STORMWATER MANAGEMENT PLAN -
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: TIP No.: SF-180178 County(ies): Bladen Page 1 of 1
General Project Information
WBS Element: TIP Number: SF-180178 Project Type: Bridge Replacement Date: 8/20/2018
NCDOT Contact: James Rerko Contractor / Desi ner: MI En ineerin , PLLC Andrew Nottin ham
Address: PO Box 1150, 28302 Address: 1011 Schaub Dr
500 Transportation Drive, 28301 Suite 100
Fa etteville, NC Ralei h NC 27606
P hone: 910-364-0834 P hone: 919-851-6606
Email: "rerko ncdot. ov Email: anottin ham mi-en ineers.com
Cit ITown: Elizabethtown, NC Count ies : Bladen
River Basin s: Ca e Fear CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 0.143 mi. Surrounding Land Use: Forest
Proposed Pro"ect Existin Site
Pro'ect Built-Upon Area ac. 0.4 ac. 0.4 ac.
Typical Cross Section Description: 2 lanes undivided highway with 11ft lanes, normal crown. 2 lanes undivided highway with 10ft lanes, normal crown.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 1000 Year: 2040 Existin : 800 Year: 2018
General Project Narrative: Existing 3 span (1 @17'-10", 1@17'-0", 1@18'-0") bridge on SR-1145 that spans Browns Creek. The existing bridge consists of a reinforced concrete floor on timber joists, with
(Description of Minimization of Water end bents and internal bents on timber caps and timber piers. The existing bridge was constructed in 1970. Multiple beams have areas of decay to the point where maintenance
Quality Impacts) activities cannot extend the life of the structure. Additionally, the structure is considered structurally deficient due to deck, superstructure, and substructure condition ratings of 5,
with an overall sufficiency rating of 53.08. The bridge is approaching he end of its useful life. Replacement of the bridge will result in safer traffic operations. The proposed bridge
is a 2-span (1 @45', 1@35') 21" cored slab with 2'-6" end bent cap on south end and vertical abutment on north end. The proposed bridge does not require deck drains and does
not discharge directly into the river. Runoff leaving the bridge deck is collected by inlet at the north end, and conveyed to a rip-rap pad at outlet, which diffuses the flow into the
floodplain before entering Browns Creek. Roadway drainage runs off on either side of the proposed roadway and disperses into wetlands and or natural ground. Construction of
the new bridge will take place while an off-site detour maintains traffic. Bank stabilization rip rap will be installed as necessary to prevent streambank degradation.
Waterbody Information
Surface Water Body (1): Browns Creek NCDWR Stream Index No.: 18-45
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: None
Other Stream Classification: None
Impairments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: N/A Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
�
�
�
�
�
�
0
�
•
.
�
.
�
�
.,
�
����� �� � ��� ��� ����
��II ��II �� � � ��II �� ���
PERMIT DRAWING
SHEET 1 OF 5
LOCATI01�: REPLACE BRIDGE l78 OVER BROWI�S CREEI�
01� SR 1145 (MAR TI1� L UTHER KI1�G DRI VE)
TYPE OF WORI�: GRADI1�lG, DRAI1�lAGE, PA T�I1�G A1�D STR UCTURE
ETLA D A D RFA E ATER I PA T PE IT
U
RO W PLA1�S
BEGI1� I'ROJECT 17BP.6.R.90
E1�D PR OJECT 17BP. 6.R. 90
-L- PT STA.18+47.39
-L- POT STA.10 + 93.28
Tp NC
8� �BYP.
�
------'
___ _
---
_ -L- —
-- -
� ---
(MARTIN LUTHER4KI
NG
� ��
�
� � �
�1
DRIVE) i �,' I
��� �
�,
�
BEGIIU BRIDGE
—�—
POT ST Ao l4 f�5o00
�
�
W
W
�
�
�
N
I � 0
�N
��
a
z
� � I�
,� ��
- �
��, l EIUD BRIDGE
s '
� —L — POT ST Ao l5 �55000
�;o
`° EUZABETH TOWN
CITY LlMITS
THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF ELIZABETHTOWN.
�
ff�
�
�
�
�
�
�
�
�
f�
f�
�
�
�
�
z
�
�o
���
���
���
���
��w
��
��Q
��z
���
��w
���
���
���
���
���
ff� ff� ff�
•,
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY METHOD II MODIFIED.
_ -
$�
NAD2011
TO ELIZABETHTOWN
Nc $� �Bus.�
DOCUMENT NOT CONSIDERED FINAL
� UNLESS ALL SIGNATURES COMPLETED
Prepared In the Offlce of: HYDRAULICS E11tGI1�EER
GRAPHIC SCALES DESIGII� DATA PROJECT LEI�GTH CDM CDM Smith Inc.
5400 Glenwood Avenue
ADT 2019 = 800 VPD Smith Suite 400 0� o��
Raleigh, NC 27612-3228 � � �
3� �5 � 3� 6� NC COA No. F-1255 �
ADT 2 04 0= 10 00 V P D FOR THE 11iORTH CAROLINA DEPARTMENT OF TRANSPORTATION Q�� �°�O
P LA N S D H V = _ 2018 STAIIIDARD SPECIFICATI011IS � ��
LE11 rGTH ROAD WA Y PR �JECT 17BP.6.R. 90 0.128 MILES DA VID J. CLODGO, PE p.E. �
D = � �
LE11lGTH BRIDGE PROJECT 17BP.6.R.90 = 0.015 MILES PROJECT ENGINEER SIGNATURE: [r� �
30 15 0 30 60 T— bo�o RIGHT OF WAY DATE: ROADWAY DESIG11t � o
V= 3 5 M P H A UG UST 3l, 2018 ADAM M. C011lRAD, PE E11 tGI1�EER � Q
P RO F I L E( H O R I Z O N TA L) PROJECT DESIGN ENGINEER � �
a
6 3 0 6 12 FUNC CLASS = LETTIIIIG DATE: � o� D� �,Q��
LOCAL TOTAL LEIIIGTH PROJECT 17BP.6.R.90 = 0.143 MILES MARCH 6, 2019 CHRISTY W. HUFF, PE �� p�
PROFILE (VERTICAL) SUB—REGIONAL TIER NCDOT CONTACT P.E.
SIGNATURE:
See Sheet l A For lndex of Sheets
See Sheet l B For Conventional Symbols
�\r\�A!\n�
\ ll �'JI�1\,�'.�I,
�JI 1.\I:�\1',�'I
�■liri■IiY■I■
■r■■■�-�r-
�. ■■■r ii� � °
�: �■■���.■ ■
iiiiiiiiii
■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■��■�■�!�ee
C�iiiiiirr�■■■�■■■■■
��������������������
��������������������
■■s�■s�■nr --r--�r�■■
■■■► ��r �� i� ■■■■ �■i ■■■
■■■� �� �► v �� _-�■ �■i ■■■
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
Bank Stabalization &
1 14+96/15+50 -L- Bridge Construction (1) 0.01 0.03 59 70
2 13+75/14+42 -L- Roadway Fill < 0.01 0.02
TOTALS*: < 0.01 0.02 0.01 0.03 59 70 0
*Rounded totals are sum of actual impacts
NOTES:
(1) - Proposed pier area = 15 SF, 33LF of channel
2016 09 09