Loading...
HomeMy WebLinkAboutNCC190012_ESC Approval Submitted (4)_20190404DEPARTMENT OF PUBLIC UTILITIES Post Office Box 2263 SMITHFIELD, NC 27577 (919) 989-5075 March 28, 2019 LETTER OF APPROVAL Nick Tsakanikas Adams Homes AEC LLC 149 US Hwy 70W Garner, NC 27529 RE: Project Name: The Orchards at Summerlyn Phase 2 Lots 5 - 27 Project ID: JC# 15-028-P Disturbed Acres Approved: 7 acres Stream Classification: Neuse River (WS-IV; NSW) Submitted By: Adams Homes AEC LLC To Whom It May Concern: Johnston County has reviewed the referenced erosion and sedimentation control plan, finds the plan acceptable, and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no -disturbing activity has been undertaken as required by Title 15A NCAC 413.0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCGO 10000. You are required to comply with all the requirements and conditions of this permit. The enclosed Certificate of Approval must be posted at the job site. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, the letter gives the notice required by G.S. I I3A — 61.1 (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Stature I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is condition upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Letter of Approval The Orchards at Summerlyn Ph2 Lots 5-27 JC# 15-028-P 3/28/19 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. You are required to notify this office of the proposed starting date for this project. In addition, please notify us if you plan to have a preconstruction conference. Sincerely, Beth McLaughlin McLaughlin Consulting Contractor for Johnston County Public Utilities cc: Charles Pender, Johnston County