HomeMy WebLinkAbout20140090 Ver 5_U-2579B sediment loss report_20190226Wanucha, Dave
From: Chapman, Amy
Sent: Tuesday, February 26, 2019 11:05 AM
To: Euliss, Amy; Wanucha, Dave
Cc: Kiser, Marcus K; Nifong, Johnny R; Wyrick, Scott D; Suggs, Phillip H
Subject: RE: U-2579B sediment loss report
Thanks Amy.
From: Euliss, Amy
Sent: Tuesday, February 26, 2019 11:03 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov>
Cc: Kiser, Marcus K<mkkiser@ncdot.gov>; Nifong, Johnny R<jnifong@ncdot.gov>; Wyrick, Scott D
<sdwyrick@ncdot.gov>; Suggs, Phillip H <psuggs@ncdot.gov>
Subject: U-2579B sediment loss report
Dave and Amy,
During yesterday's NPDES inspection 2 sediment losses into jurisdictional streams were noted. Both are due to slope
failures following approximately 5" of rain received during the last week. These were permit site 4 and the bridge over
Smith Creek which is not a permitted site. At site 4, its estimated to be approximately 200-250 yards of stream
impacted with @50, 5 gallon buckets in pockets in the stream. At Smith Creek, most of the material is in the floodplain,
but more than a 5 gallon bucket made it into the stream. The sediment will be removed to the extent practicable. The
project is very saturated making some of these areas inaccessible at this time which will cause us to exceed the 24 hr 5
day requirements. Our Resident's office is working to expedite the repairs as quickly as possible given the present
conditions and the threat of more rain beginning Thursday. If you have any questions, let me know.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
; #.
��
,; xx ,
W�:x
I i7�•i�ll c;urrc;,�,l�ui�dci�c.c� �C�u ai�d ��rur�7"i ��I�i,, ;�,c�i�dcr i,, ;�,ul�jcc.� �u �C�I�c� I"J C I�:"ul�lic. I�tac;uru,, I,avv ai�d r�7"i�y I�c di,,c.lu,�,c�d E�u �C�I�h�d I�artic�„�,,