HomeMy WebLinkAbout20190183 Ver 1_Loflin Phase II BPDP Review_20190408Strickland, Bev
From: Merritt, Katie
Sent: Monday, April 08, 2019 4:24 PM
To: 'Andrea Eckardt'
Subject: Loflin Phase II BPDP Review
Hey Andrea,
I have finalized my review of the Loflin Phase II BPDP received on February 12, 2019. My comments/edits are provided
below:
1. Page 2, Section 1.2- it says that the 30 foot access easement along Al will be released prior to recording the new
easement. will there be another access point for the long term steward of Phase I to access Phase I? Have you
contacted that long term steward to make sure that is acceptable?
2. Page 3, Section 2.1— dates on the pictures are from August 2017. Please provide updated photographs.
3. Page 3, Section 2.1- 2nd paragraph: provide any changes to landuses or riparian areas since the date of
the DWR visit in October 2018. If no changes have occurred, please state that in this paragraph
4. Page 3 below Table 1: explain how you confirmed 02R.0403 was complied with. Did you pull any data?
If so, reference that data here as requested for the Wall BPDP.
5. Section 2.6 - you reference the SHPO response for Phase I. Please include the response from SHPO that
identified no historic resources were found.
6. There wasn't anything in Section 2 regarding a FEMA review. Please provide that information and
whether the site will have any negative impact on the FEMA floodplain. Same as requested for Wall
site
7. Pg 9, below Table 5: For this bank, you only need one ledger. There also isn't anything to convert for
this bank so you can remove all the language that doesn't apply here.
8. Table 5 — It's hard to tell where the 0.03ac along 131 and the .06 acres along 133 are, when looking at the
corresponding Figure 7. Please zoom in to those areas if you can
9. Table 6 — Can you clarify below the table, that there is no overlap with the riparian widths from Phase 1?
10. Table 7—there were edits made to the credit release schedule in the UMBI. Please match.
Everything looks pretty good.
Thanks,
katie
"please note my phone number has changed"
Katie Merritt
Nutrient Offset & Buffer Banking Coordinator
401 & Buffer Permitting Unit
North Carolina Department of Environmental Quality
Office: 919-707-3637
Work Cell: 919-500-0683
Website: http://Portal.ncdenr.org/web/wq/401bufferpermitting
512 N. Salisbury Street, Raleigh, NC 27620
1617 Mail Service Center, Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.