Loading...
HomeMy WebLinkAbout20190196 Ver 1_Revised 80073 PERMIT DRAWINGS 02-28-2019_20190315� � 0 0 See Sheet 9-A For Index of Sheets ����� �� ����� �������� �������� �� �������� JOH1�lST01� CO U1�TY � � 0 �O LOCATI011L• REALIGN I11lTERSECTION OF SR-2519 (BRASWELL ROAD) £�' SR-2525 (ORM0111D ROAD) AT SR-2523 (BAKERS CHAPEL ROAD) TYPE OF WORK GRADIIVG, DRAIIVAGE A1VD PAVING ., � V W O � � -Yl- P�T 11 + 00.00 BEGI11l PROJECT -Y2- POT 15 + 60.00 E1�D PROJECT 80073 CLEARI11lG 01V THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS PROJECT IS 111OT WITHIN A1VY MUNICIPAL BOUNDARIES. ., � V � � O V _ �I 'v 0 0 01 � �; �;i �% PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepored ln tne Offlce of: �'DRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ADT 2016 = 860 DIVISION OF HIGHWAYS $0 2$ 0 $� 1�0 Division 4 DDC � pgp��� 509 Ward Blvd., Wilson NC, 27895 �� � 2018 ST9NDARD SPEC7FlCAT70NS ��� 4�p' PLANS � LENGTH ROADWAY PROJECT 80073 L71YE —YI— = 0.152 MILES P'E' � ' SIGNATURE: Pa 50 25 0 50 100 LENGTH ROADWAY PROJECT 80073 LINE —Y2— = 0.106 MILES RIGHT OF WAY DATE: RONNIE KEETER. PE s q TOTAL LENGTH PROJECT 80073 = 0.258 MILES rao�ecr sNcixEex ROADWAY DESIGN � � V= 50 MPH DECEMBER 2018 PROFILE (HORIZONTAL) ENGINEER $�.�� ���� l0 5 0 l0 zp FUNCTIONAL CLASS LETTING DATE: D.R. ETHRIDGE �� Y�A��� SUBREGIONAL TIER JUNE 2019 E'ROJECT DES/GN ENGINEER PROFILE (VERTICAL) PE SlGNATURE: WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS EXISTING CHANNEL EXISTING EXISTING PERMANENT EXCAVATION MECHANIZED HAND IMPACTS TEMP. FILL IN PERMANENT TEMP. SW CHANNEL CHANNEL SITE STRUCTURE SIZE / STATION FILL IN IN CLEARING IN CLEARING IN PERMANENT WETLANDS SW IMPACTS IMPACTS IMPACTS IMPACTS NO. TYPE (FROM/TO) WETLANDS WETLANDS WETLANDS WETLANDS BANK (AC) �AC� (AC) (AC) (AC) (AC) (AC) PERMANENT STABILIZATI TEMP. �FT� ON (FT) (FT) 1 2@30" RCP -Y1- 17+12 0.000 0.000 0.005 0.000 0.000 0.000 0.000 85.000 0.000 19.000 TOTALS: 0.005 85.000 19.000 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS JOHNSTON COUNTY PROJECT: 80073 BUFFER IMPACTS SUMMARY I M PACT BUFFER WETLANDS IN REPLACEMENT BUFFERS TYPE ALLOWABLE MITIGABLE SITE STRUCTURE SIZE / STATION NO. TYPE (FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2 CROSSING BRIDGE IMPACT ft ft ft ft ft (ft2 ft2 � 2) � 2) � 2) � 2) � 2) ) � ) �ft2) �ft2) �ft2) 1 2@30" RCP -Y1- 17+12 X 6415 3647 10062 0 0 0 234 0 TOTAL: 6415 3647 10062 0 0 0 234 0 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS JOHNSTON COUNTY PROJECT: 80073