HomeMy WebLinkAboutNCS000390_Compliance Rpt_20090217a•,
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Mr. Bill Henkel, Branch Manager
Hydrocarbon Recovery Services, Inc.
2115 Speedrail Court
Concord, North Carolina 28025
Dear Mr. IIenkel:
Division of Water Quality
Coleen H. Sullins
Director
February 17, 2009
Subject: Compliance Evaluation Inspection
Hydrocarbon Recovery Services
Permit No. NCS000390
Cabarrus County, NC
Dee Freeman
Secretary
Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection
conducted at the subject facility on February 13, 2009, by Mr. Michael L. Parker with this Office. Thank
you for your assistance and cooperation during the inspection.
The enclosed report should be self-explanatory. Overall, your facility's Stormwater Pollution
Prevention Plan (SPPP) was well developed and implemented, however, there were certain sections of
your SPPP that need to be updated and/or revised. These areas were discussed during the inspection and
are also noted on the attached inspection report. As a reminder, please notes that your SPPP should be
updated on an annual basis as required by Part II, Section A, No. 7 of your permit.
If you have any questions, comments, or need assistance with understanding any aspect of your
permit, please do not hesitate to contact Mr. Parker at (704) 663-1699.
Sincerely,
for Robert B. Krebs d1�
Regional Supervisor
Surface Water Protection Section
Enclosure
cc: Shelton Sullivan — NPS/ACO Unit
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-1699 \ Fax: (704) 663-6040 \ Customer Service: 1-877-623-6748
Internet: wNw.ncwaterquality.org
An Equal Opportunity \ Affirmative Action Employer — 50%.Recycled/10% Post Consumer paper
NorthCarollna
Natltrall'y ;
Permit: NCS000390
SOC:
County: Cabarrus
Region: Mooresville
Compliance Inspection Report
Effective: 08/15/03 Expiration: 08/31/08 Owner: Hydrocarbon Recovery Services Inc
Effective: Expiration: Facility: Hydrocarbon Recovery Services, Inc. -Concord
Facilityy
2115 Speedrail Ct
Contact Person: Thomas Tomascik
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
24 hour contact name Bill Henkel
On -site representative Anne H Pifer
Related Permits:
Title:
Inspection Date: 02/13/2009 Entry Time: 09:30 AM
Primary Inspector: Michael L Parker
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Concord NC 28025
Phone: 705-455-1333
Certification:
Exit Time: 10:30 AM
Phone:
Phone: 704-455-4678
Phone: 704-455-6863
Phone: 704-663-1699
Ext.2194
Inspection Type: Compliance Evaluation
Page: 1
Permit: NCS000390 Owner - Facility: Hydrocarbon Recovery Services Inc
Inspection Date: 02/13/2009 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
®
n
n
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a "Narrative Description of Practices"?
n
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
E
n
n
n
# Has the facility evaluated feasible alternatives to current practices?
n
0
n
n
# Dods the facillly provide all nec;essaiy secuiidary cunlainmeril?
■
❑
❑
# Does the [lion include a BMP summary?
n
■
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
n
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
n
n
n
# Does the facility provide and document Employee Training?
®
n
n
n
# Does the Plan include a list of Responsible Party(s)?
n
n
n
# Is the Plan reviewed and updated annually?
n
n
n
# Doos the Plan include, a Stormwator Facility Inspection Program?
n
CI
Has the Stormwater Pollution Prevention Plan been implemented?
n
n
n
Comment: Part II, Section A, No. 2 (a) stipulates that the permittee must evaluate the
feasiblity of current practices. This evaluation should be performed at a minimum
annually and included in the SPPP.
The SPPP did not include a BMP summary as required by Part II, Section A, No. 2 (c).
Qualitative Monitoring
res
no
NA
nt
Has the facility conducted its Qualitative Monitoring semi-annually?
®
❑
❑
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
®
n
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
n
❑
®
n
Comment: This facility does not perform vehicle maintenance.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
n
n
n
# Were all outfalls observed during the inspection?
n
n
n
# If the facility has representative outfall status, is it properly documented by the Division?
n
o
®
o
Page: 3
Permit: NCS000390 Owner - Facility: Hydrocarbon Recovery Services Inc
Inspection Date: 02/13/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine
# Has the facility evaluated all illicit (non stormwater) discharges? ® Cl [I 0
Comment: There are no other non-stormwater discharges. Annual documentation
should be included in the SPPP that indicates this area of the Plan has been evaluated.
Page: 4