HomeMy WebLinkAbout20061623 Ver 1_Triage Comments_20061017:..
a -
DWQ~~UOC~ J lri 2 7 Date iC 'i %--C' ~ Who Reviewed: ~ ~ w-"-'-~ ~
~ ~~~.
' ti ~
Plan Detail7ncompiete - ~ '
[] Please provido a location map for the project.
Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. •
PMleQas~lsehow all wetland im,~ p~~acts including/'fill slopes onr the aiteplan. -- '~~ ~ ~ r e ` ~ y ti ~ ~,,y ~Z l . ,.,,t
J ^' W~ ~~J. U I \ v~X~. T I ~l.C../ L.Q.Q. ~L._ 1,~. l ~ _ ~ /'l ~ /~ ~ ~ %' ~ S 1 Y" 1~~ NN~rC ~ .
^ Please indicato all buffer impacts one site plan. :v~tG~i l.~ LU,s K~ Z.~.e ~t~t w~~ `~^- ~ ~ ~ ' ~'`~
^ Ieaso indicate proposed lot layout as overlays on the site plan. ~ s ~( c ~ ~ v ° 5 "'~ '~~``~
ln!"(~~ l G(ili•G~ j v~.LG~~ GG'LP cq C~ ..
,Please indicate the 1 catio of tho protected buffers as Aver ays oa the site plan/. {~ ~.: c3v~4~-~ s ; i ~ ~ i ~
(~~ ~(~t~SQ ~~n,CIiCC~~ Z(J.,vc ~-V-Zt%hl~ ~. (,.~fGI.R..~~( ~^~ Lt~t12.i.~,~1.~
^ Please locate all isolated or non-isolated wetlands, streams and other waters of the Sta~e as overlays on the sito plea.
PIease provide cross section details showing the provisions for aquatic lifo passage.
^ PIeasa locato any planned•sowar lines on the silo plan.
^ Please provide the location of any proposed stormwater management practices ea required by QC
^ Please provide detail for the stormwatar management practices as required by GC •
^ Please spxify tho percent of project imperviousness eras based on the estimated built-out conditions:
. ^ e indicate all stormwatar~',o~}tfalla on the sitepitul. ,~k~ro.~sed stao~- av. ~^~ P ~ ~~"~. ~ .
Wig'. `,~~ 2 t ~.ae •.~: ~..~,`~.1~ c.~.- ~ P~ ~ •~ ;c~-~- 'a r'~t ~~ eer~c,.-#l
(~ ro`S S'y- plan. ` e/d~-Q~ ~ ~ ~ . ~ . ,~~s,- o~ ,(~j„5 S t.•1
S ~O'~' ^ Please indicate whathex or not tho proposed itnpaats already bear conducted ~ S ~..J o-~- ' .
Avoidaflce.and/or Minimization Not Provided
^ ~ The labeled as on the plane doss not appear to be necessary. Please eliminate the . or provido additional
information as to why it is neces§ary for this project.
• ^ This Office baliox+cs theft the labeled on the plans as ~ can be moved. or reconfigured to avoid the impacts to the
• .Please rovise the plans to avoid tho impacts.
^. This'Office believes that the •labeled on the plans as can ba moved or reconfigured to.minituize the impacts to'tho
• Please ravine tho plans to minimize the impacts.
^ The stormwatar discharges at tho location on the plans labeled will. not provide dii~se flow through the buffer because
. Ploase revise the plans and provido calculations to show that dii~se flow will ba achioved through tho entirebuffor. If it
is sot possiblo to achieve~diffuso flow through. the entire buffar thon~it may bm necessary to provido stormwater managemaat
practices that rarnove nutrients boforo the stormwatar can be discharged through the buffer. •
Other
i
^~. The application feo was insuffieient~because ovrx 150 fact of stream and/or.ovar I acre oi`wetland'impacts were requested. Please
provide ~ ~ .This additional fee must be received beforo your application can be reviewed.
^ Please complete Section(s) on the application. - ~ ~ '
^ Please provide a signed copy of the application.
^ Please provide ,copies of the application, . copies of the site plans sad other supporting information:
_ ^ • Please submit electronic CAD files showing ~ ;via: cinail to ian.mcmillanQncmail.net and CD:•
Mitigation
^ of compensatory mitigation is required for this project. Please provide'a compensatory mitigation plan.. 11~e
. plan must conform to tharequirements in 15 A NCAC 2H .0500 and must be appropriate to thetypo-of impacts proposed.
• ^ Please indicato which 404 Permit the USACE would use to authorize this project.
. -~
~ a r~J4 ~pt, , t~c~^-~ v-C~l1v~ '~ 5 i~'a ~7 `• Cn t1~~-