Loading...
HomeMy WebLinkAboutNCC190035_NOI Application_20190411Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/11/2019 11:08:58 AM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 4/12/2019 11:40:58 AM (Review- Construction NOI 10032) • Morman, Alaina reassigned the task to Georgoulias, Bethany 4/12/2019 11:03 AM • The task was assigned to Lucas, Annette by round robin distribution 4/11/2019 11:09 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 15, 2019 5:00 PM 4/11/2019 11:09 AM Submit by Georgoulias, Bethany 4/12/2019 11:41:24 AM (Payment Verification - NCG01-2019-0035) • The task was assigned to Georgoulias, Bethany. The due date is: April 15, 2019 5:00 PM 4/12/2019 11:41 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * HOPKINS TRACE SUBDIVISION 2. County* Wake 3. Highway or Street DUKES LAKE ROAD Address * Street narra only is acceptable if no address nurrber assigned yet 4. City or Township* ZEBULON 5. State * NC 1r-G)ff&T7G)MFalif_TiIa10141 6. Zip Code* 27597 7. Latitude * Enter the latitude in decirral degrees 35.8970 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -78.3470 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10. Date to End* 11. SIC (Primary)* 12. Acres to be disturbed * 13. Total site area (acres)* 14. Post - construction impervious area (acres) * 05/20/2019 Estirrated Construction Project Start Date 10/31 /2019 Estirrated Construction Project End Date Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrant 3.00 (including off -site borrow and waste areas) -M NCC Project NCC-WAKE-2019-HOPKINS TRACE SUBDIVISION Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving DUKES LAKE POND Wate rbody* Nacre of waterbody into which stornvwater runoff will discharge 15b. Waterbody 27-86-2-2 Index No. * NCWaterbody Index Nunber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act? * B. Permittee Information Part B. Pbrrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization SATTERWHITE CONSTRUCTION INC Name * 2. First Name* JESSE ff Corporation, enter Registered Agent First l\brre 3. Last Name * SATTERWHITE JR ff Corporation, enter Registered Agent Last INbrre 4. Permitee E-mail satterwhiteconstructioninc@gmail.com Address* 5. Permittee (919) 266-0033 Telephone No.* 6. Permittee Mailing Street Address Address* 5933 FARMWELL RD Address Line 2 City RALEIGH Fbstal / Zip Code 27610-9283 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 5933 FARMWELL Rd Address Line 2 City RALEIGH Postal / Zip Code 27610-9283 State / Province / Region NC Country USA State / Province / Region NC Country US C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site JESSE Contact - First Name * 3. Primary Site SATTERWHITE Contact - Last Name * 4. Title PRESIDENT 5. Site Contact E- satterwhiteconstructioninc@gmail.com mail Address* 6. Site Contact (919) 266-0033 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* 5933 Farmwell Rd Address Line 2 City Raleigh Rbstal / Zip Code 27610-9283 State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (MSC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/31/2019 Approved * 2. E&SC Plan Project SEC-011553-2018 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Hopkins Trace Phase Approval 3_ Watershed ManagementApproval_V.2_1-31- 324.06KB letter/documentation 19.pdf Wst be RCF format 6. NOI Certification NOI Hopkins Trace Jesse Satterwhite.pdf 1.04MB Form lutist be PCFfornat This is an Express r No Review Project* f Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ,jESYC -7417 Wlv flrC , j2 Type Name* JESSE SATTERWHITE, JR. Date * 04/11 /2019 F. Tracking and COC Info NOI Tracking No. 10032 NC Reference No. NCG01-2019-0035 Uses 'count_nunber variable (increrrented by SP) Certificate of NCC190035 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 35 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)