HomeMy WebLinkAbout20140090 Ver 5_Stream Restoration 3A & 3B REVISED Plans_20190228Wanucha, Dave
From: Euliss, Amy
Sent: Tuesday, March 5, 2019 9:39 AM
To: Wanucha, Dave; Lastinger, James C CIV USARMY CESAW (US)
(James.C.Lastinger@usace.army.mil)
Cc: Moore, Byron G; Griffin, Randy W; Kiser, Marcus K; Wyrick, Scott D; Nifong, Johnny R
Subject: FW: [External] Stream Restoration 3A & 3B REVISED Plans_
Attachments: Dragados - site plans (2019-03-01).pdf
Dave and James,
We made a revision to the plans to exclude planting at the sewer line crossing (pg 4 of the attached pdf). If there are
any changes during construction, we will submit as builts. Thanks.
Amy
From: Gallman, William Scott <wgallman@Dragados-USA.com>
Sent: Tuesday, March 5, 2019 8:35 AM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Wyrick, Scott D <sdwyrick@ncdot.gov>
Subject: [External] Stream Restoration 3A & 3B REVISED Plans
Amy,
The revised plans for the stream are attached. Let me know if you have any questions. Carolina Environmental received
the CAD files Friday, 3/1/19 so they can modify their model with the new data.
Thanks,
��c;c,>GG �,c�VV�rnc�in, V'.F. � ��a��a�s� �a���s�a�N ���a���� II ����a� ���
77�a I�c.,>µ:.sµ:.suins V'E�;^�c:;lh I�c�uV, �YE�;^�in��;^�svuVVE�;^ I`�(.�; 272£�4�
(.�;E�;^VV: 33f� 4�£�f� 1�>�,a F�rnc�uV: waallman@Draaados-USA.com
N������N�s� �5�, t��. a� �� ��a��N �g�g��ss��a��a��e �a�g�N�s�e��
I i7�•i�ll c;urrc;,�,l�ui�dci�c.c� �C�u ai�d ��rur�7"i ��I�i,, ;�,c�i�dcr i,, ;�,ul�jcc.� �u �C�I�c� I"J C I�:"ul�lic. I�tac;uru,, I,avv ai�d r�7"i�y I�c di,,c.lu,�,c�d E�u �C�I�h�d I�artic�„�,,