Loading...
HomeMy WebLinkAboutNCC190071_ESC Approval Submitted_20190418Energy, Mineral and Land Resources ENVIRONMENTAL Ot1ALITY April 9, 2019 LETTER OF APPROVAL WITH MODIFICATIONS D.R. Horton, Incorporated Attention: Bart Carroll, Division NPDES Manager 8001 Arrowridge Boulevard Charlotte, North Carolina 28273 ROY COOPER Governor MICHAEL S. REGAN Senn rary S. DANIEL SMITH lnrenm Urneror RE: Project Name: Villages at Skybrook North Lots 425-431, 435-439, 476-483 [Express Review] Acres Approved: 4.36 Project ID: CABAR-2019-078 County: Cabarrus, City: Concord Address: River Oaks Drive, NW River Basin: Yadkin — Pee Dee Stream Classification: Other Submitted By: D.R. Horton, Incorporated Date Received by LQS: April 8, 2019 Plan Type: New Dear Mr. Carroll: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: State of North Carolina Environmental Quality I Energy, Mineral and Land Resources Mooresville Regional office 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Letter of Approval with Modifications D.R. Horton, Incorporated April 9, 2019 Page 2 of 4 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �/yl�flc� Tamera Eplin E, CPESC Assistant R ional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department Letter of Approval with Modifications D.R. Horton, Incorporated April 9, 2019 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Villages at Skybrook North Lots 425-431, 435-439, 476-483 Project ID: CABAR-2019-078 County: Cabanrus 1. The new NCGOI Construction stormwater permit requires Ground Stabilization and Materials Handling and Self -Inspection, Recordkeeping and Reporting requirements on your plans. The NCGO1 compliance plan sheets for these can be found at https: l(Icq.nc.t,ov abotit/divisions/cner�w-mineral-land-resourcesiener(,v-niineral-land- pennitsistorniwater-perm i is 'constructioni-s%\ . 2. If contiguous lots are graded such that one acre or more is disturbed, individual lot controls will be insufficient, and surface dewatering is required in order to maintain compliance with the NPDES general construction permit. This site is limited to individual lot disturbance. If contiguous lot grading for lots totaling 1 acre or more is to take place, an approved plan is required before grading takes place, with specific locations for surface dewatering, specifications and calculations for surface dewatering. [N.C.G.S. 143-215.1 ] Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 4. The site, or portions of the site as applicable, are required to be stabilized after any period of inactivity. Slopes steeper than 3:1, perimeter dikes, swales, and ditches must be stabilized within 7 days. All other areas must be stabilized within 14 days. [N.C.G.S. 143-215.1 ] Silt fence may not be placed such that portions of the lot are exposed to erosion. [ 15A NCAC 4B .0105] 6. All access to the lots must be through the construction entrances. Construction entrances must be in place prior to lot disturbance. [15A NCAC 4B .0105] 7. All inlets collecting drainage or that might potentially be affected by the lot construction shall have inlet protection. Inlet protection must be maintained until all areas draining to the inlet are fully stabilized. [ 15A NCAC 4B .0105] All measures, including stone drive, will be inspected after rain and at least weekly for adequacy and needed maintenance. [N.C.G.S. 143-215.1 ] Letter of Approval with Modifications D.R. Horton, Incorporated April 9, 2019 Page 4 of 4 9. All disturbed areas not built upon will be provided with permanent groundcover. [N.C.G.S. 113A-57(2)] 10. Effective October 1, 2010, persons responsible for land disturbing activities must inspect the sediment and erosion control measures on a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is being followed. Self - inspection reports are required. A sample self -inspection report, as well as details of the self - inspection program, can be found on the Land Quality web site: lit tl)::1pooal.ncdennorg'wehi-v%q: M S,'suiconstruction Not every project will have all the possible phases, but a list of phases may include: • Installation of perimeter erosion and sediment control measures. • Clearing and grubbing of existing ground cover. • Completion of any phase of grading that requires provision of stabilization. • Installation of measures during any phase of the project. 0 Completion of construction or development. • Quarterly inspections until the establishment of permanent ground cover is fully established. Please note these inspection requirements are in addition to NPDES inspection requirements. [N.C.G.S. 113A-54.1(e)] 11. Additional measures may be necessary during the course of this project. [15A NCAC 4B .0115] CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and 113A - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). L- L- A& S ►Z N'��W L-0TS %25 -'/91 y3s z13Y', WP -- Z/r3 Project Name and Location C",4.i� ,2a11- d7r �- ,OIL � / Od 19_ �lp� � Date of Plan Approval AIVA 45S,C57r�Vl' Regional Engineer NCDENR (n'px'�3