HomeMy WebLinkAboutNCC190034_NOI Application_20190411 Action History (UTC-05:00) Eastern Time(US&Canada)
Submit by Anonymous User 4/11/2019 9:29:14 AM(NCG01 NOI Submission)
Approve by Morman,Alaina 4/12/2019 10:59:10 AM(Review-Construction NOI 10024)
• The task was assigned to Morman,Alaina by round robin distribution 4/11/2019 9:29 AM
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:April 15,2019 5:00 PM
4/11/2019 9:29 AM
Submit by Morman,Alaina 4/12/2019 10:59:55 AM(Payment Verification-NCG01-2019-0034)
• The task was assigned to Morman,Alaina.The due date is:April 15,2019 5:00 PM
4/12/2019 10:59 AM
1 sees �' � ••. -• i •• i i• i
IY sell
NORTH CAROLINA
Ernvlronmental QUII
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name* Woodland Heights Middle School
2. County* Iredell
3. Highway or Street 288 Forest Lake Blvd
Address* Street narra only is acceptable if no address nurrber assigned yet
4. City or Township* Mooresville
5. State* INC
6.Zip Code* 28117
7. Latitude* Enter the latitude in decirral degrees
35.3409
8. Longitude* Enter the longitude in decirral degrees(MJSTbe negative)
-80.5523
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 04/08/2019
Estimated Construction Project Start Date
10. Date to End* 04/30/2020
Estimated Construction Project End Date
11. SIC(Primary)* Other(0000)
Standard Industrial aassification for Developrrent
12.Acres to be 25.46
disturbed* (including off-site borrow and waste areas)
13.Total site area 52.32
(acres)*
14. Post- 12.36
construction
impervious area
(acres)*
NCC Project NCC-IREDE-2019-Woodland Heights Middle School
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Catawba River
Wate rbody* Nacre of waterbody into which stormuater runoff will discharge
15b.Waterbody 11-(75)
Index No.* NCWaterbody Index Nunber
Stormwater rJ No
discharges will flow r Yes
to additional
wate rs*
16a.Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information-Legally Responsible Entity and Individual
.....................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV,
Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part
IV,Section B, Item(6)of that permit.
1.Organization Iredell Statesville Schools
Name*
2. First Name* Rob
ff Corporation,enter Registered Agent First l\b e
3. Last Name* Jackson
ff Corporation,enter Registered Agent Last Barre
4. Permitee E-mail rjackson@iss.k12.nc.us
Address*
5. Permittee 704-873-3755
Telephone No.*
6. Permittee Mailing Street Address
Address* 549 North Race Street
Address Line 2
City State/Province/Region
Statesville NC
Rbstal/Zip Code Country
28677-3915 US
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 549 North Race Street
Address Line 2
City State/Province/Region
Statesville NC
Postal/Zip Code Country
28677-3915 us
C. Site Contact Information
Part C.
Project Site Contact Information
....................................................................................................................
1.Type of Non-Government
Ownership*
2. Primary Site Rob
Contact-First
Name*
3.Primary Site Jackson
Contact-Last
Name*
4.Title Director of Construction
5.Site Contact E- rjackson@iss.k12.nc.us
mail Address*
6.Site Contact 704-873-3755
Telephone No.*
7.Organization Iredell Statesville Schools
Name
8.Site Contact Street Address
Mailing Address* 549 North Race Street
Address Line 2
City State/Province/Region
Statesville NC
Rbstal/Zip Code Country
28677-3915 us
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Ran Approval Information
............................................................................................................................................................
1. Date E&SC Plan 04/05/2019
Approved*
2. E&SC Plan Project IREDE-2019-001
Number/ID* Assigned by agency or local program
3. E&SC Plan F State DEQ Office
Approved by r Local Program
4. State DEQ Office* Mooresville(MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application.
5. E&SC Plan jm-04052019.pdf 1.11 MB
Approval Wst be FDFforrrat
letter/documentation
6. NOI Certification NOI FORM-04052019110448.pdf 419.3KB
Form Mist be RDFforrrat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other
documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project,for
satisfying the requirements of this permit,and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is,to the best of my knowledge and belief,
true,accurate, and complete based on my inquiry of the person or persons who
manage the system,or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s)and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important:The person who signs this Certification above and signs the NOI Certification Form should be the same
person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV,
Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part
IV,Section B, Item(6)of that permit.
Signature
AM
Type Name* Rob Jackson
Date* 04/11/2019
F. Tracking and COC Info
NOI Tracking No. 10024
NC Reference No. NCG01-2019-0034
Uses'count_nunber variable(incremented by SP)
Certificate of NCC190034
Coverage (COC) Uses'count nunber variable(increrrentedbySP)
No.*
Count Number 34
Sequential nunber for subrrittal that is increrrented by Stored Procedure
COC Year 2019
Year of date reviewed,used to assign YY digits after"NOC'in OOC no.)