HomeMy WebLinkAbout20190378 Ver 1_PCN Form Submission_20190327D1�VR
�irlslan af Water Resources
Initial Review
Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned *
20190378
Is a payment required for this project?*
f No paymentrequired
� Fee received
f Fee needed - send electronic notification
Select Project Reviewer"
Dave Wanucha:eads\djwanucha
Information for Initial Review
1a. Name of project:
Replacement of Bridge #540170 over Crane Creek
1a. Who is the PrimaryContact?*
Amy Euliss — NCDOT Div 9 EO
1b. PrimaryContact Email:*
aeuliss@ncdot.gov
Date Submitted
3/27/2019
Nearest Body of Water
Crane Creek
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude:
35.626190
A. Processing Information
County (or Counties) where the project is located:
Rowan
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
G Yes r No
(NCDOT only) T.I.P. or state project number:
Ve rsion# *
1
Reviewing Office *
Winston-Salem Regional Office - (336) 776-
9800
1c. PrimaryContact Phone:*
(336)747-7500
Longitude:
-80.456513
::
WBS # (�)
17 BP.9. R.81
1a. Type(s) of approval sought from the Corps:
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
C' Yes r No
Nationwide Permit (NWP) Number:
14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
r' Non-404 Jurisdictional General Permit
r Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
Forthe record onlyfor DWR401 Certification:
For the record onlyfor Corps Permit:
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
1f. Is this an after-the-fact permit application?*
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
F Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
SR 2300 - Bridge 170 Revised - Division 9- STR - YD 103.pdf
1h. Is the project located in any of NC's twenty coastal counties?
C' Yes r No
1j. Is the project located in a designated trout watershed?
� Yes r No
B. Applicant Information
1d. Who is applying for the permit?
rJ Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
� Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT Division 9
2b. Deed book and page no.:
fWA
2c. Responsible party:
WA
2d. Address
Street Address
375 Silas Creek Parkway
Address Line 2
�Y
Winston-Salem
Fbstal / Zip Code
27127
2e. Telephone Number:
(336)747-7800
S[ate / FYovince I Region
NC
Cauntry
USA
2f. Fax Number:
64.46KB
x
C' Yes R No
C' Yes G No
�,
2g. Email Address:*
aeuliss@ncdot.gov
C. Project Information and Prior Project History "
1. Project Information
1b. Subdivision name:
(rf appropriate)
1c. Nearest municipality/town:
Salisbury
2. Project Identification
2a. Propertyldentification Number:
N/A
2c. Project Address
Street Address
SR 2300 (Main Street)
Address Line 2
�Y
Salisbury
Postal I Zip Code
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:*
Crane Creek
3b. Water Resources Classification of nearest receiving water:*
C
3c. What river basin(s) is your project located in?*
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401030301
4. Project Description and History
2b. Property size:
6.4
State / Rovince I f�gion
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Exsting Conditions include SR 2300 and Bridge #84017Q residential, agricultural, undeveloped forest and disturbed/maintained right-of-way.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
C' Yes �' No G Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
R81 _Bridg e 170_Fig u re 1_USGSMap. pdf 1.12 MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
R81 _Bridg e 170_Fig u re2_SoilsMa p. pdf 1.63 MB
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
442
4h. Explain the purpose of the proposed project:"
To improve Bridge #840170 and replace with a new, modern bridge structure.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Erosion and sedimentation control measures will be installed. Bridge demolition will include the removal of the bridge deck and the removal of the top portion of the bridge abutments,
leaving the footer and approximately one foot of the masonry abutment to match the excavation elevation. Bridge replacement construction using heavy equipment from the upland
roadway approaches. No deck drains are proposed on the bridge. A portion of the unnamed tributary to Crane Creek will require a minor stream relocation to avoid conflicts with the
bridge end bent. The proposed bridge will be built on the same alignment with a temporary off-site detour.
4j. Please upload project drewings for the proposed project.
R.81_Permit Drawings_2019-03-19.pdf
17BP.9.R.81_HYD_SMPv2.08_(20190318) (Apr 2018).pdf
1.62 MB
156.78KB
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the propertyor proposed impact areas?*
r Yes r No
Comments:
See attached WeUand Determination Form, Stream Forms, Photographs and Waters map
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
C' Preliminary r Approved r Not Verified C' Unknown C' WA
Corps AID Number:
Sc. If Sa is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
Sd1. Jurisdictional determination upload
R81 DP 1 Upland data sheet.pdf
NCDWQ RPW B- UT to Crane Cr.pdf
R81 _Bridge 170_Fig u re3_WatersMap. pdf
R.170 Photopages.pdf
6. Future Project Plans
393.01 KB
73.04KB
2.06MB
14.15MB
C' Unknown
6a. Is this a phased project?*
C' Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands fJ Streams-tributaries
r Open Waters r Pond Construction
3. Stream Impacts
r Buffers
❑ 3a. Reason for impact (') 3b.lmpact type * 3a Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact
(�) Jurisdiction" length"
Brid e re lacement Permanent Bank Stabilization Crane Creek Perennial Both 18 127
S1 9 P
Average (feet) (linear feel)
Brid e re lacement Permanent Relocation U.T. to Crane Creek Perennial Both 5 79
SZ 9 P Average (feet) (linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
206 0
3i. Total stream and ditch impacts:
206
3j. Comments:
Permanent impacts of 127 linear feet to the stream bank (riprap will be keyed into the bank) of Crane Creek is proposed for stabilization and no part of
the stream bed will be impacted. The proposed 79 linear feet of permanent impact to RPW Stream B(unnamed tributary to Crane Creek) will be
mitigated by the realignment of the stream slightly to the south and purchase of In-Lieu Fee mitigation.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
Brandon Phillips, CHMM
STV Engineers, Inc.
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Replace bridge in-place was incorporated to minimize impacts. The bridge span length was extended to reduce impacts. Riprap at the embankments is
minimized and installed on stream banks only to reduce impacts to surface waters.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
NCDOT Best Management Practices (BMPs) for Construction and Maintenance Activities will be employed. Top down demolition and construction
methods will be used to minimize impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
� Yes r No
2c. If yes, mitigation is required by (check all that apply):
r DWR fJ Corps
2d. If yes, which mitigation option(s) will be used for this project?
� Mitigation bank II� Payment to in-lieu fee I� Permittee Responsible
program Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
� Yes r No
4b. Stream mitigation requested:
(linear feet)
79
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non-riparian wetland mitigation requested:
(acres)
4c. If using stream mitigation, what is the stream temperature:
warm
4e. Riparian wetland mitigation requested:
(aores)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
4h. Comments
The minor (79 If) relocation of the unnamed tributary to Crane Creek will require mitigation for the permanent impacts proposed.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
C' Yes r No
If no, explain why:
Project is located in the Yadkin-Pee Dee River Basin and is not subject to NC Riparian Buffer Protection Rules.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
F Yes r No
Comments:
Please see attached Stormwater Management Plan for details on the minimi�ation of water quality impacts.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
f• Yes r No
�
�
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental PolicyAct (NEPAISEPA)?*
C' Yes r No
Comme nts: *
Bridge replacement project that required the preparation of a Minimum Criteria Determination Checklist.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
� Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
C' Yes r No
3b. If you answered "no," provide a short narrative description.
Project involves the replacement of an existing bridge and is not anticipated to affect future development.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
� Yes r No � WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
Sc. If yes, indicate the USFWS Field Office you have contacted.
Asheville
Sd. Is another Federal agency involved?*
C' Yes r No
Se. Is this a DOT project located within Division's 1-8?
f Yes r No
Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
Sg. Does this project involve bridge maintenance or removal?
F Yes r No
Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.?
r Yes r No
If you answered "Yes" to Sg(1), did you discover any signs of bat use?
� Yes r No � Unknown
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
C' Yes r No
r Unknown
Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
� Yes r No
S. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS IPaC and NCNHP data and site specific surveys. See Cover Letter attached under Miscellaneous for threatened and endangered species
write-ups and biological conclusions.
Consultation Documentation Upload
project_report_17bp9 r81 _12050_12050. pdf
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat? *
C' Yes r No
66. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?'�
NOAA EFH Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
873.91 KB
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
� Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
See attached "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes No Historic Properties Present or Affected Form."
7c. Historic or Prehistoric Information Upload
PA 17-05-0042 Rowan (NSR).pdf
17-05-0042 NoElig ibleProps. pdf
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?*
� Yes r No
9.09M6
3.95MB
Sb. If yes, explain how project meets FEMA requirements:
NCDOT Hydraulics Unit Coordination with FEMA.
Sc. What source(s) did you use to make the floodplain determination?"
FEMA FIRM maps
Miscellaneous
Comments
The attached cover letter indudes information regarding the Threatened and Endangered Species that are listed in Rowan County.
Miscellaneous attachments not previously requested.
Brg 170 Permit Cover Letter.pdf 229.77K6
Signature
*
�J By checking the box and signing below, I certify that:
. I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY');
. I agree to conduct this hansaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
. I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Amy Euliss
Signature
fj�frrJU�!/tctt7
Date
3/27/2019