Loading...
HomeMy WebLinkAboutNCG140435_NOV RESOLVED_20181026ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. interim Director October 26, 2018 American Concrete Inc. Attention: Gary Stroup 2698 Mount Home Church Road Morganton, North Carolina 28655 Subject: Compliance Evaluation Inspection Permit: NCG140435 Burke County, North Carolina Dear Mr. Stroup: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 16, 2018. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Enclosure: Inspection Report Sincer Isaiah-; Reed, EPSCI, MS4C Cl Environmental Specialist Land Quality Section aoATMv— oawmm.m of a.w�m aom oo:nry North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 701 Swannanoa, North Carolina 28778 828.296.4500 Compliance Inspection Report Permit: NCG140435 Effective: 08/01/17 Expiration: 06/30/22 Owner: American Concrete Inc SOC: Effective: Expiration: Facility: American Concrete Inc Ali County: Burke 2698 Mount Home Church Rd Region: Asheville J Morganton NC 28655 Contact Person: Gary Stroupe Title: Phone: 828443-9112 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/16/2018 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: EntryTime: 11:15AM Exit Time: 12:15PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge CDC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 Permit: NCG140435 Owner -Facility: American Concrete Inc Inspection Data: 10/16/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On October 16, 2018 this facility was inspected for compliance. I met with Gary Stroup and Kevin Stroup on site. Compliance issues from the Notice of Violation have been addressed and the notice of violation is now closed. Additionally, to avoid further violations in the future, please note the following: 1) The permitee shall record and document all inspections required by the permit. 2) The permitee shall continue forming the onsite SWPPP to meet all requirements of General Permit NCG140000. 3) The permitee shall monitor the areas associated with the offsite release of concrete waste for any future impacts. If you have any questions, please contact this office at (828) 296-4614 4614 Page: 2 Permit: NCG140435 Owner -Facility: American Concrete Inc Inspection Date: 10/16/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (l1SGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? M ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? M ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes Na NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page: 3