Loading...
HomeMy WebLinkAboutNCC190044_ESC Approval Submitted_20190415 ROY COOPER Governor ' MICHAEL S.REGAN .Secretary iirazY ` S. DANIEL SMITH NORTH CAROLINA Interim Director Environmental Quality April 5, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Wilkinson Solar, LLC Attn: Mr. Michael Kaplan,Vice president One South Wacker Drive, Suite 1800 Chicago, IL 60606 RE: Project Name: Wilkinson Solar Acres Approved: 52S Project ID: Beauf-2019-012 County: Beaufort City: Pantego Address: NC 1612 and NC 1619 River Basin: Tar-Pamlico Date Received by LQS: March 13, 2019 Submitted By: Timmons Group Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOT) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO L Please direct questions about the NOI form to Annette Lucas at Annette.lucasrncdenr.gov or Paul Clark at Pau l.elark runcdenr.gov. After you submit a complete and correct NOI Form,a COC will be emailed to you within three business days. Initially,DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: .� Not Carolina Department of Environmental(,duality i Division of Energy.Mineral and Land Resources E Q� Washington Regional Office 1 943 Washington Square Mall ; Washington,worth Carulina'2'7889 w3a.m nnr�ri wnwnw waa� �►`� 252.9,16.6481 I. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I 13A-6 1.1(a) of out right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other pen-nit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the farm. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Please be advised that a rule to protect and maintain existing buffers along watercourses in the Tar-Pamlico River Basin became effective on January 1, 2000, The Tar-Pamlico River Riparian Area Protection and Maintenance Rule (15A NCAC 26.0259) applies to a 50 (horizontal) foot wide zone along all perennial and intermittent streams, lakes, ponds and estuaries in the Tar-Pamlico River basin. For more information about the riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at 919-807-6300, or DWQ in our regional office at 252-946-6481. Sincerely, Samir Dumpor Regional Engineer cc w/o enc: Jerry Old, Currituck Homes, Inc.(email) David Klebitz, P'E, Bissell Professional Group(email) WaRO Division of Water Resources 1. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity, All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (I 5A NCAC 04B .0113). 2. The developer is responsible for obtaining all pen-nits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers'jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other pen-nit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance,entering existing drainage systems,impacting an on- site natural watercourse or adjoining property, (NCGS 113A-57) PROJECT INFORMATION SHEET APPROVAL DATE: Aril 5, 2019 RESPONSIBLE PARTY: Wilkinson Solar, LLC PROJECT NAME: Wilkinson Solar COUNTY: Beaufort NO.: Beauf-2019-012 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.N.R. LAND QUALITY SECTION ATTN:James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 james.edwards@ncdenr.gov