Loading...
HomeMy WebLinkAbout20140090 Ver 5_RE_ changes to sites 3a and 3b restoration U2579B_20190228Wanucha, Dave From: Euliss, Amy Sent: Monday, March 4, 2019 2:15 PM To: Wanucha, Dave; Lastinger, James C CIV USARMY CESAW (US) (James.C.Lastinger@usace.army.mil) Cc: Moore, Byron G; Griffin, Randy W; Kiser, Marcus K; Nifong, Johnny R; Wyrick, Scott D Subject: RE: changes to sites 3a and 3b restoration U2579B_ Yes, they had to tweak the structure layout due to the changes in elevation. I will send the as builts if there are any more changes. From: Wanucha, Dave Sent: Monday, March 4, 2019 2:10 PM To: Euliss, Amy <aeuliss@ncdot.gov>; Lastinger, James C CIV USARMY CESAW (US) (James.C.Lastinger@usace.army.mil) <James.C.Lastinger@usace.army.mil> Cc: Moore, Byron G<bgmoore@ncdot.gov>; Griffin, Randy W<rgriffin@ncdot.gov>; Kiser, Marcus K <mkkiser@ncdot.gov>; Nifong, Johnny R<jnifong@ncdot.gov>; Wyrick, Scott D<sdwyrick@ncdot.gov> Subject: RE: changes to sites 3a and 3b restoration U2579B Looks as though the revisions include the addition of two rock sills, a culvert and elimination of two step pools. Is that correct? And, will you be sending as-builts? Dave Wanucha Division of Water Resources Transportation Permitting Branch NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile ��v�_eVWd �_n_�a c h �_(��_n_cd_�_n_r.:.� NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 F rrrc;�l ,r rarr����aearrc���rrr c� �ea c;rrc� �rearrr r�rr� crc�c�r���s �� s�r�����r;r rra r�rc� �lrar��b�� �"e;rralir���r F��r��l�r; F����r�rarc�� �.e�r�nr e;r���� rr�r�;y� ���� c�l�r�lra���c�� ���ra r6r�rc��,�s�;rr�����. From: Euliss, Amy Sent: Thursday, February 28, 2019 12:38 PM To: Wanucha, Dave <d�v�_ew�_n_�ach�_(��_n_cd_�_n_r.�v_>; Lastinger, James C CIV USARMY CESAW (US) _.... ��_�_�_�.:�:_�:_�.-�_sti_n.��r("�us�c�.�rm�.mil) <J_�rrr.�s.:C.:_IL�sti_n��r(��us�c�.�rm�,_m.i.l> Cc: Moore, Byron G<b�mc�c�r�("�ncdc�t.��v>; Griffin, Randy W<r�rif�in("�ncdc�t.�c�v>; Kiser, Marcus K <mkkis�r("�_n_cd�t.:.�v_>; Nifong, Johnny R<`ni� fc�n�.("�_ncd_c�t:.�_v>; Wyrick, Scott D<sdwyrick(��ncdc�t.�c�v> ......................................._. _ ............... . Subject: changes to sites 3a and 3b restoration U2579B We made a few changes to the plan for restoration of temporary impacts. The changes were necessary due to downcutting of the existing channel upstream of the diversion and the relocation of the sewer line under the stream. I have attached a revised plan, the original plan, and your approvals for reference. We plan to proceed with the changes as shown in the Revised plan dated 2.28.19. If you have any questions, please let me know. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss ncdot.qov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 -.:�rx�. �.<...� x trr �: � �� � �: � tt. �. �» � . �$ z. �� � s � hN� I i7�•i�ll c;urrc;,�,l�ui�dci�c.c� �C�u ai�d ��rur�7"i ��I�i,, ;�,c�i�dcr i,, ;�,ul�jcc.� �u �C�I�c� I"J C I�:"ul�lic. I�tac;uru,, I,avv ai�d r�7"i�y I�c di,,c.lu,�,c�d E�u �C�I�h�d I�artic�„�,,