HomeMy WebLinkAbout20180901 Ver 1_2018.10.29 Higgins Response Letter_20181029v MCKIM&CREED
v
October 29, 2018
Ms. Karen Higgins, Supervisor
NCDWR, 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
RE: Buffalo Water District
Project No. 1— 2017-18 Hydraulic Improvements
401 and Riparian Buffer Permitting
Project ID No.: DWR #18-0901
Dear Ms. Higgins:
M&C 0358-0138(40)
E N G I N E E R S
SURVEYORS
P L A N N E R S
On behalf of the Buffalo Water District, we are submitting the following information for the subject project
(DWR Project ID No. 18-0901) for your review and approval based on receipt of your October 1, 2018 letter.
On October 26, 2018, McKim & Creed discussed the NCDEQ DWR's comments and concerns on the design of
the proposed water main crossing of the Neuse River with Mr. Paul Wojoski. Below is a summary of actions
that will occur as part of the design, bidding, and construction of this crossing based on our phone
conversation:
1. The Contractor will be directed to construct this crossing using a coffer dam system that meets the
requirements as identified in the design.
2. The Contractor will be directed to submit the coffer dam system to McKim & Creed, the Owner, and
the DWR for review and approval prior to construction. All parties must approve the design before
the coffer dam system is implemented.
3. McKim & Creed will extend an invitation to the DWR to attend the Pre -Bid Meeting, the Pre -
Construction Meeting, and a field meeting with construction personnel and project stakeholders prior
to commencing work to facilitate the Neuse River crossing. The schedule for these meetings has yet to
be determined.
If you have any questions, please feel free to contact me at (919) 233-8091 or by email at
anaukovidi@mckimcreed.com.
Sincerely,
M
Venture 1V Building cKIM & CREED, Inc.
1730 Varsity Drive
Raleigh, NC NC 27606 014�
Adam Paukovich, PE
Project Manager
91 9.2 3 3.8 0 91 cc: Rick Hester, PE, Wilson's Mills Water District
Chandra Farmer, PE, Wilson's Mills Water District
Fax 9 1 9.2 3 3. 8 0 3 1 Jason Steele, EEE Consulting, Inc
www.mckimcreed.com
\ \ RALINF01 \ cad \ 0358 \ 0138 \ 40 -Permit \ 45 -DEM, DEH, DOT, etc \ 401-404 Permitting \ 2018.10.29 Higgins Response Letter.doc