Loading...
HomeMy WebLinkAbout680030_Compliance Evaluation Inspection_20190321I Id Division of Water Resources �a_clli ty Number ©- 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit:Cam ' nee Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ii rArrival Time: Lj` Departure Time: /? , County: Region: Farm Name:/�� 5' nd s� Owner Email: Owner Name: Mailing Address: Phone: Physical Address: Facility Contact: Se fi 5-y ge S Title: Phone: Onsite Representative; Certified Operator - Back -up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Integrator: Certification Number: Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. =Layer on -Layer Pullets Dischar es and Stream Impacts I. Is any discharge observed from any part of the operation? Poults Design Current Longitude: Design Current Cattle Capacity Pop. Daig Cow Dai Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ONo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: 1-1 a. Was the conveyance man-made? [:]Yes QN ❑ NA ❑ NE b. Did the discharge reach waters ofthe State? (If yes, notify DWR) ❑ Yes No ❑ NA NE 0 c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes o NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 2/4/2015 Continued Facili Number: - Date of Inspection: -3 .2 1i Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E2f4o NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes Callo ❑ NA NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): S. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes NA NE o ❑ (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmen thr f, notify DWR 7. Do any of the structures need maintenance or improvement? [] Yes ❑ NA [DNE 8. Do any of the structures lack adequate markers as required by the permit? CO] Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 2fNo ❑ NA ❑ NE maintenance or improvement? Waste Auplication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? 1 l . Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C4j- l3. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ YesNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes � ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 2�No ❑ NA ❑ NE Reguired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes I/❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes r o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Q Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ MonthIy and I" Rainfall Inspectio Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? []Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - `' Date of Ins ection:'k 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA [:] NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ YesNo NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours andeor document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewerllnspector fail to discuss review?inspection with an on-site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional paszes as necessarv). n 5 / V� X Vii ! ..i• IV V 0 1 j Y fzb � tj 0 COIJ Reviewer/inspector Name: Reviewer/ Inspector Signature: 7 G Page 3 of 3 Phone: 717 t/ Z C� L,, Date: �. �? 2/4/2015