HomeMy WebLinkAboutNCC190035_NOI Application_20190411Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 4/11/2019 11:08:58 AM (NCG01 NOI Submission)
Approve by Georgoulias, Bethany 4/12/2019 11:40:58 AM (Review- Construction NOI 10032)
• Morman, Alaina reassigned the task to Georgoulias, Bethany 4/12/2019 11:03 AM
• The task was assigned to Lucas, Annette by round robin distribution 4/11/2019 11:09 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 15, 2019 5:00 PM
4/11/2019 11:09 AM
Submit by Georgoulias, Bethany 4/12/2019 11:41:24 AM (Payment Verification - NCG01-2019-0035)
• The task was assigned to Georgoulias, Bethany. The due date is: April 15, 2019 5:00 PM
4/12/2019 11:41 AM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * HOPKINS TRACE SUBDIVISION
2. County* Wake
3. Highway or Street DUKES LAKE ROAD
Address * Street narra only is acceptable if no address nurrber assigned yet
4. City or Township* ZEBULON
5. State * NC
1r-G)ff&T7G)MFalif_TiIa10141
6. Zip Code* 27597
7. Latitude * Enter the latitude in decirral degrees
35.8970
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-78.3470
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
10. Date to End*
11. SIC (Primary)*
12. Acres to be
disturbed *
13. Total site area
(acres)*
14. Post -
construction
impervious area
(acres) *
05/20/2019
Estirrated Construction Project Start Date
10/31 /2019
Estirrated Construction Project End Date
Residential, Single
Family Houses (SFE)
(1521)
Standard Industrial aassification for Developrrant
3.00
(including off -site borrow and waste areas)
-M
NCC Project NCC-WAKE-2019-HOPKINS TRACE SUBDIVISION
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving DUKES LAKE POND
Wate rbody* Nacre of waterbody into which stornvwater runoff will discharge
15b. Waterbody 27-86-2-2
Index No. * NCWaterbody Index Nunber
Stormwater fJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act? *
B. Permittee Information
Part B.
Pbrrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization SATTERWHITE CONSTRUCTION INC
Name *
2. First Name* JESSE
ff Corporation, enter Registered Agent First l\brre
3. Last Name * SATTERWHITE JR
ff Corporation, enter Registered Agent Last INbrre
4. Permitee E-mail satterwhiteconstructioninc@gmail.com
Address*
5. Permittee (919) 266-0033
Telephone No.*
6. Permittee Mailing Street Address
Address* 5933 FARMWELL RD
Address Line 2
City
RALEIGH
Fbstal / Zip Code
27610-9283
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
5933 FARMWELL Rd
Address Line 2
City
RALEIGH
Postal / Zip Code
27610-9283
State / Province / Region
NC
Country
USA
State / Province / Region
NC
Country
US
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Non -Government
Ownership*
2. Primary Site JESSE
Contact - First
Name *
3. Primary Site SATTERWHITE
Contact - Last
Name *
4. Title PRESIDENT
5. Site Contact E- satterwhiteconstructioninc@gmail.com
mail Address*
6. Site Contact (919) 266-0033
Telephone No.*
7. Organization
Name
8. Site Contact Street Address
Mailing Address* 5933 Farmwell Rd
Address Line 2
City
Raleigh
Rbstal / Zip Code
27610-9283
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (MSC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 01/31/2019
Approved *
2. E&SC Plan Project SEC-011553-2018
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* Wake County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan Hopkins Trace Phase
Approval 3_ Watershed ManagementApproval_V.2_1-31- 324.06KB
letter/documentation
19.pdf
Wst be RCF format
6. NOI Certification NOI Hopkins Trace Jesse Satterwhite.pdf 1.04MB
Form lutist be PCFfornat
This is an Express r No
Review Project* f Yes
E. Certification
North Carolina General Statute 143-215.6B (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
,jESYC -7417 Wlv flrC , j2
Type Name* JESSE SATTERWHITE, JR.
Date * 04/11 /2019
F. Tracking and COC Info
NOI Tracking No. 10032
NC Reference No. NCG01-2019-0035
Uses 'count_nunber variable (increrrented by SP)
Certificate of NCC190035
Coverage (COC) Uses 'count _nunber'variable (increrrented bySP)
No. *
Count Number 35
Sequential nunber for subrrittal that is increrrented by Stored Procedure
COC Year 2019
Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)