Loading...
HomeMy WebLinkAbout20150751 Ver 2_EEP_mitigation_acceptance_20190323��� � ��� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Division of Mitigation Services Governor July 23, 2015 Mr. Clay Willis NCDOT Division 1 Environmental Officer North Carolina Department of Transportation 113 Airport Drive, Suite 100 Edenton, North Carolina 27932 Dear Mr. Willis: Subject: Mitigation Acceptance Letter: 0 Division 1 Project, Replace Bridge 36 on SR 1143 (Sladesville-Credle Road), Hyde County; WBS Element 17BP.1.R.63 The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the coastal marsh mitigation for the subject project. Based on the information received from you on July 20, 2015, the impacts are located in CU 03020104 of the Tar-Pamlico River basin in the Northern Outer Coastal Plain (NOCP) Eco-Region, and are as follows: Tar-Pamlico 03020104 NOCP Stream Cold I Cool W etlands Warm Ri arian Non- PD:..,......_ Impacts (feet/acres) I 0 I 0 I 0 *Some of the stream and wetland impacts may be proposed to be Coastal Marsh 0.038 Donald R. van der Vaart Secretary Buffer (Sq. Ft.) Zone 1 � Zone 2 at a 1:1 mitigation ratio. See permit application for details. This unpact and associated mitigation need were under projected by the NCDOT in the 2015 impact data. DMS will commit to implement su�cient coastal marsh credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. 8420. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- �i � �'�'�✓I"��/ �B. Stanfill Management Supervisor cc: Ms. Tracey Wheeler, USACE — Washington Regulatory Field Office Mr. Greg Daisy, Division of Coastal Management — Elizabeth City Field Office Mr. John S. Abel, NCDOT — Division 1 Bridge Program Engineer Ms. Linda Fitzpatrick, NCDOT — PDEA File: SR 1143 — Bridge 36 — Division 1 1652 Mail Service Center, Raleigh, North Carolina 27699-1652 Phone: 919-707-89761 Internet: http:/lportal.ncdenr.org/web/eep An Equal Opportunity 1 Affirmative Action Employer— Made in pari by recycled paper