Hair, Sarah E CIV CESAW CESAD (US)
<Sarah.E.Hair@usace.army.mil>
Thursday, March 14, 2019 4:39 PM
Rerko, James J
Steenhuis, Joanne; Price, Gregory W
[External] bridge 178 Bladen Corps NWP 3
verification
NWP 3 SAW-2019-00309 bridge 178 Bladen-
signed.pdf; 2017NWP03.pdf; 20190219_17BP.6.R.90
Bladen 178 Wetland and Surface Water Permit
Drawing....pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send
all suspicious email as an attachment to
report.spam@nc.gov<mailto:report.spam@nc.gov>
Jim,
Attached please find a signed version of the verification letter, approved plans, and
NWP 3 for the following project:
Corps Action ID: SAW-2019-00309
Project Name: bridge 178 Bladen
This authorization also covers the temporary impacts associate with the bridge
replacement project as outlined in the PCN.
Please note that this email serves as official notification. A paper copy will not be
mailed.
Thank you!
Liz Hair
Regulatory Project Manager
Wilmington District
US Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
Sarah.e.hair@usace.army.mil
910-251-4049