Loading...
HomeMy WebLinkAbout20051881 Ver 5_PJD SAW-2018-02088_20190301SAW -2018-02088 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2018-02088 County: Guilford U.S.G.S. Quad: NC- Guilford NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: Soil & Environmental Consultants, P.A. Attn: Bob Zarzecki Address: 8412 Falls of Neuse Road Raleigh, NC 27615 Size (acres) —75 Nearest Town High Point Nearest Waterway West Fork Deep River River Basin Cape Fear USGS HUC 03030003 Coordinates 36.057276 N, -79.986833 W Location description: The proiect area, shown as the areas within the red outlined "Evaluation Area" on the attached figure entitled "Wetland Sketch Mad'. is located on the west side of Barrow Road and primarily on the south side of Clinard Farms Road, in High Point, Guilford County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters including wetlands, on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 10/30/2018. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters including wetlands, on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters including wetlands, on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters including wetlands, on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters including wetlands, on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ❑ The waters including wetlands, on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once SAW -2018-02088 verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (LAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact David E. Bailev at 919-554-4884 Extension 30 or David.E.Bailev2 (&usace.armv.mil. C. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 11/07/2018. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M 15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Digitally signed . BAILEY ent, o .=Doo, 83736 ou=PKI DN: c=US, o=BAI Government, 792837, ou=PKI, ou=USA, cn=BAILEY.DAVID.E.1379283736 Corps Regulatory Official: Date: 20,8.,,.07,2:,,:2, -05'00' Date of JD: 11/07/2018 Expiration Date of JD: Not applicable The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.anny.mil/cm apex/p.p=136:4:0 Copy furnished: Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105 Detailed Delineation or Waters of the US Suitable for Preliminary PI—rung Only S&EC reserves the right to modify tius map based on more fieldwork, and any other additional information. Approximations were mapped using topographic maps, au photos and ground —thing. V the site is going tc be disturbed, S&EC's detailed delineation should be approved and pemdtted by the U.S. Army Corps of Engineers as required. If the user of this work desires an accurate map of the regulated features flagged b y S&EC, they should retain a NC Registered Professional land Surveyor to locate S&EC's nagging. Legend Evaulation Area �•. i Potentially Jurisdictional Perennial Stream IN—. Potentially Jurisdictional Intermittent Stream 5% Potentially Jurisdictional Wetland Potential 50' Stream Buffer Potential 100' Stream Buffer January 25, 2018 -Joint USACE S DWR Site Visit Sue Homewood (DWR), David Bailey (USAGE), Bob Zaaecki(S&EC) Determination of potential WoUS and Streams verified by USACE and DWR with notable "changes 1-25-18". (NCWRC representative also present.) October 8, 2018 - DWR Site Visit - Post Pond Draining Sue Homewood (DWR), Bob Zamecki (SBEC) Stream stop points identified and flagged for streams "A" and "C" within the pond. Stream "A" evaluated and later confirmed to be "intermittent". Guilford Co., NC r ,y7s.ar , - tis f r + �r - M Project No. 13370.W1 Wetland Sketch Map Project Mgr.: 0 12s 250 500 Sail& 13z tI � Barrow Road Site - _ D�;e,;,n„ 1"= 125 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 11/7/2018 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Soil & Environmental Consultants, PA (S&EC), Bob Zarzecki, 8412 Falls of Neuse Road, Raleigh, NC 27615 = Agent for Blue Ridge Companies, Inc. C. DISTRICT OFFICE, FILE NAME, AND NUMBER: SAW -2018-02088 (BRC Barrow Road LLC / FPF High Point LLC / Barrow Road and Clinard Farms Road / High Point / Guilford County / residential) D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project area is located on the west side of Barrow Road and primarily on the south side of Clinard Farms Road, in High Point, Guilford County, NC. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Guilford City: High Point Center coordinates of site (lat/long in degree decimal format): Lat.: 36.055259° Long.: -079.986338° Universal Transverse Mercator: Name of nearest waterbody: West Fork Deep River E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: Field ® Determination. Date(s):1/25/2018 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Latitude (decimal Longitude Estimated amount of Type of aquatic Geographic authority to Number degrees) (decimal degrees) aquatic resources in resources (i.e., which the aquatic resource review area (acreage wetland vs. non- "may be" subject (i.e., and linear feet, if wetland waters) Section 404 or Section a licable 10/404 A 36.054931 -79.987055 2,250 LF non -wetland Section 404 B 36.055648 -79.990606 1,145 LF non -wetland Section 404 C 36.055450 -79.985215 150 LF Section 404 non -wetland W1 36.055759 -79.986344 2.335 Acres wetland Section 404 Section 404 W4 36.054874 -79.986801 0.51 Acre wetland W5 36.054698 -79.987122 0.274 Acre wetland Section 404 Tributary 36.054711 -79.986659 200 LF non -wetland Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AID before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AID constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Aerial, soils, and topo maps (S&EC) ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ®U.S. Geological Survey map(s). Cite scale & quad name: 1:24,000 Guilford Quadrangle ®Natural Resources Conservation Service Soil Survey. Citation: Guilford Co. Soil Survey ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100 -year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) x❑ Photographs: [OAerial (Name & Date): 2014 NCCGIA or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter:_ Nx Other information (please specify): LiDAR (NC Floodmaps) IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinatiam. Digitally signed by BAI LEY.DAVI D.E.1379283736 G DN: c=US, o=U.S. Government, ou=DoD, ou=PKl, ou=USA, cn=BAI LEY.DAVI D.E.1379283736 Date: 2018.11.07 12:11:00 -05'00' Signature and date of Regulatory staff member completing PJD Bob Zarzecki Digitally signed by Bob Zarzecki DN: cn=Bob Zarzecki, o=S&EC, PA, ou=Wetlands Department, email=bzarzecki@sandec.com, c=US Date: 2017.12.08 12:39:23 -05'00' Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. 'P N t'-2 -49" W o® � TE 8 Una Bearing Distance Li N 0'-05'-28" E 44.40' L2 N 88-37'-52' W 10.61' Stone L3 S 87=37'-15' E 91.08' ?y • ti Found L4 S 85-12'-48" E 92.14" x LS S 0'-44'-27" W 63.72' L6 S 0-51'-56' E 54.67' L7 S 0=51'-56' E 2.52' L19 1 LB S 84-32'-23" E 20.46' L9 N 3'-29'-44" E 68.99' L10 N 48'-37'-58' W 49.44 1 1.11 N 1'-23'-37" E 93.49' NL12 N 1=23'-37- E 22.04' N' T# 2 1.13 N 47'-17'_34• E 54.53• SEE S E L14 N 13'-00'-48" E 7265' 1 L15 N 5'-02'-44' E 97.02' LIS S 29'-46-31" W 133.62' L17 S 88'-321-3Y W 119.40' E E SHEET # 7 L19 S 76'-15'-07" W 01.23 E LN 0' -O8' -&1'E 163.6 L2020 569=41' -OS' E 63.82' f L21 S 89' -41' -OS" E 70.95' i. L22 N 7'-57'-50' E 4281' I L23 N 7'-57'-50" E 12244' �., LOT Art OF "LELIA B. BULLIS" P.B. 87-27 SHEET#3 V BRC BARROW ROAD, LLC Found N 2-1 -31" E �asement D.B. BO78-1479 443.52 � s PIN 7804706213 Piedmont Crossing Residential, LLC D.B.6171 Pg.2587 Duke Energy Corp( Communication Eaa D.B.4739 P CITY OF NIGH POINT MON. 'H[-PT59.Y N 839515.20' HAD E 1709123.45' N & c7� 0.9989319514 N 1S;'Mtl� E 17 6 ��29s• f "� NCOS Monument 5 NAD 03 / N 8371I&V E 171107580' 56.486 ACRES SEE SHEET#4 D7aknd Panel STREAM "C" SEE SHEET#5/ U SEE SHEET#6 Right -of -Way f cv N --------------- �0. r oN3m i �6ja i r � GRID NORTH 1983 N N egg 0.. 3 0,y�ma ov�.,3m RESUBDIVISION LOT /1 OF OF LOTS / & 2 / 5 Sda MURIEL W. ALSTON PLAT ing m P.8.140 Pg.85 N 2'-71675',g0». E .., 7.57 too_ f 'M[LLII P.1 STREAMS = 3,711 L.F. WETLANDS = 1.306 ACRES DRAINED POND = 1.621 ACRES TOTAL = 2.927 ACRES 30.673 ACRES Stone i ! N 0'-51'-56" W - Found ,s. 57.19'tot. Exhibit "A" Part One # t ad /'/ LOT 1/1 OF D.B. 6603 Page 2967 >r ..,£ O 1 N/F NORMAN WEIR & 'ANITA W. IDOL Temp- Lt NORMA IMOGENE WEIR , // & OLEN BR PKIM�SEY* E>dllbtt "A" Part One r., 1s o 4 D.B.1977 Pg.350 Pg .61 6603-2962,•:.s mo , '2Const t Temporary 603 ruc Aon Easement Exhibig empora • .-STONE- E s -72 1� D.B. Page 2975/ 300.60' oo FOUND \L77 : Curve Radius Chad Bearing and Distance Arc Length I$p$ s .... ............._.... .. ,,,,,,,ar.,_- ,,..,.,_....._...... _ 434. ,i v� C7 1277.50' S 35'-5P-18' E 405.53' 407.25' L «S4- - v N 3 i C2 1217,50'N 35'-54!-16" W 388.48' 388.12' C3 1834.93' N 71' S8' 30" W 81224' 615.88' C4 11578.04' N 68'-36'-17" W 32.23'' 3&60' 5 Tie une - - C5 578.p4' S 69' 03' 18' E 432.23' 433.60' 3'-42'-34� µ�'� "' %;' C6 1574.93' S 71'-33'-48" E 545.90' 548.90' 250.09' ~'""»••....,-� ?.. 7';sr "� N; ..,..„,., ,� C7 146236' S 12'-52'-44' W 308.78' 309.36' „ C8 152236' S 18•-48'-54" W 133.90' 133.94' •A < r��"" / i"""�"'""'�- C9 1514.93' S 85-48'-50' E 204.54' 204.69' BRC BARROW ROAD. LLC $ !` PROPOSED PARCEL UBSTATION SITE D.B. 8018-1479 N Right-ot-Way / ... ANNEXATION MAP FOR THE LANDS PIN 7804706213 E1d116It "A» OF THE CITY OF HIGH POINT D.B. 6603 Page 29711 P.B.141 P9.32 N/F J.R. SMITH PARCEL A D.B.849 P9.268 PROPOSED FIRE STATION SITE / ANNEXATION MAP FOR THE LANDS OF THE CITY OF HIGH POINT P.8.141 P9.32 / i Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 1 of 8 DEEP RIVER TOWNSHIP - GUILFORD COUNTY HIGH POINT, NORTH CAROLINA JOB NUMBER 2017066 APRIL 3, 2018 "This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction of the Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, _ this determination of Section 404 jurisdiction may be relied upon VIOF LUAMS" for a period not to exceed five years from this date. The 19.25 osement LOT #1Of undersigned completed this determination utilizing the appropriate '` "HECTOR MAU Regional Supplement to the 1987 U.S. Army Corps of Engineers & TERESA ANN NN LE eo 0 as recorded in P.B.1 Wetlands Delineation Manual, 33 C.F.R. part 328 and other U.S. Army Corps of Engineers guidance." i 19 6 1 0.6 r 5 16 9,20 8 A6 N tib / W n • i �s 8.738 ACRES N 00 i i! .!f SCALE: 1 •• 1.0T j2 DF Regulatory Official: --------------------- I 'HECTOR MARIO LEI & TERESA ANN LEN as recorded In P.B. 14 Title: °p ----------------..____-------------------- N e Kia 1 q9 5 6 z6a,, Date: ----------------------------------------- 57 / T. .rne 3�2 �,i°'09' USACE Action ID No.: 'GAROLINA CONFERQJfX 00 OF SEVENTH DAY•AO� VEN \, ae recordad'(n P.B. 6 r O ry \ . a �SITE\, CLINARD ROAD ` ' `'� Q SR#1837 p \ 0 y� WM/ O 36 � VICINITY MAP NOT TO SCALE JAMESTOWN ENGINEERING GROUP, INC. CONSULTING ENGINEERS 117 EAST MAIN STREET LM P.O. BOX 365 r Ninc JAMESTOWN, N.C. 27282 Telephone (336) 886-5523 C- 0626 Job No. 2017--066 (n, O% M aO OR m �ito,o> Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 2 of 8 DEEP RIVER TOWNSHIP — GUILFORD COUNTY HIGH POINT, NORTH CAROLINA c7D y!_— - 7 - �/' JOB NUMBER 2017066 C / APRIL 3, 2018 G) O 0 60° 30' 0 60' 120' 180' N� 77' fI( 00 0 22s a S 7 --__ ,/' , D � SCALE. 1 = 60 Nw X22 �2�7 �' C ' m L22� 230 V 00 Co N10-26'-49" W --�' 3 AVERAGE <� WIDTH 1233 ` 45 L2 q� L24 X252 LX53 oho cP CIA D 46 12 S� L236 0.239 9 1 < `L'S3 L240 L243 0` "36 0. 5 5 2�9 L2 (Dc<ss � �' � 00 C 4 A RAGE `N <� ��• CA 4 AVERAGE WI TH�0 N r-00 SNF � 0 �J'' 4' AVERAGE 0 ```----- WIDTH L263 66 N 3' AVERAGE —' 76 WIDTH N 68<<'c4.0 266<26 L269 1L272 �2 <' . L268 L270 X27 L293 r 3' AVERAGE �2> 1,3ar: C0 L2 WIDTH A N -P' _` 4' AVE AGE WIDTH SEAL cn w L'"3343 N J '� _� W ----___-- UR r ' ffi N I c9 c CP co a ' N JAESTOWN ENGINEERING GROUP, INC. moo CONSULTING ENGINEERS 117 EAST MAIN STREET GRID NORTH 1983 a ErL P.O. BOX 365 inc JAMESTOWN, N.C. 27282 oyrc_� , Telephone (336) 886-5523 \SEE SHEET#3 C— 0626 Job No. 2017--066 CD Nol� SEE SHEET 2 1 CA 4' AVERAGE (DO Q) WIDTH CD (51 00 00 09 r. LA �� s iso W 0 4' AVERAGE WIDTH co m GRID NORTH 1983 BRC BARROW ROAD, LLC D.B. 8018-1479 PIN 7804706213 SEE SHEET#4 Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 3 of 8 DEEP RIVER TOWNSHIP - GUILFORD COUNTY HIGH POINT, NORTH CAROLINA JOB NUMBER 2017066 APRIL 3, 2018 60' 30' 0 60' 120' 180, SCALE: 1 60' 54� Vss-fo -I SEAL JAMESTOWN ENGINEERING GROUP, INC. CONSULTING ENGINEERS 117 EAST MAIN STREET / P.O. BOX 365 40., Fri inc JAMESTOWN, N.C. 27282 Telephone (336) 886-5523 C— 0626 Job No. 2017-066 0 GRID NORTH 1983 BRC BARROW ROAD, LLC D.B. 8018-1479 PIN 7804706213 SEE SHEET#4 Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 3 of 8 DEEP RIVER TOWNSHIP - GUILFORD COUNTY HIGH POINT, NORTH CAROLINA JOB NUMBER 2017066 APRIL 3, 2018 60' 30' 0 60' 120' 180, SCALE: 1 60' 54� Vss-fo -I SEAL JAMESTOWN ENGINEERING GROUP, INC. CONSULTING ENGINEERS 117 EAST MAIN STREET / P.O. BOX 365 40., Fri inc JAMESTOWN, N.C. 27282 Telephone (336) 886-5523 C— 0626 Job No. 2017-066 0 10) D�- 10 C6 CC) B59 STREAM4L 7 <1 L7 M.* SEE SHEET#4 L206 B64 0 W3 = 0.144 ACRES N, GRID NORTH 1983 V Drained Pond POND AREA = 1.621 ACRES END FLAGGED r- 46 10 O t)IANI CHANNEL .. .......... .........._..._.__.._...1'..A37 cp A37—C Z-bpt wi = 0.151 ACR B44 L332 Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 5 of 8 DEEP RIVER TOWNSHIP — GUILFORD COUNTY HIGH POINT, NORTH CAROLINA _ \U4 �Q ............ . o 0 ........ ................. .. .. . ............. .......... ........ 4�- .... ...... .......... ...... . .... ............ ......... ncm CONCRETE MONUMENT .... LO .......... -J ...... . .. .. RIGHT OF WAY DISK B71 SEESHEET#6 CENTERLINE Un....... ........ POWER POLE ... ............. ... 00 RIGHT—OF—WAY ----- ----- ............. .... . ...... . co A32 �B 7 4 to, ----------- ............ DEED BOOK w ...... r8 ............ 00 ... ... .... co CO �':j . ...... ..... .. . B76 (00) 1�11-1-- -- ...rn 00 . .... ........... RCP OOA,38 rn E]GM t)IANI CHANNEL .. .......... .........._..._.__.._...1'..A37 cp A37—C Z-bpt wi = 0.151 ACR B44 L332 Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 5 of 8 DEEP RIVER TOWNSHIP — GUILFORD COUNTY HIGH POINT, NORTH CAROLINA _ \U4 �Q LEGEND 0 EIP EXISTING IRON PIN FOUND ncm CONCRETE MONUMENT NIP NEW IRON PIN SET OR/W DISK RIGHT OF WAY DISK SEESHEET#6 CENTERLINE OPP POWER POLE 21 . ...... R/W RIGHT—OF—WAY 0 TP TELEPHONE POLE co Sq Ft. SQUARE FEET STREAM D. . DEED BOOK OLP LIGHT POLE C) FORM ERLYIMPOU N DED P.B. PLAT ,POLE POLE -j 426 L.F. 0.267 ACRES P. P. POWER POLE ncB CATCH BASIN ........... RCP REINFORCED CONCRETE PIPE E]GM GAS METER CMP CORRUGATED METAL PIPE OGV GAS VALVE PDA PROTECTED DRAINAGE AREA L158 OSSMH SANITARY SEWER MANHOLE L159 LO B28 0 D. M. U. E. DRAINAGE MAINTENANCE & UTILITY EASEMENT oco SEWER LINE CLEAN OUT ELECTRICAL OSDMH STORM DRAIN MANHOLE 0 A25 E. U . UTILITY EASEMENT nyl YARD INLET L110 MBL MINIMUM BUILDING LINE CCB CATCH BASIN 0 {HYD FIRE HYDRANT �7O Q5WV WATER VALVE 7 l 7 ❑WM WATER METER L115 DWELL WELL CD CPA `jjEj' A19 118 Li 19VB15 1. 40 Q L151 L150 �71L342 0�121 L122V L148 v 47 L344 1,5 Al 11'14 . OPEN W/ BEAVER IMPC JAMESTOWN ENGINEERING GROUP, INC. CONSULTING ENGINEERS 117 EAST MAIN STREET P.O. BOX 365 L q N r inc JAMESTOWN, N.C. 27282 Telephone (336) 886-5523 0626 C Job No. 2017-066 LM 7 B 3 7 L332 Q0 00 �'q oSTREAM ........ FORM ERLYIMPOU N DED 426 L.F. 0.267 ACRES RES- ............ ......... .. ....... .... .. Li 5B B28 . ....... Ll 59 J 0 ... . ........ .......... ol ........ .. A25 0 N L110 -_j L115 CIA 0*) 0') 4171, A19 61 L'18Ll I 9/�l 5 A32 �7 10 L,341 L151 L150 47 L342 ''o 2A L14 Q, 4145 co All rn (0 -_j m SEE SHEET#5 4 - GRID NORTH 1983 L124 02-5 47 B8 J 345 1297j 0 �7 A7 C140 Ly 9 B 1 A �7 5 ,>L 136 \1,7 OPEN TATNER BEAVER IM OU DMENT Al Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 6 of 8 DEEP RIVER TOWNSHIP — GUILFORD COUNTY HIGH POINT, NORTH CAROLINA JOB NUMBER 2017066 APRIL 3, 2018 60' 30, 0 60' 120' 180, SCALE: 1 60' Q0 10 Iesslo "V SEA.L L-3348 too L7 101 • U 00 Ln JAMESTOWN ENGINEERING GROUP, INC. <Q0 n 00 CONSULTING ENGINEERS 00 0 n 117 EAST N STREET -, MAI P.O. BOX 365 Uj JAMESTOWN, N.C. 27282 Er inc 0 0 N Telephone (336) 886-5523 0626 00 C N1( Job No. 2017-066 LM 00 9 0z > m 49 w 245 �, -7 L246 _24 L248X252 L253 <254 O -j x '9 L� 0 1 0.55 (0 4' AV_ -RAGE WI TH _j`�otiF �� GRID NORTH 1983 '��' p o 7(5) rOD� IN, 00 (_0 77 1 Stone Found 6 L263 (0 C\4 3' AVERAGE _j WIDTH L272 Ul 66 6 L268 1269 L270 071C)� Ll 9 v-277 2 3' AVERAGE CV WIDTH A 1275v Ld SEE SHEET#3 z 00 Q0 0 1 FT1 Wetland Delineation Survey For BRC BARROW ROAD LLC Sheet 7 of 8 DEEP RIVER TOWNSHIP — GUILFORD COUNTY HIGH POINT, NORTH CAROLINA _U o X JOB NUMBER 2017066 CD 0 APRIL 3, 2018 0 CD CA I - 60' 30' 0 60' 120' 180' -U 00 m SCALE: 1 60' '0 �w' IV m & SEAL 0 s U VN see' j JAMESTOWN ENGINEERING GROUP, INC. CONSULTING ENGINEERS 117 EAST MAIN STREET /Z FEP.O. BOX 365 - inc JAMESTOWN, N.C. 27282 Telephone (336) 886-5523 C— 0626 Job No. 2017-066 A-01 LINE TABLE LINE TABLE LINE TABLE LINE TABLE Wetland Delineation Survey For BRC BARROW ROAD LLC L24 N 16*-34'-38" E 18.99' L100 S 73*-06'-38" E 6.02' L176 N 87*-21'-26" W 17.43' L252 N 18*-52'-44" W 30.92' L25 L26 N 50°-41'-31" E N 56*-51'-11" E 66.01' 43.90' L101 L102 N 44°-37'-14" E N 74°-20'-17" E 24.71' 11.64' L177 L178 S 87'-25'-04" S 62*-35'-44" W W 17.72' 11.30' L253 L254 N N 11°-07'-08" 25°-12'-23" E E 22.02' 23.11' Sheet 8 of 8 L27 S 54'-41'-55" E 12.32' L103 N 72*-04'-12" E 15.92' L179 N 32*-54'-05" W 20.71' L255 N 56*-16'-42" E 7.56' L28 N 81°-45 -25" E 17.78 L104 N 43°-17 -37 E 13.63' L180 N 83°-48 -53' W 20.41' L256 S 75°-10 -35 E 19.65' L29 N 57°-43'-31" E 23.83' L105 N 49*-04'-01" E 18.38' L181 S 81*-59'-15" W 33.17' L257 N 50*-54'-46" E 16.35' DEEP RIVER TOWNSHIP - GUILFORD COUNTY L30 N 69*-59'-23" E 28.10' L106 N 20*-39'-42" W 17.99' L182 S 84'-37'-44" W 25.74' L258 N 20*-48'-21" E 24.06' HIGH POINT, NORTH CAROLINA L31 N 54°-43 -39 E 16.14' L107 N 83°-32 -22 E 11.06' L183 S 77°-39 -03 W 14.56' L259 N 37°-18 -15 E 30.64' 1 Lj2 N 48,�-Tfl'-52" E 20.83' L108 N 65°-54'-43" E 10.76' L184 S 75*-43'-18" W 19.83' L260 N 57*-08'-15" E 12.71' JOB NUMBER 2 017066 L33 N 59°-59 -44 E 19.82' L109 N 78*- 14'- 04" E 9.18' L185 N 89*-09'-38" E 19.40' L261 N 74*- 19'- 49" E 44.54 APRIL 3, 2018 L34 N 86*-07'-32" E 15.59' L110 S 2*-13'-44" E 10.24' L186 N 83*-34'-30" E 30.21' L262 N 21 °-31'-16'' E 23.19' L35 S 57*-46'-53" E 10.27' L111 S 74*-19'-27" E 13.41' L187 S 21*-34'-55" E 11.89' L263 N 11 °-41'-49" E 28.46' L36 S 51*-22'-39" W 16.40' L112 N 38*-49'-53" E 18.18' L188 N 82°-58'-23" E 23.37' L264 S 83'-03'-26" E 11.81' L37 S 20*-58'-47" W 32.30' L113 N 86*-52'-05" E 4.80' L189 S 78*-27'-28" E 12.99' L265 N 84*-16'-42" E 20.26' L38 S 47°-33 '- 01 " W 26.75' L114 S 21*-07'-54" W 6.48' Ll 90 S 70*-17'-29" E 4.47' L266 N 16*-55'-24" W 18.67' LINE TABLE L39 S 84*-25'-35" W 20.72' L115 S 9*-21'-52" E 9.18' L191 S 83*-26'-53" W 15.39' L267 N 29*-37'-18" E 15.60' L40 S 61 °-11'-24" W 34.66' L116 N 51 °-54'-13" E 10.01, L192 S 82*-42'-57" W 18.66' L268 N 3'-35'-17" E 14.45' L328 N 67*-00'-43" E 18.33' L41 S 53*-31'-34" W 23.18' L117 N 21'-11'-36" E 19.00' L193 S 87'-42'-53" W 20.83' L269 N 7*-11'-31" W 16.34' L329 N 26*-40'-53" E 19.20' L42 S 67*-01'-52" W 19.43' L118 N 15*-03'-27" E 28.96' 094 S 74°-12'-39" W 8.72' L270 N 3*-28'-40" W 15.10' L330 N 3*-26'-38" E 27.86' L43 S 48'-06'-08" W 22.08' L119 N 6'-35'-46" E 12.68' L195 S 65*-52'-45" W 21.03' L271 N 10'-38'-36" W 17.25' L331 N 31 °-17'-36" E 29.04' L44 S 24*-44-42" W 10.30' L120 N 44*-34'-02" E 25.05' L196 S 79*-50'-06" W 29.51' L272 N 8*-49'-40" E 19.13' L332 N 3*-16'-39" E 23.00' L45 S 31*-37'-40" E 16.46' L121 N 12*-14'-38" W 17.43' L197 N 68*-13'-52" W 17.73' L273 N 45*-19'-43" E 18.12' L333 N 56*-21'-47" E 21.23' L46 S 35'-47'-43" E 17.46' L122 N 7°-48'-10" E 20.40' L198 S 58*-57'-07" W 25.52' L274 N 31 °-24'-26" E 35,63' L334 N 44*-26'-48" E 24.85' L47 S 64*-35'-33" W 15.97' L123 S 71*-49'-20" W 8.17' L199 S 78*-30'-05" W 30.48' L275 N 10*-26'-26" W 18.01' L335 N 51*-23'-27" E 49.19' L48 S 74°-22'-31" W 34,25' L124 N 0*-42'-33" E 23.66' L200 S 62*-39'-53" W 18.30' L276 N 65*-33'-24" W 16.89' L336 N 67*-05'-27" E 30.48' L49 N 23'-16'-34" W 20.45' L125 N 15*-45'-26" W 17.81' L201 S 69*-01'-55" W 34.60' L277 N 8*-37-51" W 11.51' L337 N 58*-52'-27" E 26.12' L50 N 40°-14'-19" W 21.56' L126 N 32*-10'-17" E 17.28' L202 S 48*-25'-35" W 55.47' L278 N 13'-47'-24" E 26.93' L338 N 76*-56'-11" E 27.31' L51 S 81°-17'-20" W 8.08' L127 S 40*-59'-14" E 11.41' L203 S 43*-22'-47" W 49.36' L279 N 88*-59'-08" W 3.37' L339 N 61*-13'-35" E 18.03' L52 S 74*-44'-04" W 21.73' L128 S 77*-38'-39" E 13.23' L204 S 24*-59'-36" W 35.13' L280 S 65*-26'-57" E 26.66' L340 N 18*-15'-56" E 22.14' L53 N 34*-56'-08" W 9.88' L129 N 17'-42'-55" E 8.01' L205 S 41 °-38'-05" W 36.72' L281 N 89*-51'-12" E 6.48' L341 N 7'-26'-05" E 29.04' L54 N 46*-14'-43" E 31,67' L130 N 22*-46'-49" E 33.04' L206 S 9'-41'-10" W 61.10' L282 N 52'-54'-02" E 32.70' L342 N 14*-10'-30" E 18.10' L55 N 57*-53'-38" E 33.02' L131 N 40*-25'-17" E 14.22' L207 S 62'-07'-49" W 21.12' L283 N 86*-01'-31 " E 43.21' L343 N 48*-18'-14" E 21.17' L56 N 40*-00'-03" E 52.36' L132 N 22°-11'-54" E 21.81' L208 S 65*-40'-15" E 13.59' L284 N 86*-43'-27" E 32.29' L344 N 10*-16'-07" E 33.52' L57 N 50*-39'-00" E 47.38' L133 N 22°-30'-01" E 23.45' L209 S 26*-23'-18" W 23.74' L285 S 88*-56'-58" E 43.21' L345 N 3*-38'-55" W 31.18' L58 N 50'-57'-59" E 29.91' L134 S 64*-44'-49" E 15.42' L210 S 36*-20'-51" W 17.03' L286 N 38'-55'-34" E 31.09' L346 N 37*-34'-18" E 22.63' L59 S 47*-20'-47" E 10.58' L135 S 44'-02'-46" W 11.49' L211 N 69°-22'-01" W 17.60' L287 N 18*-55'-43" E 19.13' L347 N 21°-05'-31" E 23.57' L60 S 42*-51'-16" E 43.99' L136 S 13'-41'-33" W 13.18' L212 N 14*-00'-26" W 17.24' L288 N 28°-36'-33" E 12.63' L348 N 22*-42'-57" E 15.47' L61 S 23*-44'-06" E 25.12' L137 S 28*-07'-13" W 17.85' L213 N 44'-26'-49" W 24.49' L289 N 36*-48'-56" E 24.98' L349 N 29*-17'-19" E 34.28' L62 S 40*-43'-04" E 19.94' L138 S 31'-42-42" W 20.74' L214 N 38°-49'-01" W 30.26' L290 N 57°-41'-51" E 5.88' L350 N 25*-50'-56" E 24.88' L63 S 38'-35'-30" E 19.14' L139 S 18*-45'-25" W 20.04' L215 N 49*-15'-03" E 11.12' L291 N 72*-54'-30" E 10.51' L351 N 81 °-55'-17" E 25.12' L64 S 26*-19'-39" E 10.95' L140 S 18*-20'-11" W 17.93' L216 N 64*-44'-38" E 9.43' L292 N 77*-20'-16" E 9.83' L352 S 87*-21'-35" E 30.61' L65 S 52*-44'-58" E 15.31' L141 S 42*-51-38" W 15.84' L217 N 43*-50'-46" W 19.59' L293 N 11 °-02'-40" W 47.97' L353 S 77*-00'-09" E 20.16' L66 S 44*-13'-22" E 18.44' L142 S 56*-12'-56" E 10.83' L218 N 34*-50'-56" W 27.32' L294 N 85*-58'-53" E 29.24' L354 N 83*-39'-06" E 16.72' L67 S 19*-59'-09" E 11.88' L143 S 12*-22'-29" E 14.55' L219 N 56*-28'-13" W 14.98' L295 N 79*-52'-25" E 27,30' L355 N 78*-50'-05" E 24.99' L68 S 44'-06'-55" E 5.75' L144 S 19*-01'-56" W 29.25' L220 N 58'-20'-14" W 14.92' L296 S 74*-09'-55" E 23.73' L356 S 89°-01'-21" E 15.70' L69 S 59*-02'-12" E 12.44' L145 S 26*-01'-39" W 23.40' L221 N 49*-03'-49" W 16.16' L297 'N 85*-42'-30" E 41.96' L357 N 89*-11'-50" E 50.12' L70 S 81°-06 -52 E 15,76 L146 S 27*-21'-20" W 9.49' L222 N 75°-39 -52 W 10,16' L298 N 80°-46 -53 E 21.15 L358 S 78'-24'-57" E 19.01, h L71 N 43°-33 -55 E 9.96' L147 S 72*-42'-24" W 11. 48' L223 N 39*-02'-01" W 11.38' L299 N 48*-44'-42" E 18.05' L359 N 88°-14 -52 E 45. P., L72 N 39°-32 -31 E 19.88' L148 S 2*-36' 47" W 13.37' L224 S 50*-57'-59" W 9.95' L300 S 58'-37'-50" E 18.85' V*� V, R L73 L74 N 72*-50'-06" E N 8*-35'-07" E 9.30' 11.31' L149 L150 S 30°-37 -56 W S 0*-43'-25" E 17.19' L225 N 72°-43 N 36*-42'-17" -42 E 35.25' L301 N N 80°-55 52*-43'-36" -11 E E 32.28' 13.58' 30.41' L226 E 20.88' L302 L75 N 0°-40 -45 E 14.88' 1151 S 11*-57'-32" W 16.60' L227 N 13°-21 -30 E 14.29' L303 N 81 *-12'-50" E 21.15' SEAL L76 S 78*-52'-,46" W 28.37' L152 S 37*-02'-16" W 17.17' L228 N 24*-09'-03" '-,31 W " 20.28' L304 N 62*-08'-56" E 28.36' L77 N 41*-49'-47" W 35.73' L153 S 87°-44 -09 W 18.54' L229 N 30°-49 W 14.06' L305 S 52'-,39'-34" E 23.23' L-3349 L78 N 30*-47'-45" W 32.21' L154 S 51*-24'-42" W 23.56' L230 N 23°-50 -01 E 12.13' L306 N 69*-42'-28" E 49.41' Ar r1% '4 L79 L80 N 35°-09 -59 W N 19°-19 -30 W 15.54' 24.01' L155 L156 S 69*-1 V-03" W S 45°-10 W 20.89' 22.97' L231 L232 N 43*-44'-00" N 35°-48 E E 22.16' L307 N N 64°-06 -25 E 33.03' 17.09' SU j Ir -36 -35' 32.75' L308 86°-02 -51 E L81 N 30°-26 -06 W 24.84' L157 N 813'-17'-58" W 16.07' L233 N 14°-16 -10 W 34.72 L309 N 44°-37 -44 E 35.57' L82 L83 N 24°-36 -31 " W N 29°-50 -25 W 39.35' 25.56' L158 L159 S 6°-41 -35 E S 0°-09 -41 E 15.20' 19.15' L234 L235 s 89°-37 N 40°-59 -03 E -19 E 14.55' 19.08' L310 L311 S N 84°-45 -25 E 70'-05'-50" E 12.53' 13.32' L84 N 18'-37'-15" W 28.46' L160 S 4°-23 -43 E 11.45' L236 N 8°-02 -29 W 22.92' L312 N 47°-11 -36 E 14.65' L85 N 23*-17'-59" W 33.65' L161 S 34*-58'-19" E 15.99' L237 N 27*-16'-45" E 18.04' L313 N 75°-43'-55" E 16.37' L86 N 6*-28'-26" W 29.99' L162 S 67'-22'-05" E 17.54' L238 N 30*-10'-43" W 20.83' L314 N 38*-38'-06" E 10.50' L87 N 29*-53'-43" E 19.98' L163 S 44*-00'-57" E 19.77' L239 N 12*-04'-22" E 28.01' L315 N 19*-46'-06" E 19,65' L88 N 59*-31'-06" E 42.06' L164 S 36*-18'-29" E 17.04' L240 N 9*-46'-08" W 22.20' L316 N 58*-34'-37" E 15.04' L89 N 48°-22 -50 E 54.42' L165 S 35°-22 -20 E 20,18' L241 N 26°-44 -07 W 14.27' L317 N 62°-23 -23 E 12.21' JAMESTOWN ENGINEE.. ING GROUP, INC. L90 N 62°-15'-51" E 48.82' L166 N 82*-55'-42" E 27.43' L242 N 22'-38'-23" E 29.38' L318 N 50°-13'-57" E 45.73' L91 N 72*-02'-24" E °-21'-01" " 51.39' Ll 67 S 86*-12'-47" E 25.56 L243 N 3*-30'-33" W 23.35' L319 N 67*-22'-05" E 40.62' CONSULTING ENGINEERS L92 N 51 01 E 37.46' Ll 68 N 81*-47'-42" E 25.60' L244 N 30*-41'-27" W 33.16' L320 N 49'-35'-50" E 29.16' L93 N 63°-09 -55 E 22.49' Ll 69 S 76'-29'-52" E 18.42' L245 N 11 *-50'-50" E 28.52' L321 N 56*-14'-30" E 37,74' L94 N 42°-44 -05 E 20.69' Ll 70 S 69*-09-04" E 19.19, L246 N 7°-11 -09 E 32.17' L322 N 70*- 11'- 40" E 60.29' 117 EASTMAN STREET L95 N 64'-49'-57" E 17.32' Ll 71 S 80'-45'-41" E 20.62' L247 N 12*-12'-37" W 24.99' L323 N 77*-58'-01" E 27.46' L P.O. BO 365 L96 S 71*-55'-40" E 12.59' Ll 72 S 46 *- 10'- 24" E 19.96' L248 N 0 *- 10'-,3 5 " W 17.23' L324 N 63'-26'-35" E 38.03' JAMESTOWN, C. 27282 L97 N 79°-41 -38 E 20.87' Ll 73 S 65'-11'-15" E 10.37' L249 N 34'-48'-01" E 16.50' L325 N 43*-05'-40" E 34.88' inc Telephone (336 886-5523 31 L98 N 81*-02'-18" E 11.46' L174 S 58°-42 -35 E 28.44' L250 N 3*-31'-38" W 28.06' L326 N 51*-36'-28 E 28.57' L99 N 36°-52 -56 E 13.37' L175 S 44°-46 -22 W 10.42 L251 N 11°-43 -53 W 18.06' L327 N 65*-23'-10" E 33.35 C- 0626 Job No. 2017-066