Loading...
HomeMy WebLinkAboutNCC190077_NOI Signed Certification_20190419 NoticeCertification ti Directions: Print this form,complete,scan and upload to the electronic NOL Then,mail the original form to the NC DEMLRStormwaer Program at: Division of Energy, Mineral&Land Resources Storm water Program 12 N.Salisbury Street,6 th Floor 1612 Mail Service Center Raleigh, NC 27 99-1612 Per NC General Statute 1 - 15a6 (I), any person who knowingly makes any false statement,representation, or certification in any application, record,report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article° ° °shall be guilty of a Glass 2 misdemeanor which may include a flue not to exceed ten thousand dollars( 1 , 00). Under penalty of law, I certify that(check all four boxes to indicate your agreement): I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. Ef The information submitted in this NOI is,to the best of my knowledge and belief,true,accurate,and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, will abide by all conditions of the IIWG01,0000 �,,,,,µiineraN IIPLq��mft and the approved Erosion and Sediment Control Plan. IV If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan)of the tV G0100 L1�i�i�ienee ���all i''Ile liri lt, I will nonetheless ensure that all conditions of � p p 1 w � all times Y q g _.I11 �,uu ......i ........ .l'��1H�„!and understand that coverage under art o the permit are met on the ro ect at I hereby request coverage under the Il�li �010 this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit, Legally Responsible OrganizationalEntity: M W ° Legally Responsible Person: I Signature: �,w ° �� Date: y. *IMPORTANTNOTE. This fora must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president,or a manager that is authorized in accordance with Fart IV,Section B, Item(6)of the NCGO10000 permit, For more information on signatory requirements,see Fart III,Section B, Item(6)of the NCG010000 permit.