Action ID: SAW-200 1-2 1 1 25
Mr. Philip S. Harris III, P.E., C.P.M.
Environmental Analysis Unit Head
Nor[h Carolina Department of Transportation
Division of Highways
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Harris:
•
L ���� V �n
�,1a� - n 7(i�y ��II
DENR•WkTERRESOURCES
TRANSPORTATION PERMITTING UNIT
Reference the Department of the Army (DA) permit modification letter dated Februazy 25,
2019 for additional impacts associated with the new location project identified as U-2524CD.
The project is a 4.8 mile, six-lane divided facility on new location extending from north of SR
2176 (Bryan Boulevard) to SR 2303 (Lawndale Drive) in Greensboro, Guilford County, North
Cazolina. Section C of this project begins immediately north of SR 2176 (Bryan Boulevazd) and
terminates immediately east of US220 (Battleground Avenue) and Section D begins immediaYely
east of Battleground Avenue and ends at SR 2303 (Lawndale Drive). The site contains a portion
of Horsepen Creek, fifreen (15) unnamed tributaries to Horsepen Creek, a portion of Richland
Creek, five (5) unnamed tributaries to Richland Creek, and fifreen (15) adjacent wetland areas in
the Cape Fear River Basin (8-Digit Cataloging Unit 03030002).
The above referenced ]etter contained a typographical error on the second page, related to the
permit expiration date, which was incorrectly listed as llecember 31, 2023. Rather, as referenced
in the DA permit issued on August 1, 2013, as well as the five previous permit modification
letters dated March 25, 2014, June 6, 2014, June 19, 2015, October 7, 2015, and July 15, 2016,
the accurate permit expiration date was December 31, 2018. As sucb, the DA permit for this
project has expired and the stream impacts authorized by the permit modification dated February
25, 2019 are hereby rescinded.
Please be advised that no work in waters of the US, including streams and wetlands, is
currently authorized for this project. On February 26, 2019, NCDOT Division 7 provided an
email synopsis including the status of U-2524 Sections C and D. This email indicated that, witY
the exception of work proposed for the permit modification request dated January 11, 2019 (U-
2524D site 4), a11 critical work on activities that required DA authorization are complete, and
remaining work would be limited to non-waters of the US, or would conducted in such a way
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
March O1, 2019
-2-
that does not require DA authorization. We strongly recommend that you confirm with all
relevant NCDOT and contractor personnel that the above statement is correct to avoid any
unauthorized activities in waters of the US.
If you deternvne that additional dischazges of dredged or fill material in waters of the US aze
necessary to complete U-2524CD, you must submit an Individual (i.e. Standard) Permit
applicarion for Corps evaluation. If it is your intention to pursue an Individual Pernut for the
completion of this project, or if you have additional questions, please contact Mr. David E.
Bailey, Raleigh Regulatory Field Office, at David.E.Bailey2(a�usace.army.mil or telephone (919)
554-4884, Extension 30.
FOR TI-� COMMANDER
,�.� �.�J.��-
Robert J. Clazk
Colonel, U.S. Army
District Commander
Copies Fumished with Attachment:
Ms. April Norton
Transportation Permitting Unit
Division of Water Resources
North Carolina Department of
Environment and Natural Resources
1617 Mail Service Center
Raleigh, North Cazolina 27699-1617
Ms. Erin Cheely
North Cazolina Department of Transportation
Division of Highways
1598 Mail Service Center
Raleigh, North Cazolina 27699-1598