HomeMy WebLinkAbout20061427 Ver 1_Approval Letter_20070213~~F W A TF~jp Michael F. Easley, Governor
`(~ ~i William G. Ross Jr., Secretary
~ tom-- North Carolina Department of Environment and Natural Resources
~ ~
p ..~ Alan W. Klimek, P.E. Director
Division of Water Quality
February 13, 2007
DWQ Project # 06-1427
Lee County
Mr. Vic Czar
City of Sanford
P.O. Box 3729
Sanford, NC 27330
Subject Property: City of Sanford -Sewer Improvement
Little Buffalo Creek [030611, 17-42, C]
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Czar:
You have our approval, in accordance with the attached conditions and those listed below, to
temporarily impact 0.064 acres of 404/wetland and temporarily impact 971inear feet of perennial
stream, and temporarily impact 182 linear feet of intermittent stream as described in your
application received by the Division of Water Quality (DWQ) on September 5, 2005, with
additional information received by the DWQ on September 13, 2006 and November 27, 2006,
for the purpose of constructing the sewer improvements. After reviewing your application, we
have decided that the impacts are covered by General Water Quality Certification Number(s)
3374 (GC3374). The Certification(s) allows you to use Nationwide Permit(s) NW 12 when
issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or
otherwise comply with any other required federal, state or local permits before you go ahead
with your project including (but not limited to) Erosion and Sediment Control, and Non-
discharge regulations. Also, this approval to proceed with your proposed impacts or to
conduct impacts to waters as depicted in your application shall expire upon expiration of
the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn•//h2o.enr state nc.us/ncwetlands
N °ehCarolina
J~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
City of Sanford
Page 2 of 4
February 13, 2007
The following impacts are hereby approved as long as all of the other specific and
general conditions of this Certification (or Isolated Wetland Permit) are met. No other
impacts are approved including incidental impacts:
Amount A roved Units) Plan Location or Reference
404/Wetland 0.064 acres) - tem orary PCN age 8 of 13
Stream -perennial 97 (linear feet) -
tem orary PCN page 8 and 9 of 13
Stream -intermittent 182 (linear feet) -
tem orary PCN page 8 and 9 of 13
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control
measures and stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
within six months of the date that the Division of Land Resources has released the project;
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
City of Sanford
Page 3 of 4
February 13, 2007
warning fencing (or similar high visibility material) for the areas that have been approved
to infringe within the buffer, wetland or water prior to any land disturbing activities to
ensure compliance with 15A NCAC 2B .0233 and GC 3404;
6. Sewer Systems
The project shall comply with 15A NCAC 2H .0219(i)(2)(G) and all other State, Federal
and local sewer system regulations.
7. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division
of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control
program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is
automatically issued to the project. This General Permit allows stormwater to be
discharged during land disturbing construction activities as stipulated by conditions in the
permit. If your project is covered by this permit [applicable to construction projects that
disturb one (1) or more acres], full compliance with permit conditions including the
sedimentation control plan, self-monitoring, record keeping and reporting requirements
are required. A copy of this permit and monitoring report forms maybe found at
http ~//h2o enr state. nc, us/su/Forms Documents. htm.;
8. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401 Oversight/Express Review
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
City of Sanford
Page 4 of 4
February 13, 2007
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-
733-1786.
AWK/ijm
Enclosures: GC 3374
Certificate of Completion
cc: Mike Horan, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Christina Breen, ECS Carolinas, LLP, 9001 Glenwood Avenue, Raleigh, NC 27617-7505
Fi I ename: 061427C03an fordSewer[mprove(Lee)40 I