Loading...
HomeMy WebLinkAbout20180901 Ver 1_2018.10.29 Higgins Response Letter_20181029v MCKIM&CREED v October 29, 2018 Ms. Karen Higgins, Supervisor NCDWR, 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 RE: Buffalo Water District Project No. 1— 2017-18 Hydraulic Improvements 401 and Riparian Buffer Permitting Project ID No.: DWR #18-0901 Dear Ms. Higgins: M&C 0358-0138(40) E N G I N E E R S SURVEYORS P L A N N E R S On behalf of the Buffalo Water District, we are submitting the following information for the subject project (DWR Project ID No. 18-0901) for your review and approval based on receipt of your October 1, 2018 letter. On October 26, 2018, McKim & Creed discussed the NCDEQ DWR's comments and concerns on the design of the proposed water main crossing of the Neuse River with Mr. Paul Wojoski. Below is a summary of actions that will occur as part of the design, bidding, and construction of this crossing based on our phone conversation: 1. The Contractor will be directed to construct this crossing using a coffer dam system that meets the requirements as identified in the design. 2. The Contractor will be directed to submit the coffer dam system to McKim & Creed, the Owner, and the DWR for review and approval prior to construction. All parties must approve the design before the coffer dam system is implemented. 3. McKim & Creed will extend an invitation to the DWR to attend the Pre -Bid Meeting, the Pre - Construction Meeting, and a field meeting with construction personnel and project stakeholders prior to commencing work to facilitate the Neuse River crossing. The schedule for these meetings has yet to be determined. If you have any questions, please feel free to contact me at (919) 233-8091 or by email at anaukovidi@mckimcreed.com. Sincerely, M Venture 1V Building cKIM & CREED, Inc. 1730 Varsity Drive Raleigh, NC NC 27606 014� Adam Paukovich, PE Project Manager 91 9.2 3 3.8 0 91 cc: Rick Hester, PE, Wilson's Mills Water District Chandra Farmer, PE, Wilson's Mills Water District Fax 9 1 9.2 3 3. 8 0 3 1 Jason Steele, EEE Consulting, Inc www.mckimcreed.com \ \ RALINF01 \ cad \ 0358 \ 0138 \ 40 -Permit \ 45 -DEM, DEH, DOT, etc \ 401-404 Permitting \ 2018.10.29 Higgins Response Letter.doc