HomeMy WebLinkAbout20140090 Ver 5_changes to sites 3a and 3b restoration U2579B_20190228Wanucha, Dave
From: Euliss, Amy
Sent: Thursday, February 28, 2019 12:38 PM
To: Wanucha, Dave; Lastinger, James C CIV USARMY CESAW (US)
(James.C.Lastinger@usace.army.mil)
Cc: Moore, Byron G; Griffin, Randy W; Kiser, Marcus K; Nifong, Johnny R; Wyrick, Scott D
Subject: changes to sites 3a and 3b restoration U2579B
Attachments: Stream Restoration Site 3A & 3B REVISED (2019-02-28).pdf; DWR permit mod
approving temp impacts at sites 3a and 3b U2579B.pdf; Sites 3a and 3b Corps
approval.pdf; U2579B Sites 3a and 3b restoration.pdf
We made a few changes to the plan for restoration of temporary impacts. The changes were necessary due to
downcutting of the existing channel upstream of the diversion and the relocation of the sewer line under the stream. I
have attached a revised plan, the original plan, and your approvals for reference. We plan to proceed with the changes
as shown in the Revised plan dated 2.28.19. If you have any questions, please let me know.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
�:R
;�
��``
_ �.,
I i7�•i�ll c;urrc;,�,l�ui�dci�c.c� �C�u ai�d ��rur�7"i ��I�i,, ;�,c�i�dcr i,, ;�,ul�jcc.� �u �C�I�c� I"J C I�:"ul�lic. I�tac;uru,, I,avv ai�d r�7"i�y I�c di,,c.lu,�,c�d E�u �C�I�h�d I�artic�„�,,