April 9, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Siemens Energy, Incorporated
Attention: Edward McFall, Site Manager
4400 Alafaya Trail MC-490
Orlando, Florida 32826
ROY COOPER
(kmerno►
MICHAEL S. REGAN
.4erretary
S. DANIEL SMITH
/ntenm Urreaor
RE: Project Name: US1440 Lincoln County Combustion Turbine Addition (Parking Lot) [Express Review]
Acres Approved: 5
Project ID: LINCO-2019-013
County: Lincoln, City: Stanley
Address: 6769 Old Plank Road
River Basin: Catawba
Stream Classification: Other
Submitted By: Siemens Energy, Incorporated
Date Received by LQS: April 8, 2019
Plan Type: New
Dear Mr. McFall:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff
in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
l . The approved E&SC plan as well as any approved deviation.
State of North Carolina i Environmental Quality 1 Energy. Mineral and land Resources
Mooresville Regional Office 610 East Center Ave Ste 301 1 Mooresville. NC 28115
704 663 1699 "r
Letter of Approval with Modifications
Siemens Energy, Incorporated
April 9, 2019
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Tamera Epl' , PE, CPESC—
Assistant egional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c via E-mail: Brooke Ahrens, HDR Engineering of the Carolinas, Incorporated
c: Inspection Department
Letter of Approval with Modifications
Siemens Energy, Incorporated
April 9, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: US1440 Lincoln County Combustion Turbine Addition (Parking Lot)
Project ID: LINCO-2019-013
County: Lincoln
Modifications pursuant to applicable North Carolina General Statutes and/or Reitulations:
1. This ESC review is for a staging parking lot associated with LINCO-2018-003.
2. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [ 15A NCAC 4B .0110]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115J
Additional Comments:
1. Approval of this erosion and sediment control plan does not supersede any requirements or
provisions of North Carolina Senate Bill 729, "The Coal Ash Management Act" or any other
applicable regulation.
2. The NPDES General Construction Stormwater Permit does not supersede any existing or
potential wastewater and/or industrial stormwater permit requirements, or anv other
applicable regulation.
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control plan
has been approved for this project by the North Carolina Department of Environment
and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and
113A - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c).
This certificate must be posted at the primary entrance of the job site before construction
begins and until establishment of permanent groundcover as required by North Carolina
Administrative Code, Title 15A, Chapter 4B.0127 (b).
�S ly�� �INCoLN Ca�NrY CDII'lgrJS�I��y 6I/lIE TidN C'?0 I�VG ZJ
Project Name and Location
'L/AeD Q13
-&9- /L -- -- 7,41--fi-e%f 6�1-4- -
ineer Enional Re
Date of Plan Approval A'VA_ �}-�SI.S%iN� g g
W1 ln Gb)F(C +--r•OAJs NCDENR