HomeMy WebLinkAbout20190118 Ver 2_REVISED DMS letter SR 1412 Bridge 50 Division 5_20190402�.�,�:'�"'h" �;�e�:�'9�;����:�;���h.
,fb�a�A�,y.s�r�r,.
1���� ,�..�.�"�ll ll "u.1V���� t��.����'„w�
�N� ��rer��,r.�°���
� Il�i+ll ���I'""hW ��P�'n'",II�W�.Y9�.N1� �I P�uIIP�I���p.4'MIi�.
�,YSk"i�"�C�'£"�.N"
Ms. Heather Montague
NCDOT Division 5 Environmental Specialist
North Carolina Department of Transportation
2612 N. Duke Street
Durham, North Carolina 27704
Dear Ms. Montague:
Stream
Cool Warm Riparian
0 0 0.145
Subject: DMS Mitigation Acceptance Letter:
Division 5 Project, Replace Bridge 50 over Devils Cradle Creek on SR 1412 (Pete Smith Road),
Franklin County, Division 5, WBS No. 17BP.S.R.66
The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (NCDEQ DMS) will
provide the compensatory wetland mitigation for the subject project. Based on the information supplied by you on March 29,
2019, the impacts are located in CU 03020101 of the Tar-Pamlico River basin in the Central Piedmont (CP) Eco-Region, and
are as follows:
Tar-Pamlico '
� 03020101 �. � ""'
Cp Cold
�.� Impacts � .... �
acres)
—..__e�e ................... �� ........�.
*Some of the stream and wetland
Wetlands
_. ,...._...
Non-
0
may be proposed to be mitigated at a 1:1
��II:��.���.�.�� �����w"����NV'��II��
�"��u��.�����������' ����ma��Mr��„P
March 29, 2019
Buffer (Sq. Ft.)
Mar....—_
tal Zone 1 ..� -`� Zone. -
sh 2
0 0 0
i ratio. See pernvt application for det
ails.
This mitigation acceptance letter replaces the mitigation acceptance letter issued on January 15, 2019.
These impacts and associated mitigation needs were under projected by the NCDOT in the 2018 impact data. DMS will
commit to implement sufficient compensatory wetland mitigation credits to offset the impacts associated with this
project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee
Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mirigation acceptance
letter will no longer be valid and a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
��,
� , _.... �
���� � � ��
, . ' � �,�� , M. .,, ,����,.�
une�; B. Stanfill
: ���Asset Management Supervisor
cc: Mr. James Lastinger, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NCDWR
Ms. Linda Fitzpatrick, NCDOT — PDEA
File: SR 1412 — Bridge 50 Revised — Division 5
�� ��� �
� �a�
� �� � � ��
�� ,� ��
n���:� `�� ,������„� ���,�
�
�'err��.fi� e�r�vl�tt�l �W�xo�r'�ir�rssl �F'�rk�rf.z�niu°iifxeJ��a,siPit;� � �4Y��i,ie�u^�c�,ltr�r�r�:ti�ii,�Er�ie,r��;
�[F�"do- �� i�������,i��t l �?e'r ,v�rru�crHi�c o.,��k��r � i'��ar�,�f¢F�,l��rr�rf�4 .,�ilni�voo�,���s�, (� �'�
`�� f�'�,D'✓.hr'r"t?�