESPONSIBLE PARTIES. F. A ROCK CHECK DAM SHALL BE INSTALLED BELOW THE DISTURBED AREA WITHIN DITCH LINES AND/OR WHERE DITCH LINES OUTLETS TO UNDISTURBED AREAS. G. SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL LOCATIONS WHERE DISTURBED AREA DRAINS TOWARD PROPERTY OWNED BY OTHERS AND/OR TOWARD STREAMS. H. ALL PROPOSED STAGING AREAS AND/OR ACCESS ROADS MUST BE INCLUDED WITHIN THE DISTURBED LIMITS. A REVISED PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO START OF LAND DISTURBANCE FOR ANY AREAS OUTSIDE THE CURRENT PERMITTED LIMITS. I. IF AN EQUIPMENT CROSSING IS NEEDED TO GAIN ACCESS ACROSS A STREAM, THE CROSSING SHALL BE CONSTRUCTED AS A BRIDGE (E.G. TIMBER MATS, STEEL, ETC.). THE TEMPORARY BRIDGE SHALL HAVE NO GAPS OR HOLES THAT WOULD ALLOW SEDIMENT TO FALL INTO THE STREAM. J. ON THE RIP -RAP PLACEMENT CONSTRUCTION DETAIL (SHEET C22), THE RIP -RAP SHALL BE EXTENDED ACROSS THE ENTIRE STREAM CHANNEL. ENSURE THE TOP OF THE STONE IS PLACED AT THE SAME ELEVATION AS THE STREAM BED. CLASS I STONE MUST HAVE A MINIMUM THICKNESS OF 20". K. STONE OUTLETS IN SILT FENCE SHALL BE PLACED IN ALL LOW-LYING AREAS AND/OR EVERY 150 LINEAR FEET. THE STONE OUTLETS MUST BE INSTALLED PER THE ATTACHED CONSTRUCTION DETAIL. L. ANNUAL RYE GRASS IS NOT PERMITTED IN THE SEEDING SPECIFICATIONS OF THE STREAM BANK SEEDING SCHEDULE. RYE GRAIN OR WHEAT MAY BE USED INSTEAD. ALL STREAM SEEDING APPLICATION RATES FOR TEMPORARY AND PERMANENT SEEDING MUST ADHERE TO THE NC EROSION AND SEDIMENT CONTROL PLANNING & DESIGN MANUAL 6.11 ON TABLES 6.11.0 6.11.b AND 6.11.c. M. SANDBAG DIKES SHALL HAVE A MINIMUM 3' TOP CREST WIDTH. 15. SWEEP ROAD WAYS DAILY WHERE WORK IS BEING PERFORMED. 16. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DITCHLINES STEEPER THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL ONLY BE REMOVED WHEN AUTHORIZED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES. 18. ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ORIGINAL CONDITION OR BETTER. 19. DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT INTERFERE WITH CONSTRUCTION ARE TO BE RESTORED TO ORIGINAL CONDITION. 20. PAVED DRIVEWAYS, PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN -CUT UNLESS SHOWN OTHERWISE. 21. CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE EXISTING DRIVEWAY CULVERTS INCLUDING HEADWALLS IF INSTALLATION OF NEW WATERLINES) REQUIRE EXCAVATION OF THE EXISTING CULVERTS, IF EXISTING CMP OR RCP CAN BE REMOVED WITHOUT DAMAGE, CONTRACTOR MAY REUSE PIPE. 22. NEW WATERLINE MATERIAL SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, UNLESS SHOWN OTHERWISE ON THE PLANS. 23. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL FITTINGS AND CONNECTIONS, IN ACCORDANCE WITH DETAIL SHEET C19. 24. FOR REVIEW PURPOSES, 2007 NCDOT LIDAR 2' CONTOURS HAVE BEEN OVERLAYED ONTO THE ATTACHED PLAN SHEETS. THE ACCURACY OF THESE CONTOURS ARE NOT GUARANTEED SO THEY SHOULD NOT BE USED FOR ESTIMATING OR CONSTRUCTION PURPOSES. THE LINE PROFILE WAS GENERATED FROM THE ACTUAL SURVEYED TOPOGRAPHIC INFORMATION AND SHOULD THEREFORE BE USED FOR ALL CALCULATIONS. 25. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED. RAD RADIUS REF REFERENCE STA STATION RAS RETURN ACTIVATED SLUDGE STL STEEL RCP REINFORCED CONCRETE PIPE S.S. SANITARY SEWER, STAINLESS STEEL RD ROAD, ROOF DRAIN SSC SECONDARY SCUM REQ'D REQUIRED REV REVISED SCH SCHEDULE RT RIGHT SECT SECTION R/W, ROW RIGHT OF WAY SHT SHEET R RISER STM STORM RS RAW SEWAGE ST STREET SE SECONDARY EFFLUENT STY STORY SIM SIMILAR TD TANK DRAIN SPEC SPECIFICATION TEL TELEPHONE SR STATE ROUTE OR SECONDARY ROAD TEMP TEMPORARY OR TEMPERATURE STD STANDARD THK THICK T & B TOP AND BOTTOM TOB TOP OF BANK TOW TOP OF WALL TDC TURNED DOWN CURB TYP TYPICAL UG UNDERGROUND UL UNDERWRITER'S LABORATORY VERT VERTICAL VC VERTICAL CURVE NCDOT NORTH CAROLINA DEPT OF TRANSPORATION W/ WITH WAS WASTE ACTIVATED SLUDGE WL WATER MAIN OHIO0 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL �..........,,• ••••.••%.. CAROB ''•.,,. =• �"�oFESS/pNq�9 SEAL l 17502 =. S •••`ANG I NE��•••��:: c0•... EHR�P••,. r '••....100940 - KEY PLAN SCALE AS NOTED No. DATE I BY I Description VISIONS TITLE LEGEND ABBREVIATIONS AND GENERAL NOTES PROJECT NO. 50046462 1 501 0291 3 T2 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE LEGEND ABBREVIATIONS AND GENERAL NOTES PROJECT NO. 50046462 1 501 0291 3 T2 SHEET NO. OF 1 0 q d C Dewberry' Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C SEAL .•010",% ••. i�L'•. :.•` ESS/QN919 ,•••: SEAL 17502 AG 4M KEY PLAN SCALE 0' 600' 1200' SCALE: 1 " = 600' No. DATE I BY I Description VISIONS DRAWN BY MWC APPROVED BY RSE CHECKED BY LAB DATE APRIL, 2019 TITLE Overall NC Waterline Layout PROJECT NO. 50046462 / 50102913 C1 SHEET NO. OF E X C0 0 1 Page 6h-52 April 2015 Typical Traffic Control Non -Stationary Operation on a Two -Lane Roadway Using Flaggers (Figure TTC-24.1) NOTES: Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, and 500'-800' where the posted speed limit is greater than 45 mph. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the flagger station and transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. Generally speaking, motorists should have a clear line of sight from the graphic flagger symbol sign to the flagger. Option: 3. Where Right -of -Way or geometric conditions prevent the use of 48" x 48" signs. 36" x 36" signs may be used. Standard: 4. Flagging stations shall be located far enough in advance of the work space to permit approaching traffic to reduce speed and/or stop before passing the work space and allow sufficient distance for departing traffic in the left lane to return to the right lane before reaching opposing traffic (see Table 6H-3 on Page 61-11-5). 5. The Flagger (W20-7) symbol sign shall stay within 1/2 mile of each flagger. Guidance: 6. Additional Flagger ymbol signs should be placed at 1 h mile intervals and either erected by the approaching flagger, or taken down as the operation proceeds past this point. 7. When a highway -rail crossing exists within or upstream of the transition area and it is anticipated that queues resulting from the lane closure might extend through the highway -rail grade crossing, the temporary traffic control zone should be extended so that the transition area precedes the highway -rail crossing (see Figure TTC-56 for additional information on highway -rail crossing). 8. If the queue of traffic reaches the BE PREPARED TO STOP (W3-4) sign, then the advance warning signs should be readjusted at greater distances. Standard: 9. All flaggers shall be state certified and have their certification card in their possession when performing flagging duties (see Section 6E.01, Qualifications for Flaggers). 10. A shadow vehicle with at least one amber rotating, flashing or oscillating lights shall be parked 80'-120' in advance of the first work crew. 11. The maximum length of the work area shall be two miles. Revision 1 - 4/11/2015 April 2015 Page 6H-55 Non -Stationary Operation on a Two -Lane Roadway Using Flaggers (Figure TTC-24.1) 53� int Z iX3N WoM OVOM L 310N 33S ar3HV ffraa 3NVl 3NO L 31ON 33S dO1S 0 03>3Yd3ad 38 31ON 33S • 9'8LS31ON 33S - NOIiV-LS ONICOY'J ONICIN3 SQNdS 1'31ON S3TON 33S 335 J� 31IN �/t - NOIiViS 9NI99V-13 ONiNNIO39 _EMD G20-2 (V) ROAD WORK 500+ 2 MILES MAX � 80'- 120' SHADOW VEHICLE REQUIRED ° SEE NOTE 10 FLAGG ING SEESTATION NOTE A SEE NOTES 2 & 5 + 005 SEE NOTES 1 & 5 xa`oe� .c�ao� J9 re W2❑ -7 SEE NOTE -� w3A SEE NOTE 1 A W20-4 SEE NOTE 1 W21 -V2 0 Page 6H-52 August 2015 Typical Traffic Control Lane Closure 011 a Two -Lane Roadway Using Flaggers (Figure TTC-23.1) NOTES Guidance: 1. Sign spacing distance should be 350'-500 'where the posted speed limit is 45 mph or less, and 500'-800'wherethe posted speed limit is greater than 45 mph. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the flagger station and transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. Generally speaking, motorists should have a clear line of sight from the graphic flagger symbol sign to the flagger. Option: 3. Where Right -of -Way or geometric conditions prevent the use of 48" x 48" signs, 36" x 36" signs may be used. Standard: 4. Flagging stations shall be located far enough in advance of the work space to permit approaching traffic to reduce speed and/or stop before passing the work space and allow sufficient distance for departing traffic in the left lane to return to the right lane before reaching opposing traffic (see Table 6H-3 on Page 61-11-5). 5. All flaggers shall be state certified and have their certification card in their possession when performing flagging duties (see Section 6E.01, Qualifications for Flaggers). 6. Cone spacing shall be based on the posted Speed and the values in Table 6H-4 on Page 61-11-6.1 7. A shadow vehicle with at least one high intensity amber rotating, flashing, or oscillating light shall be parked 80'-120' in advance of the first work crew. Option: 8. A supplemental flagger may be required in this area to give advance warning of the operation ahead by slowing approaching traffic prior to reaching the flagger station or queued traffic. Guidance: 9. If the queue of traffic reaches the BE PREPARED TO STOP (W3-4) sign then the signs, and if used the portable temporary rumble strips (PTRS), should be readjusted at greater distances. 10. When a highway -rail crossing exists within or upstream of the transition area and it is anticipated that queues resulting from the lane closure might extend through the highway -rail grade crossing, the temporary traffic control zone should be extended so that the transition area precedes the highway -rail crossing (see Figure TTC-56for additional information on highway -rail crossings). Standard: 11. At night, flagger stations shall be illuminated, except in emergencies (see Section 6E.08). Option: 12. Cones may be eliminated when using a pilot vehicle operation or when the total roadway width is 20 feet or less. 13. For low-volume situations with short work zones on straight roadways where the flagger is visible to road users approaching from both directions. a single flagger, positioned to be visible to road users approaching from both directions, may be used (see Chapter 6E). Standard: 11. When approved for use, three portable temporary rumble (PTRS) strips shall be installed across the entire travel lane adjacent to the BE PREPARED TO STOP (W3-4) sign. The portable temporary rumble strips shall be monitored and adjusted as necessary during the work shift to ensure proper placement on the roadway. When the PTRS are installed, the RUMBLE STRIPS AHEAD (W2042 sign shall also be utilized. Posted Speed 0-35 mph 36-55 mph PTRS Spacing (Center to Center) 5 Feet 8 Feet Revision 1-4/l/2015 April 2015 Page SH -53 Lane Closure on a Two -Lane Roadway Using Flaggers (Figure TTC-23.1) fl d3 M II�iOI�I aV08 Od3HY avow 3NVi 3N0 ar3yr sdl= s�awna dols 01 - ® G20-2 (V) 038Vd3dd 313 Z �T v m 500+ NOIIV-LS �1AE)0V-1J 501-100, O �] SEE NOTE 4 +009 3*10M avaa aN3 PORTABLE TEMPORARY TEMPORARY RUMBLE STRIPS SEE NOTE 14 (OPTIONAL) 1: Revision 1- 4/1/2015 80'- 120' SHADOW VEHICLE REQUIRED SEE NOTE 4 -501-100, FLAGGER STATION SEE NOTE 2 SEE NOTE 1 W20-7 i SEE NOTE 1 BE PREPARED W3-4 SEE TO STOP SEE NOTE 9 NOTE 1 RUMBLE S 1 W2o-v26 STRIP SEE AHF S SEE NOTE 14 NOTE 1 ONE LANE ROAD W20-4 SEE AHEAD NOTE 1 RDA WORD[ W20-1 4 1 5 TRANSPORTATION MANAGEMENT PLAN NOTES 1. THIS TRANSPORTATION MANAGEMENT PLAN (TMP) IS PREPARED FOR PITTSYLVANIA COUNTY FOR THE SOVA MEGA SITE AT BERRY HILL PHASE II NORTH CAROLINA WATER PROJECT. IT IS NOT THE INTENT OF THIS PLAN TO INCLUDE EVERY DETAIL WHICH MUST BE CONSIDERED FOR TRAFFIC CONTROL DURING CONSTRUCTION OF EACH WORK ZONE, BUT TO PROVIDE THE GENERAL GUIDELINES THAT THE CONTRACTOR SHALL FOLLOW WHEN DEVELOPING THE TMP FOR NCDOT APPROVAL. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE FOR SAFE TRAVEL AROUND WORK ZONES IN ACCORDANCE WITH ALL NCDOT REQUIREMENTS. THE ENGINEER DOES NOT ASSUME ANY RESPONSIBILITY FOR THE TRAFFIC CONTROL MEASURES THAT ARE IMPLEMENTED DURING PROJECT CONSTRUCTION. 2. THE WORK AREAS THAT REQUIRE TRAFFIC MANAGEMENT ARE SHOWN ON THE PROJECT AREA MAP ON THIS SHEET. OTHER ROADWAYS MAY BE AFFECTED DUE TO MATERIAL STAGING, TRAPSPORTATION OF MATERIALS, LINE TESTING, UNFORSEEN FIELD CONDITIONS, ETC., AND SHALL BE CONSIDERED FOR WORK AREA PROTECTION AND TRAFFIC MANAGEMENT TECHNIQUES AS REQUIRED. VARIOUS TEMPORARY TRAFFIC CONTROL DETAILS FROM THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 ARE SHOWN ON THIS SHEET. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE WHICH DETAILS APPLY FOR EACH SPECIFIC WORK CONDITION. ADDITIONAL DETAILS MAY BE REQUIRED PRIOR TO CONSTRUCTION BY NCDOT. 3. THE CONTRACTOR SHALL CONTACT NCDOT IN WRITING WITH A WORK SCHEDULE TWO (2) WEEKS PRIOR TO CONSTRUCTION. NCDOT WILL DETERMINE IF POLICE PATROL IS NECESSARY FOR TRAFFIC CONTROL. 4. THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF CONSTRUCTION WITH NCDOT. 5. SIGN SPACING MAY ONLY BE ADJUSTED FOR FIELD CONDITIONS IF AUTHORIZED BY NCDOT. 6. ALL PAVEMENT MARKINGS CONFLICTING WITH TRAFFIC PATTERNS SHALL BE REMOVED AND RESTRIPED AS NECESSARY. PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE NCDOT ROAD AND BRIDGE SPECIFICATIONS. 7. WHEN WORK IS NOT BEING PERFORMED, MATERIALS AND PARKED EQUIPMENT SHALL NOT INTERFERE WITH TRAFFIC. 8. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL, REVISION 1 AND AS DIRECTED BY NCDOT. WORK SHALL COMPLY WITH ALL REGULATIONS PROVIDED IN THE LAND USE PERMIT. 9. SAFE ACCESS TO ALL EXISTING PUBLIC ROADWAYS SHALL BE MAINTAINED AT ALL TIMES. 10. WORK HOURS SHALL BE APPROVED BY NCDOT PRIOR TO CONSTRUCTION. CONSTRUCTION WORK AFTER DARK IS NOT ANTICIPATED FOR THE PROJECT. HOWEVER, SHOULD CONSTRUCTION CONTINUE AFTER DARK, FLOODLIGHTS SHALL BE UTILIZED WHERE EXISTING LIGHT IS NOT ADEQUATE. THE FLOODLIGHT SHALL NOT CREATE A DISTRACTING GLARE TO DRIVERS. 11. ALL FLAGGERS SHALL BE STATE CERTIFIED AND HAVE THEIR CERTIFICATION CARD IN THEIR POSSESSION WHEN PERFORMING FLAGGING DUTIES. 12. CHANNELLING DEVICES SUCH AS CONES SHALL BE UTILIZED WHERE REQUIRED AND FOLLOW THE WORK AREA PROTECTION MANUAL, REVISION 1 GUIDELINES. 13. ALL EXISTING ROADWAY SIGNAGE SHALL BE MAINTAINED DURING THE LIFE OF THE PROJECT. 14. THIS PROJECT IS CLASSIFIED AS TYPE A, CATEGORY 1. PUBLIC COMMUNICATION PLAN NCDOT Contact: Jason Julian: 336-520-6060 Local Contact: City of Eden: 336-623-2110 Rockingham County Sheriffs Office: 336-634-3232 Emergency Management EMS: 336-634-3000 State Police Contact: NC State Police D3 Headquarters: 336-334-5621 NC State Police Troop D, District III: 336-634-5606 111 Wilson -Way Road Reidsville, NC 27320 � / HT1-Crty Airport-— or ubs 966n 1 I PR0 JECT~ A _ 9!920 Y/WATERLINE �_r• / 1 S Vicinity Map SCALE: N.T.S. Me Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U Q Z � J Z J Z Z �� W CCw w 0 LU Er Q p2 �a � UU Z o Ir SEAL ••a•����u�• °••��� CAR 01 ••• •Oti• ESs/0".. 9 SEAL 17502 •,�� .FNS 1 NE.�� ' 4 KEY PLAN SCALE AS NOTED No. DATE I BY I Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE TRANSPORTATION MANAGEMENT PLAN PROJECT NO. 50046462 / 50102913 C1.1 SHEET NO. OF E c 1 North Carolina Division of Energy, Mineral and Land Resources NPDES Stormwater Discharge Permit for Construction Activities Technical Bullentin for NCG010000 Revised Jan. 12, 2017 2 What is this permit? This is your General Stormwater Permit for Construction Activities, developed to meet federal National Pollutant Discharge Elimination System (NPDES) requirements. It is separate and in addition to your Erosion and Sedimentation Control (E&SC) Plan. Federal regulations adopted by the U.S. Environmental Protection Agency (EPA) and N.C. Environmental Management Commission require an NPDES storm- water permit for your project. In North Carolina, the EPA has delegated authority to administer the NPDES program to the Department of Environment and Natural Resources. The E&SC plan approved by the Division of Energy, Mineral and Land (DEMLR), or a delegated local pro- gram, contains the core erosion control requirements for your project. The NPDES Stormwater General Permit contains additional requirements related to a broader range of water quality issues. These permits are related, but separate. Both contain conditions your project site must meet. Are there new requirements in this permit? This General Permit reflects changes made in the federal regulations effective Feb. 1, 2010, that regulate discharges from construction sites. The federal regulations resulted from litigation decisions that mandated construction activities over a certain size must contain additional measures to reduce the amount of wastes and sediment loading that reach the nation's waters. The Department of Environment and Natural Re- sources established the Construction General Permit Technical Advisory Group to guide the development of this NPDES permit. A draft permit was available for public review in May 2011, and the final permit be- came effective on Aug. 3, 2011. The most notable change in the new permit is a requirement that ground stabilization, such as wheat straw application, be applied within 14 days from the last land -disturbing activity. For steep slopes, that area must be stabilized within 7 days. Please see page 2 of this technical bulletin for more details. Do I need to submit a Notice of Intent to have coverage under this permit? No. Your project is covered by this permit upon approval of an adequate erosion and sedimentation control plan that meets requirements for surface dewatering of basins and ground stabilization timeframes. What does this permit require me to do? You should read and become familiar with the provisions of this permit. Below is a list of the major requirements, with indications where those differ from the previous Construction Stormwater General Permit. Erosion and Sediment Control Plan You must implement the E&SC Plan approved for your project by DEMLR or by a delegated local program. Adherence to that E&SC Plan is an enforceable component of this General Permit. Your E&SC plan will identify areas where the more stringent 7- and 14- day ground stabilization requirements apply. See "Ground Stabilization Requirements" on page 2 of this bulletin. Monitoring and Inspections • You must keep a rain gauge on the project site. • Dedicated demolition and other waste areas and earthen material stockpiles must be located at least 50' from storm drains or streams unless no alternative is feasible (new requirement). • You must inspect all E&SC measures at least once a week and within 24 hours after any storm event greater than a half-inch (during a 24-hour period). You must take immediate corrective action for any device failure. • You must inspect all outlets where stormwater runoff leaves the site and evaluate the effect on near -by streams or wetlands. • Corrective action must be taken if sediment is deposited off-site or into a stream or wetland, or causes a visible increase in turbidity (cloudiness) of any waterbody. • You must keep records of these inspections and any corrective actions taken. o � STORMWATER DISCHARGE: STORM WATER DISCHARGES INTO CASCADE CREEK, DRY CREEK, AND SEVERAL UNNAMED TRIBUTARIES ALL DISCHARGE INTO THE LOWER DAN RIVER WHICH IS IN THE ROANOKE RIVER BASIN °IO 0 , 3 Operation and Maintenance You must provide the operation and maintenance necessary to maintain optimal performance of stormwater controls. This means you must take corrective action if erosion and sediment control measures are not operating properly. Operation and maintenance includes, but is not limited to: • Regularly cleaning out sedimentation basins. • Stabilizing eroded banks, channels or spillway structures. • Repairing/clearing out inlets and outlets. • Repairing and maintaining storm drainage inlet and outlet protection. • Repairing piping, seepage and mechanical damage. • Repairing silt fence damage. Reporting The self -inspections required by this permit are an opportunity to identify impacts to nearby waters. If you observe sediment that has deposited in a stream or wetland, you must notify the DEMLR regional office within 24 hours and provide written notice within five days (see item #3 on page six of the General Permit). Non-compliance and Fines Projects that violate Stormwater Permit conditions and/or have un -authorized water quality impacts are subject to fines. Civil penalties of up to $25,000 per day for each violation may be assessed. Inspections Staff from DEMLR and local pro -grams with delegated authority will perform random inspections of your project site to ensure compliance with state and federal regulation governing construction activities. That means that your project, if found to be in violation, could potentially be subject to enforcement action by both DEMLR and the local program. The inspections may be routine in nature or the result of a citizen complaint. Ground Stabilization Requirements NEW STABILIZATION TIMEFRAMES SITE AREA DESRCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, RSE O DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES APRIL, 2019 DATE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER SLOPES STEEPER THAN 3:1 7 DAYS THAN 2:1,14 DAYS ARE ALLOWED p SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH v ALL OTHER AREAS WITH 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES SLOPES FLATTER THAN 4:1 Learn more online: Stormwater Permitting: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Regional Office Map: http://deq.nc.gov/contact/regional-offices Still have questions? Call the DEMLR Regional Office nearest your project's location: Asheville Office (828) 296-4500 Washington Office (252) 946-6481 O Fayetteville Office (910) 433-3300 Wilmington Office (910) 796-7215 Mooresville Office (704) 663-1699 Winston-Salem Office (336) 776-9800 Raleigh Office (919) 791-4200 Central Office (919) 807-6300 u "SOVA 41 L•� � , = ''• dY 1d MEGA ' SITE i -,'`-• l ' _ .,meg,,, o� ' � � •• °�/e. ' • ✓-J. f ( elide /`� .+� Si \ � c m i, O' �, b � "�f �, �. . t�` C 4W O \ / 4zi�� C 4 0 'Ji m / fiRN } 6 i X " ,a _ e .o - -- VIRGINIA--- - - E�- `=- _ I,�RYLVA to CO PITT YLVANIA_C_O. VA NORTH CAROLINA __--- 7Y'9YLVANIA JJAA IFOCKIFIOHAN CO—:. _. - AN ___'+- f - �ROgCINOH U�AM ?� NC w -�'9 le - P RYA �. m CREEK • � �' guy R� NG P`� .� _ / � ` .,.. j \ J l i ! / E:b E N� .. R U i ' • .o a. 4 �r .. ..Draper o �� �•. / .. - . :. USGS VICINITY MAP SCALE: 1 "=2000' 12� WN 1 nce iiOW CONSTRUCTION SEQUENCE 1. NOTIFY NCDENR LAND QUALITY SECTION AT (336)-776-9800 PRIOR TO BEGINNING CONSTRUCTION. 2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 3. INSTALL SILT FENCE, CONSTRUCTION ENTRANCE, ROCK PIPE INLET PROTECTION, AND OTHER MEASURES AS SHOWN ON THE APPROVED PLAN PRIOR TO ANY LAND DISTURBING ACTIVITIES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. PURSUANT TO G.S.113A-57 2 THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION—CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S.113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS IN ACCORDANCE WITH THE STABILIZATION TIMEFRAMES TABLE. 5. PRIOR TO CROSSING ANY DITCHES OR STREAMS INSTALL ALL REQUIRED EROSION CONTROL MEASURES. AFTER VEGETATION HAS BEEN ESTABLISHED IN THESE AREAS, ALL TEMPORARY MEASURES SHALL BE REMOVED. 5. BEGIN EXCAVATION, GRADING AND PIPE INSTALLATION WITHIN LIMITS OF CONSTRUCTION. INSTALL PERMANENT MEASURES, OUTLET PROTECTION, AND GRASSING IN SEQUENCE WITH PIPE INSTALLATION AND GRADING AND STABILIZATION. 6. DO NOT DISTURB MORE AREA THAN WILL BE COMPLETED IN A DAY'S WORK. 7. ALL EXCAVATED AREAS SHALL BE BACKFILLED DAILY. 8. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED. 9. PROVIDE CHECK DAMS OR WATTLES WITHIN DRAINAGE SWALE ALONG WATER MAIN INSTALLATION AND AS DIRECTED BY NC DENR. 10. PURSUANT TO NC GENERAL STATUTE 113A-54.1 (e), CONDUCT "SELF INSPECTIONS" OF EROSION CONTROL DEVICES AT COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 04B .0131. 11. THE CONTRACTOR SHALL MAINTAIN THE DEVICES ACCORDING TO THE LATEST VERSION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 12. ALL TRENCH WATER SHALL BE PUMPED THROUGH A SILT BAG. 13. AFTER THE DISTURBED AREAS ARE STABILIZED AND WHEN APPROVED BY THE ENGINEER REMOVE THE TEMPORARY DEVICES AND PROPERLY DISPOSE OF THE TRAPPED SEDIMENT. STABILIZE THE AREAS DISTURBED DURING THE REMOVAL OPERATION BY APPLYING SEED AND MULCH ACCORDING TO THE SEEDING SCHEDULE AND THE DITCH PROTECTION SHOWN ON THE DRAWINGS. 14. CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTFALLS WEEKLY AND AFTER EVERY RAIN EVENT 1/2" OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT DOCUMENTS. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. MAINTAIN THESE RECORDS AT THE ON—SITE OFFICE FOR AUDIT. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON—SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. 16. MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY NC DENR LAND QUALITY DIVISION PRIOR TO EXECUTION. A COPY OF ALL PERMITS SHALL BE MAINTAINED BY THE CONTRACTOR ON—SITE AT ALL TI M.ES. - - - - - - - - - - - - - - - - - 4ND OP/ PITTSYLVANIA CO, VA ROCKINGHAM CO, N 011271 CD LEGEND WETLANDS STREAMS V CONTACT INFORMAT19ON FOR ON-SITE EROSION AND SEDIMENT CONTROL MEASURES: TERRY SHELTON PHONE: 1-336-627-1009 EXT. 131 FAX: 1-336-623-3933 AREA OF LAND DISTURBANCE = 4.55± (ACRES) *CONSTRUCTION WILL OCCUR WITHIN A 20' WIDE STRIP TYPICALLY 10' OFF EDGE OF PAVEMENT. E&S LEGEND LIMITS OF DISTURBANCE CDCHECK DAMS ' NC E&S STD. 6.63 CE TEMPORARY STONE CONSTRUCTION ENTRANCE, NC. E&S STD. 6.06 TS TEMPORARY SEEDING, TS NC E&S STD. 6.10 PS PERMANENT SEEDING, �7 NC E&S STD. 6.11 OPS �RECP� SOIL STABILIZATION BLANKETS & MATTING, NC E&S STD. 6.17 SF SILT FENCE, NC E&S STD. 6.62 — SF Clp CULVERT INLET PROTECTION, r NC E&S STD. 6.55 USC UTTILITY CROSSING E S STD. 3 25 VA DRAINAGE FLOW ARROW 0.0% w/ APPROXIMATE SLOPE Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U w Q z � J Z J Z Z � �W� w �0 wCCa� Q o� LU oQ o Z o SEAL •` �Q�oFESS/pN919 SEAL 17502 r TIC KEY PLAN SCALE 0' 600' 1200' SCALE: 1 " = 600' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 1 2/11/19 MWC PER DEQ COMMENT No. DATE BY Description REVISIONS TITLE Erosion and Sedimentation Control Plan PROJECT NO. 50046462 / 50102913 SHEET NO. C2 7 MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE Erosion and Sedimentation Control Plan PROJECT NO. 50046462 / 50102913 SHEET NO. C2 7 1 z a E L i �+J Q — C- 210 — F KA — -Z-6 9 — J J C0 X 0 2 gINATION � � LL C�M�E @ INSTA ASE STA. 2�\M REQ\CATION �� o F� AlR � P��N-� EXACT HIGH MINED IN DETER L zss STA. 122+25, INSTALL AIR RELEASE Zss VALVE ® HIGH POINT (EXACT R� LOCATION TO BE DETERMINED IN J FIELD) (TURN UP TRACING WIRE) Fqo STA. 121+50, INSTALL ANEW HYDRANT ASSEMBLY 3 CONTRACTOR SHALL INSTALL CLA-VAL SERIES MODEL -136 -AU ELECTRONIC PROGRAMMABLE CONTROL VALVE W/ X102 FLOW LIMITING ASSEMBLY & PILOT SYSTEM COMPONENTS. THIS SETUP SHALL INCLUDE THE FOLLOWING OPTIONS X46A FLOW CLEAN STRAINER, CK2 ISOLATION VALVE, X43 "Y" STRAINER OR APROVED EQUAL. LIQUID FILLED PRESSURE GAGE 0-100 PSI W/ BRASS PET COCK 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER r FIRECONTRACTOR SHALL STA. 121+08, INSTALL STA. 121+16, INSTALL INSTALL 12" GV, BOX 20"x10" ECCENTRIC RED. 20" - 22 1/2° BEND AND 12"x2" COMPANION WITH RES FITTINGS WITH RES. FITTINGS FLG. STA. 121+06, INSTALL 10" ` GV WITH RES. FITTINGS STA. 119+89, INSTALL I Z STA. 120+96, NC MASTER 20" - 22 1/2- BEND of CO I v,, VALVE VAULT WITH RES. FITTINGS j STRUCTURE AND LIGHT POLE BORE PIT WITH RES. FITTINGS STA. 120+86, INSTALL 12" GV LOCATION 12'X25' I STA. 120+84, INSTALL ° ° a 12"x20" ECCENTRIC RED. STA. 120+29, INSTALL WITH RES. FITTINGS AUTOMATIC FLUSHING VALVE 20" - 45' BEND REF. DETAIL SHT C2.1. WITH RES. FITTINGS I 50 (LF) - 20" D.I.P. TO EXTEND EACH END OF CASING 5'-0" APPROX. STA. 120+30 TO 120+80 D RES. FITTINGS REQ'D FROM STA. 119+60 TO 121+40 12'x8' (INSIDE) RAFFIC RATED 40 (LF) - 30" DIA. X 0.500 WALL THICKNESS STEEL COMPANION FLG. (SEE CASING PIPE, TO BE DRY BORE AND JACKED TO EXTEND 5'-0" MIN. BEYOND E.O.P. STA. STA. 120+35 TO 120+75 ADJUSTABLE PIPE SADDLE SUPPORT STA. 120+76, INSTALL HALLIDAY OR APPROVED EQUAL) 20" - 45• BEND WITH RES. FITTINGS C0 X 0 2 gINATION � � LL C�M�E @ INSTA ASE STA. 2�\M REQ\CATION �� o F� AlR � P��N-� EXACT HIGH MINED IN DETER L zss STA. 122+25, INSTALL AIR RELEASE Zss VALVE ® HIGH POINT (EXACT R� LOCATION TO BE DETERMINED IN J FIELD) (TURN UP TRACING WIRE) Fqo STA. 121+50, INSTALL ANEW HYDRANT ASSEMBLY 3 CONTRACTOR SHALL INSTALL CLA-VAL SERIES MODEL -136 -AU ELECTRONIC PROGRAMMABLE CONTROL VALVE W/ X102 FLOW LIMITING ASSEMBLY & PILOT SYSTEM COMPONENTS. THIS SETUP SHALL INCLUDE THE FOLLOWING OPTIONS X46A FLOW CLEAN STRAINER, CK2 ISOLATION VALVE, X43 "Y" STRAINER OR APROVED EQUAL. LIQUID FILLED PRESSURE GAGE 0-100 PSI W/ BRASS PET COCK 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER r FIRECONTRACTOR SHALL STA. 121+08, INSTALL STA. 121+16, INSTALL INSTALL 12" GV, BOX 20"x10" ECCENTRIC RED. 20" - 22 1/2° BEND AND 12"x2" COMPANION WITH RES FITTINGS WITH RES. FITTINGS FLG. NC - MASTER METER VAULT SITE PLAN SCALE: 1 " = 50' FLOWFROM OM EDEN 12" D.I.P. 2" COPPER (SEE NC - MASTER METER AND CONTROL VALVE VAULT DETAIL THIS SHT.) CONTRACTOR SHALL EXTEND PVC DRAIN PIPE FROM HATCH FRAME DRAIN ROUTING ALONG WALL TO 6" ABOVE VAULT BOTTOM. ALUM. LADDER EQUAL TO HALLIDAY SERIES L1 D (FLOOR & HATCH FRAM MOUNTED) W/ PULL UP EXTENSION POST EQUAL TO HALLIDAY SERIES L1 E. (REF. PLAN VIEW FOR PROPER ORIENTATION) PROVIDE POSITIVE DRAINAGE AWAY FROM TOP OF VAULT TYP. ENTIRE STRUCTURE PIPE SUPPORTS- (TYP.) REF. DETAIL THIS SHT. 4" WEEP HOLE - (TYP. OF 4) . —to ..... .. . — 2" COPPER 39-0" 2" UNION INSULATED HOT BOX 2'-0"H x 3'-0"L / /-FIBERGLASS WITH STAINLESS STL. HARDWARE AND ANCHORS. E 5 GENERAL NOTES: 1. ALL ABOVE GROUND PIPING SHALL HAVE INSULATION AND HEAT TAPE, REF. ELECTRICAL. 2. ALL PIPE IN MASTER METER VAULT, ABOVE GROUND D.I. PIPE FOR FLUSHING ASSEMBLY, AND MISC. CARBON STEEL COMPONENTS SHALL RECEIVE HIGH PERFORMANCE COATING SYSTEM (REF. SPEC. 099600) 24 MESH S.S. SCREENED N o o OUTLET U � cV o c° I 1 I I I 1'-0" MIN. CLEAR X a. \X PIPE FELT o z TYP. io 2" COPPER CONTRACTOR SHALL INSTALL DLJ EPDXY COATED BRONZE WATER METER MODEL DLJ 200 2" AND MUELLER / McCULLOUGH EZ -VAULT OR APPROVED EQUAL 6" CLEAN STONE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL N.T.S. CONCRETE COLLAR 4" D. 1. W/ COMPANION FLG. 60" X 48" ALUM. DOUBLE LEAF H2O TRAFFIC RATED DOOR (BY HALLIDAY OR APPROVED EQUAL) TO BE PRECAST IN TOP BY VAULT MANUFACTURER 8" TOP THICKNESS TOP ELEV.=592.00' FLUSH W/ GRADE (0-160 PSI) LIQUID FILLED PRESSURE GAUGE WITH BRASS PET COCK (TYP. OF 2) 1/2" NON -THREADED SAMPLE TAP i 10" BOTT. SLAB T CLASS I RIP -RAP 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER CENTERLINE=573.90' FL TWO 0 INDUSTRIAL PARK 12"x12" M.J. TEE W/ RES. FITTINGS Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL 6"Sle.....,,� �••�.••��� CARpZ •••,•. ��FESS/0*1% •':. SEAL l 17502 .,•,•��rT EHR�P••,. KEY PLAN SCALE 0' 2' 4' SCALE: 1 /2" = 1'-0" 0' 50' 100' SCALE: 1 " = 50' STA. 121+06, INSTALL 10" ` GV WITH RES. FITTINGS J I Z STA. 120+96, NC MASTER a METER AND CONTROL v,, VALVE VAULT ELECTRICAL SERVICE STRUCTURE AND LIGHT POLE WITH RES. FITTINGS STA. 120+86, INSTALL 12" GV 60" X 48" ALUM. DOUBLE LEAF STA. 120+84, INSTALL ° ° a 12"x20" ECCENTRIC RED. WITH RES. FITTINGS AUTOMATIC FLUSHING VALVE REF. DETAIL SHT C2.1. NC - MASTER METER VAULT SITE PLAN SCALE: 1 " = 50' FLOWFROM OM EDEN 12" D.I.P. 2" COPPER (SEE NC - MASTER METER AND CONTROL VALVE VAULT DETAIL THIS SHT.) CONTRACTOR SHALL EXTEND PVC DRAIN PIPE FROM HATCH FRAME DRAIN ROUTING ALONG WALL TO 6" ABOVE VAULT BOTTOM. ALUM. LADDER EQUAL TO HALLIDAY SERIES L1 D (FLOOR & HATCH FRAM MOUNTED) W/ PULL UP EXTENSION POST EQUAL TO HALLIDAY SERIES L1 E. (REF. PLAN VIEW FOR PROPER ORIENTATION) PROVIDE POSITIVE DRAINAGE AWAY FROM TOP OF VAULT TYP. ENTIRE STRUCTURE PIPE SUPPORTS- (TYP.) REF. DETAIL THIS SHT. 4" WEEP HOLE - (TYP. OF 4) . —to ..... .. . — 2" COPPER 39-0" 2" UNION INSULATED HOT BOX 2'-0"H x 3'-0"L / /-FIBERGLASS WITH STAINLESS STL. HARDWARE AND ANCHORS. E 5 GENERAL NOTES: 1. ALL ABOVE GROUND PIPING SHALL HAVE INSULATION AND HEAT TAPE, REF. ELECTRICAL. 2. ALL PIPE IN MASTER METER VAULT, ABOVE GROUND D.I. PIPE FOR FLUSHING ASSEMBLY, AND MISC. CARBON STEEL COMPONENTS SHALL RECEIVE HIGH PERFORMANCE COATING SYSTEM (REF. SPEC. 099600) 24 MESH S.S. SCREENED N o o OUTLET U � cV o c° I 1 I I I 1'-0" MIN. CLEAR X a. \X PIPE FELT o z TYP. io 2" COPPER CONTRACTOR SHALL INSTALL DLJ EPDXY COATED BRONZE WATER METER MODEL DLJ 200 2" AND MUELLER / McCULLOUGH EZ -VAULT OR APPROVED EQUAL 6" CLEAN STONE AUTOMATIC FLUSHING VALVE ASSEMBLY DETAIL N.T.S. CONCRETE COLLAR 4" D. 1. W/ COMPANION FLG. 60" X 48" ALUM. DOUBLE LEAF H2O TRAFFIC RATED DOOR (BY HALLIDAY OR APPROVED EQUAL) TO BE PRECAST IN TOP BY VAULT MANUFACTURER 8" TOP THICKNESS TOP ELEV.=592.00' FLUSH W/ GRADE (0-160 PSI) LIQUID FILLED PRESSURE GAUGE WITH BRASS PET COCK (TYP. OF 2) 1/2" NON -THREADED SAMPLE TAP i 10" BOTT. SLAB T CLASS I RIP -RAP 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER CENTERLINE=573.90' FL TWO 0 INDUSTRIAL PARK 12"x12" M.J. TEE W/ RES. FITTINGS Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL 6"Sle.....,,� �••�.••��� CARpZ •••,•. ��FESS/0*1% •':. SEAL l 17502 .,•,•��rT EHR�P••,. KEY PLAN SCALE 0' 2' 4' SCALE: 1 /2" = 1'-0" 0' 50' 100' SCALE: 1 " = 50' a.o....o .0. o . ........ . .................. ..... ° . PIPE SUPPORT DETAIL NOT TO SCALE 4" THROUGH 36" PIPE 20"x10" M.J. ECCENTRIC RED. W/ RES. FITTINGS 10" M.J. G.V. W/ RES. - FITTINGS AND BOX NOTE: CONTRACTOR TO PROVIDE ADDITIONAL PIPE SUPPORTS AS NEEDED TO ENSURE ADEQUATE PIPE SUPPORT. -20"x20"02" M.J. RED. TEE W/ RES. FITTINGS (TYP. 2 PLACES) -20"x12" M.J. ECCENTRIC RED. W/ RES. FITTINGS .12" M.J. G.V. W/ RES. FITTINGS AND BOX 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER NC Master Meter and Control Valve Vault PROJECT NO. 50046462 / 50102913 C2.1 SHEET NO. OF 'I I I L CONTRACTOR SHALL INSTALL 60" X 48" ALUM. DOUBLE LEAF ° ° a 12" GV, BOX AND 12"x2" H2O TRAFFIC RATED DOOR (BY °4 12'x8' (INSIDE) RAFFIC RATED COMPANION FLG. (SEE ADJUSTABLE PIPE SADDLE SUPPORT HALLIDAY OR APPROVED EQUAL) PRECAST CONCRETE VALVE VAULT AUTOMATIC FLUSHING VALVE BY ANVIL OR APPROVED EQUAL TO BE PRECAST IN TOP BY ° I I (TINDALL OR APPROVED EQUAL) ASSEMBLY DETAIL THIS SHT.) (MATCH TO PIPE TO BE SUPPORTED) VAULT MANUFACTURER I I o No. DATE BY Description 3", (USED W/ 4" STANCHION) I I I 3 1/2", 4" (USED W/ 6" o REVISIONS STANCHION) DIA. G.S. PIPE 1 d MWC ° I I METER I ° PROVIDE LINKS L DRAWN BY ALL -THREADED ROD( I I TYP. (TYP. 2 PLACES) RSE APPROVED BY 4" STANCHION 4"-16" LAB o DIA. PIPES 6" STANCHION CHECKED BY CY 18"-36" DIA. PIPES FLOW TO APRIL, 2019 U) Q EPDXY ANCHOR BOLTS FLOW FROM /-EMBEDDED 6" MIN. EDEN �. �- 1,-6„ ®' INDUSTRIAL DATE TITLE a.o....o .0. o . ........ . .................. ..... ° . PIPE SUPPORT DETAIL NOT TO SCALE 4" THROUGH 36" PIPE 20"x10" M.J. ECCENTRIC RED. W/ RES. FITTINGS 10" M.J. G.V. W/ RES. - FITTINGS AND BOX NOTE: CONTRACTOR TO PROVIDE ADDITIONAL PIPE SUPPORTS AS NEEDED TO ENSURE ADEQUATE PIPE SUPPORT. -20"x20"02" M.J. RED. TEE W/ RES. FITTINGS (TYP. 2 PLACES) -20"x12" M.J. ECCENTRIC RED. W/ RES. FITTINGS .12" M.J. G.V. W/ RES. FITTINGS AND BOX 4" CLEAN STONE W/ HEAVY DUTY WEED BARRIER FABRIC 4'-0" MIN. AROUND ALL STRUCTURES INCLUDING ELECTRIC SERVICE SHELTER NC Master Meter and Control Valve Vault PROJECT NO. 50046462 / 50102913 C2.1 SHEET NO. OF IDewberr Dewberry Engineers Inc. 551 PINEY FOREST RC DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C SEAL .N•••••••q, •,���.•o��N CARO ��' �`'•. . oFESS/0N•, q • �� SEAL 9l . 17502 DAF KEY PLAN C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' 1 2/11/19 MWC PER DEQ COMM No. DATE BY I Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE 11 PROJECT NO. 50046462 / 501 025 C3 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••.•.•••.....,•• ESS%pN9lq SEAL 17502 .,,,•,• TT EHR�•,, C SCALE I 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT NO. 50046462 / 50102913 C4 SHEET NO. OF 2 3/14/19 MWC PER DWQ COMMENT 1 2/11/19 MWC PER DEQ COMMENT No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT NO. 50046462 / 50102913 C4 SHEET NO. OF E 1 1 2 1 3 1 4 1 5 C V 0 STA. 134+00, INSTALL 20"-� 1 BV WITH RES. FITTINGS �V STA. 135+00, INSTALL Y� FIRE HYDRANT ASSEMBLY PROVIDE STREAM RESTORATION PER DETAILS STA. 135+25 TO 135+3 INSTALL 20' OF STEEL ENCASEMENT (SEE BORIN DET. SHT. C19) STA. 135+56, INSTALL 2 BV WITH RES. FITTINGS 565 IMPACT 560 SITE 1 555 1 1 l� �L �1 \ 550 MAINTAIN MIN. 5'-0" 545 H J H J J SEPARATION BETWEEN 00-rr OF CULVERT Zs zw zw Q TOP OF ENCASEMENT 540 X 00vi Z STA. 135+25 TO - L 520 w� N� o= 1�JNLSTALL 20' OF TEEL Q� zo I Q �d ow N ENCASEMENT (SEE 150 (LF) - 20" U) + 2/11/19 BORING DET. SHT. zw 1 1/10/19 >(, C19) 535 0 FITTINGS APPROX m Z _ 530 525 PROVIDE STREAM 1 RESTORATION PER DETAILS % I I I � U I Ij _ II j l I i STA. 137+93, INSTALL (2) 20" 45• VERTICAL BENDS 0 = W/ RES. FITTINGS c I� .0 � WV.52g 80 24" RCP � / ��o o ���� 9�s\ Ns CURVE=52�6.o7l —\ loo — 06 \ �� NC �t "'v5 ly / F M G E F 0 . J �_ 5.28 �U �—� y NV 3 ,.VZ / CQ M OgR R— / I , I US 311 /NC 770�— E — — — — —� INV= �RE� / 7� IINV=5,3 529. VE I � 4� /ll SMP SES I 3�1 zt5— \\� X44+ G 3 j V ION \dl Z2S\ C 1 GMp E T O• Es sr � I MKp ION BORE PIT x IOn :-3so-", I I !�/ WIL Iq GA LINE LOCATION 12'X25' 4 nes I I STA. 144+78, INSTALL BORE PIT � � � I I � STA. 138+00, INSTALL AIR STA. 141+80, INSTALL AIR LOCATION 12'X25' I I I RELEASE VALVE ® HIGH RELEASE VALVE S HIGH a 20" 11.25• BEND WITH POINT (EXACT LOCATION TO POINT (EXACT LOCATION TO RES. FITTINGS w� BE DETERMINED IN FIELD) BE DETERMINED IN FIELD) STA. 145+20, INSTALL �o o J� �� I (TURN UP TRACING WIRE) (TURN UP TRACING WIRE) N 20" 11.25• BEND WITH % STA. 137+93, INSTALL RES. FITTINGS wl I w z FIRE HYDRANT ASSEMBLY STA. 140+90, INSTALL FIRE Z Lu �` z z �' i » HYDRANT ASSEMBLY Q 10' PERMANENT -� I 150 (LF) - 20 D.I.P. W/ RES. FITTINGS 2 EASEMENT I APPROX. STA. 136+60 TO 138+10 NOTES: 105 (LF) - 30" DIA. X 0.500 WALL 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT THICKNESS STEEL CASING PIPE, TO BE OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. DRY BORE AND JACKED TO EXTEND 5'-0" ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE MIN. BEYOND UTILITY RIGHT-OF-WAY SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. APPROX. STA. 136+85 TO 137+90 5 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL G CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL 0" REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 565 550 560 545 STA. 13r+00 TO 135+56 NOTES: 56'LF D.I. REQUIRED 1. WILLIAMS GAS LINES ARE SHOWN APPROX. ONLY. w PROVIC E STREAM 2. CONTRACTOR WILL CROSS THE WILLIAMS GAS RESTORATION PER PIPELINE AT THIS LOCATION. 0. fs )c DETAIL 3. WILLIAMS GAS PERSONNEL MUST BE ON-SITE 555 540 zCL U -� RING - > LOCATION OF EACH LINE. a 4. THE MINIMUM SEPAFkTION IS 24" AND IT MUT PASS EITHER OVER OR U DER ALL GAS LINES PRE ENT. 5. THE LINES ARE BELIEVED TO BE 6'-0" DEEP THE WATERLINE INVERT BE APPROX. 10'-0"DEP. 550 535 z I w w qT�OV/ �'OF� A EXTEND FIRE HYDRANT a W _ EX. GRADE /3j FROM LOW SPOT FOR z �( Z w qR��F LINE BLOW -OFF o w w 545 530 o Al FAT � O 3 \ z a - 4' MIN. COVER Q U w Z o X�0 OVER PIPE AT N o ; ARV'S TYP. 0 .0- 40 52 w m 00 z0 O m <w J 0" WATERLINE H J H J J W Zs zw zw Q = W3 X 00vi Z w L 520 w� N� o= L� Q� zo I Q �d ow N I 150 (LF) - 20" U) + 2/11/19 MWC zw 1 1/10/19 >(, REV PER USACE COMMENTS No. 0 FITTINGS APPROX m Z _ 515 �� c~nNL- OO O M (O I� L O M O N OO M 00 00 O LO LO 0 LO Oj LO LO LO L LO LO LO 132+00 133+00 134+00 PROVIDE STREAM 1 RESTORATION PER DETAILS % I I I � U I Ij _ II j l I i STA. 137+93, INSTALL (2) 20" 45• VERTICAL BENDS 0 = W/ RES. FITTINGS c I� .0 � WV.52g 80 24" RCP � / ��o o ���� 9�s\ Ns CURVE=52�6.o7l —\ loo — 06 \ �� NC �t "'v5 ly / F M G E F 0 . J �_ 5.28 �U �—� y NV 3 ,.VZ / CQ M OgR R— / I , I US 311 /NC 770�— E — — — — —� INV= �RE� / 7� IINV=5,3 529. VE I � 4� /ll SMP SES I 3�1 zt5— \\� X44+ G 3 j V ION \dl Z2S\ C 1 GMp E T O• Es sr � I MKp ION BORE PIT x IOn :-3so-", I I !�/ WIL Iq GA LINE LOCATION 12'X25' 4 nes I I STA. 144+78, INSTALL BORE PIT � � � I I � STA. 138+00, INSTALL AIR STA. 141+80, INSTALL AIR LOCATION 12'X25' I I I RELEASE VALVE ® HIGH RELEASE VALVE S HIGH a 20" 11.25• BEND WITH POINT (EXACT LOCATION TO POINT (EXACT LOCATION TO RES. FITTINGS w� BE DETERMINED IN FIELD) BE DETERMINED IN FIELD) STA. 145+20, INSTALL �o o J� �� I (TURN UP TRACING WIRE) (TURN UP TRACING WIRE) N 20" 11.25• BEND WITH % STA. 137+93, INSTALL RES. FITTINGS wl I w z FIRE HYDRANT ASSEMBLY STA. 140+90, INSTALL FIRE Z Lu �` z z �' i » HYDRANT ASSEMBLY Q 10' PERMANENT -� I 150 (LF) - 20 D.I.P. W/ RES. FITTINGS 2 EASEMENT I APPROX. STA. 136+60 TO 138+10 NOTES: 105 (LF) - 30" DIA. X 0.500 WALL 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT THICKNESS STEEL CASING PIPE, TO BE OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. DRY BORE AND JACKED TO EXTEND 5'-0" ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE MIN. BEYOND UTILITY RIGHT-OF-WAY SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. APPROX. STA. 136+85 TO 137+90 5 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL G CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL 0" REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING SCHEDULES AND MIXTURES SHT. C22. 565 550 560 545 STA. 13r+00 TO 135+56 NOTES: 56'LF D.I. REQUIRED 1. WILLIAMS GAS LINES ARE SHOWN APPROX. ONLY. w PROVIC E STREAM 2. CONTRACTOR WILL CROSS THE WILLIAMS GAS RESTORATION PER PIPELINE AT THIS LOCATION. 0. fs )c DETAIL 3. WILLIAMS GAS PERSONNEL MUST BE ON-SITE 555 540 zCL U -� RING - > LOCATION OF EACH LINE. a 4. THE MINIMUM SEPAFkTION IS 24" AND IT MUT PASS EITHER OVER OR U DER ALL GAS LINES PRE ENT. 5. THE LINES ARE BELIEVED TO BE 6'-0" DEEP THE WATERLINE INVERT BE APPROX. 10'-0"DEP. 550 535 z I w w qT�OV/ �'OF� A EXTEND FIRE HYDRANT a W _ EX. GRADE /3j FROM LOW SPOT FOR z �( Z w qR��F LINE BLOW -OFF o w w 545 530 o Al FAT � O 3 \ z a - 4' MIN. COVER Q U w Z o X�0 OVER PIPE AT N o ; ARV'S TYP. 0 .0- 40 52 w m 00 z0 O m <w J 0" WATERLINE o w w 535 520 Q Phr)Dp- PIT ? Q Soo E B. ,,p0 H J H OCATION W Zs zw zw aQ = W3 U N N 0 + oQ oQ L ^w N� Z L� Q� zo I Q �d ow N I o w w 535 520 Q Phr)Dp- PIT ? Q Soo E B. ,,p0 a LL \ w w0 O N .a Z�O 30 5151m Sz6 /iy F To 625 510 135+00 136+00 137+00 138+00 139+00 520 1 505 515 1 500 140+00 smP J J N Z Ln O + N+ Ln II �z cn — N 141+00 + z W �JO �m CL = w V) Q z o 142+00 X'0 m U w�_: _ U) Z W Z 0 � W 143+00 144+00 J H J H OCATION RSE zw zw 0 0� m 0 - DATE N 0 + L N� L� LL. vi ow ow N N W N 150 (LF) - 20" D.I.P. W/ RES. N 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE FITTINGS APPROX STA. 136+60 TO Cn _ - . C— o 0.500 WALL THICKNESS STEE QN CASING PIPE, TO BE DRY BO E AND Lo JACKED TO EXTE Z D 5'-0" MI o L o CD � BEYOND UTILITY RIGHT-OF-WAY Q m Q� 0 0 r a- APPROX. STA. 136+85 TO 137+90 __ Q Q z_ Q W_ a_ _ J� J Qf J LijJ u J � � 0 � Q — w Z O U N m N J Q Q Q N00� W Z Jm m H J W w Z Qjr Ln ZQ vi 0)O 00 O Zw x Q NLOQ �tZ � N00� � �� II QC9 Z� UZ ZO_w0- Q OZ O > H — H =mom O +� Ln +a Lo Ln + + + >� II +� > L� +< + _~ 0 +� 00L M� �2 r� L0 >U) � z r) w N ��u > rq LLJ �0 N pe) 00 M ZF- ®O� r� w II m Z � U � cn z � CD � � � 2 � LLI � II V)LL. �z __0 Q�Q�zz �z� o� �� LLI miaow �z V) CV LL cn O cn Q � crn � o N ?i N il: V)l > _j L _ Lf) Cl? O co O 0 0 Ln —0) O O O Lf) O 0 Ln 0 05 N O r O LL LL N L.0 O � 00 O 't't � M 0 CVLO LO LO LO LO LO LO LO LO LO LO LO LO a LL \ w w0 O N .a Z�O 30 5151m Sz6 /iy F To 625 510 135+00 136+00 137+00 138+00 139+00 520 1 505 515 1 500 140+00 smP J J N Z Ln O + N+ Ln II �z cn — N 141+00 + z W �JO �m CL = w V) Q z o 142+00 X'0 m U w�_: _ U) Z W Z 0 � W 143+00 144+00 J H J H RSE zw zw 0 0� m 0 m DATE N 0 + N� L� LL. vi ow ow N N W N N W 145+00 550 545 �110_0�, Dewberry0��'1 Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL •••.•.........,�� CARoZ ESS%0 '. SEAL 17502 :i� .:.O�. *GINE-��:gyp;, zoos ENR;:••' 540 SCALE 0' 50' 100' SCALE: 1 " = 50' 535 VERT. 1 "=5' HORIZ. 1 "=50' 530 525 \ 520 510 505 500 146+00 REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C5 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C5 SHEET NO. OF E C 0 W 1 2 3 4 5 ----- - i :� � Dewberry R-STR1=AM—P RESSATION PER — I DETAILS 1 04 1 eaI Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 ;u PHONE: 434.797.4497 _ — — / PROVIDE STREAM FAX: 434.797.4341 / i RESTORATION PER o n NCBELS # F-0929 len ' �� / SF DETAILS _ 00 10 MAX LI M ITS OF DISTURBANCE -° L - - —— — �/`' WITHIN STREAM IMPACT SITE 2 SCALE: ��' � sq - ----- - \ '0 70 70 \ \ \ KEY LESS o o CH pR) CIRCLE -BAR- N RAN 4000 / �= 9eq-111 ^� Z 2 ��H EAD 240+0 = Ji \ — f + _ Io \ 0 Q z 52–+ \ 38+00 BHO co v / ° I O — �n 111 2�D0 — — — — — 152 l � � � �; X50+ 151 +00 J �+50, I N STALL AIR o ���RR >- w � 0 • RELEASE VALVE ® HIGH V LL) U — POINT (EXACT LOCATION TO Lu Er U) Q LL n �y A -en �,s BE DETERMINED IN FIELD) Er Q U Q O T Q = 10 RMANENT �-sH7 Z� o� (TURN UP TRACING WIRE) NOTES: Lu 3z o EASEMENT is / /° STA. 152+42, INSTALL 20'• 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL Q ` BVWITH RES. FITTINGS PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER o STA. 151 +00, THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE > U z INSTALL 20" BV BORE PIT MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 O O �— WITH RES. FITTINGS LOCATION 12'X25' DAYS OF ACHIEVING FINAL GRADES. I z U STA. 151 +20 INSTALL 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL • STA. 152+12, INSTALL AND STREAMS UNLESS OTHERWISE DIRECTED ON O y 20 - 45 BEND 20" - 45° BEND WITH THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY I 2 WITH RES. FITTINGS RES. FITTINGS MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS STA. 151+30, INSTALL STA. 152+06, INSTALL EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM 20 - 45' BEND 20" - 45° BEND THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL SEAL ...•••••••.., WITH RES. FITTINGS WITH RES. FITTINGS REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) .��.•• s** \ CARoZ .DESS/p�. q •�: STA. 151+32, INSTALL STA. 151+35 TO 152+05, 9 FIRE HYDRANT ASSEMBLY 70 (LF) - 30" X 0.500" SEAL l 10 PERMANENT EASEMENT WALL THICKNESS STEEL : 17502 CASING PIPE, TO BE DRY J '•,' ' F*GI NE'�• BORE AND JACKED (SEE . C pTT BORING DET. SHT. C19) •.,,,,ENR�P,o KEY PLAN 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. OF 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••.•.•••.....,•• ESS%pN9lq SEAL 17502 .,,,•,• TT EHR�•,, C SCALE I 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT No. 50046462 / 50102913 C7 SHEET NO. OF 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT No. 50046462 / 50102913 C7 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••.•.•••.....,•• ESS%pN9lq SEAL 17502 .,,,•,• TT EHR�•,, C SCALE I 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT NO. 50046462 / 50102913 SHEET NO. OF 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE m RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE U PROJECT NO. 50046462 / 50102913 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••••.•••.....,•• ESS/pN919 SEAL 17502 .,,,•,• TT EHR�•,, C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' I No. I DATE I BY I Description REVISIONS U DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C9 SHEET NO. OF E ❑C C V 0 1 50-27 _ INV=500.56 �,�p 20 + FENCE > w LOCATION 12'X25' p\67 P\ STA.- 206+09, INSTALL 20" - 45° BEND WITH RES. FITTINGS STA. 206+19, INSTALL 20" - 45° BEND WITH RES. FITTINGS STA. 206+22, INSTALL FIRE HYDRANT ASSEMBLY NOTES: -i STA. 206+25 TO 206+95,-/ 70 (LF) - 30" X 0.500" WALL THICKNESS STEEL CASING PIPE, TO BE DRY BORE AND JACKED (SEE BORING DET. SHT. C19) 4 WOOD FENCE 86 } w� 2� Q 0 Z m SE5 3 (-` T O INSTALL 20 cll�J o SE4��' c M SE5 En x 3:: ��3 STA. 211+50, INSTALL i O SF �s PROVIDE STREAM RESTORATION PER DETAILS Q I— I o- paww_ C. X I I STA AHEAD = 207+25.00 IMPACT SITE 5 z = I STA BACK = 207+13.29 96 SCALE: 1 "=20' 0� _ 1s0C,, I CS0 �, F M G1drP- BOLLARD _ X69 — _ _ 0 9° rr r j`"" ^\'E RHEA / 05�*-0 Z�� US 311/NC 77000 un \ INV=496.44 INV=501 .41 TSTA. 208+00, INSTALL AIR STA. 207+07, INSTALL RELEASE VALVE ® HIGH 20" - 45° BEND POINT (EXACT LOCATION TO WITH RES. FITTINGS BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) STA. 206+97, INSTALL 20" - 45° BEND WITH RES. FITTINGS 10' PERMANENT EASEMENT IMPACT SITE 5 atm — STA. 211+48, INSTALL 20 �± BV WITH RES. FITTINGS m I STA. 211+50, INSTALL m FIRE HYDRANT ASSEMBLY NOTES: -i 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL n PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER 3 3/14/19 THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE PER DWQ COMMENT 2 2/11/19 MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 PER DEQ COMMENT 1 1 /10/19 DAYS OF ACHIEVING FINAL GRADES. REV PER USACE COMMENTS No. DATE 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL Description WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM I THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) I 520 520 515 515 510 EXTEND FIRE HYDR4.NT 510 FROM LOW SPOT FOR EQ ALITY LINE LOW—OFF STA HEAD = 207+ 5.00 z � TA. 206+09 TO 207+07 �✓ 0 98LF D.I. REQUIRED STA BACK = 207+1 .29 z 0Y UJI 505 505 x. GRADE z o o a En IMPACT > a I —��--� SITE o � 50 �.. �500 ORE PIT \ wOSITNEOCATION 12'X25' -j It P Mpl -TO ARV o i-' — SuO E z — — MAINTAIN POSITIVE M QZ � J 495 SLOPE TO AlV 495 _ z \-20" WATERLINE��OSlTNE a a M INTAIN MIN. 5'-0" MA�NTAlt4 P V Q 3 SEPA ATION BETWEEN BOTT. SCOPE TO AR w 0 0 OF REEK AND TOP OF U) 490 MAINTAI • a 4 _ ENCASEMENT POSITIVE MAINTAIN POSITIVE o TO RV m STA. 206+2 TO 206+95, 70 (LF) - 0" X 0.500" 00 WALL THICK ESS STEEL z Z CASING PIPE, TO BE DRY o 485 BORE AND JACKED (SEEDo- ),C�Q a w1.1 N } 485 BORING DET SHT. C19 � = m a J J J Jm J J J� D �i -10 JM H N H N HV) N H (n U) O W 0 HZ HNLn (n 0 (n 0 U) I (n c� (n c� N® u- Z V) I= N N x 0 °r° z oz z z zQ z oz z oz z z Z� zQ O m U 480 rn m� ai � Nz �� � m� r, m� O-, Q Z I c6w 6Z W I o� 480 U) + ir) + ° + a Ln + in + in + O w a + a + a U) Lri ~O �w O W O� �� p �w ^O �w 0(n 00 UJIJ Z ` � �>- U F-: _0 Z 0 04 1 x N 1 X N2 ON N 1 X N 1 x 04 0 W Z I NN2 Z p N U = = LLI II = = a Q Ld I W U II LL: H O~ H� ~ HW Q> O~ HOF Hw Ld H I H� H� w Q> 475 (n N� (n (na �z (n N� (n N� cna"o" cnm cna nz 475 O r— LO O O O M O M O O O O O 00 LO N N O O r— O O O O O O O O O 00 N O O N O O 00 00 N 00 O O O 00 O O O O O 00 N O O O O O 00 00 M N N O O I� O O O O 00 00 M O M O O O M M N N O O I� O O O O O M O 06 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Lo Lo Lo LO LO O O O LO LO LO LO LO LO O O LO O LO O O O O O O O O O O O O O O O O O O LO O O Lo Lo Lo LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL •••.•.........,•• CAROZ �4o�ESS%pN9lq t:: SEAL 17502 :i� •. 0 • • ..... .,,,•,• TT EHR�•,, SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. C10 OF 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1 /10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. C10 OF E 0 C V 0 1 2 3 i i -eke FEN CE J �� CH N LINK D - DO Z O 9z. _ 6 g1 c PANE' i z� U C� R \j > US 311 /NC 770 CTI — �_ +00 / — — — — STA. 222+00, INSTALL AIR 524— RELEASE VALVE ® HIGH STA. 221+50, INSTALL POINT (EXACT LOCATION TO m i �7 �� FIRE HYDRANT ASSEMBLY BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) D Irn z m j N 0 n o O -� 0 m 0 I I C. NOTES: 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) Z s\ ez s\ GGA\ v CD OhECP00 � O STA. 226+48, INSTALL 20" I �„ U BV WITH RES. FITTINGS N tiz STA. 226+50, INSTALL FIRE HYDRANT ASSEMBLY U - TRUCKS ��- 1 N 5 INV=499.17 5�5 a2 d° Ud / I U�d �- 0 n 00 I I , C/)' s m/ STA. 229+75, INSTALL AIR y RELEASE VALVE ® HIGH POINT (EXACT LOCATION TO (7 BE DETERMINED IN FIELD) (TURN UP TRACING WIRE) N I i 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 P'i�� "616. Dewberry' GO=p Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL •••.•.•••.....,•• ESS/pN9lq SEAL 17502 :i� .,,,•,• TT EHR�•,, SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' No. DATE I BY I Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 SHEET NO. C11 OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••••.•••.....,•• ESS/pN919 SEAL 17502 .,,,•,• TT EHR�•,, C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' I No. I DATE I BY I Description REVISIONS U DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C12 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••••.•••.....,•• ESS/pN919 SEAL 17502 .,,,•,• TT EHR�•,, C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' I No. I DATE I BY I Description REVISIONS U DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C13 SHEET NO. OF IDewberr Dewberry Engineers Inc. 551 PINEY FOREST RC DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C SEAL .N•••••••q, .•'',��o��N CARO ��' ``'•. . oFESS%0N•, q • �� SEAL 9l . 17502 DAF KEY PLAN C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 3 3/14/19 MWC PER DWQ COMM 2 2/11/19 MWC PER DEQ COM 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE 11 PROJECT NO. 50046462 / 501 025 C14 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••••.•••.....,•• ESS/pN919 SEAL 17502 .,,,•,• TT EHR�•,, C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' I No. I DATE I BY I Description REVISIONS U DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C15 SHEET NO. OF 1 9 q A V' Dewberry D Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 C C X Z J z J Z Z U) -J Lu Z:) Q>-WCCIrLU 00 LUErC)Q LL wEr<0Q0 W � = _ _ CO Q iZ 0< 0 C) z O rr SEAL •••••.•••.....,•• ESS/pN919 SEAL 17502 .,,,•,• TT EHR�•,, C SCALE 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' I No. I DATE I BY I Description REVISIONS U DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE 20" WATERLINE 'LAN AND PROFILE PROJECT NO. 50046462 / 50102913 C16 SHEET NO. OF E C 0 0 1 1 2 3 1 4 1 5 NOTES: 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT o OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. dd ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. c�, 2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND �\ �STREAMS UNLESS DIRECTED CON DOES DISTURB WETLANDS, OTHERWISE THEY MUST BENRESTOR DTHENTOFOR GINRAL ACTOR IoW o � 5�3� I ��//�y �y y �b ®���� O� CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY 3607 y�6��� �ti ((�� �,`� �d�` �_ �c, REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL IMPACT SITE 7 — ��+ �ti ti°�° <���' g` REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.) 5��.. 3. CONTRACTOR SHALL LOCATE BOTH EXISTING 12" WATERLINES AND (NO IMPACT) TIE-IN EXISTING SERVICES TO NEWER D.I. LINE CLOSEST TO ROAD. I EXISTING 12" CAST IRON WATERLINE TO BE ABANDONED IN PLACE. TOP OF WL PIPE COORDINATE WITH CITY OF EDEN FOR LOCATION OF METERS, VALVES, AND db� rn = o GW z TOP = 529.06 TIE-INS. n 0O PP '5�34 WV W� 1 � GPS 0HE < -ELE-V 7-28\5 S G o S 311/NC 770 z \ o lilt MEADOW RD. \ ,00 3+87 F� I / w SF ' �RECP�A2� z WA + STA. 303+07, IN�MLL APPROX. LOCATION OF EX. 16" WATERLINE WA5 + A 20" - 45' BEND WIS = HORIZ. EX. 16" WATERLINE PRIOR TO RES. FITTINGS S+ CONNECTING NEW 16" WATERLINE. CONTRACTOR SF SHALL TIE-IN TO WITH NEW 16" WATERLINE, I V 16" TAPPING TEE AND 16" GV, 16"X20" STA. 303+17, INSTALL ECCENTRIC INCREASER, (2) 45' BENDS WITH 545 20" - 45' BEND WITH Q STA. 303+76, INSTALL AIR RES. FITTINGS I 3/14/19 MAINTAIN MIN. 12'-0" OW -OFF _ BE DETERMINED IN FIELD) OFF E.O.P. (TYP.) (TURN UP TRACING WIRE) I STORM STRUCTURE Z EX. 16" WATERLINE BEGIN THROUGHT=537.66 EX. 12" WATERLINE DATE INV = 534.94 Description 20" - 45' BEND WITH 15" RCP INV=534.84 RES. FITTINGS STA. 303+19 TO 303+59, 20" - 45' BEND WITH 40 (LF) - 30" X 0.500" RES. FITTINGS WALL THICKNESS STEEL I FIRE HYDRANT ASSEMBLY CASING PIPE, TO BE DRY TA. 303+07 TO 303+73 BORE AND JACKED (SEE I BORING DET. SHT. C19) BOX CULVERT 9'W x 10'H INV = 527.7' _--- STORM STRUCTURE COLLAPSED _ THROUGH=538.21 INV=NO ACCESS MWC OHE da 8" CONC. WALL TW=53 IMPACT SITE 7 RSE APPROX. LOCATION OF EX. 16" WATERLINE = NTRACTOR TO FIELD LOCATE VERT. AND LAB HORIZ. EX. 16" WATERLINE PRIOR TO CONNECTING NEW 16" WATERLINE. CONTRACTOR SF SHALL TIE-IN TO WITH NEW 16" WATERLINE, p o 16" TAPPING TEE AND 16" GV, 16"X20" OW SPOT FOR ECCENTRIC INCREASER, (2) 45' BENDS WITH 545 RES. FITTINGS (REF. DET. THIS SHT.) STA. 303+76, INSTALL AIR ..FROM RELEASE VALVE ® HIGH 3/14/19 POINT (EXACT LOCATION TO OW -OFF _ BE DETERMINED IN FIELD) 2/11/19 (TURN UP TRACING WIRE) I APPROX. LOCATION OF END Z EX. 16" WATERLINE BEGIN REV PER USACE COMMENTS EX. 12" WATERLINE DATE STA. 303+73, INSTALL Description 20" - 45' BEND WITH RES. FITTINGS STA. 303+63, INSTALL 20" - 45' BEND WITH IMPACT SITE 7 RES. FITTINGS STA. 303+61, INSTALL FIRE HYDRANT ASSEMBLY 300+00 301+00 302+00 303+00 304+00 305+00 305+50 UGT US 311/NC 770 E. MEADOW RD. -0 G -vv �LL UGW 302+00 I WA2 WA4 + P + MWC DRAWN BY RSE EXTEND FIRE HYDRANT LAB 545 EX. 0 p o OW SPOT FOR 00 545 0 ..FROM 3 3/14/19 LINE B OW -OFF _ 2 2/11/19 MWC I 1 Z MWC REV PER USACE COMMENTS No. DATE BY Description IMPACT SITE 7 z TA. 303+07 TO 303+73 540 EX. GRADE z 66LF D.I. REQUIRED 540 � Y — oW 535 535 1 MA/NTgI l 530 SLO PE 20" 0 ARV E WATERLINE \ ` APPROX. VE LOCATION OF EX. T. AND HORIZ. EX. 16" 6" ATERLINE 530 MAINTAIN NIN. 5'-0" PRI R TO CONNECTING NEW 16" SEPARATION B17WEEN BOTT. WATERLINE. CONTRACTOR SH LL TIE-IN T 525 OF CREEK AID TOP OF WIT NEW 16" WATERLINE, 1 " TAPPING 525 ENCASEMENT TEE AND 16" GV, 16"X20" CENTRIC INCREASER, 2 45' BENDS ITH RES. FI INGS (REF. DET. THIS SH'-.) STA. 303+19 TO 303+19, 520 40 (LF) - 30" X 0.500" W.A.1-1- THICKNESS STEEL CASING PIPE, TO BED Y 520 BORE AND JACKED (SE BORING DET. SHT. C19) 515 515 510 510 } w w J H J J H �N �� �� �wVw� Z Z Z Z ZQ Z Z ZQ 505 U = rmm �mm cmm Z Z O V ^mm ^wao� 505 + �,— + �� coz �Z �— j— 0 n �� �— a_ J Z O �� O W O O o PO I M O� I L r� O 2 V) I O -J M I M uj U M z H0W HOW H� HOW iaOW Hui 500 NW N� V) 11: cn NX 0 CN of cnQ...O.. 500 M M N co M C M M C N M . CD N co M LO co M M M LO LO 00 CO M CO LO LO 00 CO M CO I LO 00 M M co Lo LO 00 M M M LO ILO M M LO 300+00 301+00 302+00 303+00 304+00 305+00 305+50 UGT US 311/NC 770 E. MEADOW RD. -0 G -vv �LL UGW 302+00 I WA2 WA4 + P + AIR RELEASE VALVE (REF. DET. SHT'S. C18) 1A WA SBI EX. 16" 50't REF. SITE PLAN FOR LOCATION AND LAYOUT THIS SHT. 20"x16" ECCENTRIC REDUCER W/ RES. FITTINGS (REF. DET. SHT'S. C19) (2) 20" 90° BENDS W/ RES. FITTINGS (REF. DET. SHT'S. C19) I I b NEW 20', I O LL ^O •p 303+87 2 SF S B4 + ,\ \PRO%STR / FQESTORATION P DETAILS IMPACT SITE 7 SCALE:1 "=20' %e me � .v Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL ••4060...0#,,. �•••.••��� CARO #**#* ,. 'SS 0* SEAL l 17502 .:�'' FNOIN���.•�p;. 0 .. EHR�P••,. THRUST BLOCKING KEY PLAN REF. DET. SHT. C19 a 16"x16" TAPPING SLEEVE a W/ RES. FITTINGS (REF. DET. SHT. C19) FIELD VERIFY PIPE TYPE PRIOR TO INSTALLATION EX. 16" 16" GATE VALVE W/ RES. FITTINGS AND TRAFFIC RATED BOX (REF. DET. SHT'S. C18 AND C19) 0 a 40 0 a. a0 THRUST BLOCKING REF. DET. SHT. C19 WATERLINE CONNECTION DETAIL SCALE: 1/2" = 1'-0" THRUST BLOCKING REF. DET. SHT. C19 SCALE 0' 1' 2' 4' SCALE: 1/2" = l'- 0" 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' MWC DRAWN BY RSE 0 LAB CHECKED BY EX. 12.. p o 00 ° 0 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC I AIR RELEASE VALVE (REF. DET. SHT'S. C18) 1A WA SBI EX. 16" 50't REF. SITE PLAN FOR LOCATION AND LAYOUT THIS SHT. 20"x16" ECCENTRIC REDUCER W/ RES. FITTINGS (REF. DET. SHT'S. C19) (2) 20" 90° BENDS W/ RES. FITTINGS (REF. DET. SHT'S. C19) I I b NEW 20', I O LL ^O •p 303+87 2 SF S B4 + ,\ \PRO%STR / FQESTORATION P DETAILS IMPACT SITE 7 SCALE:1 "=20' %e me � .v Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL ••4060...0#,,. �•••.••��� CARO #**#* ,. 'SS 0* SEAL l 17502 .:�'' FNOIN���.•�p;. 0 .. EHR�P••,. THRUST BLOCKING KEY PLAN REF. DET. SHT. C19 a 16"x16" TAPPING SLEEVE a W/ RES. FITTINGS (REF. DET. SHT. C19) FIELD VERIFY PIPE TYPE PRIOR TO INSTALLATION EX. 16" 16" GATE VALVE W/ RES. FITTINGS AND TRAFFIC RATED BOX (REF. DET. SHT'S. C18 AND C19) 0 a 40 0 a. a0 THRUST BLOCKING REF. DET. SHT. C19 WATERLINE CONNECTION DETAIL SCALE: 1/2" = 1'-0" THRUST BLOCKING REF. DET. SHT. C19 SCALE 0' 1' 2' 4' SCALE: 1/2" = l'- 0" 0' 50' 100' SCALE: 1 " = 50' VERT. 1 "=5' HORIZ. 1 "=50' REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 3 3/14/19 MWC PER DWQ COMMENT 2 2/11/19 MWC PER DEQ COMMENT 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C17 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY DATE APRIL, 2019 TITLE 20" WATERLINE PLAN AND PROFILE PROJECT NO. 50046462 / 50102913 C17 SHEET NO. OF MANHOLE FRAME & COVER TO BE MODEL USF GROUND OR 385 RING AND J COVER BY U.S. FOUNDRY & STREET SURFACE MFG. CORP. OR ENGR. APPROVED EQUAL (STAMPED: WATER - CITY OF EDEN - VALVE) E ADDITIONAL SECTION OR C SPACERS AS REQUIRED AIR VALVE AS DETAILED 4' VENT PIPE W/ DOWNWARD IN SPECIFICATIONS ELBOW AND SCREEN (SEE NOTE) 3-2 STD. 4' PRECAST BALL VALVE I I NIPPLE FLATTOP MANHOLE p o7. WATERMAIN TAPERED COUPLING OR CORP. STOP= Q V-0" GRAVEL TO TOP OF MAIN V _ 4" GRAVEL BASE _ NCDOT NO. 7 OR 8„ _ 8 STONE 46 O O NCDOT NO. 7 OR III I I I I I I 8 STONE BEDDING 12" PLACE CONC. BLOCK ASTM C-139, OR POUR 12" x 8" CONC. RING FOOTING TO SUPPORT CHAMBER, BUT LEAVE OPENING BELOW PIPE. FILL SPACE INSIDE RING W/ CLEAN GRAVEL FOR DRAINAGE. ELIMINATE CONC. FOOTING IF SOLID ROCK IS ENCOUNTERED. AIR RELEASE VALVE DETAIL NOT TO SCALE NOTES: 1. CONTRACTOR SHALL COORDINATE W/ENGINEER AND OWNER FOR PLACEMENT OF AIR RELEASE VALVES AT ALL LOCATIONS.AIR RELEASE VALVES SHALL BE PLACED BEHIND GUARDRAILS AND DITCHES, AND NOT IN FILL SLOPES OR CUT SLOPES. 2. PROVIDE BASKWASH ACCESSORIES ASSEMBLED TO VALVE CONSISTING OF A 90' EL., A SHUT OFF VALVE, CLEARWATER INLET VALVE, RUBBER SUPPLY HOSE AND QUICK DISCONNECT COUPLINGS. SAW TO NEAT EDGE (TYP.) EXISTING PAVEMENT 21A OR B 6"MIN. 6" COMPACTED 21A BACKFILL TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT ORIGINAL GRADE WALLS SHALL BE SLOPED — AND/OR SHEETING PROVIDED AS PER OSHA REQUIREMENTS HAND PLACED CAREFULLY — COMPACTED TO 90% DENSITY AT OPTIMUM MOISTURE CONTENT IN 6" LIFTS PLACE STONE UP TO SPRING LINE FOR D.I. OR PVC PIPE 2" MIN. OVERLAY ASPHALT CONCRETE SURFACE COURSE TYPE (SM -2A) EXISTING PAVEMENT TYPE 1 SIZE 21A ORB AGG. COMPACTED TO 100% MAX. DENSITY AT OPTIMUM MOISTURE CONTENT 6" BENCH (TYP.) O.D. PIPE O.D. + 24"(*) 1 MIN. TRENCH WIDTH TO SUPPORT TRENCH BOX ASPHALT DRIVEWAY REPAIR DETAIL NOT TO SCALE 6" OR SAME THICKNESS AS EX. CONCRETE DRIVE. WHICHEVER IS GREATER SAW TO NEAT EDGE (TYP.) EXISTING ASPHALT 6" ABC STONE 6" COMPACTED BACKFILL SEE TYP. TRACING WIRE ACCESS BOX DET. FOR TAPE AND WIRE SLOPE AS REQUI ED APPROVED BACKFILL 6" PIPE O.D. 12" PIPE SPRING LINE 1pn % 0 4" IN SOIL 6" IN ROCK COMPACTED STONE SOIL BEDDING MATERIAL ROCK TRENCH UNDERCUT 24" + O.D. MAX. MINIMUM 6" BELOW 20" + O.D. MIN. BARREL OF PIPE IN ROCK PIPE LAYING CONDITION NOT TO SCALE *NOTE: USE NO. 25 / NO. 26 STONE FOR BEDDING MATERIAL. PLAN / SECTION ly/�\� \ TYP. O.D. NOTES: 1. CONTRACTOR SHALL PROTECT PIPE JOINTS �. AS NECESSARY FOR PORTIONS ENCASED. 2. CONTRACTOR SHALL USE VIBRATORY METHOD TO ENSURE COMPLETE ENCASEMENT. 3. FLOTATION OF THE PIPE DURING CONCRETE / p PLACEMENT SHALL BE D NON -TRAFFIC RATED SNAKEPIT TRACER WIRE TERMINATION BOX, INSTALL EVERY 500' (DO NOT INSTALL IN DRIVEWAYS, ROADS, OR HEAVY TRAFFIC AREAS. 2' MIN. 4' MAX. j CN MARKER TAPE 12" ABOVE \ -O�MAIN 12 AWG TRACER WIRE 3" -,-�ABOVE MAIN MAIN ih TYPICAL TRACING WIRE NOTE: NON -TRAFFIC RATED SNAKEPIT TRACER WIRE TERMINATION AT ACCESS BOX DETAIL EVERY 5 ' AND/OR TERM NATEO INTO NOT TO SCALE AIR RELEASE VALVE BOX 5000 PSI AIR -ENTRAINED "HIGH -EARLY" CONCRETE \ - 6"x6" W.W.F. 2" EXPANSION JOINT EXISTING CONCRETE 6" BENCH (TYP.) O.D. PIPE MIN. TRENCH WIDTH TO O.D. + 24"(*) SUPPORT TRENCH BOX CONCRETE DRIVEWAY REPAIR DETAIL NOT TO SCALE 6" TYP. GQ 5" MIN. MINIMUM -L AROUND PE 2 COURSES OF BRICK AS SHOWN VALVE BOX CONCRETE COLLAR ON NCDOT RAN RECESS TOP 4" MIN. OTHERWISE, EXISTING OR PROPOSED GRADE 6" (TYP.) ' SCREW TYPE 6" TYP. ADJUSTABLE C.I. VALVE 1 BOX W1 BASE — PIPE O.D. MORTAR PREVENTED. / 6" TYP. METER BOX W/ COVER 2 1/2" BRASS NSFT DISCHARGE AP OPERATING NUT & COCK WING \� . .. . . . SECTION A—A\\/ \ CARRIER PIPE CONCRETE ENCASEMENT DETAIL 1 cu. ft. CLEAN GRAVEL TYPE "C" BLOW OFF/ HIDDEN FLUSHING HYDRANT N.T.S. NOT TO SCALE NOTE: 1. PROVIDE TAR PAPER BETWEEN HYDRANT & HYDRANT THRUST BLOCK 2. ALL THRUST BLOCKS & SUPPORT- ING CONC. IS 2500 PSI PLAN Dewberry' WATER MAIN Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 VALVE CAST IRON COVER 3000 PSI 14" CONCRETE (TYP.) COLLAR A U) z J z O 0 W ^O zz W (0 co W T- 0 O U) U) SUPPORT BOX W/ MIN. J 2 COURSES OF BRICK z BOTTOM OF TOP BRICK TO BE EVEN W/ TOP OF BONNET MORTAR BOLT FLANGE JOINT COMPACTED BACKFILL TO . . . . . . '.'.:.:.D4': .'. .': .':..Y.: .': .':. . .. NATURAL GROUND a':::::?:::: ':. ............. ....::: :........ . CONCRETE SUPPORT SECTION TYPICAL VALVE SETTING DETAIL SCREW TYPE NOT TO SCALE 2-1/2" HOSE CONNECTION EQUAL TO TOWN OR NATIONAL STANDARD BREAK RING - FINISHED GRADE 1/2 CU. YARD NO. 57 STONE 5/8" G.S. TIE RODS CONC. THRUST BLOCK BEARING (2 REQ'D.) w/STAINLESS AGAINST 6 SQ. FT. UNDISTURBED STEEL NUTS & WASHERS SOIL, DRAIN HOLES SHALL BE CLEAR OF CONC. TYPICAL FIRE HYDRANT ASSEMBLY DETAIL N.T.S. SEAL ' ��,•�aa•a•••• CARoZ"%,�•. O ti� �����ESSlpN9lq I ••�: s SEAL 17502 Q . �.FNGIJE- .4Z- 009 sees KEY PLAN SCALE AS NOTED No. DATE BY Description REVISIONS TITLE WATERLINE DETAILS PROJECT NO. 50046462/50102913 C18 SHEET NO. OF MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL. 2019 DATE TITLE WATERLINE DETAILS PROJECT NO. 50046462/50102913 C18 SHEET NO. OF E D DRY BORED & JACKED WELDED STEEL CASING PIPE. —6" MIN. THRUST BLOCK (TYP.) A �PLAN BENDS N.T.S. 2 X PLAN TEES 18" MIN.-10"DIA. & LESS 24" MIN.-12"DIA. & GREATER , 45° I� B*ce:.:. SECTION X -X BENDS & TEES N.T.S. PLAN & ELEV. PLUGS N.T.S. TYP. CONCRETE BLOCKING DETAIL N.T.S. N.T.S. 10" MIN. TYP. CONC. THRUST I d ':.::. '• �16 #4 BARS COLLAR MIN. 2" : AS SHOWN INTO DISTURBED MAT ON 3 SIDES :d.. TYP. MJ BEND w/ RESTRAINER GLANDS 3 '• '• TRENCH BOTTOM MIN. /\\ \\ :::•,: UNDISTURBED SOIL (TYP.) NOTES: 1. FOR VERT. BEND DOWN IN EXCESS OF 1 1/4" ANCHORAGE SHALL BE RECOMMENDED BY ENGINEER. 2. FOR VERT. BEND UPWARD, BLOCKING TO BE SIMILAR TO THAT FOR HORZ. BEND. RES. FITTINGS MAY NOT BE SHOWN ON THE PLANS, CONTRACTOR SHALL INSTALL RES. FITTINGS PER ENGINEERS RECOMMENDATION OR SPEC. 333313. 3. GLANDS & BOLTS SHALL BE PROTECTED FROM CONC. WHEN POURING THRUST BLOCKS 4. ALL THRUST BLOCK & SUPPORT CONC. SHALL BE 4,000 psi CONCRETE, REF. SPEC. 033000. SECTION - VERT. BEND N.T.S. 8" BRICK BULKHEAD AT EACH END OF CASING PIPE (WATER TIGHT 6" TYP. 6" TYP. GROUT AS REQ'D.) �� / D.I. CARRIER PIPE L CONC. CRADLE EXTEND FROM END (SEE PLANS FOR SIZE) B OF CASING TO FIRST JOINT OF SPIDER SUPPORT & SPACER BY SPIDER MFG. CARRIER PIPE (MIN. 5 LF) INC. DURHAM N.C., OR APPROVED EQUAL (3 REQUIRED PER 18' JOINT OF PIPE) 1/4 CU. YD. CRUSHED STONE @ PROVIDE 3/4" COPPER OR PVC WEEP HOLE C WEEP HOLE IN BULKHEAD @ LOW END OF CASING PIPE, EXTEND INTO CRUSHED STONE. BORING DETAIL (GREATER THAN 4" CARRIER) NOT TO SCALE NOTE: CONTRACTOR SHALL INSTALL RESTRAINED FITTINGS THROUGHOUT CASING PIPE TO NEAREST VERTICAL BEND REF. JOINT RESTRAINT TABLE THIS SHT. FOR PIPE LENGTHS REQUIRED TO BE RESTRAINED FROM THE BEND. APPROVED DEWATERING DEVICE (SILT BAG REF. TEMPORARY PUMP AROUND DET. SHT. C22) OR DISCHARGE TO W O SECTION A -A NOTES: NOT TO SCALE THE DETAIL IS NOT INTENDED AS FINAL FOR CONSTRUCTION. THE CONTRACTOR IS STILL RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION AND SAFETY PRECAUTIONS AS NECESSARY TO OBTAIN A NCDOT PERMIT PRIOR TO CONSTRUCTION. TYPICAL BORING PIT DETAIL NOT TO SCALE 25' TO CHECK DAM --j STEEL SHEETING DISCHARGE HOSES DEWATERING PUMP A NUMBER OF TWIST -OFF NUTS STEEL PUSH RING A RATED PRESSURE THRUST BLOCK DETAILS JACK 4 2 4 PIPE 90° BEND 45° BEND 22 1/2° BEND 11 1/4 BEND TEE JACK PLUG SIZE A B A B A B A B A B A B 4" 20" 18" 12" 18" 6" 16" 4" 12" 16" 18" 16" 18" 6' 34„ 24" 22" 20" 12" 20" 8" 16" 32„ 20" 32„ 20" 8" 54" 26" 32" 24" 16" 24" 12" 16" 48" 24" 48" 24" 10" 68" 32„ 48" 26„ 26„ 24" 18" 18" 55" 28" 55" 28" 12" 100" 32" 60" 28" 34" 26" 20" 24" 76" 30" 76" 30" 14" 128„ 34„ 72" 32„ 38" 32„ 24" 26„ 96„ 32„ 96„ 32„ 16" 120" 48" 88" 34" 46" 34" 24" 34" 120" 34" 120" 34" 20 138" 64" 130" 36" 66" 36" 34" 36" 170" 36" 170" 1 36" 8" BRICK BULKHEAD AT EACH END OF CASING PIPE (WATER TIGHT 6" TYP. 6" TYP. GROUT AS REQ'D.) �� / D.I. CARRIER PIPE L CONC. CRADLE EXTEND FROM END (SEE PLANS FOR SIZE) B OF CASING TO FIRST JOINT OF SPIDER SUPPORT & SPACER BY SPIDER MFG. CARRIER PIPE (MIN. 5 LF) INC. DURHAM N.C., OR APPROVED EQUAL (3 REQUIRED PER 18' JOINT OF PIPE) 1/4 CU. YD. CRUSHED STONE @ PROVIDE 3/4" COPPER OR PVC WEEP HOLE C WEEP HOLE IN BULKHEAD @ LOW END OF CASING PIPE, EXTEND INTO CRUSHED STONE. BORING DETAIL (GREATER THAN 4" CARRIER) NOT TO SCALE NOTE: CONTRACTOR SHALL INSTALL RESTRAINED FITTINGS THROUGHOUT CASING PIPE TO NEAREST VERTICAL BEND REF. JOINT RESTRAINT TABLE THIS SHT. FOR PIPE LENGTHS REQUIRED TO BE RESTRAINED FROM THE BEND. APPROVED DEWATERING DEVICE (SILT BAG REF. TEMPORARY PUMP AROUND DET. SHT. C22) OR DISCHARGE TO W O SECTION A -A NOTES: NOT TO SCALE THE DETAIL IS NOT INTENDED AS FINAL FOR CONSTRUCTION. THE CONTRACTOR IS STILL RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION AND SAFETY PRECAUTIONS AS NECESSARY TO OBTAIN A NCDOT PERMIT PRIOR TO CONSTRUCTION. TYPICAL BORING PIT DETAIL NOT TO SCALE 25' TO CHECK DAM --j STEEL SHEETING DISCHARGE HOSES DEWATERING PUMP A NUMBER OF TWIST -OFF NUTS STEEL PUSH RING A RATED PRESSURE 3 PLYWOOD _v 4 JACK 4 2 4 INTAKE HOSE 6 3 6 PIPE 8 4 JACK 350 PSI 10 6 8 350 PSI GUIDERAILS BORING PIT PLAN DIRECTIONAL DRILL PIPING CONNECTION ASSEMBLY DETAIL (TYP.) 3 4 NOTES: 1. THRUST RESTRAINT SHALL BE INSTALLED ON DUCTILE IRON "DIP" AND PVC FORCEMAINS AND WATERLINES IN THE MANNER SHOWN PER THIS DETAIL. SEE STANDARD THRUST BLOCK DETAIL FOR ADDITIONAL RESTRAINT CRITERIA. 2. RESTRAINING DEVICES SHALL CONFORM TO ANSI/AWWA C111/A21.11 AND ANSI/AWWA C153/A21.53 OF LATEST REVISION. 3. COMPACT FITTINGS ARE ACCEPTABLE FOR USE WITH IRON RETAINING GLAND M.J. RESTRAINT. 4. THE MINIMUM LENGTH OF RESTRAINT INDICATED SHALL REQUIRE ALL JOINTS WITHIN THAT DISTANCE BE RESTRAINED. 5. RESTRAINT SYSTEMS SHALL BE INSPECTED AND APPROVED PRIOR TO BACKFILLING. 6. RESTRAINT SYSTEMS MAY VARY BASED UPON THE ENGINEERS DESIGN AS SHOWN ON THE PLAN AND PROFILE SHEETS. 7. MAKE ANY JOINT DEFLECTION NECESSARY BEFORE TORQUING THE T -HEAD BOLTS. 8. TIGHTEN T -HEAD BOLTS, BOTTOM FIRST, THEN TOP, SIDES AND REMAINDER. 9. REPEAT NOTE 1. UNTIL ALL T -BOLTS ARE PROPERLY TOURQED. 10. TIGHTEN TWIST -OFF NUTS SO THAT ALL WEDGES FIRMLY CONTACT PIPE. -OFF NUTS IN ALTERNATING MANNER, SHEARING OFF NUTS. 11. TIGHTEN TWIST 12. MEGALUG, STARGRIP, (OR APPROVED EQUAL) MAY BE RESET OR REUSED BY ASSEMBLY AS DESCRIBED ABOVE AND TORQUE WEDGE BOLTS TO 90 FT LBS. 13. ANY PLACE A RESTRAINED FITTING IS CALLED OUT ON THE DRAWINGS THE ADJOINING PIPE JOINTS SHALL ALSO BE RESTRAINED TO A DISTANCE IN BOTH DIRECTIONS FROM THE DESIGNATED FITTING AS INDICATED IN THIS TABLE. NOMINAL PIPE SIZE (INCHES) NUMBER OF TWIST -OFF NUTS NUMBER OF T -BOLTS RATED PRESSURE 3 2 4 350 PSI 4 2 4 350 PSI 6 3 6 350 PSI 8 4 6 350 PSI 10 6 8 350 PSI 12 8 8 350 PSI 16 12 12 350 PSI 18 12 12 250 PSI 24 16 16 250 PSI 30 1 20 1 20 1 250 PSI 36 1 24 1 24 1 250 PSI 42 1 28 1 28 1 250 PSI ,—TWIST -OFF NUT GAS ET :!I VMECHANICAISIDE VIEW FRONT JOINT BELL VIEW EBAA IRON MEGALUG RESTRAINING DEVICE OR APPROVED SUBSTITUTE IRON RETAINING GLAND MA RESTRAINT JOINT RESTRAINT TABLE - PVC RESTRAIN ALL JOINTS WITHIN THESE LENGTHS. (LF EA SIDE OF FITTIN( ) PIPE SIZE ONCHES) V4 BEND 221/2 BEND 46 BEND 90 BEND DEAD END/ VALVE REDUCER VERT. 45 BEND U/L 6" 4 8 17 41 99 6"x8" 54' 41'/17' 8" 6 11 22 53 129 8"x12" 97' 54'/22' 12" 8 15 31 73 182 12"x16" 99' 76'/31' 16" 10 19 39 93 233 16"x20" 99' 97'/39' 20" 11 22 46 111 282 20"x24" 99' 117746' 24" 13 26 53 127 328 - 136'/53' JOINT RESTRAINT TABLE - DIP RESTRAIN ALL JOINTS WITHIN THESE LENGTHS. aF EA SIDE OF FITTING) OPNCFSEZS) V V4 BEND 221/2 BEND 45 BEND 90 BEND DEAD D/ VALVEBEND REDUCER VERT. 45 U/L 6" 3 6 13 30 54 6"x8" 54' 23'/13' 8" 4 8 17 39 70 8"x12" 97' 29717' 12" 6 11 23 55 98 12"x16" 99' 41'/23' 16" 7 14 29 69 126 16"x20" 99' 52'/29' 20" 9 17 35 83 152 20"x24" 99' 63735' 24" 10 19 40 96 177 - 71T/40' CALCULATION CONDITIONS: TRENCH = TYPE 3 SOIL TYPE = ML DEPTH = 3 FEET TEST PRESSURE = 150 PSI SAFETY FACTOR = 2.0 GRADE UPPER "U"{ GoA UPPER 45° i 5 FLG. _DERS FELT JCRETE SLAB LOWER LOWER "L" VERTICAL RESTRAINT V90. EL M.J. W/ CONCRETE BLOCKING (REF. CONCRETE AGIAjo RT LRcLEIV BLOCKING DET.) AND RES. VR=X_ 1?,P�NEO 8E RES RTH TA/AtEO O FITTINGS REF. TABLES THIS SES E ?S5Gl A CH DET. (COVER RES. PSEE APOLYWRAP PRIOR T/O I POURING CONCRETE DUCT� ON PSPN P F l RO lP / DIPIPER �UCTu DIP RESTRAINT STARGRIP SERIES 4000 OR MEGALUG SERIES 2000 PV BY EBAA IRON (TYP.) (OR EQUAL) RP\NEO � R PVG RESTRAINED PIPE DETAIL NOT TO SCALE 3', MIN i \ / 3' MI ONE 20 SECTION OF DIP HDPE 15' MIN \—EX. STREAM VARIES TYPICAL DIRECTIONAL DRILL FOR STREAM/WETLAND CROSSINGS DETAIL NOT TO SCALE NCDOT SPECIAL PROVISIONS FOR DIRECTIONAL DRILLING: ONE 20' SECTION OF DIP DIRECTIONAL DRILLING METHODS HAVE NOT BEEN GIVEN STATEWIDE APPROVAL FOR USE ON NCDOT RIGHT OF WAY. UNDER NO CONDITION SHALL JETTING ALONE OR WET BORING WITH WATER OF UTILITY PIPELINES BE ALLOWED. DIRECTIONAL BORING USING JETTING WITH A BENTONITE (OR EQUIVALENT MATERIAL) SLURRY IS APPROVED AT A MINIMUM DEPTH OF TEN (1110') FEET B(ELO))W THE PAVEMENT SURFACE [FIFTEENTCH LINE S (15') FEET BELD REOCTIONAL BORINGW THE S ISOFNOT RTA L OWED IAND/ONREMBAN MENT MATFULL CONTROL OERIAL.CED R COTIONALABOR GFIVE ISSALLOWEDFEET B BEONEATHANY EMIBANKMENT MATER AL RN EK BED. NATURALLY OCCURRING SOIL. ANY PARALLEL INSTALLATION UTILIZING THE DIRECTIONAL BORING METHOD SHALL BE MADE AT A MINIMUM DEPTH OF FOUR (4') FEET (COVER) BELOW THE GROUND SURFACE AND OUTSIDE THE THEORETICAL 1:1 SLOPE FROM THE EXISTING EDGE OF PAVEMENT EXCEPT WHERE THE PARALLEL INSTALLATION CROSSES A PAVED ROADWAY. ALL DIRECTIONAL BORES SHALL MAINTAIN TEN (10') FEET MINIMUM (CLEAR) HORIZONTAL DISTANCE FROM THE NEAREST PART OF ANY STRUCTURE, INCLUDING BUT NOT LIMITED TO BRIDGES, FOOTINGS, PIPE CULVERTS OR BOX CULVERTS. ALL DIRECTIONAL BORES SHALL MAINTAIN TEN (10') FEET MINIMUM (CLEAR) VERTICAL DISTANCE FROM THE NEAREST PART OF PIPE CULVERTS OR BOX CULVERTS. DIRECTIONAL BORES ARE NOT ALLOWED BENEATH BRIDGE FOOTINGS, CULVERT WINGWALL FOOTINGS OR RETAINING WALLS. THE TIP OF THE DRILL STRING SHALL HAVE A CUTTER HEAD. DETECTION WIRE SHALL BE INSTALLED WITH NON-FERROUS MATERIAL. ANY CHANGES SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. FOR MULTIPLE CONDUIT INSTALLATIONS (INCLUDING PERPENDICULAR AND PARALLEL INSTALLATIONS), INSTALL CONDUITS WITH FIVE (5') FEET MINIMUM (CLEAR) HORIZONTAL SEPARATION BETWEEN EACH CONDUIT OR INSTALL MULTIPLE CONDUITS WITHIN A SINGLE DUCT. ALL DIRECTIONAL DRILLED PIPING FOR SEWER FORCE MAINS AND WATERLINES SHALL BE A MINIMUM OF SDR -9. AN OVERBORE SHALL NOT BE MORE THAN TWO (2") INCHES GREATER THAN THE DIAMETER OF THE PIPE OR ENCASEMENT. AN OVERBORE EXCEEDING TWO (2") INCHES GREATER THAN THE DIAMETER OF THE PIPE OR ENCASEMENT WILL BE CONSIDERED IF THE ENCROACHMENT AGREEMENT INCLUDES A STATEMENT SIGNED AND SEALED BY A NORTH CAROLINA REGISTERED PROFESSIONAL ENGINEER INDICATING THAT AN OVERBORE IN EXCESS OF TWO (21 INCHES OF THE DIAMETER OF THE PIPE OR ENCASEMENT WILL ARCH AND NO DAMAGE WILL BE DONE TO THE PAVEMENT OR SUB -GRADE. HDPE PIPE INSTALLED BY DIRECTIONAL BORING SHALL NOT BE CONNECTED TO EXISTING PIPE OR FITTINGS FOR ONE (1) WEEK FROM THE TIME OF INSTALLATION TO ALLOW TENSIONAL STRESSES TO RELAX. REINFORCING ANCHOR RING — EBAA IRON WORKS 110OSDB OR APPROVED EQUAL MID—SPAN PIPE RESTRAINT _ TRENCH WALL RESTRAINT RETAINING GLANDS - STARPIPE 3000 SERIES (TYP.) (OR EQUAL) RESTRAIN MJ JOINTS WITH IRON M.J. RESTRAINT RETAINING GLANDS - STARPIPE 3100P SERIES (TYP.) (OR EQUAL) STARPIPE SERIES 1100 (TYP.) �(OR EQUAL) arT, RESTRA/NEO PVC Pvc DUCTILE IRON RESTRAINED JOINT FITTING (TYP.) RESTRAINED JOINT VALVE (TYP.) PVC RESTRAINT PE/ MJ TRANSITION ASSEMBLY DIMJ W/ MEGA LUG CONCRETE THRUST COLLAR ONE SECTION OF DUCTILE IRON PIPE 3/4" RODS 2 PER CONNECTION TRANSITION GASKET - BOLTED STE­�/ COUPLING, ROMAC STYLE 501 OR APPROVED EQUAL FOR TRANSITIONING DUCTILE IRON PIPE TO PVC PIPE TYPICAL DIRECTIONAL DRILL PIPING CONNECTION ASSEMBLY DETAIL NOT TO SCALE 4'-0" t B CONCRETE THRUST J_ COLLAR (3,000 P.S.I.) A �' ANCHOR a RING C WATER MAIN a a A O . ,4 UNDISTURBED SECTION SOIL NOTE: 6" TO 16" MAINS = 12—N0. 7 BARS CONCRETE THRUST 20" TO 36" MAINS = 12—N0. 8 BARS _COLLAR (3,000 P.S.I.) BARS PLACED AS SHOWN 11=III=III— —III=III=III=III= WATER TRENCH WALL MAIN TAMPED BACKFILL ......................... PLAN UNDISTURBED SOIL SCHEDULE PIPE DIAMETER CONCRETE THRUST COLLAR ANCHOR RING RINGS REQUIRED A B C 6",8",12" 3'-0" 3'-0" 2" ONE 16",18",20" 3'-6" 3'-6" 2" ONE 24" 4'-0" 4'-0" 2" TWO TYPICAL THRUST COLLAR INSTALLATION DETAIL NOT TO SCALE r.:;:,. Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U a z uj J Z J Z Z � >_ Lu w �0 w�a� Q o� oQ o z o SEAL KEY PLAN SCALE • �Q�oFESS/pN919 . SEAL 17502 5 `ANG IQQL.� .,•.•�rT EHR.�•••,',. •••••••••••• AS NOTED REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 1 2/11/19 MWC ADDED DET. PER DEQ No. DATE BY Description REVISIONS TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C19 7 MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE WATERLINE DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C19 7 E D C 1 Pwrianertt Seeding PS Section 6.11 Definition Controlling runoff and erosion on disturbed areas by establishing perennial vegetative cover with seed. RFPM To reduce erosion and decrease sediment yield from disturbed areas, to permanently stabilize such areas in a manner that is economical, adapts to site conditions, and allows selection of the most appropriate plant materials. Condfflli Where Pracdoe Applies Fine -graded areas on which permanent, long-lived vegetative cover is the most practical or most effective method of stabilizing the soil. Permanent seeding may also be used on rough -graded areas that will not be brought to final grade for a year or more. Areas to be stabilized with permanent vegetation must be seeded or planted within 15 working days or 90 calendar days after final grade is reached, unless temporary stabilization is applied. Plam Consiiderat" Vegetation controls erosion by protecting bare soil surfaces from raindrop impact and by reducing the velocity and volume of overland flow. The most common and economical means of stabilizing disturbed soils is by seeding grasses 9 rasses and legumes. The advantages of seeding over other means of establishing plants include the smaller initial cost, lower labor input, and greater flexibility of method. The disadvantages of seeding include: potential for erosion during the establishment stage, the need to reseed areas that fail to establish, seasonal limitations on suitable seeding dates, and a need for water and appropriate temperatures during germination and early growth. The probability of successful plant establishment can be maximized through good planning, knowledge of the soil characteristics (Table 6.11 a), selection of suitable plant materials for the site, good seedbed preparation, adequate liming and fertilization, and timely planting and maintenance. SELECTING PLANT MATERIALS Climate, soils, and topography are the major factors affecting the suitabilityof plants for articular site. All three of P P these factors vary Y wide) across North Carolina with the most significant contrasts occurring among the three major physiographic regions of the state --Mountains, Piedmont, and Coastal Plain (Figure 6.11a). To simplify plant selection, a Key to Permanent Seeding Mixtures is presented in Table 6.11 b. To find seeding specifications for a specific site, follow this key through the different steps --region, slope, soil, and maintenance level --to theappropriate seedin number. Seeding mixtures 9 9 recommended here are designed for general use and are well proven in practical field situations Table 6.11a Suitability of Soil for Establishment of Low -maintenance Vegetation Criteria Suitability SITE AREA DESCRIPTION Limiting Factors Good Fair Poor 7 days pH 5.6-7.8 4.5-5.5 <4.5 Too acid; possible SIa es steeper than 3:1 P P 7 days If slopes are 10' or less in length and are Al, Mn, Fe toxicity Available >.10 .05-.10 -0.5 Too dry water capacity' All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. Texture' I, all, si, at Be], Biel, cl Be, sic, c Too high in clay Is s Too high in sand Coarse (3-10 in) <15% 15-35 >35 Lg. stones restrict fragments' (>10 in) <3% 3-10 >10 tillage; droughty Depth to 40 20-40 <20 Insufficient bedrock (in.) - ; rooting depth Salinity (mmhos/cm) 8-16 >16 i Excess salt r. m.kn. 'Sandy day loam (scl), silty clay loam (sic'), clay loam (cl), sandy loam (sl), silt loam (sh), loamy sand (Is), sandy clay (so), silty day (sic), clay (c), silt (sr, sand (s), and loam (1). 'Percent by weight. Source: National Soils Handbook, USDA -SCS, 1983. Coastal Plain Mountains Piedmont Upper Middle Lower Figure 6.11a Major physiographic regions of North Carornadiffering in dinars, soils and topography 6.11.2 (Tables 6.11 c through 6.11v). They are designed to produce maximum stabilization and minimize the amount of maintenance and repair required. Land use is a primary consideration in planning permanent seedings. For this purpose land use, whether residential, industrial, commercial, or recreational, can be divided into two general categories: High -maintenance areas are mowed frequently, limed and fertilized regularly, and either (1) receive intensive use (e.g., athletic fields) or (2) require maintenance to an aesthetic standard (e.g., home lawns). Grasses used for these situations are long-lived perennials that form a tight sod and are fine -leaved and attractive in appearance. They must be well -adapted to the geographic area where they are planted and able to endure the stress of frequent mowing. Sites where high -maintenance vegetative cover is desirable include homes, industrial parks, schools, churches, and recreational areas. Low -maintenance areas are mowed infrequently or not at all, and do not receive lime and fertilizer on a regular basis. Plants must persist with little maintenance over long periods of time. Grass and legume mixtures are favored for these sites because legumes are a source of soil nitrogen. Mixed stands are also more resistant to adverse conditions. Sites suitable for low -maintenance vegetation include steep slopes, stream or channel banks, some commercial properties, and "utility" turf areas such as roadbanks. SEEDBED PREPARATION The soil on a disturbed site must be amended to provide an optimum environment for seed germination and seedling growth. The surface soil must be loose enough for water infiltration and root penetration. The pH (acidity or alkalinity) of the soil must be such that it is not toxic and nutrients are available --preferably between 6.0 and 6.5. Sufficient nutrients --added as fertilizer --must be present. It is as important to add lime as to add fertilizer. Lime is used primarily as a pH, or acidity modifier, but it also supplies calcium and magnesium, which are important plant nutrients. By increasing soil pH, it also makes other nutrients more available to plants. At the same time, it prevents aluminum toxicity by decreasing the solubility of soil aluminum. Many soils in North Carolina are high in aluminum, which stunts plant growth. After seed is in place, it must be protected with a mulch to hold moisture and modify temperature extremes, while preventing erosion during seedling establishment. STEEP SLOPES The operation of equipment is restricted on slopes steeper than 3:1, severely limiting the quality of the seedbed that can be prepared. The soil cannot be sufficiently worked, and amendments cannot be thoroughly incorporated. Provisions for establishment of vegetation on steep slopes can be made during final grading. In construction of fill slopes, for example, the last 4-6 inches might be left uncompacted. A loose, rough seedbed is essential. Large clods and stones provide irregularities that hold seeds and fertilizer. Cut slopes should be roughened (Practice 6.03, Surface Roughening). Where steepness prohibits the use of farm machinery, seeding methods are limited to broadcast or hydroseeding, with hydroseeding giving the most dependable results. Vegetation chosen for these slopes must not require mowing or other intensive maintenance. Using a hydraulic seeder, seed, fertilizer, wood fiber mulch, and a tacking agent can be applied in one operation. Good mulching practices are critical to protect against erosion on steep slopes. When using straw, anchor with netting or asphalt. On slopes steeper than 2:1, a rolled erosion control product may be required to protect the slope. Specifications ter SEEDBED REQUIREMENTS Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.11 a), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: Enough fine-grained (silt and clay) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 inches of water to 1 inch of soil). Sufficient pore space to permit root penetration. Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. A favorable pH range for plant growth, usually 6.0-6.5. Freedom from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met--i.e., if the existing soil is too coarse, dense, shallow, or acidic to foster vegetation --special amendments are required. The soil conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Topsoiling. SOIL CONDITIONERS In order to improve the structure or drainage characteristics of a soil, the following materials may be added. These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat --Appropriate types are sphagnum moss peat, hypnum moss peat, reed -sedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned in storage piles for at least 6 months after excavation. Sand --clean and free of toxic materials. Vermiculite--horticultural9 rade and free of toxic substances. Rotted manure --stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust --free of stones and debris. Add 6 Ib of nitrogen to each cubic yard. Sludge --Treated sewage and industrial sludges are available 9 9 9 in various forms; these should be used only in accordance with local, State, and Federal regulations. SPECIES SELECTION Use the Ke to Permanent Seeding Mixtures Table 6.11 b to Y 9 ( ) select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of species, including scientific names and characteristics, is given in Appendix 8.02. SEEDBED PREPARATION Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing is performed free of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county Agricultural Extension offices or from NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of final grading. Testing is also done by commercial laboratories. When soil tests are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11 c through 6.11v). Application rates usually fall into the following ranges: Ground agricultural limestone: Light -textured, sandy soils: 1- 1 1/2 tons/acre Heavy textured, clayey soils: 2-3 tons/acre Fertilizer: Grasses: 800-1200 Ib/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-1200 Ib/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-6 inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slopes less than 3:1). Fill in or level depressions that can collect water. Broadcast seed into a freshly loosened seedbed that has not been sealed by rainfall. SEEDING Seeding dates given in the seeding mixture specifications (Table 6.11c through 6.11v) are designated as "best" or "possible". Seedings properly carried out within the "best" dates have a high probability of success. It is also possible to have satisfactory establishment when seeding outside these dates. However, as you deviate from them, the probability of failure increases rapidly. Seeding on the last date shown under "possible" may reduce chances of success by 30-50%. Always take this into account in scheduling land -disturbing activities. Use certified seed for permanent seeding whenever possible. Certified seed is inspected by the North Carolina Crop Improvement Association. It meets published North Carolina Standards and should bear an official "Certified Seed" label (Figure 6.11 b). Figure 6.11 b Label displayed on all North Carolina certified seed. Labeling of non -certified seed is also required by law. Labels contain important information on seed purity, germination, and presence of weed seeds. Seed must meet State standards for content of noxious weeds. Do not accept seed containing "prohibited" noxious weed seed. Inoculate legume seed with the Rhizobium bacteria appropriate to the species of legume (Chapter 3, Vegetative Considerations). Apply seed uniformly with a cyclone seeder, drop -type spreader drill, cultipacker seeder, or hydroseeder on a firm, friable seedbed. When using a drill or cultipacker seeder, plant small grains no more than 1 inch deep, grasses and legumes no more than 1/2 inch. Equipment should be calibrated in the field for the desired seeding rate. When using broadcast -seeding methods, subdivide the area into workable sections and determine the amount of seed needed for each section. Apply one-half the seed while moving back and forth across the area, making a uniform pattern; then apply the second half in the same way, but moving at right angles to the first pass (Figure 6.11 c). Figure 6.11 c Suggested pattern for broadcasting seed and fertilizer (source: NCAES Bulletin AG -69). Cover broadcast seed by raking or chain dragging; then firm the surface with a roller or cultipacker to provide good seed contact. Mulch all plantings immediately after seeding (Practice 6.14, Mulching). HYDROSEEDING Surface roughening is particularly important when hydroseeding, as a roughened slope will provide some natural coverage for lime, fertilizer, and seed. The surface should not be compacted or smooth. Fine seedbed preparation is not necessary for hydroseeding operations; large clods, stones, and irregularities provide cavities in which seeds can lodge. Rate of wood fiber (cellulose) application should be at least 2,000 Ib/acre. Apply legume inoculants at four times the recommended rate when adding inoculant to a hydroseeder slurry. If a machinery breakdown of 1/2 to 2 hours occurs, add 50% more seed to the task, based on the proportion of the slurry remaining. This should compensate for damage to seed. Beyond 2 hours, a full rate of new seed may be necessary. Lime is not normally applied with a hydraulic seeder because it is abrasive. It can be blown onto steep slopes in dry form. 2 TABLE 6.110 SEEDING NO. 5P FOR: GRASS -LINED CHAN N E LSPraCtiCe Standards an SpecifIcations Seeding mixture Species, Tall fescue Rate (lblacre) 200 (4-5 lb/1,000 tt2) Nurse plants Between May 1 and Aug, 15 add 15lb/acre Sudangrass or 10 lb/acre Ger- man millet. Before May 1, or after Aug. 15; add 40 lb/acre rye (grain). Seeding dates Best: Aug. 25 -Oct. Possible: Feb. Apr. 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 40 lb/acre rye grain and use a channel lining that offers maximum protec- tion. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 lb/acre ground agricultural limestone and 1,4001b/acre 10-1040 fertilizer, Operate tillage equipment across the waterway.; Mulch Use lute excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 fbtacre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they can clog drainage devices. Maintenance l inspect and repair mulch frequently. Refig ilize in late winter of the follow- ing year; use soil tests or apply 150 Ib/acre 10-10-10. Mow regularly to a height of 2.4 inches. 'Defer to appendix 8.021or botanical names. TABLE 6.11 K SEEDING NO. 1 P FOR STEEP yractice Standards and � eci ications SLOPES OR POOR SOILS: LO MAINTENANCE Seeding mixture Species' Rate (Iblecre) Tall fescue 100 Sericea lespedeza 30 Kobe lespedeza 10 Seeding notes 1. In Eastern Piedmont add 25 Iblacre Pensacola Bahiagrass or 10 Ibtacre common Bermuclagrass. Use common Bermudagrass only where it is un- likely to become a pest. 2. After Aug. 15 use unscarifiedsericea seed. 3. Where a neat ,appearance is desired; omit SeriEea and substitute 40 ib/acre Bahiagrass or 15 Ib/acre Bermudagrass. 4. To extends spring seeding p ng se ding dates into Duna, add 15 lb/acre hulled: Bar- mudagrass. However, it is preferable to seed temporary cover and seed fescue in Sept. Nurse plants Between May 1 and Aug. 15, add 10 lblacre German millet or 15<iblacre Sudangrass. Prior to May 1 or after Aug. 15, add 40 lblacre rye (grain). Seeding dates. Best Possible. Fail; Aug, 25 - Sept. 15 Aug. 20 - Oct. 25 Late winter: Feb, 15 - Mar. 21 Feb. 1 -Apr. 15 Fall is best for tall fescue and late winter for lespedezas. Overseeding of Kobe lespedeza over falf-seeded tall fescue is very effective. Use unhulled BermudagrassseedIn fall. Soil amendments Apply lime and fertilizer according to soil tests, or apply 4,000 ib/acre ground agricultural limestone and 1,040 fbtacre 10-10-10fertif li Mulch Apply 4,000-5,040 macre grain straw, or equivalent cover of another suitable mulching material, Anchor mulch by tacking with asphalt, roving, or netting, Netting is the: preferredanchoring method on steep slopes. Maintenance' Refertilize in the :second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fsrtil- lze, and mulch damaged areas it1 mediatefy. 'Refer to Appendix 8.02for botanical frames. 3 immmy seeding Section 6.10 PlaO nntinngrapid-growing annual grasses, small grains, or legumes to provide initial, temporary cover for erosion control on disturbed areas. To temporarily stabilize denuded areas that will not be brought to final grade for a period of more than 21 calendar days. Temporary seeding controls runoff and erosion until permanent vegetation or other erosion control measures can be established. In addition, it provides residue for soil protection and seedbed preparation, and reduces problems of mud and dust production from bare soil surfaces during construction. Conditions Where PractW Applies On any cleared, unvegetated, or sparsely vegetated soil surface where vegetative cover is needed for less than 1 year. Applications of this practice include diversions, dams, temporary sediment basins, temporary road banks, and topsoil stockpiles. Considerations Annual plants, which sprout and grow rapidly and survive for only one season, are suitable for establishing initial or temporary vegetative cover. Temporary seeding preserves the integrity of earthen sediment control structures such as dikes, diversions, and the banks of dams and sediment basins. It can also reduce the amount of maintenance associated with these devices. For example, the frequency of sediment basin cleanouts will be reduced if watershed areas, outside the active construction zone, are stabilized. Proper seedbed preparation, selection of appropriate species, and use of quality seed are as important in this Practice as in Practice 6.11, Permanent Seeding. Failure to follow established guidelines and recommendations carefully may result in an inadequate or short-lived stand of vegetation that will not control erosion. Temporary seeding provides protection for no more than 1 year, during which time permanent stabilization should be initiated. S tions Complete grading before preparing seedbeds, and install all necessary erosion control practices such as, dikes, waterways, and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during radio loosen them to a P 9 9 9. depth of 6-8 inches using a ripper, harrow, or chisel plow. SEEDBED PREPARATION Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose, and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming --Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the 6.10 6 rate of 1 to 1 1/2 tons/acre on coarse-textured soils and 2-3 tons/acre on fine -textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer --Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 Ib/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening --If recent tillage operations have resulted in a loose surface additional roughening not be 9 9 ma Y required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods. Groove or furrow slopes steeper than 3:1 on the contour before seeding(Practice 6.03, Surface Roughening). PLANT SELECTIN Select an appropriate species or species mixture from Table 6.10a for seeding in late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. In the Mountains, December and January seedings have poor chances of success. When it is necessary to plant at these times, use recommendations for fall and a securely tacked mulch. SEEDING Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hydroseeder. Use seeding rates given in Tables 6.10a -6.10c. Broadcast seeding and hydroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grasses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. MULCHING The use of an appropriate mulch will help ensure establishment under normal conditions, and is essential to seeding success under harsh site conditions (Practice 6.14, Mulching). Harsh site conditions include: seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), slopes steeper than 3:1, excessively hot or dry weather, adverse soils (shallow, rocky, or high in clay or sand), and areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching). 6.10.2 Practice ftrKW& and SpecIlImtbns Makftrlarim Reseed and mulch areas where seedling emergence is poor, or where erosion occurs, as soon as possible. Do not mow. Protect from traffic as much as possible. Site Preparation 6.03, Surface Roughening 6.04, Topsoiling Surface Stabilization 6.11, Permanent Seeding 6.14, Mulching Appendix 8.02, Vegetation Tables SPECIAL SLOPE SEEDING SLOPE PROTECTION SHALL REQUIRE IMMEDIATE STABILIZATION OF ALL DENOTED GRADED SLOPES IN ACCORDANCE WITH THE SEEDING SPECIFICATION. STABILIZATION AND SEEDING SHALL OCCUR IMMEDIATELY AFTER THE GRADING OF THE SLOPE. MULCH AND ANCHOR SHALL BE APPLIED AT THE RATE SPECIFIED. SURFACE ROUGHENING FOR CUTS, FILLS, AND GRADED SLOPES MAKE MOWED SLOPES NO STEEPER THAN 2:1 UNLESS INDICATED ROUGHEN THESE AREAS TO SHALLOW GROOVES BY NORMAL TILLING, DISKING, HARROWING, OR USE OF CULTIPACKER-SEEDER MAKE THE FINAL PASS OF ANY SUCH TILLAGE IMPLEMENT ON THE CONTOUR. MAKE GROOVES FORMED BY SUCH IMPLEMENTS CLOSE TOGETHER (LESS THAN 10 INCHES) AND NOT LESS THAN 1 INCH DEEP. ROUGHENING WITH TRACKED MACHINERY LIMIT ROUGHENING WITH TRACKED MACHINERY TO SANDY SOILS TO AVOID UNDUE COMPACTION OF THE SOIL SURFACE. OPERATE TRACKED MACHINERY UP AND DOWN THE SLOPE TO LEAVE HORIZONTAL DEPRESSIONS IN THE SOIL DO NOT BACK -BLADE DURING THE FINAL GRADING OPERATION. SEEDING - IMMEDIATELY SEED, AND MULCH, AND ANCHOR ROUGHENED AREAS TO OBTAIN OPTIMUM SEED GERMINATION AND GROWTH. PERIODICALLY CHECK THE SEEDED SLOPES FOR RILLS AND WASHES. FILL THESE AREAS SLIGHTLY ABOVE THE ORIGIANL GRADE, THEN RESEED AND MULCH AS SOON AS POSSIBLE. AM Ni Stormwater Discharge Permit for Construction Activities (NCG01) NCDENR/Division of Water Quality NEW STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS FILL SLOPE Perimeter dikes, swales, ditches, slopes 7 days None High Quality Water (HQWi Zones 7 days None SIa es steeper than 3:1 P P 7 days If slopes are 10' or less in length and are 4„IFF & 4" FORWARD ALONG not � Y steeper than 2:9 14 days are allowed. P Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. TYPICAL STABILIZATION TIMEFRAMES NOT TO SCALE SEEDBED PREPARATIONS 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL MINIMUM 4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A DEPTH OF 6 INCHES. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER DEBRIS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURE LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. (SEE BELOW*) 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING. ANCHOR MULCH AGAINST WIND. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS DURING PLANTING SEASON IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, RE-ESTABLISH FOLOWING ORIGINAL LIME, FERTILIZER, AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENENCE TREATMENT AND FERTILIZER AFTER PERMANENT COVER IS ESTABLISHED. * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) FERTILIZER - 1,000 LBSJACRE OF 10-10-10 SUPERPHOSPHATE - 500 LBSJACRE AT 20% ANALYSIS MULCH - 2 TONS/ACRE OF SMALL GRAIN STRAW ANCHOR - ASPHALT EMULSION AT 0.1 GAL/SY (10 GAL/SQ. FT.) 5 SedimSnt Fence $F XX _ Deflnldon VARIES 8' MAX. STAY WIRES MIN. _ 14 GAUGE ELEVATION STEEL POST Dewberry"10 Section 6.62 '�18:;�' Lu T-0" MIN. WIDTH co FILTER FABRIC q FILL SLOPE Ch o In cV GROUND LINE 0 ANCHOR FILTER `14I FABRIC MIN. 8" DEEP 4„IFF & 4" FORWARD ALONG THETRENCH SECTION Dewberry"10 Section 6.62 '�18:;�' Lu U) Dewberry Engineers Inc. �D C 551 PINEY FOREST ROAD Lu DANVILLE, VA 24540 z PHONE: 434.797.4497 J g FAX: 434.797.4341 NCBELS # F-0929 GENERAL NOTES: 1. SILT FENCE SHALL BE INSTALLED OUTSIDE TOE OF EARTHFILL EMBANKMENTS. MAY ALSO BE INSTALLED AROUND ALL STORM DRAIN INLETS, & MANHOLES AS DIRECTED. 2. WIRE SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL HAVE A MAXIMUM MESH SPACING OF 6". 3. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED SECURELY TO THE WIRE. 4. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF SELF -FASTENER ANGLE STEEL TYPE. NOTE: THE FILTER FABRIC SHALL MEET THE FOLLOWING REQUIREMENTS: A) EOS IS NOT LARGER THAN U.S. STANDARD SIEVE NO.30 B) GRAB STRENGTH 90-120 LB MAINTENANCE: 1. INSPECT SILT FENCE ONCE PER WEEK AND AFTER EVERY RAINFALL. 2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR ANY DAMAGE TO FENCE. SILTFENCE SILTFENCE TOP VIEW DITCHLINE TURNOUT DETAIL N.T.S. 1. NOTE: STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR EROSION CONTROL PURPOSES. 2. SEDIMENT CONTROL STONE SHALL BE NO.5 OR NO. 57 STONE. SEEDING SCHEDULE IN PIEDMONT AREAS SILTFENCE SILTFENCE 1. LIME, SEED AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF MATERIALS TO BE APPLIED PER ACRE: TEMPORARY SEEDING FERTILIZER TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE STRAW MULCH DATE RYE (GRAIN) 120 LBSJACRE 750 LBSJACRE 2000 LBSJACRE 4000 LBSJACRE JAN. 1 - MAY 1 KOBE LESPEDEZA * 50 LBSJACRE GERMAN MILLET ** 40 LBS./ACRE 750 LBSJACRE 2000 LBSJACRE 4000 LBSJACRE MAY 1 - AUG. 15 RYE (GRAIN) 120 LBSJACRE 1000 LBSJACRE 2000 LBSJACRE 4000 LBS./ACRE AUG. 15 - DEC. 30 PERMANENT SEEDING FERTILIZER *** TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE *** STRAW MULCH DATE TALL FESCUE 200 LBSJACRE 1000 LBSJACRE 4000 LBSJACRE 6000 LBSJACRE AUG. 20 -OCT. 25 KOBE LESPEDEZA 20 LBSJACRE FEB. 1 -APR. 15 SERICEA LESPEDEZA 60 LBS./ACRE * OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. ** A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBS/ACRE. *** QUANITIY OF FERTILIZER AND LIME SHALL BE CONFIRMED BY SOILS TEST. 2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. 3. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. 4. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. 5. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. 6. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN UNDISTURBED FOR MORE THAN FIFTEEN (15) WORKING DAYS OR THIRTY (30) CALENDAR DAYS, WHICHEVER IS LESS. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS OF ESTABLISHING FINAL GRADES. PROVIDE PERMANENT SEEDING WITHIN FIFTEEN (15) WORKING DAYS OR SIXTY (60) CALENDAR DAYS, WHICHEVER IS LESS, OF ESTABLISHING FINAL GRADES. SLOPES SHALL BE SEEDED WITHIN TWENTY-ONE (21) CALENDAR DAYS. 7. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION. 8. CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. U a z UJ J Z J Z Z <�W� w �0 w�a� Q o� 3Z 3: = oQ o Z o .•••••o`��� SEAL KEY PLAN SCALE CAR 0Z OSEAL ESS/pN 17502 ,,•�i • F*� �O; AS NOTED No. I DATE I BY I Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE EROSION AN D SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C20 7 • DITCHLINE TURNOUT DETAIL N.T.S. 1. NOTE: STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR EROSION CONTROL PURPOSES. 2. SEDIMENT CONTROL STONE SHALL BE NO.5 OR NO. 57 STONE. SEEDING SCHEDULE IN PIEDMONT AREAS SILTFENCE SILTFENCE 1. LIME, SEED AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF MATERIALS TO BE APPLIED PER ACRE: TEMPORARY SEEDING FERTILIZER TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE STRAW MULCH DATE RYE (GRAIN) 120 LBSJACRE 750 LBSJACRE 2000 LBSJACRE 4000 LBSJACRE JAN. 1 - MAY 1 KOBE LESPEDEZA * 50 LBSJACRE GERMAN MILLET ** 40 LBS./ACRE 750 LBSJACRE 2000 LBSJACRE 4000 LBSJACRE MAY 1 - AUG. 15 RYE (GRAIN) 120 LBSJACRE 1000 LBSJACRE 2000 LBSJACRE 4000 LBS./ACRE AUG. 15 - DEC. 30 PERMANENT SEEDING FERTILIZER *** TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE *** STRAW MULCH DATE TALL FESCUE 200 LBSJACRE 1000 LBSJACRE 4000 LBSJACRE 6000 LBSJACRE AUG. 20 -OCT. 25 KOBE LESPEDEZA 20 LBSJACRE FEB. 1 -APR. 15 SERICEA LESPEDEZA 60 LBS./ACRE * OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. ** A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBS/ACRE. *** QUANITIY OF FERTILIZER AND LIME SHALL BE CONFIRMED BY SOILS TEST. 2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. 3. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. 4. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. 5. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. 6. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS AFTER CLEARING AND GRUBBING OPERATION IF THE AREA IS TO REMAIN UNDISTURBED FOR MORE THAN FIFTEEN (15) WORKING DAYS OR THIRTY (30) CALENDAR DAYS, WHICHEVER IS LESS. PROVIDE TEMPORARY SEEDING WITHIN SEVENTY-TWO (72) HOURS OF ESTABLISHING FINAL GRADES. PROVIDE PERMANENT SEEDING WITHIN FIFTEEN (15) WORKING DAYS OR SIXTY (60) CALENDAR DAYS, WHICHEVER IS LESS, OF ESTABLISHING FINAL GRADES. SLOPES SHALL BE SEEDED WITHIN TWENTY-ONE (21) CALENDAR DAYS. 7. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION. 8. CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. U a z UJ J Z J Z Z <�W� w �0 w�a� Q o� 3Z 3: = oQ o Z o .•••••o`��� SEAL KEY PLAN SCALE CAR 0Z OSEAL ESS/pN 17502 ,,•�i • F*� �O; AS NOTED No. I DATE I BY I Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE EROSION AN D SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C20 7 E C Rolled erosion Control Products ORECIF"o Section 6.17 Definition Rolled erosion control products are manufactured or fabricated into rolls designed to reduce soil erosion and assist in the growth, establishment and protection of vegetation. Examples of RECP's are blankets, nets, and matting. Purpose Erosion control mats and blankets are intended to protect soil and hold seed and mulch in place on slopes and in channels so that vegetation can become well established. Turf reinforcement mats can be used to permanently reinforce grass in drainage ways during high flows. Nets are made of high tensile material woven into an open net which overlays mulch materials. Blankets are made of interlocking fibers, typically held together by a biodegradable or photodegradable netting (for example, excelsior or straw blankets). They generally have lower tensile strength than nets, but cover the ground more completely. Coir (coconut fiber) fabric comes as both nets and blankets. Conditions Where Practice Applies Rolled Erosion Control Products (RECP's) should be used to aid permanent vegetated stabilization of slopes 2:1 or greater and with more than 10 feet of vertical relief. RECP's should also be used when mulch cannot be adequately tacked and where immediate ground cover is required to prevent erosion damage. RECP's should be used to aid in permanent stabilization of vegetated channels when runoff velocity will exceed 2 ft/sec on bare earth during the 2 -year rainfall event that produces peak runoff. The product selected must have a permissible shear stress that exceeds the shear stress of the design runoff event. Maintenance 1. Inspect Rolled Erosion Control Products at least weekly and after each significant P Y 9 (1/2 inch or greater) rain fall event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover as established. IN CHANNELS OR SLOPES, ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH. 18" OVERLAP ANCHOR NETTING JOIN STRIPS BY ANCHORING IN A 6" TRENCH. AND OVERLAPPING. MAINTENANCE REQUIREMENTS: 1. CONTRACTOR SHALL INSPECT MULCHES PERIODICALLY, AND AFTER RAINSTORMS CHECK FOR RILL EROSION. WHERE EROSION IS OBSERVED, APPLYADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR SLOPE GRADE, RESEED, AND REINSTALL MULCH AND JUTE MATTING. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. D. ..:....7777-77 ....------------ z B. A. C. 01 Af'E: C-rAMI EC B 10.5" TYPICAL STAPLES NTS C� DETAIL FOR STABILIZING CHANNEL WITH EXCELSIOR MAT NOTES: NTS A. BURY THE TOP END OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. B. TAMP THE TRENCH FULL OF SOIL. SECURE WITH A ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. C. OVERLAP -BURY UPPER END OF LOWER STRIP AS IN "A" AND "B". OVERLAP END OF TOP STRIP 4" AND STAPLE. D. EROSION STOP -FOLD OF MAT BURIED IN SILT TRENCH AND TAMPED, DOUBLE ROW OF STAPLES. i 2 CHECK DAM CD DEFINITION SMALL TEMPORARY STONE DAMS CONSTRUCTED ACROSS A DRAINAGEWAY. PURPOSE TO REDUCE EROSION IN A DRAINAGE CHANNEL BY RESTRICTING THE VELOCITY OF FLOW IN THE CHANNEL. CONDITIONS WHERE THIS PRACTICE MAY BE USED AS A TEMPORARY OR EMERGENCY PRACTICE APPLIES MEASURE TO LIMIT EROSION BY REDUCING FLOW IN SMALL OPEN CHANNELS. LIMIT DRAINAGE TO 2 ACRES OR LESS. DO NOT USE CHECK DAMS IN LIVE STREAMS. CONSTRUCTION 1. PLACE STONE AT THE LOCATION SHOWN ON THE PLAN ON A FILTER SPECIFICATIONS FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FT. BEYOND THE DITCH BANKS (FIG. 6.83b) TO KEEP OVERFLOW WATER FROM UNDERCUTTING THE DAM AS IT RE-ENTERS THE CHANNEL. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL DOWNSTREAM FROM THE LOWEST CHECK DAM, CONSIDERING THAT WATER WILL FLOW OVER AND AROUND THE DAM. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT CHANNEL APPURTENANCES, SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS INSTALLING A PROTECTIVE RIP RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 3 PLAN VIEW 9" MINIMUM 1.5' MIN. FILTER FABRIC #57 WASHED STONE NOTES: CROSS-SECTION VIEW 1. ROCK CHECK DAMS SHALL BE INSTALLED IN DITCH LINES IMMEDIATELY BELOW DISTURBED AREAS. 2. HEIGHT AND WIDTH DETERMINED BY EXISTING TOPOGRAPHY. 3. KEY RIP RAP INTO THE DAM FOR STABILIZATION. AM Temporary Gravel ConstPlJCtion Entrance/Exit C'E Section 6.06 Definition A graveled area or pad located at points where vehicles enter and leave a construction site. AT Purpose NTER To providea buffer area where vehicles can drop their NTE mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Practice Applies Wherever traffic will be leaving a construction site and moving directly onto a public road or other paved off-site area. Construction plans should limit traffic to properly constructed entrances. Design Criteria Aggregate Size --Use 2-3 inch washed stone. Dimensions of gravel pad -- Thickness: 6 inches minimum Width: 12 -feet minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50 -feet minimum Location --Locate construction entrances and exits to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. 6.06.1 t 50' NIN. TYPICAL CHECK DAM DETAIL (TEMPORARY) N.T.S. CROSS SECTION SEE INSETS A AND B I I CHANNEL BOTTOM WIDTH CLASS B RIPRAP PLAN VIEW NOTES: o� o>)0o ' OO O O FZ2 �= 1. USE MINIMUM 12 INCH. DIAMETER Constnic ion specificatkms EXCELSIOR WATTLE. 1. Clear the area of all debris that might hinder excavation 2. USE 2 FT. WOODEN STAKES WITH A 2 IN. 2. Install the Class B or Class I riprap in a semi -circle NOMINAL CROSS SECTION. around the pipe inlet. The stone should be built up higher on 3. ONLY INSTALL WATTLE TO A HEIGHT IN crest width of the riprap should be 3 feet, with a minimum DITCH SO FLOW WILL NOT WASH AROUND bottom width of 11 feet. The minimum height should be 2 THE WATTLE AND SCOUR DITCH SLOPES AND embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should AS DIRECTED. be placed on the outside slope of the riprap. 4. The Y Y sediment storage area should be excavated around the 4. INSTALL A MINIMUM OF 2 UP SLOPE STAKES m grade. AND 4 DOWN SLOPE STAKES AT AN ANGLE STAKESSTAPLES TO WEDGE WATTLE TO BOTTOM OF DITCH. INSET A INSET B 5. PROVIDE STAPLES OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT and after each significant (% inch or greater) rainfall event LESS THAN 12 IN. IN LENGTH. and repair immediately. Remove sediment and restore the 6. INSTALL STAPLES APPROXIMATELY EVERY 1 sediment has accumulated to one-half the design depth of LINEAR FOOT ON BOTH SIDES OF WATTLE the trap. Place the sediment that is removed in the AND AT EACH END TO SECURE IT TO THE of the gravel facing. Check the structure for damage. Any SOIL. TYPICAL WATTLE DETAIL (TEMPORARY) NOT TO SCALE STEP SEQUENCE rem )I W, 7 * - K1 I FILTER CLOTH- C MMIN.I SIDE ELEVATION EXISTING PAVEMENT 5:1 1 Washing --If conditions at the site are such that most of the mud and sediment are not removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade It. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 -inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. References Runoff Conveyance Measures 6.30, Grass -lined Channels Sediment Traps and Barriers 6.60, Temporary Sediment Trap 6.06.2 TYPICAL INLET/OUTLET PROTECTION NOTE: 1. FOR OUTLET TYPE "B", PLACE RIP -RAP FROM TOP OF BANK TO TOP OF BANK IN RECEIVING CHANNEL. NOT TO SCALE TENT �o oCJO�o� no O ASO°U v O°O v O OOO DIP Qo(3 OOU Oc O p� 0�0 000 CHANNEL 3Do po 0�Qp0�0 W BOTTOM oOb V9-)0( 00 O00 X00 (°0 0° °o u PLANPLANYQ ° �° a goo o�°go0 �'`O�O La� VOA UV VOA W d SECTION O C1�0r0 O n�,�O� "FILTER LAYER -FILTER FABRIC OR 6" "5 WASHED STONE TYPE A - PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL FABRIC OR 6" #5 WASHED STONE TYPE B - PIPE OUTLET TO DEFINED CHANNEL RIPRAP OUTLET PROTECTION: ADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL SHALL BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER SHALL CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE AS SPECIFIED IN THE SCHEDULE. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES ONCE PER WEEK AND AFTER EACH RAINFALL EVENT (1/2 INCH OR GREATER) TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. 5 Rock Pipe Inlet Proteotlon CIP - DefiMtlon A horseshoe shaped rock dam structure at a pipe inlet with a sediment storage area around the outside perimeter of the structure. d Topreventsediment from entering, accumulating in and being transferred by a culvert or storm drainage system prior to stabilization of the disturbed drainage area. This practice allows early use of the storm drainage system. Conditlons Where PMC*M Applies Rock pipe inlet protection may be used at pipes with a maximum diameter of 36 inches. This inlet protection may be used to supplement additional sediment traps or basins at the pipe outlet, or used in combination with an excavated sediment storage area to serve as a temporary sediment trap. Pipe inlet protection should be provided to protect the storm drainage system and downstream areas from sedimentation until permanent stabilization of the disturbed drainage area. Do not install this measure in an intermittent or perennial stream. Plaming Conekleratkm8 When construction on a project reaches a stage where culverts and other storm drainage structures are installed and many areas are brought to the desired grade, there is a need to protect the points where runoff can leave the site through culverts or storm drains. Similar to drop and curb inlets, culverts receiving runoff from disturbed areas can convey large amounts of sediment to lakes or streams. Even if the pipe discharges into a sediment trap or basin, the pipe ttorr� pipe system itself may clog with sediment. piI om When used in combination with an excavated sediment storage area to serve as a temporary sediment trap, the design criteria for temporary sediment traps must be satisfied. The maximum drainage area should be 5 acres, and 3600 cubic feet of sediment storage per acre of disturbed drainage area should be provided. The minimum stone height should be 2 feet, with side slopes no steeper than 2:1. The stone "horseshoe" around the pipe inlet should be constructed of Class B or Class I riprap, with a minimum crest width of 3 feet. The outside face of the riprap should be coved with a 12 -inch thick layer of #5 or #57 washed stone. In preparing plans for rock pipe inlet protection, it is important to protect the embankment over the pipe from overtopping. The top of the stone should be a minimum of 1 foot below the top of the fill over the pipe. The stone should tie into the fill on both sides of the pipe. The inside toe of the stone should be no closer than 2 feet from the culvert opening to allow passage of high flows. The sediment storage area should be excavated upstream of the rock pipe inlet protection, with a minimum depth of 18 inches below grade. Section 6.55 CLASS B RIPRAP RIPRAP AREAS TO BE DISTURBED PIPE INVERT (CUT, FILLED, ETC.) CLASS B RIPRAP 1' 1--aw- 2' T o� o>)0o ' OO O O FZ2 �= g <D OOOOOpOOOO OOO �L)n HEADWALL Filter Berm NC DOT #5 or #57 washed stone INVERT OF PIPE RIPRAP HEADWALL 1' MIN. HEIGHT FROM ROAD SHOULDER C NATURAL GROUND �.:_:,. Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U a z � J Z J Z Z � �W� w �0 w�a� Q o� oQ o Z o SEAL KEY PLAN SCALE �Q�oFESS/pNk_ . SEAL 17502 *G Pio; AS NOTED No. I DATE I BY I Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE EROSION AN D SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C21 7 CLASS B RIPRAP NCDOT #5 OR #57 WASHED STONE Figure 6.55, Rock pipe inlet protection plan view and cross-section view Constnic ion specificatkms 1. Clear the area of all debris that might hinder excavation and disposal of spoil. 2. Install the Class B or Class I riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 11 feet. The minimum height should be 2 feet, but also 1 foot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4. The Y Y sediment storage area should be excavated around the m outside of the stone horseshoe 18 inches below natural m grade. ILL ILL 00 5. When the contributing drainage area has been stabilized, fill depression and establish final grading elevations, compact 0 0 area properly, and stabilize with ground cover. Maintenance Inspect rock pipe inlet protection at least weekly and after each significant (% inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). Referenim Inlet protection 6.52, Block and Gravel Inlet Protection (Temporary) Sediment Trap and Barriers 6.60, Temporary Sediment Trap Surface Stabilization 6.15, Riprap North Carolina Department of Transportation Erosion & Sedimentation Guidelines for Division Maintenance Operation, 1993. Virginia Erosion and Sediment Control Handbook. 1992. STD & SPEC 3.08, Culvert Inlet Protection. pages III -46 - III -51 (Culvert Inlets Sediment Trap). �.:_:,. Dewberry Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 U a z � J Z J Z Z � �W� w �0 w�a� Q o� oQ o Z o SEAL KEY PLAN SCALE �Q�oFESS/pNk_ . SEAL 17502 *G Pio; AS NOTED No. I DATE I BY I Description REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE MWC RSE LAB APRIL, 2019 TITLE EROSION AN D SEDIMENT CONTROL DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C21 7 E C Ck 1 STD & SPEC 3.25 UTILITY STREAM CROSSING USC NOTE: FOR STREAMS LESS THAN 10' WIDE, CONTRACTOR SHALL USE THE FLUME CROSSING METHOD. FOR STREAMS GREATER THAN 10' IN WIDTH, CONTRACTOR SHALL USE THE COFFERDAM METHOD. REF. EROSION SEDIMENT CONTROL HANDBOOK SECTION 3.25. FLUME PIPE CROSSING 1. CONSTRUCTION SHALL LAST LESS THAN 72 HOURS. 2. THE FLUME PIPE CROSSING MUST BE MADE OPERATIONAL PRIOR TO THE START OF CONSTRUCTIONJ. 3. THE MATERIALS USED (CULVERT(S), STONE AND FILTER FABRIC MUST MEET THE PHYSICAL CONSTRAINTS OF THOSE USED IN VEHICULAR STREAM CROSSING, STD. & SPEC. 3.24 4. A LARGE FLUME PIPE (OR CULVERT) OF AN ADEQUATE SIZE TO SUPPORT NORMAL WATER CHANNEL FLOW (SEE TABLE 3.24-A) SHALL THEN BE INSTALLED IN THE STREAM BED ACROSS THE PORPOSED PIPE LINE TRENCH CENTERLINE. NCDOT #1 COARSE AGGREGATE (MIN. SIZE) OR RIP -RAP SHALL BE PLACED CLOSE TO EACH END OF THE FLUME PIPE SO AS TO DAM OFF THE CREEK FORCING THE WATER TO FLOW THROUGH THE FLUME PIPE (SEE PLATE 3.25-3. 5. THE ENTRAPPED WATER CAN THEN BE PUMPED FROM THE CREEK WITHIN THE DAMMED OFF AREAAND IN THE PROPOESD TRENCH CENTERLINE INTO AN APPROVED DEWATERING STRUCTURE (SEE STD. & SPEC.3.26). THE TRENCH CAN THEN BE DUG UNDER THE FLUME PIPE. AFTER PIPE SECTIONS ARE INSTALLED, THE DITCH WILL BE BACKFILLED AND RESTABLIZATION SHALL BE CARRIED OUT. 6. RESTABILZATION SHALL CONSIST OF THE INSTALLATION OF UNDERGROUND RIP -RAP ON ALL DISTURBED STREAMBANK AREAS (OR ON THE AREA 6 FEET ON BOTH SIDES OF THE CENTERLINE OF THE UTILITY TRENCH, WHICHEVER IS GREATER) WITH SLOPES OF 3:1 OR GREATER. REFER TO STD. & SPEC. 3.19, RIPRAP, FOR INSTALLATION REQUIREMENTS. FOR SLOPES OF 3:1 OR LESS, VEGETATIVE STABILIZATION MAY BE USED, PENDING APPROVAL BY THE PLAN -APPROVING AUTHORITY OR INSPECTION AUTHORITY. STABILIZATION OF IT'S STREAMBED AND BANKS AND THE APPROACH AREAS SHOULD OCCUR IMMEDIATELY FOLLOWING THE ATTAINMENT OF FINAL GRADE. 7. AFTER COMPLETION OF BACKFILLING OPERATION AND RESTORATION OF THE STREAM/CREEK BANKS AND LEVELING OF STREAM BED, THE FLUME PIPE CAN THAN BE REMOVED. THE GRAVEL CAN BE REMOVED OR SPREAD IN THE STREAM BED DEPENDING ON PERMIT REQUIREMENTS. SEDIMENT CONTROL IN APPROACH AREAS SHALL NOT BE REMOVED UNTIL ALL CONSTRUCTION IS COMPLETED IN STREAM/CREEK CROSSING AREA. ALL GROUND CONTOURS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION. FLUME PIPE CR 0 S SING B EROSION CONTROL B MEASURES TO BE LOCATED BELOW APPROACH ARIAS R •o: ,. •b• •v e.� -,, a TEMPORARY SEEDING RECOMMENDATIONS •d SPECIES 1/2 W AUG. 15 - DEC. 31 RYE (GRAIN) (MIN. WATER FLOW FLUME 120 PIPE FLOW APR. 15 - AUG. 15 GERMAN MILLET 40 INDIAN GRASS (D) TRENCHLINE e.� -,, a TEMPORARY SEEDING RECOMMENDATIONS •d SPECIES 1/2 W AUG. 15 - DEC. 31 PLAN VIEW CJN I EXWM M13M SECTION "A -A" EXCAVATED TRENCH A EROSION CONTROL MEASURES TO BE LOCATED BELOW APPROACH AREAS 2 3 GENERAL CONSTRUCTION NOTES: 1. GRADING OF THE STREAM BANK SHALL BE CONDUCTED ABOVE THE NORMAL FLOW ELEVATION, WHICH ASSURES NO DISTURBANCE AT OR BENEATH WATER LEVEL. 2. ANY DEPOSITION OF EXCAVATED MATERIALS IN UPLAND AREAS AND ALL EARTHWORK OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER AS TO PREVENT THE EROSION OF THESE MATERIALS AND PRECLUDE THEIR ENTRY INTO STATE WATERS. RESTORED STREAMS SHALL BE PROTECTED FROM SEDIMENTATION FROM DISTURBED BANKS BY THE INSTALLATION OF SILT FENCING OR TEMPORARY EARTHEN BERMS WITH ROCK CHECK OUTLETS ALONG THE TOE OF THE BANK SLOPE ABOVE NORMAL WATER FLOW LEVEL. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE PRIOR TO CLEARING AND GRADING AND SHALL BE MAINTAINED IN GOOD WORKING ORDER TO MINIMIZE IMPACTS TO STATE WATERS IN ACCORDANCE WITH THE CURRENT EDITION OF THE "VIRGINIA EROSION AND SEDIMENTATION HANDBOOK. BANKS SHALL BE IMMEDIATELY STABILIZED PER PLANTING REQUIREMENTS AND SPECIFICATIONS INDICATED ON THESE PLANS. 3. STREAM BANKS TO BE RESTORED SHALL BE GRADED AS SHOWN ON PLANS. 4. EXCAVATION EQUIPMENT WILL AVOID WORKING WITHIN THE STREAM. WHEN THE NEED IS UNAVOIDABLE, DIVERSION DIKES, PORTABLE DAMS AND PUMPS WILL BE UTILIZED. NO EXCAVATION EQUIPMENT WILL BE ALLOWED TO OPERATE WITHIN A FLOWING (LIVE) STREAM. 5. TRENCHES SHALL REMAIN OPEN ONLY DURING WORKING HOURS. TRENCHES WILL NOT BE LEFT OPEN OVER NIGHT 6. A MINIMUM OF THE TOP 6 INCHES OF A TRENCH IN WETLAND AREAS SHALL BE BACKFILLED WITH TOPSOIL FROM THE TRENCH. 7. TIMBER CONSTRUCTION MATS SHALL BE USED FOR OPERATING EQUIPMENT IN WETLAND AREAS TO MINIMIZE COMPACTION. 8. RESTORATION AND SEEDING SHALL BE IMPLEMENTED PER THE PLANTING NOTES AND TABLES ON THIS SHEET. 9. WHILE CROSSING CASCADE CREEK, THE STREAM MAY BE CROSSED UTILIZING A COFFERDAM AND MODIFIED PUMP AROUND OF MAIN CHANNEL. CONTRACTOR SHALL UTILIZE SUMP PUMP WITH A SCREEN ON THE INTAKE HOSE. DISCHARGE HOSE 1' 1' Note: Construct depression with TO CHECK DAM 1 1' base 1' (min) wider than silt bag. SILT BAG TOP VIEW TO CHECK DAM 6" (min) LEVEL GROUND SILT BAG PROFILE VIEW Note: Fill and seed the silt bag depression when pump around operation is completed. SOURCE: Va. DSWC PLATE. 3.25-3 COFFERDAM UTILITY CROSSING 1. CONSTRUCTION SHALL BE PERFORMED IN LOW FLOW PERIODS. 2. CROSSING SHALL BE ACCOMPLISHED IN A MANNER THAT WILL NOT PROHIBIT THE FLOW OF THE STREAM. 3. AS WITH ALL UTILITY LINE CROSSINGS, APPROACH AREAS MUST BE CONTROLLED WITH MEASURES SUCH AS SILT FENCE OR STRAW BALES. 4. REMOVE LARGE ROCKS, WOODY VEGETATION, OR OTHER MATERIAL FROM THE STREAMBED AND BANKS THAT MAY GET IN THE WAY OF PLACING THE RIP -RAP, SANDBAGS, SHEET METAL PILINGS, OR WOOD PLANKS OR INSTALLING THE UTILITY PIPE OR LINE. 5. FORM A COFFERDAM BY PLACING THE RIP -RAP (OR OTHER NON -ERODIBLE MATERIALS) IN A SEMICIRCLE ALONG THE SIDE OF THE STREAM IN WHICH THE UTILITY INSTALLATION WILL BEGIN. IT MUST BE SURROUNDED AND UNDERLAIN WITH FILTER CLOTH AS SHOWN IN PLATE 3.25-4. THE HEIGHT OF AND AREA WITHIN THE DAM WILL DEPEND UPON THE SIZE OF THE WORK AREA AND THE AMOUNT OF STREAM FLOW IS SUCCESSFULLY DIVERTED BY THE COFFERDAM, DEWATER THE WORK AREA AND STABILIZE IT WITH AGGREGATE (NCDOT #57 OR #68 COARSE AGGREGATE) OR SAND. MAKE SURE TO DISCHARGE THE WATER INTO A SEDIMENT TRAPPING DEVICE (SEE DEWATERING STRUCTURE, STD. & SPEC. 3.26). 6. INSTALL THE UTILITY PIPE OR LINE IN HALF THE STREAMBED AS NOTED IN PLATE 3.25-4. REMOVE THE RIP -RAP OR OTHER MATERIALS AND BEGIN PLACING THEM ON THE OTHER SIDE OF THE STREAM. PEI C01 * (o MINII BE 25% OF TOTAL WIDTH (W) OF THE STREAM. COFFERDAM CROSSING TEMPORARY SEEDING RECOMMENDATIONS EXISTING STREAM WIDTH SPECIES 1/2 W AUG. 15 - DEC. 31 RYE (GRAIN) (MIN. JAN. 1 - APR. 15 RIPRAP OR OTHER 120 NON- ERODIBLE A MATERIAL APR. 15 - AUG. 15 GERMAN MILLET 40 INDIAN GRASS (D) TRENCHLINE RIVER OATS 5 PANCIUM CLANDESTINUM DEERTONGUE AGGREGATE OR FLOW SAND A FILTER CLOTH PLAN DEWATERING DEVICE SEE STD. & SPEC. 3.26 SECTION A -A TRENCHLINE i PLATE. 3.25-4 DISCHARGE HOSE LEVEL GROUND APPROVED DEWATERING DEVICE (SILT BAG) OR DISCHARGE TO TEMPORARY SEDIMENT TRAP DISCHARGE HOSES TO CHECK DAM DEWATERING PUMP P FLOW INTAKE HOSE CLEAN WATER DIKE •1;FFAMFNT DIKE .. .. .. .. . . WORK AREA LENGTH NOT TO EXCEED PUMPS SHOULD DISCHARGE THAT WHICH CAN BE ONTO A STABLE VELOCITY COMPLETED IN ONE DAY IMPERVIOUS SHEETING DISSIPATOR MADE OF RIP RAP OR SANDBAGS BASE FLOW+ 1 FOOT PLAN VIEW WORK AREA (2 FOOT MIN.) NOTE: ESTIMATED MINIMUM PUMP SIZE NEEDED FOR BASE FLOW IS 2" PUMP. CONTRACTOR IS RESPONSIBLE FOR SIZING SECTION A -A PUMP AND MAINTAINING WORK "IN THE DRY". CROSS SECTION OF SANDBAG DIKE NOTE: CONTRACTOR MAY UTILIZE A PORTABLE DAM IN LIEU OF SAND BAGS IF DESIRED. TEMPORARY PUMP AROUND N.T.S. CABLE TIES 12' 12"X12" TIMBER CONNECTIONS I- 12" MAX. T TIMBER MATTING DETAIL NOT TO SCALE 0 6" RIP -RAP CLASS 1 ROCK TO BE KEYED OR PUSHED INTO BANK 3-0" STREAM DIVERSION PUMPS (ALT. - USE THROUGH DIKE GRAVITY PIPING IN LIEU OF PUMP.) INTAKE HOSE FLOW SUMP -HOLE OR POOL (12" to 18" DEEP 2' DIA.) TOP OF E 7/777777, TOP MINIMUM THICKNESS AT TOP -18" STREAM BED SLOPE NOT TO EXCEED 1-1/2:1 \_ STABLE GRADE \ MINIMUM THICKNESS AT 3-0" BOTTOM - 2'-0" MIN. S RIP -RAP PLACEMENT DETAIL NOT TO SCALE NOTES: BIODEGRADABLE EROSION BLANKET 1. BRING THE MATERIAL TO THE STREAM BANKS EDGE BEFORE TERMINATING THE INSTALLATION DETAIL INSTALLATION. TURN THE END UNDER 4" AND STAKE AT 12" INTERVALS. 2. CONTRACTOR SHALL SEED BEFORE EROSION CONTROL BLANKET IS PUT IN PLACE N.T.S. 'L DOWEL PLACE 4 5 PLANTING NARRATIVE THE FIRST STEP OF THIS PLAN INVOLVES THE TEMPORARY SEEDING OF ALL DISTURBED AREAS FOR THE PURPOSE OF PROVIDING A QUICK MEANS OF EROSION AND SEDIMENT CONTROL FOR THE ENTIRE SITE. SEE THE SECTION TITLED "SEEDING" ON THIS SHEET FOR TEMPORARY SEEDING SPECIFICATIONS. BECAUSE THE TEMPORARY SEEDING TYPICALLY ONLY LASTS ONE SEASON, IT IS NECESSARY TO APPLY PERMANENT SEEDING BEFORE THE END OF THE FIRST SEASON. THE PERMANENT SEEDING PROVIDES A MORE PERMANENT VEGETATIVE LAYER OVER ALL DISTURBED AREAS FOR EROSION & SEDIMENT CONTROL PURPOSES AND FOR THE BENEFIT OF HABITAT. REFER TO THE SECTION TITLED "SEEDING" BELOW FOR PERMANENT SEEDING SPECIFICATIONS. THE SEED MIX SPECIFIED WAS CHOSEN TO SPECIFICALLY ADDRESS BOTH EROSION CONTROL AND HABITAT GOALS. SEEDING 1. TEMPORARY SEEDING. A TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING PLANTS. SELECT PLANTS APPROPRIATE TO THE SEASON FROM TABLE 6.10A -C LISTED ON THIS SHEET. THE SEED MIX WAS OBTAINED FROM THE "NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" FOR THE PIEDMONT REGION. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH POLYMER OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. APPLY 2DOO LBS/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE 10-10-10 FERTILIZER. TABLE 6.10A, 6108 & 6.10C TEMPORARY SEEDING RECOMMENDATIONS PLANTING DATES SPECIES RATE US./ACRE) AUG. 15 - DEC. 31 RYE (GRAIN) 120 JAN. 1 - APR. 15 RYE (GRAIN) 120 WOOLGRASS ANNUAL LESPEDEZA (KOBE) 50 APR. 15 - AUG. 15 GERMAN MILLET 40 * USE WINTER AND SUMMER MIX DUE TO TIME OF YEAR. PERMANENT SEEDING 2. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN THE SEEDING TABLE BELOW. THE SELECTED SEED MIX IS BASED ON THE EXISTING CONDITIONS AND TAKES INTO CONSIDERATION SUN/SHADE TOLERANCE AND HYDROLOGIC TOLERANCE. NOTE THAT THIS MIXTURE IS THE PREFERRED SEED MIX OF SPECIES. IF ANY OF THESE SPECIES ARE NOT AVAILABLE FOR ANY REASON, CONTACT THE RESIDENT ENGINEER FOR SUBSTITUTE SPECIES. SEED MIX RATE SHALL BE 75 POUNDS PER ACRE. APPLY 300 LBS/ACRE 10-10-10 FERTILIZER PERMANENT SEED MIXTURE - STABILIZATION SEED MIX SCIENTIFIC NAME COMMON NAME % OF MIX DACTYLIS GLOMERATA ORCHARDGRASS 5 ANDROPOGON GLOMERATUS BLUESTEM 5 SCIRPUS CYPERINUS WOOLGRASS 5 ELYMUS VIRGINICUS VIRGINIA WILDRYE 5 SORGHASTRUM NUTANS INDIAN GRASS 15 CHASMANTHIUM LATIFOLIUM RIVER OATS 5 PANCIUM CLANDESTINUM DEERTONGUE 30 PANCIUM VIRGATUM SWITCHGRASS 30 2 TOTAL 100 GENERAL PLANTING NOTES: 1. AFTER THE AREA HAS BEEN SEEDED EROSION CONTROL PROTECTION WILL CONSIST OF STRAW MULCH UNLESS OTHERWISE SPECIFIED. 2. THE SOIL SURFACE SHALL BE SCARIFIED APPROXIMATELY 1 TO 3 INCHES BELOW THE SURFACE PRIOR TO TEMPORARY SEEDING. GENERAL PLANTING NOTES INTRODUCTION 1. THE GOAL OF THE PLANTING PLAN IS TO STABILIZE THE STREAM BANK. 2. TEMPORARY SEEDING AND MATTING OF DISTURBED AREAS SHALL BE REQUIRED TO PROVIDE SEDIMENT AND EROSION CONTROL PURPOSES AND FOR THE BENEFIT OF HABITAT. 3. PERMANENT SEEDING SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN PERMANENT SEEDING MIXTURE PROVIDED HEREIN. IF ANY SPECIES, ON THE PERMANENT SEEDING MIXTURE IS NOT AVAILABLE, CONTACT THE CONSTRUCTION MANAGER FOR SUBSTITUTE SPECIES. THE SEEDING SHALL BE COVERED WITH COIR MATTING BELOW BANKFULL AND STRAW MULCH, OR APPROVED REPLACEMENT, ABOVE BANKFULL TO THE LIMITS OF DISTURBANCE. MULCH IS TO BE SPREAD BY HAND, BLOWER, OR OTHER SUITABLE EQUIPMENT AND ANCHORED INTO THE TOPSOIL WITH POLY DURING BLOWING, OR BY DISCING. 4. BARE ROOT SEEDLINGS, LIVE STAKES OR PLUGS WILL BE PLANTED AFTER THE TEMPORARY SEED MIXTURE HAS BEEN APPLIED. 5. TREES, SHRUBS, LIVE STAKES, BARE ROOT SEEDLINGS AND PLUGS SHALL BE PLANTED IN A MANNER TO ENSURE THEIR SURVIVAL. CONTRACTOR SHALL PLANT INTACT ROOTS, PLANT AT PROPER DEPTH, PROVIDE PROPER BACKFILLING, AND PROVIDE WATERING. 6. PLANT MATERIALS SHALL BE STORED IN A MANNER TO PREVENT DESICCATION OF THE ROOT SYSTEM. PROTECT PLANTS AT ALL TIMES FROM SUN AND DRYING WINDS. PLANTS THAT CAN NOT BE PLANTED IMMEDIATELY SHALL BE KEPT IN THE SHADE AND WELL WATERED. PLANTS NOT PLANTED WITHIN TWO DAYS SHALL BE PROVIDED WITH ADEQUATE IRRIGATION AND ON-SITE PROTECTION FROM THE ELEMENTS. 7. PLANTS SHALL NOT BE HANDLED BY THE STEMS DURING TRANSPORT TO PLANTING SITE OR DURING PLANTING. 8. IF AN EROSION CONTROL BLANKET IS PRESENT, A CIRCULAR OPENING SHALL BE CUT IN THE BLANKET PRIOR TO EXCAVATION OF THE PIT. 9. NON -BIODEGRADABLE MATERIAL SURROUNDING THE EARTHEN BALL OF THE PLAN SHALL BE REMOVED PRIOR TO BACKFILLING OF THE PIT. 10. TO SET THE PLANTS, PREPARE ALIGNMENT OF INDIVIDUAL TREE SAPLINGS PLUMB AND STRAIGHT AND PROVIDE ALLOWANCE FOR SETTLEMENT. 11. BACKFILL THE PLANTING HOLES WITH IN-SITU SOIL MATERIALS REMOVED FOR PLANTING. 12. AFTER BACKFILLING, WATER TO THE POINT OF SOIL SATURATION AND TAMP TO COMPACT THE BACKFILL MIXTURE. ADD EXISTING SOIL TO BRING THE FINAL GRADE IN THE PLANTING HOLE TO THE SURROUNDING SOIL SURFACE. RAKE THE UNUSED SOIL OUTSIDE THE PLANTING HOLES, TAKING CARE NOT TO MOUND THE SOIL OR TO SIGNIFICANTLY ALTER THE EXISTING GRADES. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING 80% SURVIVABILITY THROUGH THE FIRST YEAR AFTER CONSTRUCTION. AS -BUILT, VEGETATIVE MONITORING AND GEOMORPHOLOGICAL MONITORING WILL BE COMPLETED WITHIN 60 DAYS AFTER CONSTRUCTION COMPLETION. 14. TREES, SHRUBS AND LIVE STAKE PLANTING IS TO OCCUR BETWEEN NOVEMBER 15 AND MARCH 15, DURING DORMANCY. LIVE STAKES SHOULD ONLY BE USED WITHIN THE AREA WHERE ADEQUATE DRAINAGE AND SOIL SATURATION WILL INDUCE ADEQUATE ROOT GROWTH. LIVE STAKES SHALL HAVE A MINIMUM DIAMETER OF 1/2 INCHES AND A MINIMUM OF LENGTH 24 INCHES. SOAK THE STAKE FOR 24 HOURS. CUT ENDS AT A 45° ANGLE PRIOR TO INSTALLATION. DRIVE STAKE INTO THE GROUND TO 3/4 OF ITS LENGTH, AT A 45° IN THE DOWNSTREAM DIRECTION. 15. THE SUPPLIER OF ALL SEEDS AND/OR VEGETATION SHALL CERTIFY THAT THE ORIGIN OF THE SEEDS FROM WHICH THE PLANTS OR SEEDS WERE PRODUCED IS FROM HARDINESS ZONES 7A AND 7B, EAST OF TENNESSEE, AND AS DIRECTED BY THE SPECIAL PROVISIONS. 16. ALL PLANTS SHALL BE CONSERVATION GRADE, FIRST CLASS REPRESENTATIVES OF THEIR SPECIES, NURSERY GROWN ACCORDING TO GOOD HORTICULTURE PRACTICES AND GROWN IN A CLIMATE SIMILAR TO THE PROJECT AREA. PLANTS SHALL BE VIGOROUS, HEALTHY AND FREE OF DISEASE, INSECTIVOROUS PESTS, DECAY, INJURIES AND ALL FORMS OF OBJECTIONABLE DISFIGUREMENTS. TRUNKS AND BRANCHES SHALL BE FREE OF CUTS AND ABRASIONS. PLANTS SHALL CONFORM TO ALL ASPECTS OF THE CURRENT EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1) FOR CONSERVATION GRADE PLANT MATERIAL. 17. TREES AND SHRUBS SHALL BE PLANTED ON 10 FT CENTERS. LIVE STAKES SHALL BE PLANTED IN GROUPS WHERE PLANS SHOW ON 4 FT CENTERS. A COMBINATION OF BARE ROOT AND PLUG PLANTS SHOULD BE PLANTED IN CONJUNCTION WITH THE APPLIED WETLAND VARIETY SEED MIX IN ORDER TO CREATE A NATURALIZED STREAM BANK AND TO ESTABLISH ADEQUATE VEGETATIVE COVER TO PREVENT SLOUGHING AND EROSION OF THE BANK. 18. THE SELECTED WETLAND SEED MIX SHALL BE SURFACE SOWN AT THE RATE OF 150 LBS/ACRE TO ALL DISTURBED AREAS ALONG THE EASEMENT. 19. ALL BARE ROOT SEEDLINGS OR PLUGS SHALL BE PLANTED IN SUCH A MANNER AS TO ENSURE THEIR SURVIVAL. THIS SHALL INCLUDE THE PLANTING OF INTACT ROOTS, PLANTING AT PROPER DEPTH, PROPER BACKFILLING AND WATERING. 20. IN AREAS WHERE THE RESTORATION DESIGN REQUIRES SLOPES TO BE CUT BACK AND GRADED, SLOPES SHALL BE SCARIFIED APPROXIMATELY 4 TO 6 INCHES BELOW THE SURFACE PRIOR TO PLANTING. BIODEGRADABLE EROSION CONTROL MAT SHALL BE USED IN ALL AREAS. AN OPENING SHALL BE CUT IN THE MAT FOR EACH PLANTING PRIOR TO INSTALLATION. BARE ROOT SEEDLINGS OR PLUGS SHALL BE PLANTED AND THE ENTIRE AREA SHALL BE TOP DRESSED WITH A WETLAND SEED MIX. 21. BARE ROOT SEEDLINGS OR PEAT POTS THAT ARE TO BE SELECTED FROM THE PLANTING SPECIES LIST ON THIS SHEET SHALL BE PLANTED IN MONOSPECIFIC GROUPS USING A 2 -FOOT ON CENTER SPACING WITHIN THE GROUP TO A MAXIMUM NUMBER OF 50 PLANTS PER GROUP. THE PLANTS TO BE LOCATED NEAREST TO THE BANKFULL ELEVATION SHOULD BE FACULTATIVE WET (FACW). 22. BARE ROOT/PLUG PLANTS DIMENSIONS ARE MAXIMUMS, PLANTINGS SHALL BE RANDOM. v-speat Dewberry' Dewberry Engineers Inc. 551 PINEY FOREST ROAD DANVILLE, VA 24540 PHONE: 434.797.4497 FAX: 434.797.4341 NCBELS # F-0929 SEAL KEY PLAN SCALE CARo • • �Q�oFESS/pN919 . SEAL 17502 �,•s 4`19 Nl���..P�o; AS NOTED REVISIONS MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE 2 4/12/19 MWC REV PER USACE COMMENTS 1 1 1/10/19 MWC REV PER USACE COMMENTS No. DATE BY Description REVISIONS TITLE STREAM AND WETLAND DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C22 7 MWC DRAWN BY RSE APPROVED BY LAB CHECKED BY APRIL, 2019 DATE TITLE STREAM AND WETLAND DETAILS PROJECT NO. 50046462 / 50102913 SHEET NO. C22 7