HomeMy WebLinkAbout20190196 Ver 1_Revised 80073 PERMIT DRAWINGS 02-28-2019_20190315�
�
0
0
See Sheet 9-A For Index of Sheets
����� �� ����� ��������
�������� �� ��������
JOH1�lST01� CO U1�TY
�
�
0
�O
LOCATI011L• REALIGN I11lTERSECTION OF SR-2519 (BRASWELL ROAD) £�'
SR-2525 (ORM0111D ROAD) AT SR-2523 (BAKERS CHAPEL ROAD)
TYPE OF WORK GRADIIVG, DRAIIVAGE A1VD PAVING
.,
�
V
W
O
�
�
-Yl- P�T 11 + 00.00
BEGI11l PROJECT
-Y2- POT 15 + 60.00
E1�D PROJECT 80073
CLEARI11lG 01V THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
THIS PROJECT IS 111OT WITHIN A1VY MUNICIPAL BOUNDARIES.
.,
�
V
�
�
O
V
_
�I
'v
0
0
01
� �;
�;i
�%
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepored ln tne Offlce of: �'DRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH
ADT 2016 = 860 DIVISION OF HIGHWAYS
$0 2$ 0 $� 1�0 Division 4 DDC � pgp���
509 Ward Blvd., Wilson NC, 27895 �� �
2018 ST9NDARD SPEC7FlCAT70NS ��� 4�p'
PLANS �
LENGTH ROADWAY PROJECT 80073 L71YE —YI— = 0.152 MILES P'E' � '
SIGNATURE: Pa
50 25 0 50 100 LENGTH ROADWAY PROJECT 80073 LINE —Y2— = 0.106 MILES RIGHT OF WAY DATE: RONNIE KEETER. PE s q
TOTAL LENGTH PROJECT 80073 = 0.258 MILES rao�ecr sNcixEex ROADWAY DESIGN � �
V= 50 MPH DECEMBER 2018
PROFILE (HORIZONTAL) ENGINEER $�.�� ����
l0 5 0 l0 zp FUNCTIONAL CLASS LETTING DATE: D.R. ETHRIDGE �� Y�A���
SUBREGIONAL TIER JUNE 2019 E'ROJECT DES/GN ENGINEER
PROFILE (VERTICAL) PE
SlGNATURE:
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
EXISTING
CHANNEL
EXISTING EXISTING
PERMANENT EXCAVATION MECHANIZED HAND IMPACTS
TEMP. FILL IN PERMANENT TEMP. SW CHANNEL CHANNEL
SITE STRUCTURE SIZE / STATION FILL IN IN CLEARING IN CLEARING IN PERMANENT
WETLANDS SW IMPACTS IMPACTS IMPACTS IMPACTS
NO. TYPE (FROM/TO) WETLANDS WETLANDS WETLANDS WETLANDS BANK
(AC) �AC� (AC) (AC) (AC) (AC) (AC) PERMANENT STABILIZATI TEMP.
�FT� ON (FT)
(FT)
1 2@30" RCP -Y1- 17+12 0.000 0.000 0.005 0.000 0.000 0.000 0.000 85.000 0.000 19.000
TOTALS: 0.005 85.000 19.000
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
JOHNSTON COUNTY
PROJECT: 80073
BUFFER IMPACTS SUMMARY
I M PACT BUFFER WETLANDS IN
REPLACEMENT BUFFERS
TYPE ALLOWABLE MITIGABLE
SITE STRUCTURE SIZE / STATION
NO. TYPE (FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2
CROSSING BRIDGE IMPACT ft ft ft ft ft (ft2 ft2
� 2) � 2) � 2) � 2) � 2) ) � ) �ft2) �ft2) �ft2)
1 2@30" RCP -Y1- 17+12 X 6415 3647 10062 0 0 0 234 0
TOTAL: 6415 3647 10062 0 0 0 234 0
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
JOHNSTON COUNTY
PROJECT: 80073