TITLE SHEET
SITE PLAN
AROFILES AND CROSS-SECTIONS
PLANTIIYG PLAN
DETAILS
SITE STABILIZATION PLAN
DIRECTIONS TO SITE
FROM RALEIGH, TAKE I-40 WEST TO OLD
GREENSBORO ROAD NE IN WINSTON-
SALEM. TAKE EXIST IO FROM I-40 BUS
WEST /US-421 NORTH. TAKE US-158 E/
REIDSVILLE ROAD TO FREEMAN PARK
COURT, WHICH IS THE ACCESS TO THE
SITE.
PROJECT DATA
SITE 3A RESTORATION LEIYGTH = 424 FEET
SITE 3B RESTORATION LENGTH = 170 FEET
P�epored for;
ANGELCRESPO
DEPUTY PROfECT MANAGER
P�epo�ed in the Office of:
� ��
�� ASSOCWTES OF :VC
ENGWEERS•PLANNERS•ECOLOGISTS
SUITE 220 LANDMARK CENTER II
4601 SIX FORKS RD., RALBGH, NC
Prepored by:
TIM MORRIS
PROJECT h1ANAGER
ALEX FRENCH
PROfECT DES7GNER
898
894
890
0
r
m
�
886
882
878
874
870
1��I��
PROFILE - SITE 3A
11��� 12��� 1��0�
REACH - SITE 3A
STATION 10+00 TO 14+24
TIE BACK TO EXISTING i 10.0' i
GRADE AT 2:1 SLOPE
(TYPICAL) � �
^ 5.0' M I N. I 27' I 2.3' I 2.3' I 27' I 5.0' M I N. �
� �¢ �I¢ I I � �
� alm FIm � I I i
-- -+------ oi�--��-�I Wfe�---+------r--�
� � �------ II Wbkf II -- I I�
�
I �
J------ --
__- o
TYPICAL RIFFLE
0 = THALWEG LOCATION
5.0' MIN. 9.0' 5.0' 5.0' MIN.
1�4�0� 16�0�
---I�--1-----------�I�a----+------r--�
---------��kf --- � I ��
NI -- II
TYPICAL POOL - RIGHT MEANDER
0 = THALWEG LOCATION
TIE BACK TO EXISTING
GRADE AT 2:1 SLOPE
(TYPICAL)
5.0' MIN. 5.0' 9.0' 5.0' MIN.
� I W�a � �
---�------+---- -----------r--�- --
� � � __Wbkf -------- I I �
m
N
TYPICAL POOL - RIGHT MEANDER
0 = THALWEG LOCATION
PROFILE - SITE 3B
898
894
890
886
882
878
874
870
REACH - SITE 3B
STATION 20+00 TO 21+70
TIE BACK TO EXISTING 10.0' i,
GRADE AT 2:1 SLOPE �
(TYPICAL) 5.0' MIN. I 27' I 2.3' i 2.3' I 27' I 5.0' MIN. ^i
I I¢ ��¢ � I I I
I alm ��m � I I I
-- -�---�li°--�°-��eT--+----�r--�
_-� -_ � Wbkfl_-_ I I �
�I- � i �
- M
----- ---_- o
TYPICAL RIFFLE
0 = THALWEG LOCATION
5.0' MIN. 9.0' 5.0' 5.0' MIN.
---I�--1-----------���a----t------r--�
---------tW4kf --- I
�I - - I
N �
------------�
TYPICAL POOL - RIGHT MEANDER
0 = THALWEG LOCATION
TIE BACK TO EXISTING
GRADE AT 2:1 SLOPE
(TYPICAL)
5.0' MIN. 5.0' 9.0' 5.0' MIN.
I I WfJ�a ------------I I
---�------+---- r---i- --
--VWkf�--------- I I �
- I -- �
I"
TYPICAL POOL - RIGHT MEANDER
0 = THALWEG LOCATION
STRUCTURES - SITE 3A
STATION ELEVATION STRUCTURE I
10+00.00 887.20 ROCK SILL-BEGIN
10+12.62 887.06 ROCK SILL-END
10+20.49 887.06 ROCK SILL-BEGIN I
10+35.70 886.89 ROCK SILL-END
�p+48.07 886.89 ROCK SILL-BEGIN
10+62.40 886.74 ROCK SILL-END �
10+62.40 886.74 STEP POOL-SILL
10+77.65 886.26 ROCK SILL-BEGIN
10+89.82 886.13 ROCK SILL-END
11+04.99 886.13 ROCK SILL-BEGIN
11+20.98 885.95 ROCK SILL-END
11+20.98 885.95 STEP POOL-SILL
11+35.97 885.49 ROCK SILL-BEGIN �
11+51.15 885.32 ROCK SILL-END
11+58.92 885.32 ROCK SILL-BEGIN
11+70.21 885.20 ROCK SILL-END
11+g0.45 885.20 ROCK SILL-BEGIN
11+g3.81 885.05 ROCK SILL-END
11+g3.81 885.05 STEP POOL-SILL
12+04.79 884.61 ROCK SILL-BEGIN
12+20.64 884.44 ROCK SILL-END
12+31.26 884.44 ROCK SILL-BEGIN
12+qg.58 884.25 ROCK SILL-END
12+55.25 884.25 ROCK SILL-BEGIN
12+72.53 884.06 ROCK SILL-END
12+g1.13 884.06 ROCK SILL-BEGIN
12+g7.g3 883.87 ROCK SILL-END
12+g7,g3 883.87 STEP POOL-SILL
13+15.26 883.37 ROCK SILL-BEGIN
13+30.89 883.20 ROCK SILL-END
13+40.64 883.20 ROCK SILL-BEGIN
13+72.60 882.85 ROCK SILL-END
13+gg.q6 882.83 ROCK SILL-BEGIN
14+05.42 882.51 ROCK SILL-END
14+15.18 882.50 ROCK SILL-BEGIN
STRUCTURES - SITE 3B
STATION ELEVATION STRUCTURE
20+00.00 885.10 ROCK SILL-BEGIN
20+11.89 884.97 ROCK SILL-END
20+22.05 884.97 ROCKSILL-BEGW
20+37.00 884.80 ROCK SILL-END
20+37.00 884.80 STEP POOL-SILL
20+51.94 884.35 ROCK SILL-BEGIN
20+65.97 884.20 ROCK SILL-END
20+72.72 884.20 ROCK SILL-BEGIN
20+g4.31 884.07 ROCK SILL-END
20+94.33 884.08 ROCK SILL-BEGIN
21+pg.24 883.93 ROCK SILL-END
21+18.38 883.93 ROCK SILL-BEGIN
21+34.67 883.75 ROCK SILL-END
21+34.67 583.75 STEP POOL-SILL
21+48.41 883.31 ROCK SILL-BEGIN
a
�
�
t/�
�
0
a
�
a
�
�
�
�
�
�� = w
�o U
�
�
�a w
5
������ z
w
N
Z
O
�
>
W
�
wN
�Q
�z
��
o�
a�
oa
�V
�_
Y �
�o
oZ
LL
X =
��
��
e�
Q
� M
J m �
m � �
Z N �
� � Z
_ � �
�
� W �
Z O �r^
G L.1� vJ
w
J � �
Z � W
U
O Z �
� �
Z
�
�
Q�
PROFILES
AND
CROSS-
SECTIONS
a
Z
0
�
Q
U
2
F
�
O
z
�
Z
�
O
U
x
�
�
�
�
O
�
SHEET 3 OF 8
2�fG� 21��� 22���
�
Z
0
�
>
W
�
a
t/�
�
tI�
O
0
a
c�
a
oc
0
�
u F
1� z Z
W
' `o U
V �'
m
�
�� w
¢
������ Z
�
Z
W
�
Q
M
�
m � �
Z N �
� � Z
_ � �
�
� W �
z � �
� � �
W
J � �
Z � W
U
� Z �
Z
�
oare: MAv 2015
PLANTING
PLAN
N �
W N
F Q
�Z
N�
o�
aQ
OU
[� _
Y~
��
O�
Z
X=
N�
�W
V �
Q
Z
O
�
Q
U
_
H
�
O
Z
z
�
O
U
x
�
�
�
�
O
�
PLANTING DETAILS
❑ TYPE 1 STREAMBANK REFORESTATION SHALL BE PLANTED 3 FT. TO 5 FT.
LIVE STAKES PLANTING DETAIL BAREROOT PLANTING DETAIL
DIBBLE PI.ANTING METHOD ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER, s
>
USING THE KBC PLANTING BAR APPROXIMATELY 2724 PLANTS PER ACRE. �
LIVE STAKE ❑ TYPE 2 STRF,AIVIBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT.
«.iI ON CENTER, ItANDOM SPACING, AVERAGING 8 FT. ON CENTER,
I, I � 2�°°h APPROXIMATELY 680 PLANTS PER ACRE.
SOUARE CUT �
�
I I I� I� � I I—I I I—I I I I I I—I I I— I 1=1 I I—I I I I I I I I I— I H I I—I I I
_�_� �� i��ID=� —� �� � ��� � �� H� H� NOTE: TYPE 1 AND TYPE 2 STRF,AMBANK REFORESTATION SHALL BE
iii—ii�ii ii—iii-iii iii=iii=ii ii=iii=iii ii iii-ii ii�i�ili ❑
—i i i—i i i— —Tu i i=i —i i i=i i i_ i i i=i i�i i i�iT_ —W=i i i—i i
ll1— _ �— _ �— — � ���—�— —� �W
guos �FaaNc uPwARm —�1�1=1= _�_ —=�i i��i�ll T�-��—�I PAID FOR AS "STREAMBANK REFORESTATION" y
iTi-i i i—i i i—i i i—i i i—i i i I i I=I I la I�I I i-1 I I-I i I I I I-I i I-I I I-i I I-i I i-1 I I
1. Insert planting bar 2. Remove planting bar 3. Insert planting bar �
ae shown and pull handle and place seedling at Z inches toward planter
toward planter. correct depth. kom seedling. �
uVE CU�TING 0
(I/2._2" DIAMETEPo 2 - 3 F22t �
STRF�AMBANK REFORESTATION TYPICAL a
a
ANGLE CUT 30°-45°� �
0
r. "1► I TI'PE II I �
�
�
� TI'PE I � _ � � �
w �Q
�a U �Z
f/J � J
I I � I— I I—� I �—I I � I I I I—� I I I—I I I I I—� I I I�I I I—I � � o W � O
� I I I � I I I—II I I—� I � I I—I � I I I—� I I—� I I I I I �—I I � I—I I I �� ¢ Z (� _
I � I I—I I �—I I I I I I I I—� I I I �—I I I I � I I—� I I �I I I—I � j Y�
I I I� I ——I � I—I I I—� I � I I I—I � I I I—� I I—� I I I I I I—I � I � I—I I I I ��. I a � Z
—I I H I I—I I I I I— I—I I H I—I I I—I I I —I I I-1— I�I I I-I I j����� Z � W
I I I I II I H H I 1=1 I 1=1 I 1=1 I I E111=1 I 1=1 I 1=1 I 1=1 I I H I I-1 I I—I I 1=1 I I-1 I I `� x=
I- 1 I I- 1 I I- 1 I I� � I I I I- I I- 1 I H I E I I L— I I I === = w ��
6 Leave compaction � ¢
4. Pull handle of bar 5. Push handle forward � � r�
toward plt�nter, firming firming soil at top. hole open. Water I r I w
soil at bottom. thoroughly.
i�iF�
��
COIR FBER MAT gTRF�N�
LIVE STAKES� � Q
� � PLANTING NOTES:
; � �m� z
w rn w J
PL.ANTING BAG m � �
� During planfing, seedlinge � Z N(n �
s6aI1 be kept in a moist �, � � Q
_ �� canvas bag or similar � � �� Z U
— � eontainer to prevent the ,S1'�'.�$E�K REFORESTATION =*k � F
iy� root systems from drying. ��� �
� ExisTiNciPROPos�o
� c�ouNo MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: � U� �
i� � � z
����a�„__<` TYPE 1 Z p � �
ii ! iu�n�i� - � � (n z
�csc P�TING B.v� 50% SALIX NIGRA BLACK WILLOW 2 ft — 3 ft LIVE STAI�S w� w o
Planting bar shall have a J Q' U
blade with a triangular Q~
ExisriNciPROPosEo �ross se�rio�, �a sh�� 50% CORNUS AMOMUM SILKY DOGWOOD 2 ft — 3 ft LIVE STAI�S Z� w }
STREAMBED be 12 iucheslong,
4 iaches wide and �pE � � � � �
1 inch thick at center.
anNK srABi�izATioN wirH uvE sraKEs 25% FR.�NUS PENNSYLUANICA GREEN ASH 12 in — 18 in BR ��� "
z
NOTE: �f ��T /��7� �i !.��� nL� �r� 1 �
LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET GS� P�Tti1�US OC1..11JENTLiLIS SYl.H1vlOnr' 1G 111 — 1� 111 BR
ON CENIER il��Ii,i
uvE sTnKEs sHa�� eE oRivEN uNn� APPRoxiMnTE�v 3/4 xooT exo�ivs 25/o QUERCUS PHELLOS WILLOW OAK 12 in — 1g in BR
OF LIVE STAKE IS WITHIN GROUND All seedlings shall be root �
onre: MAY 2015
pruued, if necessary, so that
SCALE
"° `°°`S eX`e�a m°`e `h9� 25% QUERCUS NIGRA WATER OAK 12 in — 18 in BR
10 inches below the
root collar. PLANTING
PLAN
SHEET 5 OF 8
FILTER
FABRIC
TOP OF
BANK 3�
ELEVATION POINT �
(SEE PROFILE SHEET)
I
BOULDERS 1
(SEE NOTE �
FOR SIZE) �
I
C �
1 I
I I
FILTER �
FABRIC I
ROCKSILL �
(USEDOUBLE YLA ER
SILL FOR STEP POOLS, I
SEE DETAIL BELOVN �
I
I
I
�
ELEVATION POINT —
(SEE PROFILE SHEET)
I
I
I
HEAD OF I
RIFFLE �
I
I
I
I
I
RIFFLE �
I I
I
HEAD OF 18" NOM. THICKNESS WELL
PoFRE � � GRADEO MIX OP (60%) CLASS "1".
(20 % ) CLASS "B", (10 % ) CLASS "A",
AND (10%) N0. 67 STONE
v "" � oo� "'- t ROCKSILL
// ��// / oC�B NsE ooue�E �nvER
���� �O� SILL FOR STEP POOLS,
SEE DETAIL BELOVN
3'
MINIMUM GEOTEXTILE
SECTION A-A
COIR FIBER Dmax
MATTING (NP.)
� 1/3 Dmax
�
CENTER BOULDER 2"-4" LOWER
THAN ABUTTING BOULDER TO
ENCOURAGE FLOW THROUGH CENTER
OF CHANNEL DURING LOW FLOWS.
� TOE OF
� RIFFLE
I
�
PLAN VIEW
REACH 3A & 3B
Vvbkf(ft) 10.0'
Dmax(k) 1]'
CW7 Q
� I �
� I
� I
� I�
Y Y I� Y W
m Q m J
m LL
LL
O O O �'
O O I O
~ � I ~
5FT
� MIN.
� �� o
�QOO �
UP�' �6'MIN.
O Oo( ;�_J
� C
/ �
i
��
r
/ �OO�
q TOE OF
� BANK
ROCK SILL DETAIL
NOT TO SCALE
STONE BOULDER SILL
(N10 LAYERS) �
18" NOM. THICKNESS WELL
GRADED MIX OF (80%) CLASS "1",
AND�(10o) NO. 57�STONEASS "A",
i
i �l(
; , ,,,
, �%F`O� �
,
O� �
LAY FILTER FABRIC OVER UPSTREAM �
TOP EDGE OF SILL ROCK(S); BEHIND
RLTER FABRIC, BACKFILL WITH #57
STONE, CLASS A OR B STONE AND/OR
NATURAL STREAM MATERIALS.
PROPOSED
� PROFILE
NOTE:
1. BOULDERS SHOULD BE NATIVE STONES
OR SHOT ROCK, ANGULAR AND OBLONG,
WITH AN AXIS APPROXIMATELY
3'Lx2'Wx1.5'D
NOTES:
1. BOULDERS SHOULD BE NATIVE STONES
OR SHOT ROCK, ANGULAR AND OBLONG,
WITH AN AXIS APPROXIMATELY
3'Lx2'Wx1.5'D
2. BOULDER SILLS TO EXTEND 5' MINIMUM
INTO STREAM BANKS FOR STEP POOL
STRUCTURES.
FILTER J STONE �'
FABRIC BOULDERS
� R�FF�E�
PLAN VIEW
STEP POOL DETAIL
NOT TO SCALE
SEE PROFILE SHEETS FOR
STATIONS AND ELEVATIONS
BASEFLOW
FINISHED — —
GRADE _�_�_
— — I I—I I I—mI I I—mI I
_-- i� d —� � r�—I I I1 I C
I IIIIIIIIIIII III—III—III—� II III,J I—III—III—III—II
-�-��iTilli��iTi'��l ��-�-i-%i�T-�
18" NOM. THICKNESS FILTER FABRIC
WELL GRADED MIX (KEY IN UNDER
OF (80%) CLASS "1", STREAM BED)
(20 % ) CLASS "B", (10 % )
CLASS "A", AND (10%)
N0.57STONE
PROFILE VIEW
\ /
\ SILT BAG WITH
U1ILIZEASTABILIZED _ ` a
OUTLET FOR THE �� ROCK PAD
DISCHARGE OF I r
CLEAN WATER
I \ 1
DEWATERING
IMPERVIOUS DIKE ' PUMP
�
I \ I EXISTING
� CHANNEL
I I
TEMPORARY � ' - IMPERVIOUS DIKE
FLEXIBLE HOSE I � I
I � I
CONTRACTOR MAY UTILIZE I � 1
ACCEPTABLE MATERIALS TO 1
INCLUDE SHEET PILES, SANDBAGS, I I I FLOW WLET FOR CLEAN
AND/OR THE PLACEMENT OF AN 1 WATER TO BE RAISED
ACCEPTABLE STONE LINED WITH OFF OF STREAM
POLYPROPOLENE OR OTHER I � BOTTOM.THIS MAY
IMPERVIOUS FABRIC. EARTH I ` REQUIRE PLACEMENT
MATERIALS SHALL NOT BE USE� I � OF GRAVEL UNDER
TO CONSTRUCT THE IMPERVIOUS INTAKE.
DIKES. 1 � � \
1 ` �
1 �
♦
� `� \ � �
�_-� � ,
PUMP-AROUND \ �
PUMP
� �
��
SEQUENCE OF DEWATERING OPERATIONS� � � � � �
' ANY DEVIATION FROM ABOVE DEWATERING PLAN
WILL RE�UIRE DESIGNERAPPROVAL.
1. INSTALL SILT BAGS(S) AND ROCK PAD(S).
2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE.
3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING
OPERATIONS FOR STREAM DIVERSION.
4. PLACE �OWNSTREAM IMPERVIOUS DIKE AND PUMPING
APPARATUS. �EWATERENTRAPPEDAREA.
5. PERFORM REPAIR WORK IN ACCORDANCE WITH THE PLANS.
6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE
REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS
DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE
(DOWNSTREAM IMPERVIOUS DIKES FIRST).
7. REMOVE SILT BAG(S) AND STABILIZE DISTURBED AREA WITH
SEED AND MULCH.
EXAMPLE OF PUMP-AROUND OPERATION
NOT TO SCALE
STILLING BASIN MAINTENANCE:
1. SEDIMENT BAGS SHOULD BE REPLACED WHEN THE CAPACITY OF THE SEDIMENT
BAG HAS EXCEEDED 50%.
2. ACCUMULATED SEDIMENT SHOULD BE DISPOSED OF IN A DESIGNATED
DISPOSAL AREA.
3. SPENT BAGS SHOULD BE DISPOSED OF PROPERLY AND NOT BURIED.
4. GRAVEL PADS SHOULD BE CHECKED DAILY DURING USE TO ENSURE THAT
GRAVEL HAS NOT BEEN WASHED AWAY OR BEEN CHOKED BY EXCESSIVE
SEDIMENTATION.
5. REPLACE PAD WITH CLEAN GRAVEL, AS NEEDED.
EXISTING TERRAIN SILT BAG
15.0 - 20.0 ft.
FILTER FABRIC
STREAMBANK
B.O IN., STONE FOR EROSION CONTROL, CLASS A
NOTE: PROVIDE STABILIZED OUTLET DOWN BANK TO STREAM
SPECIAL STILLING BASIN (SILT BAG) WITH ROCK PAD
NOT TO SCALE
O
m
K
N
�
O
!a�
V
a
0
F
F
�= W
�o U
N
K
�¢ w
¢
������ Z
C7
z
w
Q
(h
�
w � W
m � �
Z N �
� � z
_ � �
�
� w �
Z O �
W � �
Z � W
U
�Z�
Z
>
wN
�
�z
N �
o�
Oa
�V
N =
Y �
�O
OZ
x=
w�
�J
�a
v�
Q
Z
J
O
�
Q
U
2
F
�
�
Z
H
Z
7
�
U
2
}
�
�
0
�
�
DETAILS
SECTION B-B
18"NOM.THICKNESS WELL
GRADED MIX OF (60%) CLASS "1",
COIR FIBER (20%) CLASS "B", (10%) CLASS "A",
MATTING (NP) AND (10 %) NO. 57 STONE
1/3 Dmax
o� ° �
00 0000
TOE OF
SECTION C-C BANK
TEMPORARY AND PERMANENT SEED MIXES:
THE CONTRACTOR SHALL UTILIZE LINE ITEMS 317, 318 & 336 OF THE
CONTRACT FOR SEED/FERTILIZER/MULCH IN ALL DISTURBED AREAS
WITHIN THE STREAM PROJECT LIMITS. SEE TABLE BELOW.
LINE ITEM DESCRIPTION UNIT
312 TEMPORARY SILT FENCE LF
317 SEED FOR TEMP SEEDING LB
318 FERT FOR TEMP SEEDING TON
336 SEEDING AND MULCHING ACR
GROUND STABILIZATION
SITE AREA STABILIZATION
DESCRIPTION TIME FRAME
PERIMETER DIKES,
SWALES, DITCHES 7 DAYS
AND SLOPES
HIGH QUALITY
WATER (HQV� 7 DAYS
ZONES
SLOPES STEEPER 7 DAYS
THAN 3:1
SLOPES 3:1 OR 7 DAYS
FLATTER
ALL OTHER AREAS
WITH SLOPES FLATTER 7 DAYS
THAN 4:1
INSPECTIONS
WEEKLY INSPECTIONS REQUIRED.
RAIN GAUGE MUST BE PRESENT AT SITE.
INSPECTIONS REQUIRED AFTER 0.5" RAIN EVENTS.
INSPECTIONS ARE ONLY REQUIRED DURING
"NORMAL BUSINESS HOURS".
INSPECTION REPORTS MUST BE AVAILABLE
ON-SITE DURING BUSINESS HOURS UNLESS A SITE
SPECIFIC EXEMPTION IS APPROVED.
RECORD MUST BE KEPT FOR 3 YEARS AND
AVAILABLE UPON REQUEST.
ELECTRONICALLY-AVAILABLE RECORDS MAY BE
SUBSTITUTED UNDER CERTAIN CONDITIONS.
NOTES:
1. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION
THROUGHOUT THE CONSTRUCTION OF THE PROJECT TO PREVENT EROSION 6. SEE NCDOT STANDARD SPECIFICATIONS, SECTION 1605 FOR SILT FENCE SPECIFICATIONS.
AND SILTATION. EROSION CONTROL MEASURES SHALL BE INSTALLED AND SILT FENCE SHALL BE INSTALLED APPROXIMATELY 8' FROM THE TOP OF BANK
MAINTAINED IN ACCORDANCE WITH THE PROJECT PLANS, NORTH CAROLINA FOR THE PROJECT STREAM PRIOR TO THE COMMENCEMENT OF DISTURBANCE
SEDIMENT AND EROSION CONTROL GUIDELINES AND AS DIRECTED BY ACTIVITIES. SILT FENCE SHALL BE TEMPORARILY REMOVED IN EACH ISOLATED
THE DESIGNER. WORK AREA TO PERMIT GRADING OF THE RESTORED STREAM. IMMEDIATELY
2. ALL REPAIR WORK SHALL BE PERFORMED IN DRY OR ISOLATED AREAS, WITH FOLLOWING THE COMPLETION OF STABILIZATION MEASURES FOR EACH ISOLATED
NO STANDING WATER OR WATER FLOWING THROUGH THE WORK AREA. AREA AND PRIOR TO THE INITIATION OF WORK ON ANOTHER SECTION, THE SILT
3. ALL EXCAVATED MATERIAL SHALL BE STOCKPILED WITHIN THE LIMITS OF FENCE SHALL BE REINSTALLED AT ITS ORIGINAL LOCATION. SILT FENCE SHALL BE
DISTURBANCE FOR LATER REUSE OR DISPOSAL. THE CONTRACTOR IS MAINTAINED HEREAFTER AND SHALL NOT BE REMOVED UNTIL GROUND COVER
RESPONSIBLE FOR INSTALLING APPROPRIATE STABILIZATION MEASURES HAS BEEN FULL ESTABLISHED WITHIN THE LIMITS OF DISTURBANCE. SILT FENCE
AROUND THE STOCKPILE AREA(S) AND ANY TEMPORARY OR PERMANENT SHALL ALSO BE INSTALLED ON THE LOW SIDE OF ANY TEMPORARY STOCKPILES OF
SPOIL AND TOPSOIL PILES TO PREVENT EROSION AND SEDIMENTATION. ALL EXCAVATED MATERIAL.
PERMANENT OR TEMPORARY SPOIL PILES SHALL HAVE SILT FENCE INSTALLED 7. ALL DISTURBED SOILS WILL BE SEEDED FOR VEGETATIVE STABILIZATION
ON THE LOW SIDE OF THE SPOIL PILES. FOLLOWING THE GUIDELINES DESCRIBED ON THIS SHEET AND ACCORDING
4. A TEMPORARY PUMP-AROUND SHALL BE UTILIZED BY THE CONTRACTOR TO THE FOLLOWING SCHEDULE: TEMPORARY OR PERMANENT SEEDING
DURING WORK ON THE STREAM TO DIVERT FLOW FROM AND DEWATER MUST BE APPLIED ON ALL GRADED SLOPES AND FILL WITHIN 7 CALENDAR
THE DESIGNATED AREA IN ORDER TO WORK. THE TEMPORARY DAYS, PERMANENT SEEDING MUST BE APPLIED TO ALL DISTURBED AREAS
PUMP-AROUND USED BY THE CONTRACTOR SHALL MEET ALL REQUIREMENTS WITHIN 15 WORKING DAYS OR 90 CALENDER DAYS.
SPECIFIED IN THESE PLANS. THE TEMPORARY PUMP-AROUND SHALL BE 8. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR
INSTALLED AND REMOVED IN ACCORDANCE WITH THE MANUFACTURER'S STABILITY AND FUNCTIONAL OPERATION FOLLOWING EVERY RUNOFF
GUIDELINES. TWENTY-FOUR (24) HOURS PRIOR TO THE INITIATION OF PUMP-AROUND PRODUCING RAIN EVENT AND/OR AT LEAST ONCE PER WEEK. ANY NEEDED
ACTIVITIES, THE CONTRACTOR SHALL MEASURE THE APPROXIMATE FLOW MAINTENANCE OR REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL
RATE AT THE PUMP-AROUND LOCATION. THE FLOW RATE SHALL BE SUBMITTED MEASURES AS DESIGNED. ACCUMULATED SEDIMENT SHALL BE REMOVED FROM
TO THE DESIGNER FOR APPROVAL. THE CONTRACTOR SHALL, THEREAFTER, CONTROL MEASURES WHEN THEY REACH APPROXIMATELY 50% OF THEIR
UTILIZE A PUMP(S) SUFFICIENT TO ACCOMODATE 120% (1.2 TIMES) THE APPROVED FUNCTIONAL CAPACITY. THESE MEASURES SHALL BE REPAIRED IF DISTURBED
FLOW RATE. DURING MAINTENANCE. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED
5. IN THE EVENT OF A STORM, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE AND MULCHED, AS NECESSARY, TO PROMOTE THE ESTABLISHMENT OF
REMOVAL OR PROTECTION OF ANY EQUIPMENT, TOOLS, MATERIALS OR VEGETATION COVER.
OTHER ITEMS NEEDED TO COMPLETE THE WORK THAT COULD BE AFFECTED
BY STORM FLOWS.
CONSTRUCTION SEQUENCE:
THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE SEQUENCE OF CONSTRUCTION IN ACCORDANCE WITH THE PLANS, AS DIRECTED
BY THE DESIGNER. CONSTRUCTION SHALL PROCEED IN THE SPECIFIED MANNER UNLESS OTHERWISE DIRECTED OR APPROVED BY THE
DESIGNER. THE FOLLOWING PROVISIONS, ALONG WITH THE INSTRUCTIONS CONTAINED IN THE PLANS, CONSTITUTE THE SEQUENCE OF
CONSTRUCTION.
GENERAL SITE NOTES:
- ALL PUMP AROUND OPERATIONS SHALL BE INSTALLED IN A MANNER THAT IT WILL BE ALLOWED TO RUN 24 HOURS A DAY UNLESS CHANNEL
WITHIN THE PUMP AROUND LOCATION CAN BE STABILIZED WITHIN THE WORK DAY.
- UPON APPROVAL FROM THE DESIGNER, PHASES 2 THROUGH 4 MAY BE CONSTRUCTED IN A DIFFERENT SEQUENCE THAN INDICATED BELOW
OR CONCURRENTLY.
PHASE 1: INITIAL SITE PREPARATION.
1. INSTALL EROSION CONTROL DEVICES IN ACCORDANCE WITH THE SITE STABILIZATION PLAN AND AS DIRECTED BY THE DESIGNER.
PHASE 2: COMPLETE STREAM RESTORATION OF SITE 3A - STA 10+00 TO 13+50
2. BEFORE CONSTRUCTION ACTIVITIES START, INSTALL PUMP AROUND OPERATIONS AS DESCRIBED IN THESE PLANS.
3. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT.
4. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM.
PHASE 3: COMPLETE STREAM RESTORATION OF SITE 3B
5. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT.
6. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM.
PHASE 4: COMPLETE STREAM RESTORATION OF SITE 3A - STA 13+50 TO 14+00
7. BEFORE CONSTRUCTION ACTIVITIES START, INSTALL PUMP AROUND OPERATIONS AS DESCRIBED IN THESE PLANS. THIS MAY
REQUIRE SIMULTANEOUSLY PUMPING AROUND THE UPSTREAM PORTION OF SITE 3A AND SITE 3B.
8. BUILD CHANNEL AS DEPICTED IN THESE PLANS, BEGINNING AT THE MOST UPSTREAM POINT.
9. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP AROUND SYSTEM(S).
PHASE 5: PLANTING
10. INSTALLING LIVE STAKES AND BARE ROOT TREES CAN BE INITIATED PRIOR TO, AFTER, OR CONCURRENTLY AS PHASES 2-4 ARE
COMPLETED, AS LONG AS THE PLANTING OCCURS AFTER DISTRUBANCE IS COMPLETE AND STABILIZATION IS INITIATED. LIVE STAKES
AND BARE ROOT TREES SHALL BE INSTALLED DURING THE DORMANT SEASON (NOVEMBER 6- MARCH 24). PREPARE AND INSTALL LIVE
STAKES AND BARE ROOT TREES IN ACCORDANCE WITH THESE PLANS AND AS DIRECTED BY THE DESIGNER.
*** IF CONSTRUCTION OCCURS OUTSIDE OF THE DORMANT SEASON, UPON APPROVAL OF THE DESIGNER, PHASE 5 SHALL BE COMPLETED
IN THE DORMANT SEASON, AFTER PHASE 6.
PHASE 6: COMPLETION OF PROJECT SITE
11. REMOVE ALL REMAINING WASTE MATERIALS AND RESTORE THE REMAINING DISTURBED AREAS TO THEIR PRIOR CONDITION.
SEED AND MULCH ALL DISTURBED AREAS UTILIZING THE SEED AND MULCH MIXES SPECIFIED IN THE PLANS.
a
H
�
�
0
�
a
c�
a
oc
0
�
H
�= w
' `o U
�
V _ �,
�¢ �
w
Z
Z
�����i �
�
z
w
Q
M
J C� �
m��—
Z N N
� j Z
_ � �
H
� W �
z O O
� � N
W
J � �'
Z � W
U
� z �
Z
�
N �
w�
�
sZ
��
00
a�
OU
�_
Y ~
��
o°
x=
� c�
�J
a�
Q
z
O
�
Q
U
2
�
�
0
z
�
�
O
U
x
�
�
�
�
O
�
SCALE:
SITE
STABILIZATION
PLAN
SHEET 8 OF 8