Loading...
HomeMy WebLinkAboutNCC190029_NOI Application_20190410Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/10/2019 4:32:04 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 4/11/2019 8:17:00 AM (Review- Construction NOI 10018) • Georgoulias, Bethany reassigned the task to Georgoulias, Bethany 4/11/2019 8:12 AM • The task was assigned to Morman, Alaina by round robin distribution 4/10/2019 4:32 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 12, 2019 5:00 PM 4/10/2019 4:32 PM Submit by Georgoulias, Bethany 4/11/2019 8:17:15 AM (Payment Verification - NCG01-2019-0029) • The task was assigned to Georgoulias, Bethany. The due date is: April 12, 2019 5:00 PM 4/11/2019 8:17 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * PROVIDENCE LANDING 2. County* Lee 3. Highway or Street FARRELL ROAD / CROSBY LANE Address * Street narra only is acceptable if no address nurrber assigned yet 4. City or Township * DEEP RIVER TOWNSHIP 5. State * NC 1r-i)iTII�T:2,11111711MFalf_TiIa10141 6. Zip Code* 27330 7. Latitude * Enter the latitude in decirral degrees 35.5900 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.1300 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10. Date to End* 11. SIC (Primary)* 12. Acres to be disturbed * 13. Total site area (acres)* 14. Post - construction impervious area (acres) * 04/11 /2019 Estirrated Construction Project Start Date 06/01 /2020 Estirrated Construction Project End Date Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrant 7.60 (including off -site borrow and waste areas) 20.70 2.00 NCC Project NCC-LEE-2019-PROVIDENCE LANDING Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving COPPER MINE CREEK Wate rbody* I\brre of waterbody into which stornvdater runoff will discharge 15b. Waterbody 18-4-7-1 Index No. * NCWaterbody Index Ninber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act? * B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization HARRINGTON PROPERTIES OF NC, LLC Name * 2. First Name* BRANDON ff Corporation, enter Registered Agent First NBrre 3. Last Name * HARRINGTON ff Corporation, enter Registered Agent Last Barre 4. Permitee E-mail brandon@harringtonpropertiesofnc.com Address* 5. Permittee 9197705969 Telephone No.* 6. Permittee Mailing Street Address Address* 2659 SAN LEE DRIVE Address Line 2 City Sanford Fbstal / Zip Code 27330 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 2659 SAN LEE DRIVE Address Line 2 City Sanford Postal / Zip Code 27330 State / Province / Region NC Country United States State / Province / Region NC Country United States C. Site Contact Information Part C. Roiect Site Contact hforrration 1. Type of Individual Ownership* 2. Primary Site BRANDON Contact - First Name* 3. Primary Site HARRINGTON Contact - Last Name * 4. Title OWNER 5. Site Contact E- brandon@harringtonpropertiesofnc.com mail Address* 6. Site Contact 9197705969 Telephone No.* 7. Organization HARRINGTON PROPERTIES OF NC, LLC Name 8. Site Contact Street Address Mailing Address* 2659 SAN LEE DRIVE Address Line 2 City Sanford Fbstal / Zip Code 27330 State / Rovince / Region North Carolina Country UNITED STATES D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 04/10/2019 Approved * 2. E&SC Plan Project LEE-2017-013 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan LEE-2017-013 LOA 20190410 revised.pdf 60.12KB Approval Mast be FDFfornat letter/documentation 6. NOI Certification NCG01 NOI.pdf 426.94KB Form Mist be RDFforrrat This is an Express f• No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * BRANDON HARRINGTON Date * 04/10/2019 F. Tracking and COC Info NOI Tracking No. 10018 NC Reference No. NCG01-2019-0029 Uses 'count_nunber variable (increrrented by SP) Certificate of NCC190029 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 29 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)