Loading...
HomeMy WebLinkAboutNCS000583_Missing Application Item_20150721A. For each outfall, provide an estimate of the area (include units) of impervious surfaces (including paved areas and building roofs) drained to the oulfall. and an estimate of the total surface area drained by the outfall. Cuffall Area of Impervious Surface Total Area Drained Outiall Area of Impervious Surface Total Area Drained N,,moer Number 1 4,42 acres B. Provide a narrative description of significant materials that are currently or in the past three years have been treated, stored or disposed in a manner to allow exposure to storm water; method of treatment, storage, or disposal; past and present materials management practices employed. in the last three years. to minimize contact by these materials with storm water runoff; materials loading and access areas; and the location. mannerand frequency in which pesticides. herbicides. soil conditioners, and fertilizers are applied. See Process and Site Description which is attached. C For each cutia:: provide the location and a description of existing structural and nonstructural control measures to reduce pollutants in storm water rune!!: and a description of the treatment the storm water receives, including the schedule and type of maintenance for control and treaimenimeasures h fluid oudall Ust Codes from • m r Treatment Table -t 1 None V. Nonstormwater Discharges A. I certify under penaLy of law Inat the cuffall(s) covered by this application have been tested or evaluated for the presence of nonstormwatef discharges. and that all nonstornlwater discharges from these ouffall(s) are identified in either an accompanying Form 2C r F rm 2E applicaion for the Name and Cfftclal Title !type orprint) Signature Date Signed John Santos, Operations Manager E. Provide a oescrpdon of the method used. the date of any testing, and the onsile drainage points that were directly observed during a test. See Attached Process and Site Description for discussion of non -storm discharge evaluation V1. Significant Leaks or S Ills Provide existing information regarding the history of significant leaks or spills of toxic or hazardous pollutants at the facility in the last three years, including the approximate date and location of the spill or leak. and the "and amount of material released. There have been no known significant leaks or spills at the facility in the past three years. PP• Fn.rn 151113-eP r.x_em Pan. 9M n Continue on Paoe 3 Not Available at this time vii. DisCltaf a in?OQRaciort l.urrtn,uctl uvr,r a o ., . , , -. each instructions for additional details. Part A- You must provide the resuhs of at least one analysis for every pollutant in this table. Complete one table fAP0llUt*AtS Pollutant and CAS Number (it availabrer Maximum Values !include units) Average Values (include units) Number of Storm Events Sampled Source Grab Sample Taken DuringTaken Fret 30 Minutes Flaw weighted Composite Grab Sample During First 30 Minutes Flow•weightetl Composite Oil and Grease biological Oxygen Demand (BOM Chemical Oxygen Demand (COD) Total Suspended Solids ITSS) Total Kjeldaht Nitrogen Nitrate plus Nante Nitrogen 'ota =.csc«or..- ch 4•r ^jm Max-num Minimum Maximum Part B - os: eacn pc:.utari :rat re :+mgec in an effluent gmdel,ne wh¢h the facility is subject :o or any btnutam. ns;eo it, the facility s N DES perm.: for * protass wastewater (if the facility is operating under an existing NPOES permit/. Complete one table for each curtail. h in r n i r ii n i ;Is ' Maximum Values I Average Values I Number (irclude units; (include units) of a^C Grab Samole Grab Sample Storm C-S Taker. During i Flow -weighted I Ta F Cr:ng Flow- weighted Events ; First 3C henutes. Cemoeslte Minutes Composite SampledSources of P:L'utants I I i I I I I i I I I I ' I i I Continue on Revert& EPA Form 3510-21F (11-90) ^sy° v"" Not Available at this time . —.. «......, ,.. , �..va cr•c, 11-0. env cr- MAX YOU Know or nave reason to believe is addleonal debate and r;uiraments. Complete one table for each outfslf. present. See the instructions for Pollutant and CAS Number (favailable) Maximum Values (Include units) Average Values (include units) Number of Storm Events Sampled! Sources of Pollutants Grab Sample Taken During Fret a Minutes Flowwwighted Composite Grab Sample Taken During first 30 Minutes Flow-wei htad 9 Composite I ! i I I I � l I i I ; I ! I I i I I I ' I l PartD - Provide data for the storm oven! s which resulted in the maximum values for the flow wei hted com osite sam le. 1. Date of Storm Event 2. Duration of Storm (in mimes 3. Total rainfall during storm event in inches e. Number of hours between beginning of storm mass- ured and end of previous P measurable rain event 5. Maximum boo rate during rain event allons minute or (g if s units 6. Total flow from rain event Ig allons or s units) 7. Season sample was taken 6. Form of Precipitation no(law nfifi snowmee) 9. Provide a description of the method of flow measurement or estimate. ee• c___ —... — ... -_.