HomeMy WebLinkAboutNCC190012_NOI Application_20190404Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 4/4/2019 11:09:25 AM (NCG01 NOI Submission)
Approve by McCoy, Suzanne 4/4/2019 11:19:39 AM (Review- Construction NOI 9863)
• The task was assigned to McCoy, Suzanne by round robin distribution 4/4/2019 11:09 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 8, 2019 5:00 PM
4/4/2019 11:09 AM
Submit by McCoy, Suzanne 4/4/2019 11:21:02 AM (Payment Verification - NCG01-2019-0012)
• The task was assigned to McCoy, Suzanne. The due date is: April 5, 2019 5:00 PM
4/4/2019 11:19 AM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * Orchards at Summerlyn Ph2
2. County* Johnston
3. Highway or Street Trailing Oak Trail
Address * Street narra only is acceptable if no address nurrber assigned yet
4. City or Township* Clayton
5. State * NC
1r-i)iTII�T:2,11111711MFalf_TiIa10141
6. Zip Code* 27527
7. Latitude * Enter the latitude in decirral degrees
35.6387
8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative)
-78.4131
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
10. Date to End*
11. SIC (Primary)*
12. Acres to be
disturbed *
13. Total site area
(acres)*
14. Post -
construction
impervious area
(acres) *
04/10/2019
Estirrated Construction Project Start Date
12/30/2020
Estirrated Construction Project End Date
Residential, Single
Family Houses (SFE)
(1521)
Standard Industrial aassification for Developrrant
6.10
(including off -site borrow and waste areas)
8.37
1.80
NCC Project NCC-JOHNS-2019-Orchards at Summerlyn Ph2
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving Neuse
Wate rbody* Narre of waterbody into which stornvwater runoff will discharge
15b. Waterbody NEU
Index No. * NC Waterbody Index Narrber
Stormwater fJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act? *
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.........................................................................................................................................................................
1. Organization Adams Homes AEC LLC
Name *
2. First Name*
William Bryan
V Corporation, enter Registered Agent First W e
3. Last Name *
Adams
V Corporation, enter Registered Agent Last f brre
4. Permitee E-mail
ntsakanikas@adamshomes.com
Address*
5. Permittee 9192336747
Telephone No.*
6. Permittee Mailing Street Address
Address* 149 U.S. 70 W
Address Line 2
City
State / Province / Region
Garner
NC
Postal / Zip Code
Country
27529
US
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 149 U.S. 70 W
Address Line 2
City
State / Province / Region
Garner
NC
Postal / Zip Code
Country
27529
US
h
C. Site Contact Information
Part C.
Roiect Site Contact hforrration
1. Type of Individual
Ownership*
2. Primary Site Nick
Contact - First
Name *
3. Primary Site Tsakanikas
Contact - Last
Name *
4. Title
5. Site Contact E-
ntsakanikas@adamshomes.com
mail Address*
6. Site Contact
9192336747
Telephone No.*
7. Organization
Adams Homes
Name
8. Site Contact
Street Address
Mailing Address*
149 US HWY 70 West
Address Line 2
aty
GARNER
Rbstal / Zip Code
27529
State / Rovince / Region
North Carolina
Country
United States
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 03/28/2019
Approved *
2. E&SC Plan Project JC# 15-028-P
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* Johnston County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan Certificate Orchards at summerlynp2lots5-27.pdf 698.82KB
Approval EC Plan for OR.pdf 517.22KB
letter/documentation
NCG01-Permit-4.30.19. pdf 997.39KB
Orchards at Summerlyn P21-ots5-
150.85KB
27_ESCApprova I_3.28.19. pdf
Mist be RCF format
6. NOI Certification NOI Certification 4-4-19 Orchards at Summerlyn
Form Ph2.pdf 69.04KB
Mist be RJF format
This is an Express r No
Review Project* f Yes
E. Certification
North Carolina General Statute 143-215.6B (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person'
"This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
its %I-. d
Type Name* Nick Tsakanikas
Date * 04/04/2019
F. Tracking and COC Info
NOI Tracking No. 9863
NC Reference No. NCG01-2019-0012
Uses 'count_nunber variable (increrrented by SP)
Certificate of NCC190012
Coverage (COC) Uses 'count _nunber'variable (increrrented bySP)
No. *
Count Number 12
Sequential nunber for subrrittal that is increrrented by Stored Procedure
COC Year 2019
Year of date reviewed, used to assign YY digits after "NOC' in OOC no.)