HomeMy WebLinkAbout20181609 Ver 1_More Information Received_20190228Staff Review
Does this application have all the attachments needed to accept it into the review process?
r Yes r No
ID#* Version* 1
20181609
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Sue Homewood:eads\slhomevtood
Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800
Submittal Type:*
Application Attachments
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r New Project
r Pre -Application Submittal
r More Information Response
r Other Agency Comments
r For the Record Only (Courtesy Copy)
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Project Contact Information
Name: Briana Bill
Who is subrritting the inforrration?
Email Address: bbill@dewberry.com
Project Information
Existing ID #: Existing Version:
20181609 1
20170001 (no dashes)
Project Name: City of Eden Waterline to SoVA Mega Park; SAW -2018-02188
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Rockingham
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
2019.1.25 - USACE SoVA PCN Response Letter.pdf 182.98KB
SoVA Impact Maps.pdf 31.8MB
Only pdf or lore files are accepted.
Describe the attachments:
Attached is the response letter to USACE and the corresponding impact maps.
rJ By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the online form."
Signature:
A(au tv,
Submittal Date:
f= Dewberry
Dewberry Engineers Inc.
551 Piney Forest Road
Danville, VA 24540-3353
434.797.4497
434.797.4341 fax
www,dewberry.com
January 25, 2019
Mr. David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE -SAW -RG -R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
RE: Request for Additional Information: City of Eden Waterline to SoVA Mega Park,
Rockingham Co.
SAW -2o18-02188
Dear Mr. Bailey:
Per the request for additional information received December 20, 2018 via email, provided
below are responses and updated documents:
1. Project plans require additional details:
a. Currently wetland areas are not clearly visible on the plan sheets. Add all wetland
boundaries to the plans and label them according to the delineation documentation
provided by Dewberry on 8/24/2018. I recommend that a different color be used on
the plan sheets for wetland lines (such as green?). Show and label the wetland
boundaries on the profile drawings as well;
Response: Wetland boundaries are shown in color and labeled on
updated plans.
b. Clearly label all streams on the plan sheets according to the delineation
documentation provided by Dewberry on 8/24/2018. I recommend that a different
color be used on the plan sheets for stream lines (such as blue?). Show and label the
streams on the profile drawings as well;
Response: Streams are shown in blue and labeled on the updated plans.
c. Currently there is no way to match up itemized impacts listed in the PCN with the
plans. As such, add Impact Site labels to the plans, and add corresponding labels to
Section D. of the PCN for clarity purposes:
Impact Site 1: Wetlands WD and WE
Impact Site 2: Stream SH;
Impact Site 3: Wetlands WC (2 areas);
Impact Site 4: Streams SF and SG, Wetland WB;
Impact Site 5: Stream SE;
Impact Site 6: Streams SC and SD;
Impact Site 7: Streams SA and SB, Wetland WA;
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 2 of 7
Response: Impact site labels were added to the updated plans and the
Impact Table was revised to reflect site labels. Currently Impact Sites
are labeled as:
Impact Site 1: Wetland WD
Impact Site 2: Stream SH
Impact Site 3: Cascade Creek (Stream SF and SB)
Impact Site 4: Wetland WB
Impact Site 5: Stream SE
Impact Site 6: Stream SD
Impact Site 7: Stream SC
Impact Site 8; Stream SB and SA
d. Specify whether the utility corridor would include a permanent maintenance
easement where vegetation would be maintained in an herbaceous state. If so,
include zoomed -in details of each stream and/or wetland crossing showing the
footprint of the permanent maintenance and temporary construction corridors. Such
details must also show the extent of temporary impacts (streams and wetlands) and
extent of permanent maintenance impacts through wetland areas. Further, for each
applicable crossing, quantify the acreage of wetlands proposed to be converted from
forested wetlands and permanently maintained in an herbaceous state and add those
as separate impacts in Section D of the PCN;
Response: The wetlands and streams are within NCDOT right-of-way
and maintained by that agency. Any current regular maintenance by
NCDOT will be the same going forward.
Zoomed in details are shown for each impact for a clearer view. All
construction within wetlands and streams will be a temporary impact,
with the exception of rip rap stabilization on the stream banks, which
will be permanent. The wetlands in their existing state are not forested
within the NCDOT right-of-way.
2. Project plans indicate that stream crossings include discharging rip rap. If so, please
confirm (including via profile drawings) that any rip rap placed below the ordinary high
water mark will be placed such that the top of the rip rap will be no higher than the existing
stream bed elevation (see NWP 12 Regional Condition 4.1.11). Note that the "Rip -Rap
Placement Detail" on Sheet C22 does not appear to comply with this Regional Condition.
Also, since discharged rip rap would not be removed, the lengths of stream subject to rip rap
discharge must be added to the PCN as permanent impacts;
Response: Referring to Sections 4.1.11 and 3.5.2 of the NWP 12 Regional
Condition, riprap will be pushed or keyed into the bank of the waterbody, no
higher than existing stream bed elevation. This method is shown on the rip -rap
placement detail. Please advise of any outlying concern.
y.:
Dewberry
.....
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 3 of 7
3. Given the time past from the date of the USFWS Section 7 self -certification letter, as well as
the known occurrences of several aquatic species in Cascade Creek and the Dan River, we
have initiated informal consultation with the USFWS. Please note that the Corps cannot
verify the use of a NWP until Section 7 consultation is complete;
Response: The USFWS letter sent on 12/20/2019 identified species of concern
as the Roanoke Logperch, James Spinymussel, Atlantic Pigtoe, and Smooth
Coneflower. A Smooth Coneflower survey will be performed in May.A revised
Self -Certification package for the project will be re -submitted to USACE as soon
as possible.
Further information regarding the aquatic species is discussed in the next
comment.
4. Given that occurrences of Roanoke logperch are known in Cascade Creek, and occurrences of
James spinymussel are known just downstream in the Dan River, avoidance of impacts to
Cascade Creek via HDD or jack and bore methods seem reasonable. However, the plans note
an alternative trenching method through Cascade Creek and the PCN accounts for
temporary impacts to Cascade Creek due to trenching. Please clear up this discrepancy in the
plans and PCN, such that the project would be compliant with NWP 12 Regional Condition
4.1.1. If the Cascade Creek crossing would be installed via HDD, remove this impact from
Section D of the PCN and add a note on this page clearly indicating that the impact would be
avoided in this manner;
Response: The impacts in the PCN consider that Cascade Creek is open cut
(trench installation) — thus indicating maximum impact possible. The contract
documents allow for the contractor to choose either directional bore or open
cut methods. However, we do not want to strictly limit the crossing to only
directional drilling or jack and bore methods due the following concerns:
Directional Drill — Though directional drilling is becoming very
conventional for smaller utilities, directional drilling and installation of a
large 20" waterline is highly specialized, will require greater depth into
consolidated material/rock (due to relatively shallow saturated overlying
soil conditions), and require a bore of approximately l000 LF due to setup
conditions at this site. Based on our experience, approximately two years
ago in installing a 16" sewer forcemain on the opposite side of the road to
cross Cascade Creek, contractors bidding this work were only able to get one
price from a subcontractor that had the capability to directional bore the
large 16" forcemain. Price for this work was more than three times the cost
of open cut; consequently we had to delay the project and obtain approval to
open cut and install the sewer forcemain via open cut. It is an
unreasonable expectation of the City of Eden taxpayers to take on this
".g.-:1,Dewberry�a
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 4 of 7
additional cost and risk to the project when reasonable mitigation measures
appear to be available to adequately safeguard the environment.
Jack and Bore — In order to dig the bore pits deep enough to execute the
bore of Cascade Creek, an extensive amount of shoring will be required to
retain the road embankment. The groundwater table is also very high in
this area, which will also require specialized dewatering methods in the
bore pit area, in addition to the shoring. These are sophisticated and
higher -risk construction methods, which also pose a safety risk to workers.
We do not recommend jack and bore for installation under Cascade Creek.
If open cut is utilized, to minimize potential impacts to listed threatened or
endangered aquatic species, we propose to restrict work so that work will only
occur outside the spawning season of each of the listed species. Construction
details, related mitigation methods, as well as restoration indicated on sheet C-
22 will be strictly adhered to. Full time inspection will be provided to insure
compliance with mitigation measures. Final restoration of grade to original,
and restoration of vegetation per planting schedules on C-22 will be performed.
5. Provide a plan including any pertinent detail sections for typical wetland impacts via
trenching. Such plans should include dewatering methods, lengths of time that trenches will
be open in wetlands, and confirmation that the top 6 to 12 inches of the trench will be
backfilled with topsoil from the trench. Per NWP 12 Regional Condition 4.1.9, provide a
specific wetland restoration plan including how grade and contour will be re-established,
anti -compaction measures in soils subject to construction traffic and matting, stabilization
methods, and seeding/planting lists and specifications. Be sure to specify wetland
restoration differences in temporary and permanent easement areas. Such details should be
provided as an addendum that can be referenced in permit Special Conditions;
Response: C22 serves as the Wetland and Stream Impacts detail sheet and
includes temporary and permanent seeding mixtures.
6. Plan sheet -specific comments:
a. Sheet C5: Wetland lines do not appear on the plan sheet (should be Wetlands WD
and WE, per comment 1)a above. The footprint of wetland areas proposed for impact
(permanent maintenance as well as temporary construction corridors) should be
clearly shown on a zoom -in of the crossing (should be labeled "Impact Site 1" per
comment 1)c. above. The sheet references "Provide Stream Restoration per Details";
however, this area includes wetlands rather than streams, and the plan sheet should
reference a Wetland Restoration plan (see comment 5 above);
Response: Wetland lines and labels added, zoom -in view of impact
added, and temporary construction corridor is shown. The permanent
maintenance easement is the NCDOT right-of-way. Refer to the profile
y.:
Dewberry
.....
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 5 of 7
view of the stream bank restoration detail area — this is to protect the
bank where the pipe goes under the existing stormwater culvert. This
does not impact the wetland, and the note simply refers to the detail by
which the rip rap shall be installed.
b. Sheet C6: Clearly show and label Stream SH per comment 1)b above. The footprint of
the stream proposed for impact should be clearly shown on a zoom -in of the crossing
(should be labeled "Impact Site 2" per comment 1)c. above);
Response: Stream label added, and zoom -in view of impact added.
c. Sheet C7: Wetland lines do not appear on the plan sheet (should be Wetland WC [2
segments], per comment 1)a above). The footprint of wetland areas proposed for
impact (permanent maintenance as well as temporary construction corridors) should
be clearly shown on a zoom -in of the crossing (should be labeled "Impact Site 3" per
comment 1)c. above). The sheet should also reference a Wetland Restoration plan
(see comment 5 above);
Response: Wetlands are located outside the NCDOT right-of-way and
construction is limited to within the right-of-way. Thus, no impact to the
wetlands. Wetland lines have been illustrated on the plan sheet.
d. Sheet C8: Clearly show and label Streams SF and SG per comment 1)b above. If
applicable, the footprint of the stream proposed for impact should be clearly shown
on a zoom -in of the crossing. The plan sheet shows both an HDD plan and an
"Alternative Open -Cut Cascade" option. Please clear up this discrepancy (per
comment 4 above). Wetland lines do not clearly appear on the plan sheet (should be
Wetland WB, per comment 1)a above). The footprint of wetland areas proposed for
impact (permanent maintenance as well as temporary construction corridors) should
be clearly shown on a zoom -in of the crossing. The sheet should also reference a
Wetland Restoration plan (see comment 5 above); Note that both the stream and
wetland crossing should be labeled "Impact Site 4" per comment 1)c. above;
Response: Wetland and stream lines and labels added, zoom -in view of
impact added, and reference to Wetland and Stream Impacts Details
added.
e. Sheet C1o: Clearly show and label Stream SE per comment 1)b above. The footprint
of the stream proposed for impact should be clearly shown on a zoom -in of the
crossing (should be labeled "Impact Site 5" per comment 1)c. above);
Response: Wetland lines and labels added, and zoom -in view of impact
added.
y.:
Dewberry
.....
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 6 of 7
f. Sheet C14: Clearly show and label Streams SC and SD per comment 1)b above. The
plan sheet indicates that the waterline would be installed essentially within the bank
of Stream SC. As such it is reasonable to assume that the waterline would impact
Stream SC itself. Provide information to justify that impacts to Stream SC would be
avoided with the current plan, or quantify proposed impacts and add to the
plan/profile sheets and PCN. The footprint of the streams proposed for impact
should be clearly shown on a zoom -in of the crossing (should be labeled "Impact Site
6" per comment 1)c. above);
Response: Stream labels added, impacts to SC revised to account for
potential construction encroachment on fringe of stream.
g. Sheet C17: Clearly show and label Streams SA and SB per comment 1)b above. The
footprint of the streams proposed for impact should be clearly shown on a zoom -in of
the crossing. Wetland lines do not clearly appear on the plan sheet (should be
Wetland WA, per comment 1)a above). The footprint of wetland area proposed for
impact (permanent maintenance as well as temporary construction corridors) should
be clearly shown on a zoom -in of the crossing. The sheet should also reference a
Wetland Restoration plan (see comment 5 above); Note that both the streams and
wetland crossing should be labeled "Impact Site 7" per comment 1)c. above.
Response: Stream labels added, wetland lines added, zoom -in view is
shown. Wetland WA will not be impacted.
If you have any questions regarding the above responses, please do not hesitate to contact me at
434-549-8494•
Sincerely,
Dewberry Engineers Inc.
to—
Briana L. Bill, PWS
Senior Environmental Scientist
Troy A. Shelton, PWS
Environmental Department Manager
cc: Leslie Barksdale, Dewberry
Sue Homewood, NC DEQ
LAB/rse/BLB/tas
Dewberry
Mr. David E. Bailey, PWS
US Army Corps of Engineers
January 25, 2019
Page 7 of 7
WOTUS
ImpactTable
Impact Site
Number
Detail Sheet
Number
Wetland
Type
Map ID
(Zone)
Latitude
Impact
Site
Number
Detail
Sheet
Number
WOTUS
Map ID
(Zone)
Latitude
Longitude
Permanent
Impacts
Length Width
Area
LF
LF LF SF AC
2
C6
R4
SH
36.3207416°
0
-079.3833303°
No Impact
10
10
3
30
0.001
3
C8
Cascade Creek
SF/SG
36.3154571°
WB
-079.3900377°
-079.6513517°
20
20
40
800
0.018
5
C10
R4
SE
36.3151492°
-079.3933847°
10
10
10
100
0.002
6
C14
R3
SD
36.3150097°
-079.4033173°
10
10
20
200
0.005
7
C14
R4
SC
36.3147065°
- .4036233ol
90
90
3
270
0.006
8
C17
R4
SB
36.5237388°
-079.6867089°
10
10
2
20
0.000
8
C17
R3
SA
36.5237388°
-079.6867089°
10
10
12
120
0.003
TOATL:
160
160
90
1540
0.035
Rip -rap impacts assume 3' depth x3' height keyed into bottom, and 2' depth x (length of bank) height
shown on drawings, multiplied by total width of impact. Refer to rip -rap placement detail on Sheet C22.
Wetland Impact Table
Impact Site
Number
Detail Sheet
Number
Wetland
Type
Map ID
(Zone)
Latitude
Longitude
Total Temporary Impacts
Square Feet Acres
1
C5
PEM
WD
36.5367077°
-079.6370762°
209.32
0.005
No Impact
C5
PFO
WE
36.5319596°
-079.6491798°
0
0.000
No Impact
C7/C8
PFO
WC
36.5320709°
-079.6487220°
0
0.000
4
C8
PEM
WB
36.5316528°
-079.6513517°
2645.07
0.061
No Impact
C17
PFO
WA
36.5237388°
-079.6867089°
0
0.000
TOTA L:
2854.39
0.066
Attachments: Updated Plans, Impact Table
P:\50102913\Adm\Comment Responses\2019.1.3 - USACE Response\2019.1.25 Review Response\2019.1.25 - USACE Response.docx
Dewberry
E
E
C
B
u
Drawing Index
General
T1 COVER SHEET
T2 LEGEND ABBREVIATIONS AND GENERAL NOTES
Civil
C1 EROSION AND SEDIMENTATION CONTROL PLAN
C2 OVERALL WATERLINE LAYOUT
C5 WATERLINE PLAN AND PROFILE
C6 WATERLINE PLAN AND PROFLE
C7 WATERLINE PLAN AND PROFILE
Ca WATERLNE PLAN AND PROFILE
C10 WATERLINE PLAN AND PROFLE
C14 WATERLNE PLAN AND PROFILE
C 1 7 WATERLINE PLAN AND PROFLE
C16 WATERLNE DETAILS
C 1 9 WATERLINE AND EROSION & SEDIMENT CONTROL DETAILS
C20 EROSION AND SEDIMENT CONTROL DETAILS
C21 EROS ON AND SEDMENT CONTROL DETAILS
C22 STREAM AND WETLAND DETAILS
9
n
SOVA Mega Site at
Berry Hill -Phase
NC Water
City of Eden, NC
Rockingham County, NC
r,
240
SOVA Mega Site
Mtm
199
\ /
20" VA Waterline - I' :� s'''�F •
Z Pittsylvania Co., VA
_ � O
KNG"ATMRockingham Co., NC
Ex. 16" Eden 5 �' �' p -
SBO O /
Waterline
20"'NC Waterline
� Ex. Freedom
o
Eden, NC Park Tank �`rgv
Vicinity Map
SCALE: N.T.S.
Contacts:
Director of
Environmental Services
Terry Shelton
P.O. Box 70
Eden, NC 27269-0070
PH. (336) 623-2110
FAX (336) 623-4041
TSHELTON®EDENNC.US
ENGINEER:
Dewberry
Leslie Barksdale E.I.T.
551 Piney Forest Road
Danville, Virginia 24540
PH. (434) 549-6504
FAX (434) 797-4341
Iba rksda Ie®dewberry.com
NJBWrTA1.
E3 PRELN W
9iAFFMDVAL
E3 B111OIn9
o P FAM
o NW=
BEr NUMM
EDA Project #: 04-01-07214
DENR: H-SRP-D-17-0015WIF-1927
i W �®=- y
a
Dewberry Engineers Inc.
%1 PNEP FOREST ROAD
DANVINE, VA24540
PHONE` -.-
FAX: 490.]B]A9M11
NMEIS # F-0
LU Q
U
z
J Z
(n — J
Z Z
Q= LLJ CC — OCC
00
CCCnQ
LU �U
LLLJJ
LAB
�CCQUQQ0Q
> L_
QmCL=
JANUARY, 2010
%~ CC
OQ p
CMZ
Z
O
M
am.
KEl F VAN
NOT FOR CONSTRUCTION
ALE
AS NOTED
REVISIONS
nil M PACT MAP
COVER SHEET
PPOJECTNO 50046462 / 50102913
T1
SHEETNO. [�F
MWC
DRAWN BY
RSE
APPROVEDBY
LAB
CHECKED BY
DATE
JANUARY, 2010
nil M PACT MAP
COVER SHEET
PPOJECTNO 50046462 / 50102913
T1
SHEETNO. [�F
E
E
f
I
EVS77NG
LEGEND
DESCRIPTION
0
10.
BENCHMARK
EXISTING
PROPOSED
DESCRIPTION
EVS77NG
PROPOSED
DESCRIPTION
ABBREVIATIONS
REINFORCED CONCRETE RPE
FIBER OPTIC)
- W-
- W-
WATEIBINE
uu
a
BUILDING
AYH
'dVH
SILT FENCE
REOD
READIED REV REVISED
SCI
SHEIK E
CD
YARD HYDRANT
_00-
-DO-
CONTOURS
V
®
WATER METER
®
CI
CULVERT INLET PRDIECRION
®
4_
FIRE HYORANT ASSEMBLY
FINISH
IP
CURB a aITTER
MIO
NOT N CONTRACT
PERMANENT SEEDING
RAW SEWAGE
ST
TEMPORARY SEEDING
DWG
OLEVEL
VALVE ASSBIBLY
O
NV
CONCRETE WAX OR SLAB
��A
USC
UIILLIY STREAM CROSSIG
ABUTMENT
CB
CATCH BASIN
TRANSPORkTION
SIN
PRESSURE PPE a FITTINGS
70
TAN( OWN
PAVEMENT
NA
.AIN
NR RELEASE VALVE
UNIMPROVED OR GRAVEL
-SS--43Y - -
- - - - - --
SAM. SEWER Y.H. a UNE
FLEXIBLE
s
TREE IRE
SR
FORCBWN
O
O
TREE OR SHRUB
C.0
�!
CoO.
CLEANOUT
^^
^^
IL
-G-
-6--
GASUME
ADJUSTABLE
-It
FENCE 6AlE
DI
DROP INLET
FL
FLOOR
IB
POUND
-0E-
_OW
OVERHEAD ELECTRIC UNE
OUCH OR SWALE
DIP
DUCTILE IRON PIPE
FD
FLOOR DRAIN
LG
LENGTH OR LONG
-UGE_
-Et
UNOBEGROIIID ELECTRIC UIE
AGGREGATE
CO
GRED( / WATERS ME
DO
_111116`
OVERHEAD UTILIIY UNE
----
PROPERTY UNE
f'A�"
f POLE,
GUY. a ANCHOR
FLOURESCENT
LF
LINEAR FEET
D
D
TELEPHONE PEDESTAL
---
CONC
CBIIERUME
-R�W----
-R�W----
STREET RIGHT -DF -WAY
-FD -
-� -
FIBER OPTIC CABLE
-
a
UMTS OF DISTURBANCE
-WT-
EAE-
UNDERGOIIND TELEPHONE
FORCE MAIN
IP
LOW POINT
-LK+U-
-E�-
UWERDWND UTILITY
CONN
CONNECTION
STORY STRUCTURE d LINE
FLARED END SECTION
IL
SURVEY TRAVERSE PONTIS
ENDWAIL
DWEUJNG
FLO
SUBSURFACE BORING
EVS77NG
PROPOSED
DESCRIPTION
0
10.
BENCHMARK
FES
QREVISION
NUMBER
�p
�p
CABLE (IDEV= OR
ABBREVIATIONS
REINFORCED CONCRETE RPE
FIBER OPTIC)
®
®
WELL
®
®
MONUMENT
S
RAMS REF AEFf1iDDE
ROW SIGN
0
DIM
MAILBOX
FES
FlARED END SECTION
GROUND LIGHTS
NSIE DIAMETER
N
LIGHT POLE
ABBREVIATIONS
REINFORCED CONCRETE RPE
GUARD PPE POST
VA
DISTANCE
FIG
X100.00 x100.00
LBUL
SPOT ELEVATION
NOOT
SF
SILT FENCE
REOD
READIED REV REVISED
SCI
SHEIK E
CD
CHECK DAN
10
O
DIVERSION
DIVERSION
SECRLII
CE
DONSREUCTKN ENTRANCE
®
CI
CULVERT INLET PRDIECRION
®
OP
OUIET PROTECTION
FINISH
IP
INET FROTEM
MIO
NOT N CONTRACT
PERMANENT SEEDING
RAW SEWAGE
ST
TEMPORARY SEEDING
DWG
OLEVEL
SPREADER
L�aA.L�
NV
ROLLED EROSION CONTROL PROWCI
��A
USC
UIILLIY STREAM CROSSIG
n
F,,
GENERAL NOTES
1. VERTICAL CONTROL FOR THIS PROJECT IS REFERENCED TO VIRGINIA STATE PLANE GRID COORDINATES (SOUTH ZONE) US SURVEY FEET.
HORIZONTAL- NADa3 (CORS) BLKV,DOBS ASUB
VERTICAL_- NAVDB8
AVERAGE COMBINED FACTOR: GROUND TO GRID 0.999987
2. THE CONTRACTOR SHALL COORDINATE ANY CONSTRUCTION ACTIVITY WITH NCDOT AND THE CITY OF EDEN.
3. "IF ARCHEOLOGICAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROCEDURES CODIFIED AT 33 CFR 800.13(B) WILL
APPLY AND EDA, THE NORTH CAROUNA STATE HISTORIC PRESERVATION OFFICE, AND THE CATAWBA INDIAN NATION SHALL BE CONTACTED
IMMEDIATELY. ARCHEOLOGICAL MATERIALS CONSIST OF ANY ITEMS, FIFTY YEARS OR OLDER WHICH WERE MADE OR USED BY MAN.
THESE ITEMS INCLUDE, BUT ARE NOT LIMITED T0, STONE PROJECTILE POINTS (ARROWHEADS), CERAMIC SHERDS, BRICKS, WORKED
WOOD, BONE AND STONE, METAL AND GLASS OBJECTS, AND HUMAN SKELETAL REMAINS."
4. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED
TO OFFSITE BORROW AND WASTE AREAS). THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER
FOk REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
5. CONTRACTOR SHALL UTILIZE MODIFIED PUMP AROUND SETUP IF DEWATERING UTILITY TRENCH IN WETLAND IS REQUIRED. CONTRACTOR
SHALL UTILIZE SUMP PUMP, INTAKE HOSE WITH SCREEN, AND APPROVED DEWATERING DEVICE (SILT BAG) TO CHECK DAM. REFERENCE
TEMPORARY PUMP AROUND DETAIL SHEET C22
S. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK.
7. ALL PIPING SHALL HAVE 36" MINIMUM COVER (TMP.) UNLESS OTHERWISE NOTED.
B. CONTRACTOR SHALL FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL
CONTACT NC -1 -CALL (1-800-632-4949) 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
9. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY LOCATION OF AND PREVENT DISTURBANCE OF ANY EXISTING UTILITIES
IN WORK AREA, AND PROVIDE IMMEDIATE TEMPORARY SERVICE TO ANY DAMAGED UTILITIES AT THE EXPENSE OF THE CONTRACTOR. ANY
EXISTING UTILITIES NOT LOCATED PRIOR TO BEGINNING CONSTRUCTION THAT ARE DAMAGED DURING CONSTRUCTION OR WHICH CONFLICT
WITH PROPOSED CONSTRUCTION SHALL BE REPAIRED OR RELOCATED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S
EXPENSE.
10. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY
TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE
11. CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING OUTSIDE THE CONSTRUCTION LIMITS. CONTRACTOR SHALL USE
EXTREME CAUTION TO PREVENT DISTURBANCE TO THE TREES, SHRUBS, ETC., WHICH ARE IN THE CONSTRUCTION LIMITS AND NOTED TO
REMAIN.
12. THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RESIDENT OFFICE (336-634-5644) PRIOR TO
START OF CONSTRUCTION. THE CONTRACTOR MUST PROVIDE ALL TRAFFIC SAFETY CONTROLS NECESSARY WHEN WORKING IN DR NEAR
NCDOT RIGHT-OF-WAY PER MUTCD a NCDOT ROADWAY STANDARD DRAWINGS LATEST' EDITION FOR TRAFFIC CONTROL
13. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL k VEHICULAR ACCESS TO a FROM ALL DWELLINGS do BUSINESSES DURING
CONSTRUCTION.
14. EROSION AND SEDIMENT CONTROL NOTES:
A ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM TO THE LATEST EDITIONS OF THE NORTH CAROLINA EROSION k
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
B. CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONSTRUCTION ENTRANCES AT POINTS OF INGRESS AND EGRESS TO
PUBLIC RIGHT-OF-WAY, STABILIZE DISTURBED AREAS, AND PROVIDE OTHER MEASURES REQUIRED AS SHOWN ON THE DRAWINGS AND
SPECIFIED.
C. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT TRACKING ON EXISTING PAVEMENTS.
D. CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD STABILIZATION OF ADEQUATE AREA TO ACCOMMODATE CONSTRUCTION VEHICLE
PARKING, MATERIAL STORAGE, ETC. AT A LOCATION CONVENIENT TO THE INDIVIDUAL CONSTRUCTION AREAS AND CONSISTENT WITH THE
CONSTRUCTION SEQUENCES.
E. ANY DISTURBANCE TO EROSION AND SEDIMENTATION CONTROL MEASURES BY OTHER CONTRACTOR(S) SHALL BE REPAIRED AND/OR
REPLACED BY THE RESPONSIBLE PARTIES.
F. A ROCK CHECK DAM SHALL BE INSTALLED BELDW THE DISTURBED AREA WITHIN DITCH LINES AND/OR WHERE DITCH LINES OUTLETS TO
UNDISTURBED AREAS.
G. SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL LOCATIONS WHERE DISTURBED AREA DRAINS TOWARD PROPERTY
OWNED BY OTHERS AND/OR TOWARD STREAMS.
H. ALL PROPOSED STAGING AREAS AND/OR ACCESS ROADS MUST BE INCLUDED WITHIN THE DISTURBED LIMITS. A REVISED PLAN MUST BE
SUBMITTED AND APPROVED PRIOR TO START OF LAND DISTURBANCE FOR ANY AREAS OUTSIDE THE CURRENT PERMITTED LIMITS.
I. IF AN EQUIPMENT CROSSING IS NEEDED TO GAIN ACCESS ACROSS A STREAM, THE CROSSING SHALL BE CONSTRUCTED AS A BRIDGE
(E.G. TIMBER MATS, STEEL SHALLETC.). THE TEMPORARY BRIDGE SEWHAVE NO GAPS OR HOLES THAT WOULD ALLOW SEDIMENT TO FALL
INTO THE STREAM.
J. ON THE RIP -RAP PLACEMENT CONSTRUCTION DETAIL_ (SHEET C22), THE RIP -RAP SHALL BE EXTENDED ACROSS THE ENTIRE STREAM
CHANNEL ENSURE THE TOP OF THE STONE IS PLACED AT THE SAME ELEVATION AS THE STREAM BED. CLASS I STONE MUST HAVE A
MINIMUM THICKNESS OF 20
TO ".
K. SNE OLIRETS IN SILT FENCE SHALL BE PLACED IN ALL LOW-LYING AREAS AND/OR EVERY 150 LINEAR FEET. THE STONE OUTLETS
MUST BE INSTALLED PER THE ATTACHED CONSTRUCTION DETAIL
L. ANNUAL RYE GRASS IS NOT PERMITTED IN THE SEEDING SPECIFICATIONS OF THE STREAM BANK SEEDING SCHEDULE. RYE GRAIN OR
WHEAT MAY BE USED INSTEAD. ALL STREAM SEEDING APPLICATION RATES FOR TEMPORARY AND PERMANENT SEEDING MUST ADHERE TO
THE NC EROSION AND SEDIMENT CONTROL PLANNING R DESIGN MANUAL 5.11 ON TABLES 6.1 to 6.11.15 AND 6.11.c.
M. SANDBAG DIKES SHALL HAVE A MINIMUM 3' TOP CREST WIDTH.
15. SWEEP ROAD WAYS DAILY WHERE WORK IS BEING PERFORMED.
16. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DITCHLINES STEEPER THAN 2.00R SLOPE. ALL
DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES.
17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL ONLY BE REMOVED WHEN AUTHORIZED BY THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT BL NATURAL RESOURCES.
18. ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ORIGINAL CONDITION OR BETTER.
19. DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT INTERFERE WITH CONSTRUCTION ARE TO BE RESTORED TO
ORIGINAL CONDITION.
20. PAVED DRIVEWAYS. PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN -CUT UNLESS SHOWN OTHERWISE.
21. CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE EXISTING DRIVEWAY CULVERTS INCLUDING HEADWALLS IF INSTALLATION OF
NEW WATERLINES) REQUIRE EXCAVATION OF THE EXISTING CULVERTS, IF EXISTING CMP OR RCP CAN BE REMOVED WITHOUT DAMAGE,
CONTRACTOR MAAYY REUSE PIPE.
22. NEW WATERLINE MATERIAL SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, UNLESS SHOWN OTHERWISE ON THE PLANS.
23. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL FITTINGS AND CONNECTIONS, IN ACCORDANCE WITH DETAIL SHEET C19.
24. FOR REVIEW PURPOSES, 2007 NCDOT LIDAR 2' CONTOURS HAVE BEEN OVERLAYED ONTO THE ATTACHED PLAN SHEETS. THE ACCURACY
OF THESE CONTOURS ARE NOT GUARANTEED SO THEY SHOULD NOT BE USED FOR ESTIMATING OR CONSTRUCTION PURPOSES. THE LINE
PROFILE WAS GENERATED FROM THE ACTUAL SURVEYED TOPOGRAPHIC INFORMATION AND SHOULD THEREFORE BE USED FOR ALL
CALCULATIONS.
25. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED.
RAD
RAMS REF AEFf1iDDE
STA
STATION
DIM
DIMENSION
FES
FlARED END SECTION
D
NSIE DIAMETER
N
AEW
ABBREVIATIONS
REINFORCED CONCRETE RPE
B.S.
DIST
DISTANCE
FIG
FIGURE
LBUL
INSULATION
NOOT
NORTH CAROWNA DEPARNNT
TONED DOWN CDB
REOD
READIED REV REVISED
SCI
SHEIK E
TIP
TYMCAL
RT
BDHT
SCT
SECRLII
OF TRANSPORTATION
A
AIR
O
CASE IRON
ON
DOWN
FIN
FINISH
INTNTEBLON
STORM
MIO
NOT N CONTRACT
RS
RAW SEWAGE
ST
STREET
DWG
DRAWING
FH
FIRE HYDRANT
NV
NWRT
NCDOT
NORTH CAROLINA OPT OF
ABUT
ABUTMENT
CB
CATCH BASIN
TRANSPORkTION
SIN
SIMILAR
70
TAN( OWN
NA
NOT TO SCALE
W/
DR
DRIVE
FLEX
FLEXIBLE
s
JUNCTION BOX
SR
A00
ADDITIONAL
OEM
CEMENT
AIED SI
WASTE ACMDLE
IL
W
W1IGER
ADM
ADJUSTABLE
CL
CENTERUNE
DI
DROP INLET
FL
FLOOR
IB
POUND
OF
ON CENTER
DIP
DUCTILE IRON PIPE
FD
FLOOR DRAIN
LG
LENGTH OR LONG
AGGR
AGGREGATE
CO
CLEAN OUT
DO
WT90E DIAMETER
DMH
DROP MANHOLE
FLOUR
FLOURESCENT
LF
LINEAR FEET
ALT
ALTERNATE
CONC
CONCRETE
OSHA
OCCUPATIONAL SAFETY d
D
DRAIN
FM
FORCE MAIN
IP
LOW POINT
HEALTH ACT
ALUM
ALUMINUM
CONN
CONNECTION
DWL
DWEUJNG
FLO
FLANGE
LT
LET
PB
PAPER BOX
ASTM
AMERICAN STANDARD FOR
CONT
CONTINUOUS
TESTING d MATERIALS
TEA
EACH
GPM
GALLONS PER MINUTE
W
MAILBOX
PVC
POLYVINYL QRORDE
CMP
CORRUGATED METAL PIPE
AWWA
AMERICAN WATER WORKS
EF
EACH FACE
GALV
GALVANIZED
W
MANHOLE
PRV
PROM RELU VALVE
ASSOCIATION
OF
CUBIC FEET
F EON REDUCING VALVE
ASSY
ASSEMBLY
CFM
CUBIC FEET PER MINUTE
EW
EACH WAY, END WALL
GV
GATE VALVE
TER
MANUFACTURER
PL
PROPERTY LINE
EDP
EDGE OF PAVEMENT
GRD
GRADE
MATT.
WIBRUL
APPROX
APPROXIMATE
CFS
CUBIC FEET PER SECOND
PED
PEDESSTA.
EL
ELBOW
GA
GAUGE
MAX
YANWY
BOC
BACK OF CURB
CU IN
CUBIC NCH
PmT
PAVEMENT
EEC
ELECTRICAL, ELECTRIC
GROW
GYPSUM DRYWALL
W
MECHANICAL DONT
BSMT
BASEMEN
CULV
CULVERT
PEW
PBEORAED
E.EV
ELEVATION
HTR
HEATER
Mm
MILLIONGALLONSPER DAY
Ep
BLOW OFF
CV
CHECK VALVE
POINT OF L1NYAlUE
ENGR
ENGINEER
HVAC
HEATING VENTILATION
MN
MINIMUM
BIRD
BEARING
C a G
CURB a GUTTER
a AIR CONDITIONING
POO
POINT OF COMPOUND
BM
BENCH MARK
Cy
CUBIC YARD
EINTR
ENTRANCE
HT
HEIGHT
MSC
MISCELLANEOUS
R
MAIM PONT OF INIBtgCTION
EQUIP
EQUIPMENT
MIL
WED UOUOR
B
BEND
DEPT
DEPARTMENT
WY
HIGHWAY
W
POWER POE
BORT
BOTTOM
GEN
GENERATOR
IX, EXIST. EXISTING
NOR
HORIZONTAL
NEMA7
MANUFACTURERS
PBC
POINT OF REVERSE CURVE
BOB
BOTTOM OF BANK
GOVT
GOVERNMENT
EJ
EXPANSION JOINT
OF
HNORSE'DIW1R. HIGH PONT
NPW
NON POTABLE WATER
PT
PONT OF TANGENCY
BRZ
BRONZE
DEET
DETAIL
EXT'
EXTERIOR
N
NCI
NPR
NON POTABLE RB1S WATER
I'm
PONE OF VERTICAL VARVE
FOC
FACE OF CURB
BLDG
BUILDING
CIA
DIAMETER
D
N90E DIAMETER
NAIL
NATIONAL
PM
PONT OF VERTICAL INTERSECTION
FT
FEET
n
F,,
GENERAL NOTES
1. VERTICAL CONTROL FOR THIS PROJECT IS REFERENCED TO VIRGINIA STATE PLANE GRID COORDINATES (SOUTH ZONE) US SURVEY FEET.
HORIZONTAL- NADa3 (CORS) BLKV,DOBS ASUB
VERTICAL_- NAVDB8
AVERAGE COMBINED FACTOR: GROUND TO GRID 0.999987
2. THE CONTRACTOR SHALL COORDINATE ANY CONSTRUCTION ACTIVITY WITH NCDOT AND THE CITY OF EDEN.
3. "IF ARCHEOLOGICAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, THE PROCEDURES CODIFIED AT 33 CFR 800.13(B) WILL
APPLY AND EDA, THE NORTH CAROUNA STATE HISTORIC PRESERVATION OFFICE, AND THE CATAWBA INDIAN NATION SHALL BE CONTACTED
IMMEDIATELY. ARCHEOLOGICAL MATERIALS CONSIST OF ANY ITEMS, FIFTY YEARS OR OLDER WHICH WERE MADE OR USED BY MAN.
THESE ITEMS INCLUDE, BUT ARE NOT LIMITED T0, STONE PROJECTILE POINTS (ARROWHEADS), CERAMIC SHERDS, BRICKS, WORKED
WOOD, BONE AND STONE, METAL AND GLASS OBJECTS, AND HUMAN SKELETAL REMAINS."
4. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED
TO OFFSITE BORROW AND WASTE AREAS). THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER
FOk REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
5. CONTRACTOR SHALL UTILIZE MODIFIED PUMP AROUND SETUP IF DEWATERING UTILITY TRENCH IN WETLAND IS REQUIRED. CONTRACTOR
SHALL UTILIZE SUMP PUMP, INTAKE HOSE WITH SCREEN, AND APPROVED DEWATERING DEVICE (SILT BAG) TO CHECK DAM. REFERENCE
TEMPORARY PUMP AROUND DETAIL SHEET C22
S. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT WORK REQUIRED TO PROPERLY CONSTRUCT THE WORK.
7. ALL PIPING SHALL HAVE 36" MINIMUM COVER (TMP.) UNLESS OTHERWISE NOTED.
B. CONTRACTOR SHALL FIELD VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR
SHALL NOTIFY THE UTILITY COMPANIES 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CONTRACTOR SHALL
CONTACT NC -1 -CALL (1-800-632-4949) 48 HOURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
9. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO VERIFY LOCATION OF AND PREVENT DISTURBANCE OF ANY EXISTING UTILITIES
IN WORK AREA, AND PROVIDE IMMEDIATE TEMPORARY SERVICE TO ANY DAMAGED UTILITIES AT THE EXPENSE OF THE CONTRACTOR. ANY
EXISTING UTILITIES NOT LOCATED PRIOR TO BEGINNING CONSTRUCTION THAT ARE DAMAGED DURING CONSTRUCTION OR WHICH CONFLICT
WITH PROPOSED CONSTRUCTION SHALL BE REPAIRED OR RELOCATED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S
EXPENSE.
10. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY
TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE
11. CONTRACTOR SHALL NOT DISTURB ANY TREES, SHRUBS, OR LANDSCAPING OUTSIDE THE CONSTRUCTION LIMITS. CONTRACTOR SHALL USE
EXTREME CAUTION TO PREVENT DISTURBANCE TO THE TREES, SHRUBS, ETC., WHICH ARE IN THE CONSTRUCTION LIMITS AND NOTED TO
REMAIN.
12. THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RESIDENT OFFICE (336-634-5644) PRIOR TO
START OF CONSTRUCTION. THE CONTRACTOR MUST PROVIDE ALL TRAFFIC SAFETY CONTROLS NECESSARY WHEN WORKING IN DR NEAR
NCDOT RIGHT-OF-WAY PER MUTCD a NCDOT ROADWAY STANDARD DRAWINGS LATEST' EDITION FOR TRAFFIC CONTROL
13. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN, POSTAL k VEHICULAR ACCESS TO a FROM ALL DWELLINGS do BUSINESSES DURING
CONSTRUCTION.
14. EROSION AND SEDIMENT CONTROL NOTES:
A ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL CONFORM TO THE LATEST EDITIONS OF THE NORTH CAROLINA EROSION k
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
B. CONTRACTOR SHALL INSTALL SILT BARRIERS, INLET PROTECTION, CONSTRUCTION ENTRANCES AT POINTS OF INGRESS AND EGRESS TO
PUBLIC RIGHT-OF-WAY, STABILIZE DISTURBED AREAS, AND PROVIDE OTHER MEASURES REQUIRED AS SHOWN ON THE DRAWINGS AND
SPECIFIED.
C. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT TRACKING ON EXISTING PAVEMENTS.
D. CONTRACTOR SHALL INSTALL GRAVEL CONSTRUCTION ROAD STABILIZATION OF ADEQUATE AREA TO ACCOMMODATE CONSTRUCTION VEHICLE
PARKING, MATERIAL STORAGE, ETC. AT A LOCATION CONVENIENT TO THE INDIVIDUAL CONSTRUCTION AREAS AND CONSISTENT WITH THE
CONSTRUCTION SEQUENCES.
E. ANY DISTURBANCE TO EROSION AND SEDIMENTATION CONTROL MEASURES BY OTHER CONTRACTOR(S) SHALL BE REPAIRED AND/OR
REPLACED BY THE RESPONSIBLE PARTIES.
F. A ROCK CHECK DAM SHALL BE INSTALLED BELDW THE DISTURBED AREA WITHIN DITCH LINES AND/OR WHERE DITCH LINES OUTLETS TO
UNDISTURBED AREAS.
G. SILT FENCE SHALL BE PROVIDED BELOW DISTURBED AREAS FOR ALL LOCATIONS WHERE DISTURBED AREA DRAINS TOWARD PROPERTY
OWNED BY OTHERS AND/OR TOWARD STREAMS.
H. ALL PROPOSED STAGING AREAS AND/OR ACCESS ROADS MUST BE INCLUDED WITHIN THE DISTURBED LIMITS. A REVISED PLAN MUST BE
SUBMITTED AND APPROVED PRIOR TO START OF LAND DISTURBANCE FOR ANY AREAS OUTSIDE THE CURRENT PERMITTED LIMITS.
I. IF AN EQUIPMENT CROSSING IS NEEDED TO GAIN ACCESS ACROSS A STREAM, THE CROSSING SHALL BE CONSTRUCTED AS A BRIDGE
(E.G. TIMBER MATS, STEEL SHALLETC.). THE TEMPORARY BRIDGE SEWHAVE NO GAPS OR HOLES THAT WOULD ALLOW SEDIMENT TO FALL
INTO THE STREAM.
J. ON THE RIP -RAP PLACEMENT CONSTRUCTION DETAIL_ (SHEET C22), THE RIP -RAP SHALL BE EXTENDED ACROSS THE ENTIRE STREAM
CHANNEL ENSURE THE TOP OF THE STONE IS PLACED AT THE SAME ELEVATION AS THE STREAM BED. CLASS I STONE MUST HAVE A
MINIMUM THICKNESS OF 20
TO ".
K. SNE OLIRETS IN SILT FENCE SHALL BE PLACED IN ALL LOW-LYING AREAS AND/OR EVERY 150 LINEAR FEET. THE STONE OUTLETS
MUST BE INSTALLED PER THE ATTACHED CONSTRUCTION DETAIL
L. ANNUAL RYE GRASS IS NOT PERMITTED IN THE SEEDING SPECIFICATIONS OF THE STREAM BANK SEEDING SCHEDULE. RYE GRAIN OR
WHEAT MAY BE USED INSTEAD. ALL STREAM SEEDING APPLICATION RATES FOR TEMPORARY AND PERMANENT SEEDING MUST ADHERE TO
THE NC EROSION AND SEDIMENT CONTROL PLANNING R DESIGN MANUAL 5.11 ON TABLES 6.1 to 6.11.15 AND 6.11.c.
M. SANDBAG DIKES SHALL HAVE A MINIMUM 3' TOP CREST WIDTH.
15. SWEEP ROAD WAYS DAILY WHERE WORK IS BEING PERFORMED.
16. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR SOD ON ALL DITCHLINES STEEPER THAN 2.00R SLOPE. ALL
DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES.
17. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL ONLY BE REMOVED WHEN AUTHORIZED BY THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT BL NATURAL RESOURCES.
18. ALL DISTURBED PAVEMENT AND GRAVEL DRIVES ARE TO BE RESTORED TO ORIGINAL CONDITION OR BETTER.
19. DRIVEWAYS, FENCES, MAILBOXES, ROAD SIGNS, STEPS, SIDEWALKS, ETC., THAT INTERFERE WITH CONSTRUCTION ARE TO BE RESTORED TO
ORIGINAL CONDITION.
20. PAVED DRIVEWAYS. PARKING LOTS, AND PRIVATE ROADS SHALL BE OPEN -CUT UNLESS SHOWN OTHERWISE.
21. CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE EXISTING DRIVEWAY CULVERTS INCLUDING HEADWALLS IF INSTALLATION OF
NEW WATERLINES) REQUIRE EXCAVATION OF THE EXISTING CULVERTS, IF EXISTING CMP OR RCP CAN BE REMOVED WITHOUT DAMAGE,
CONTRACTOR MAAYY REUSE PIPE.
22. NEW WATERLINE MATERIAL SHALL BE IN ACCORDANCE WITH THE SPECIFICATION, UNLESS SHOWN OTHERWISE ON THE PLANS.
23. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL FITTINGS AND CONNECTIONS, IN ACCORDANCE WITH DETAIL SHEET C19.
24. FOR REVIEW PURPOSES, 2007 NCDOT LIDAR 2' CONTOURS HAVE BEEN OVERLAYED ONTO THE ATTACHED PLAN SHEETS. THE ACCURACY
OF THESE CONTOURS ARE NOT GUARANTEED SO THEY SHOULD NOT BE USED FOR ESTIMATING OR CONSTRUCTION PURPOSES. THE LINE
PROFILE WAS GENERATED FROM THE ACTUAL SURVEYED TOPOGRAPHIC INFORMATION AND SHOULD THEREFORE BE USED FOR ALL
CALCULATIONS.
25. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED.
RAD
RAMS REF AEFf1iDDE
STA
STATION
T a B
TOP AND BOTTOM
RAS
RETURN ACIIVAIED BLDIE
SR
FREE.
TOB
TOP O' BAN(
RCP
REINFORCED CONCRETE RPE
B.S.
SANITARY SEVER, STAINLESS STEEL
TOW
TOP OF WALL
RD
ROAR ROOF BRAN
SSC
SECONDARY SM
TOC
TONED DOWN CDB
REOD
READIED REV REVISED
SCI
SHEIK E
TIP
TYMCAL
RT
BDHT
SCT
SECRLII
uG
UNDERGROUND
R/W ROW RIGHT OF WAY
SHT
9EFT
UL
ONBRWRlIm LABORATORY
R
BSER
SIM
STORM
VEU
VERTICAL
RS
RAW SEWAGE
ST
STREET
VC
VERTICIL CIRVE
SE
SECONDARY EFFLUENT
SIY
STORY
NCDOT
NORTH CAROLINA OPT OF
TRANSPORkTION
SIN
SIMILAR
70
TAN( OWN
W/
MIH
SPEC
SPECFlCAROI
TF1
TE EPHpE
SR
STATE ROBE OR SECONDARY ROAD
UP
TEMPORARY OR 1EMPE ATUE
WAS
AIED SI
WASTE ACMDLE
IL
WATER MIN
SD
STANDARD
IN
THICK
W �®
i=- ya
Dewberry Engineers Inc.
%1 PNEP FOREST ROAD
DAWIU& VA24540
PHONE494.]B]A4W
FAX: 490.]B]A9M11
NCBELS # F-0
Lu a
U
z
Z
J
(n - J
Z Z
Q= -O
LLJ CC
Cc o0
UQ0LLJ
LL
Q
Q mL%
E
C
E
i
q
r,
WOTUS ImpactTable
Impact Detail Map ID Permanent Length Width Area
Site Sheet WOTUS (Zone) Latitude I Longitude Impacts -
It Dewberry®
Dewberry Engineers Inc.
SSI PINEY FOREST ROAD
DANVILLE,VA 24590
PHONE: 434.]9].4497
FAX: 434.797.4341
NCBELS # F-0929
U
Z
J z H
J J Z Z
Q>-wCC w o0
(D Er (n Q U
W E < (-) LL
Qm = L_
o~�� 0z
0a O
Z O
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 600' 1200'
SCALE: 1" = 600'
INo.1 DATE IBYDescription
REVISIONS
MWC
DRAWNBY
RSE
APPROVED BY
LAB
CHECKED BY
DATE
JANUARY, 2019
TITLE
Overall
NC Waterline
Layout
PROJECT NO. 50046462/50102913
C1
SHEET NO. OF
I
North Carolina Division of Energy Mineral and Land Resources
NPDES Stormwater Discharge Permit
for Construction Activities
Technical Bullentin for NCGO10000
Revised Jan. 12, 2017
What is this permit?
This is your General Stormwater Permit for Construction Activities, developed to meet federal National Pollutant Discharge Elimination
System (NPDES) requirements. It is separate and in addition to your Erosion and Sedimentation Control (E&SC) Plan.
Federal regulations adopted by the U.S. Environmental Protection Agency (EPA) and N.C. Environmental Management Commission require
an NPDES storm -water permit for your project. In North Carolina, the EPA has delegated authority to administer the NPDES program to the
Department of Environment and Natural Resources.
The E&SC plan approved by the Division of Energy, Mineral and Land (DEMUR), or a delegated local pro- gram, contains the core erosion
control requirements for your project. The NPDES Stormwater General Permit contains additional requirements related to a broader range of
water quality issues. These permits are related, but separate. Both contain conditions your project site must meet.
Are there new requirements in this permit?
This General Permit reflects changes made in the federal regulations effective Feb. 1, 2010, that regulate discharges from construction sites.
The federal regulations resulted from litigation decisions that mandated construction activities over a certain size must contain additional
measures to reduce the amount of wastes and sediment loading that reach the nation's waters.
The Department of Environment and Natural Re- sources established the Construction General Permit Technical Advisory Group to guide the
development of this NPDES permit. A drag permit was available for public review in May 2011, and the final permit be- came effective on
Aug.3,2011.
The most notable change in the new permit is a requirement that ground stabilization, such as wheat straw application, be applied within 14
days from the last land -disturbing activity. For steep slopes, that area must be stabilized within 7 days. Please see page 2 of this technical
bulletin for more details.
Do I need to submit a Noticeof Intent to have coverage under this permit?
No. Your project is covered by this permit upon approval of an adequate erosion and Sedimentation control plan that meets requirements for
surface dewatering of basins and ground stabilization timeframes.
What tloes this permit require me to do?
You should read and become familiar with the provisions of this permit. Below is a list of the major requirements, with indications where those
differ from the previous Construction Stormwater General Permit.
Erosion and Sediment Control Plan
You must implement the E&SC Plan approved for your project by DEMLR or by a delegated local program. Adherence to that E&SC Plan is
an enforceable component of this General Permit. Your E&SC plan will identify areas where the more stringent 7- and 14- day ground
stabilization requirements apply. See "Ground Stabilization Requirements" on page 2 of this bulletin.
Monitoring and Inspections
• You must keep a rain gauge on the project site.
• Dedicated demolition and other waste areas and earthen material stockpiles must be located at least 50' from stoml drains or streams
unless no alternative is feasible (new requirement).
• You must inspect all E&SC measures at least once a week and within 24 hours after any storm event greater than a half-inch (during a
24-hour period). You must take immediate corrective action for any device failure.
• You must inspect all outlets where stormwater runoff leaves the site and evaluate the effect on near -by streams or wetlands.
• Corrective action must be taken if sediment is deposited off -she or into a stream or wetland, or causes a visible increase in turbidity
(cloudiness) of any waterbody.
r (• You must keep records of these inspections and any corrective actions taken.
A//fit Jll H--�Ti�\J( 1)11/J�/////�
a
D
STORMWATER DISCHARGE:
STORM WATER DISCHARGES INTO
CASCADE CREEK, DRY CREEK, AND
SEVERAL UNNAMED TRIBUTARIES
ALL DISCHARGE INTO THE LOWER
DAN RIVER WHICH IS IN THE
ROANOKE RIVER BASIN
0
q
Operation and Maintenance
You must provide the operation and maintenance necessary to maintain optimal performance of slormwater controls. This means you must
take corrective action if erosion and sediment control measures are not operating properly. Operation and maintenance includes, but is not
limited to:
• Regularly cleaning out sedimentation basins.
• Stabilizing eroded banks, channels or spillway structures.
• Repairing/clearing out inlets and outlets.
• Repairing and maintaining storm drainage inlet and outlet protection.
• Repairing piping, seepage and mechanical damage.
• Repairing silt fence damage.
Reporting
The self -inspections required by this permit are an opportunity to identify impacts to nearby waters. If you observe sediment that has
deposited in a stream or wetland, you must notify the DEMLR regional office within 24 hours and provide written notice within five days (see
item #3 on page six of the General Permit).
Non-compliance and Fines
Projects that violate Stormwater Permit conditions and/or have un -authorized water quality impacts are subject to fines. Civil penalties of up
to $25,000 per day for each violation may be assessed.
Inspections
Staff from DEMUR and local pro -grams with delegated authority will perform random inspections of your project site to ensure compliance
with state and federal regulation governing construction activities. That means that your project, if found to be in violation, could potentially be
subject to enforcement action by both DEMUR and the local program. The inspections may be routine in nature or the result of a citizen
complaint.
Ground Stabilization Requirements
Learn more online:
Stormwater Permitting: http://deq.nc.govlabouttdivisions/energy-mineral-land-resources/stormwater
Regional Office Map: http://deq.ne.gov/contact/mgional-offices
Still have questions? Call the DEMUR Regional Office nearest your project's location:
Asheville Office (828) 296-0500 Washington Office (252)946-6481
Fayetteville Office (910) 433-3300 Wilmington Office (910) 796-7215
Mooresville Office (704) 663-1699 Winston-Salem Office (336) 776-9800
Raleigh Office (919) 791A200 Central Office (919) 807-6300
., MEGA
s C<
SITE
DRY CREEK J� \0J
r-�
I
DAN
t
USGS VICINITY MAP
SCALE: 1"=2000'
r -a
PITTSYLVANIA CO. VA
ROCKINGHAM CO.,NC - - -
A
3.33%
r,
110
OP�/
PITTSYLVANIA CO, VA
ROCKINGHAM CO, N
LEGEND
WETLANDS 0
STREAMS 0
CONTACT INFORMAT19ON FOR
\11
ON-SITE EROSION AND SEDIMENT
CONTROL MEASURES: TERRY SHELTON
(� PHONE: 1-336-627-1009 EXT. 131
V D FAX: 1-336-623-3933
CONSTRUCTION SEQUENCE
1. NOTIFY NCDENR LAND QUALITY SECTION AT (910) 433-3300 PRIOR TO BEGINNING CONSTRUCTION.
2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT
NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
3. INSTALL SILT FENCE CONSTRUCTION ENTRANCE ROCK PIPE INLET PROTECTION AND OTHER MEASURES AS SHOWN ON THE
APPROVED PLAN PRIOR TO ANY LAND DISTURBING ACTIVITIES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES.
4. PURSUANT TO G. S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT
CAN BE RETAINED BY VEGETATIVECOVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY
EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED
OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
PURSUANT TO G.S.113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE
ACCOMPLISHED FOR ALL DISTURBED AREAS IN ACCORDANCE WITH THE STABILIZATION TIMEFRAMES TABLE.
5. PRIOR TO CROSSING ANY DITCHES OR STREAMS, INSTALL ALL REQUIRED EROSION CONTROL MEASURES. AFTER VEGETATION
HAS BEEN ESTABLISHED IN THESE AREAS, ALL TEMPORARY MEASURES SHALL BE REMOVED.
5. BEGIN EXCAVATION, GRADING AND PIPE INSTALLATION WITHIN LIMITS OF CONSTRUCTION. INSTALL PERMANENT MEASURES,
OUTLET PROTECTION, AND GRASSING IN SEQUENCE WITH PIPE INSTALLATION AND GRADING AND STABILIZATION.
6. DO NOT DISTURB MORE AREA THAN WILL BE COMPLETED IN A DAY'S WORK.
7. ALL EXCAVATED AREAS SHALL BE BACKFILLED DAILY.
8. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED.
9. PROVIDE CHECK DAMS OR WATTLES WITHIN DRAINAGE SWALE ALONG WATER MAIN INSTALLATION AND AS DIRECTED BY NC
DENR.
10. PURSUANT TO NC GENERAL STATUTE 113A-54.1(.), CONDUCT "SELF INSPECTIONS" OF EROSION CONTROL DEVICES AT
COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 04B .0131.
11. THE CONTRACTOR SHALL MAINTAIN THE DEVICES ACCORDING TO THE LATEST VERSION OF THE NORTH CAROLINA EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
12, ALL TRENCH WATER SHALL BE PUMPED THROUGH A SILT BAG.
13, AFTER THE DISTURBED AREAS ARE STABILIZED, AND WHEN APPROVED BY THE ENGINEER, REMOVE THE TEMPORARY DEVICES
AND PROPERLY DISPOSE OF THE TRAPPED SEDIMENT. STABILIZE THE AREAS DISTURBED DURING THE REMOVAL OPERATION
BY APPLYING SEED AND MULCH ACCORDING TO THE SEEDING SCHEDULE AND THE DITCH PROTECTION SHOWN ON THE
DRAWINGS.
14. CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTFALLS WEEKLY AND AFTER EVERY
RAIN EVENT 1/2" OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT
DOCUMENTS.A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. MAINTAIN
THESE RECORDS AT THE ON-SITE OFFICE FORAUDIT. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT
BY 959 VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL
TEMPORARY EROSION CONTROL DEVICES.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND
SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT
FROM LEAVING THE SITE.
16. MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY NC DENR LAND QUALITY
DIVISION PRIOR TO EXECUTION. A COPY OF ALL PERMITS SHALL BE MAINTAINED BY THE CONTRACTOR ON-SITE AT ALL
TMES.
(AREA OF LAND DISTURBANCE = 4.55t (ACRES)
`CONSTRUCTION WILL OCCUR WITHIN A 20' WIDE
STRIP TYPICALLY 10' OFF EDGE OF PAVEMENT.
NEW STABILIZATION TIMEFRAMES
SITE AREA DESRCRIPTION
STABILIZATION
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES,
NC E&S STD. 6.63
CE
O DITCHES AND SLOPES
7 DAYS
NONE
HIGH QUALITY WATER (HOW)
7 DAYS
NONE
ZONES
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER
SLOPES STEEPER THAN 3:1
7 DAYS
THAN 2:1,14 DAYS ARE ALLOWED
SLOPES 3:1 OR FLATTER
14 DAYS
7 DAYS FOR SLOPES GREATER THAN WIN LENGTH
s ALL OTHER AREAS WITH
14 DAYS
NONE, EXCEPT FOR PERIMETERS AND HOW ZONES
SLOPES FLATTER THAN 4:1
Learn more online:
Stormwater Permitting: http://deq.nc.govlabouttdivisions/energy-mineral-land-resources/stormwater
Regional Office Map: http://deq.ne.gov/contact/mgional-offices
Still have questions? Call the DEMUR Regional Office nearest your project's location:
Asheville Office (828) 296-0500 Washington Office (252)946-6481
Fayetteville Office (910) 433-3300 Wilmington Office (910) 796-7215
Mooresville Office (704) 663-1699 Winston-Salem Office (336) 776-9800
Raleigh Office (919) 791A200 Central Office (919) 807-6300
., MEGA
s C<
SITE
DRY CREEK J� \0J
r-�
I
DAN
t
USGS VICINITY MAP
SCALE: 1"=2000'
r -a
PITTSYLVANIA CO. VA
ROCKINGHAM CO.,NC - - -
A
3.33%
r,
110
OP�/
PITTSYLVANIA CO, VA
ROCKINGHAM CO, N
LEGEND
WETLANDS 0
STREAMS 0
CONTACT INFORMAT19ON FOR
\11
ON-SITE EROSION AND SEDIMENT
CONTROL MEASURES: TERRY SHELTON
(� PHONE: 1-336-627-1009 EXT. 131
V D FAX: 1-336-623-3933
CONSTRUCTION SEQUENCE
1. NOTIFY NCDENR LAND QUALITY SECTION AT (910) 433-3300 PRIOR TO BEGINNING CONSTRUCTION.
2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT
NOT LIMITED TO, OFFSITE BORROW AND WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION
CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
3. INSTALL SILT FENCE CONSTRUCTION ENTRANCE ROCK PIPE INLET PROTECTION AND OTHER MEASURES AS SHOWN ON THE
APPROVED PLAN PRIOR TO ANY LAND DISTURBING ACTIVITIES. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES.
4. PURSUANT TO G. S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT
CAN BE RETAINED BY VEGETATIVECOVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY
EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED
OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
PURSUANT TO G.S.113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE
ACCOMPLISHED FOR ALL DISTURBED AREAS IN ACCORDANCE WITH THE STABILIZATION TIMEFRAMES TABLE.
5. PRIOR TO CROSSING ANY DITCHES OR STREAMS, INSTALL ALL REQUIRED EROSION CONTROL MEASURES. AFTER VEGETATION
HAS BEEN ESTABLISHED IN THESE AREAS, ALL TEMPORARY MEASURES SHALL BE REMOVED.
5. BEGIN EXCAVATION, GRADING AND PIPE INSTALLATION WITHIN LIMITS OF CONSTRUCTION. INSTALL PERMANENT MEASURES,
OUTLET PROTECTION, AND GRASSING IN SEQUENCE WITH PIPE INSTALLATION AND GRADING AND STABILIZATION.
6. DO NOT DISTURB MORE AREA THAN WILL BE COMPLETED IN A DAY'S WORK.
7. ALL EXCAVATED AREAS SHALL BE BACKFILLED DAILY.
8. SWEEP ROADWAYS DAILY WHERE WORK IS BEING PERFORMED.
9. PROVIDE CHECK DAMS OR WATTLES WITHIN DRAINAGE SWALE ALONG WATER MAIN INSTALLATION AND AS DIRECTED BY NC
DENR.
10. PURSUANT TO NC GENERAL STATUTE 113A-54.1(.), CONDUCT "SELF INSPECTIONS" OF EROSION CONTROL DEVICES AT
COMPLETION OF EACH CONSTRUCTION PHASE AND DOCUMENT SUCH INSPECTIONS AS OUTLINED IN 15A NCAC 04B .0131.
11. THE CONTRACTOR SHALL MAINTAIN THE DEVICES ACCORDING TO THE LATEST VERSION OF THE NORTH CAROLINA EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
12, ALL TRENCH WATER SHALL BE PUMPED THROUGH A SILT BAG.
13, AFTER THE DISTURBED AREAS ARE STABILIZED, AND WHEN APPROVED BY THE ENGINEER, REMOVE THE TEMPORARY DEVICES
AND PROPERLY DISPOSE OF THE TRAPPED SEDIMENT. STABILIZE THE AREAS DISTURBED DURING THE REMOVAL OPERATION
BY APPLYING SEED AND MULCH ACCORDING TO THE SEEDING SCHEDULE AND THE DITCH PROTECTION SHOWN ON THE
DRAWINGS.
14. CONDUCT PROJECT INSPECTIONS OF EROSION CONTROL MEASURES AND STORMWATER OUTFALLS WEEKLY AND AFTER EVERY
RAIN EVENT 1/2" OR GREATER. ALL CONTROL DEVICES SHALL BE MAINTAINED AS SPECIFIED BY THE CONTRACT
DOCUMENTS.A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE TO FACILITATE RAINFALL MONITORING. MAINTAIN
THESE RECORDS AT THE ON-SITE OFFICE FORAUDIT. INSPECTIONS ARE REQUIRED UNTIL PROJECT STABILIZATION IS EVIDENT
BY 959 VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING, AT SUCH TIME THE CONTRACTOR SHALL REMOVE ALL
TEMPORARY EROSION CONTROL DEVICES.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND
SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT
FROM LEAVING THE SITE.
16. MAINTAIN COMPLIANCE WITH ALL PERMITS AND PLANS. ANY CHANGES SHALL BE APPROVED BY NC DENR LAND QUALITY
DIVISION PRIOR TO EXECUTION. A COPY OF ALL PERMITS SHALL BE MAINTAINED BY THE CONTRACTOR ON-SITE AT ALL
TMES.
(AREA OF LAND DISTURBANCE = 4.55t (ACRES)
`CONSTRUCTION WILL OCCUR WITHIN A 20' WIDE
STRIP TYPICALLY 10' OFF EDGE OF PAVEMENT.
TS TEMPORARY SEEDING, TS
NC E&S STD. 6.10
PERMANENT SEEDING,
PS NC E&S STD. 6.11 PS
�RECP� SOIL STABILIZATION BLANKETS & MATTING,
NC E&S STD. 6.17
SF SILT FENCE, NC E&S STD. 6.62—SF_
CIP CULVERT T0TECTION,
NCE&S STD 6.5
USC
UTT1171
VA E S STD. 3.2ROSSING
CROSSING
�FLOW
/A APPROXMATEA SL
OW �-0%OPE
It Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24540
PHONE: 434.797.4497
FAX 434.797.4341
NCBELS # F-0929
U
Z
J Z H
J J Z Z
Q>_LUIY LU LUU
(_D
r(nQ U
WEr<0<0�
Q m0 - L
O�D~C 0
0Q O U
Z O
Er
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 600' 1200'
6iiIII
SCALE: 1" = 600'
N, I DATE I BY I Description
REVISIONS
DRAWNBY MWC
APPROVED BY RSE
CHECKED BY LAR
DATE JANUARY, 2019
TITLE
Erosion and
Sedimentation
Control Plan
PROJECT NO. 50046462/50102913
C2
SHEET NO. OF
E&S LEGEND
LIMITS OF DISTURBANCE
CHECK DAMS '
CD
NC E&S STD. 6.63
CE
TEMPORARY STONE CONSTRUCTION®
ENTRANCE, NC. E&S STD. 6.06
TS TEMPORARY SEEDING, TS
NC E&S STD. 6.10
PERMANENT SEEDING,
PS NC E&S STD. 6.11 PS
�RECP� SOIL STABILIZATION BLANKETS & MATTING,
NC E&S STD. 6.17
SF SILT FENCE, NC E&S STD. 6.62—SF_
CIP CULVERT T0TECTION,
NCE&S STD 6.5
USC
UTT1171
VA E S STD. 3.2ROSSING
CROSSING
�FLOW
/A APPROXMATEA SL
OW �-0%OPE
It Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24540
PHONE: 434.797.4497
FAX 434.797.4341
NCBELS # F-0929
U
Z
J Z H
J J Z Z
Q>_LUIY LU LUU
(_D
r(nQ U
WEr<0<0�
Q m0 - L
O�D~C 0
0Q O U
Z O
Er
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 600' 1200'
6iiIII
SCALE: 1" = 600'
N, I DATE I BY I Description
REVISIONS
DRAWNBY MWC
APPROVED BY RSE
CHECKED BY LAR
DATE JANUARY, 2019
TITLE
Erosion and
Sedimentation
Control Plan
PROJECT NO. 50046462/50102913
C2
SHEET NO. OF
E
7
C
B
A
1 2 3 4 5
I/ Impact Area
MWC
m—m—
RSE
----
/
m�m—
LAB
CHECKEDBY
DATE
JANUARY, 2019
I "
®gym
I
// /
I
P I
I
I
and WD- \
i I i STA. 137+93, INSTALL (2)
20" 45' VERTICAL BENDS
W/ RES. FITTINGS
eland WE
IMPACT SITE
2SCAL F/1"=20'cl==s�
1
—\
SCALE: 1"=20'
I L845 ly / I.�
F— —
—
GGA FM o "0
IMPACT SITE 1 9 9S
�REGP 143"
�\
3te
C)
Lu W
Lli
C0
se
; 1
o
3
vv W
STA. 138+00, INSTALL AIR
STA.
144+78, INSTALL
LU
\S�
u
I I 1 RELEASE VALVE ® HIGH
I
STA. 141 +80, INSTALL AIR
20" 11.25' BEND WITH
\ \
�Z \ \_� (n
s
a5 y s
+oa •CR• s
e I
POINT EXACT LOCATION TO
I I I I (
BE DETERMINED IN FIELD)
RELEASE VALVE ® HIGH
POINT (EXACT LOCATION TO
o RES. FITTINGS
O
zg y.
w �LLJ
z z
N / 9ye
I I I 3�1
I (TURN UP TRACING WIRE)
I
BE DETERMINED IN FIELD)
(TURN UP TRACING WIRE)
/ STA. 145+20, INSTALL
20" 11TTI BEND WITH
O- Z
A�
sw J
STA. 134+00, INSTALL 20"
� 1 � I STA. 137+93, INSTALL
RES.
FITTINGS
@ Q
U)) BV WITH RES. FITTINGS
, I I I FIRE HYDRANT ASSEMBLY
' I IHYDRANT
STA, 140+90, INSTALL FIRE
ASSEMBLY
3
r?
10' PERMANENT
a 3
N U
150 (LF) - 20" D.I.P. W/ RES. FITTINGS
I
2
EASEMENT
O
�A STA. 135+00, INSTALL
1 APPROX. STA. 136+60 TO 138+10
NOTES: 105 (LF) - 30" DIA. X 0.500 WALL
12
\" FIRE HYDRANT ASSEMBLY
\1.
PROVIDE STREAM
CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT THICKNESS STEEL CASING PIPE, TO BE
OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. DRY BORE AND JACKED TO EXTEND 5'-0"
o
w
RESTORATION PER
Q DETAILS
ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE MIN. BEYOND UTILITY RIGHT-OF-WAY
SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. APPROX. STA. 136+85 TO 137+90
z I
\
STA. 135+25 TO 135+35,
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND
STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR
�w
INSTALL 10' OF CONCRETE
ENCASEMENT (SEE DET.
DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL
I
CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY
SHT. C18)
REMOVED FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
STA. 135+56, INSTALL 20"
REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
BV WITH RES. FITTINGS
3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING
I
SCHEDULES AND MIXTURES SHT. C22.
565
565
550
550
560
IMPACT
560
545SITE
545
1
STA. 13
+00 TO 135
56
NOTES:
\
56'LF
D.I. REQUIRED
1. WILLIAM
3GAS LINES
ARE
ARE SHOWN
APPROX. 0
LY.
PROVICE
STREAM
2. CONT
CTOR WILL
THE WLLIAMS
GAS
o
555
RESTORATION
DETAI
PER
PIPELIN
3. WILLIAM
AT THIS LOCATION.
GAS PERS
NNEL MUST
BE ON-SITE
555
540
z
540
LOCATI
NOF EACH
LINE.
a
4. THE MI
IMUM SEPARATION
IS 24
AND IT MU
PASS
a
EITHER
OVER OR UNDER
ALL G
LINES PRE
ENT.
550
5. THE LINES
ARE BELIEVED
TO BE
6'-0" DEEP
THE
550
535
535
SEWER
INE INVERT
0 BE APPR
X. 10'-0"DEP.
MAINTAIN MIN.
3'-O"
Mq�
EXTEND FIRE
HYDRANT
m ¢ z
_
/
EX. GRADE
545
SSEPPAROTT.OAT ON
BEETWEEN
p�N
FROM LOW
POT FOR
z w w
545
53O
� >
530
LRT
TROIy�
p
\
LINE BLOW
OFF
o
0
ENCASEMENT
�n
3¢"S0T `A
�'F
\
.
4' MINCO
R Qa LL
\
a of
3
OVER PIPE
w
AT wOO
540
STA. 135+25
TO
Xoo 4y
ARV
? o'
540
52 w
\
525
10' OF
ONCRETE
\
ENCASEMENT
(SEE
�2OD
z
0" WATERLIN
\
DET. SHF.
C18)
z
¢
/N
\
535
\
535
520
a
SCp o
\ 520
\
150
(LF) - 20"
D.I.P. W/ RES.
\w
N p
o
FITTINGS
APPROX
STA. 136+60
TO
.a
138
10. 105 (
) - 30" DLA.
X
2E
530
0.5co
WALL THICKNESS
STEEL"
_
30
515.1 m
JACI
ED TO EXTE
D 5'-0" MI
BEYI
ND UTILITY
RIGHT-OF-W
Y a
740
APP
OX. STA. 136+85
TO 1
7+90 zo
w
zo
<
525
Z i a
1425
510
a
510
�m
N
x
goOaN
J
Jw
O
.w-iKU U
zti 4a
J
JJ®
0
F33
2
JS
va~i
VjN
¢
w
Nd _
a a 3
m _ ON
m
N NN
Q U Z
00~
a a
�/1
z
z
Q x
Xm
O
(nm
Z
z
z
Z
520
m
wF
U
of
o
om
a
a
a
o>
u z—
F—Inf
m=
520
505
o
0>
w
w"
z
m
w�
U
a6min
w
omvl
w
505
3m
(7F
M
3
UI
M�
u+iN
6
3>
+
N
+j+
a
ii +LLQ
°i
> +K
=�D:
+M
®�^�N
+
O+
OJO
4z
w
Z.
U,F
m
+inz
�N
a^�
+tn?
ION
�mz
�w
�N
M
MZM-Z
rl
t2
U�
�
��N
mZ
a
515
500
;
dux
w
o
UQ
qaw
mow
aow
500
VlrU1
O515
i
N
&
77
132+00 133+00 134+00 135+00
136+00 137+00 138+00 139+00 140+00
141+00 142+00
143+00
144+00
145+00 146+00
Dewberry®
Dewberry Engineers Inc.
5 PINEY FOREST ROAD
DANVILLE,VA24540
PHONE: 434.797.4497
FAX: 434.797.0.941
NCBELS # F -0W9
U
z
Lu
J Z
J J z z
>_LLIM W 00
wEr<0Qp�
Q mH
> C� 0z
0Q O U
Z U
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
REVISIONS
MWC
m—m—
RSE
----
m�m—
LAB
CHECKEDBY
DATE
JANUARY, 2019
®gym
REVISIONS
TrrLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C5
SHEET NO. OF
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKEDBY
DATE
JANUARY, 2019
TrrLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C5
SHEET NO. OF
1 2
--- —.� UGG ___ —
--��—__------ mpact;Ga
4
5
11 ( \
E �C)h
--
�/ IMPACT SITE 2
/c1
\ 10LF/30SF
\� Stream SH SCALE: 1"=20' 1 / �$Fp 'e _ _ _ — M
e:4=7 --lzm (n
cl
x0 a a`� 1° 5�0 9es y �o a
r \ ° \ '10 coop 3 e Bos os z (n
z =
IMPACT SITE 2 I p /ice V F� �sS M
BGG — 1BS'� �'�l /
239+nn
STA. {2+50, INSTALL AIR m
A ]$ o
• ��� �, RELEASE VALVE 0HIGH •v
� POINT (EXACT LOCATION TO
\ �a� IonBE DETERMINED IN FIELD)
\ 2 10' MANENT Z�
EASEMENT ion / (TURN UP TRACING WIRE) NOTES:
ado / STA. 152+42, INSTALL 20" 1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL
2 / BV WITH RES. FITTINGS PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER
a o THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE
—/ STA. 152+18, INSTALL MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7
20" - 45' BEND WITH 2.GRADES. RCONNTRACTOR SHALL RE RAIN OM DISTURBING ALL
RES. FITTINGS WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON
STA. 151+99, INSTALL THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY
X2I
2 STA. 151 +00, 20" - 45' BEND MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS
INSTALL 20" BV WITH RES. FITTINGS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM
WITH RES. FITTINGS PROVIDE STREAM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
STA. 151 +30, INSTALL RESTORATION PER REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
FIRE HYDRANT ASSEMBLY DETAILS
STA. 151 +47, INSTALL STA. 151+68, INSTALL
20" - 45' BEND 20" - 45' BEND
WITH RES. FITTINGS WITH RES. FITTINGS
10' PERMANENT
EASEMENT STA. 151+50 TO 151+65,
INSTALL 15' OF CONCRETE
ENCASEMENT (SEE DET.
SHT. C18)
L
B
A
525
U
Z
J Z
}
z
J
Q=-0on
W BC
Z
O
LU�
w=U Q
OQ
CHECKED BY
i
E
7
C
B
A
1 1 2 3 4 5
Dewberry®
Dewberry Engineers Inc.
- PINEY FOREST ROAD
DANVILLE, VA 245 CO
PHONE: 434.797.9497
FAX: 434.797.0.941
NCBELS # F -0W9
0
Z
Lu
J Z
J J Z Z
>-LLIM w 00
wEr<0Q0
Q mH
> C� 0Y
0Q O
Z U0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
1 1/10/19 MWC REV PER USACECOMMENTS
No. DATE BY Description
REVISIONS
MWC
NOTES:
RSE
APPROVED BY
1.
CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL
LAB
CHECKEDBY
DATE
PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER
THAN 2.007 SLOPE. ALL DISTURBED AREAS ARE TO BE
MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7
DAYS OF ACHIEVING FINAL GRADES.
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL
WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON
THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY
MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS
/
EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM
THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
/
REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
OD FENCE 2
——
RFRRY HILLRD. 6 `
��—
— — — --
�.ye✓�� d
_-�6B.`e°_ — �/�y--�— _ � �_.. sen.
� \\
/
C
/
\
I
C1 G� moi/' /
Wetland WC w
UVJ
SF
(NO IMPACT) o
FC co
all
1 7
P.
m STA. 161+30, INSTALL
�
m FIRE HYDRANT
1
U
ASSEMBLY
Z
505
505
500
500
495
LI
495
Aft
$
A1N
E TO ARV
_
\
z
490
J
EX. GRADE
<
I
490
485
485
480
20" WATERLINE
MS OT EN
0 A V�
w
480
m
W
Z
7
475
Q
<
475
470
W
f/1
Z
�
O
O
470
m
W
N
m"
m"
m"
a
U
465
w�
w�
w�
Nm
465
=
Zw
ZwZw
Ia
460
460
�a
v.6
a°�'
as
-m,6
�d
160+00 161+00 162+00 163+00
164+00 165+00
166+00 167+00 168+00 169+00
170+00 171+00 172+00
173+00 174+00
Dewberry®
Dewberry Engineers Inc.
- PINEY FOREST ROAD
DANVILLE, VA 245 CO
PHONE: 434.797.9497
FAX: 434.797.0.941
NCBELS # F -0W9
0
Z
Lu
J Z
J J Z Z
>-LLIM w 00
wEr<0Q0
Q mH
> C� 0Y
0Q O
Z U0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
1 1/10/19 MWC REV PER USACECOMMENTS
No. DATE BY Description
REVISIONS
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C7
SHEET NO. OF
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKEDBY
DATE
JANUARY, 2019
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C7
SHEET NO. OF
E
7
C
B
A
W
LU
0=
U
LI
a
Q
U¢
✓ � I �11
_ ------ �b--------------_�Sl;—I!
LU — — —
LLI
U..I _a 89
J 9d0
BEGIN
(� 174+50 ed(j�
1032 LF
181+83 Wetland WC (NO IMPACT) Al
1
`fix—� ---
89
Wetland WC = NO IMPACT
SCALE: 1"=20'
NOTES:
1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL
PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER
THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE
I MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7
DAYS OF ACHIEVING FINAL GRADES.
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL
I WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON
THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY
MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS
EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM
THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING
SCHEDULES AND MIXTURES SHT. C22.
IMPACT SITE 3
1 2
STA. 174+24, INSTALL
5
20" BV WITH RES.
FITTINGS
STA. 174+25, INSTALL
FIRE HYDRANT ASSEMBLY
25'x50' STAGING AREA
STA. 174+50
NOTE
20" 45- VERT. EL. W/ RESTRAINED
FITTINGS (EXACT LOCATION TO BE
DETERMINED IN FIELD) (TURN UP
A WOOD �ENCE
TRACING WIRE) (REF. FITTINGS
DET'S. SHT. C19)
�6
CABLE FENCE I Z6p _ _ r^ ^ =/ •, _`�
0
H
W
— m
W
_
W
LU
0=
U
LI
a
Q
U¢
✓ � I �11
_ ------ �b--------------_�Sl;—I!
LU — — —
LLI
U..I _a 89
J 9d0
BEGIN
(� 174+50 ed(j�
1032 LF
181+83 Wetland WC (NO IMPACT) Al
1
`fix—� ---
89
Wetland WC = NO IMPACT
SCALE: 1"=20'
NOTES:
1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL
PRODUCT OR SOD ON ALL DISTURBED DITCHLINES STEEPER
THAN 2.00% SLOPE. ALL DISTURBED AREAS ARE TO BE
I MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7
DAYS OF ACHIEVING FINAL GRADES.
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL
I WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON
THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY
MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS
EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM
THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
3. REFERENCE WETLAND TEMPORARY AND PERMANENT SEEDING
SCHEDULES AND MIXTURES SHT. C22.
IMPACT SITE 3
174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00
Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE,VA24540
PHONE: 434.797.4497
FAX: 434.797.0.941
NCBELS # F -0W9
0
z
J Z >
Cl) J J Z Z
w M w 0 0
wEr<0Q0
Q mH
> C� 0Y
0Q O
Z U0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
1 1TV' MWC COMMENTS
No. DATE BY Description
REVISIONS
DRAWN BY MWC
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C8
SHEET NO. OF
3
4
5
NOTE
A WOOD �ENCE
-7�
�6
CABLE FENCE I Z6p _ _ r^ ^ =/ •, _`�
yg+
=,50 �' = — — —
— m
—
FM —y �FM
�tt
1. CO
TRACTORS
LL PROVIDE
AN ELECTR
NIC WALKOVER
TRACKING
rn
L
m
- —
—
— a9p
490
�/ TYP.
— —
mpact
Cn
u—
_ ---
To
C GUIDANC
AQ.F qHAl I lip
_
PROBE
Ppnvinr
_BERG
_
ROBE. THE
7 OCATION
>_ Im
�
w°__
— 9-
505
N
o I
IMPACT SITE 4
Qo
W00 FENCEBEGIN L
Zd(t 2645.07SF/0.061AC
Wetland WB
g
174+50
RILL HEAD CURING
THE DRILLING
OPE
-N.4
n
1032 LF
N
STA. 181+34 END
181+83
20- 49 RFITTINGS
'
50'X50STAGING AREA
RESTRAINED (EXACT
0
ZE
LOCATION TO BE DETERMINED
=
IN FIELD) (TURN UP TRACING
WIRE) (REF. FITTINGS DET'S.
Cascade Creek (Stream SF/SG CO
U
-EET AND IN
ANY SOIL CONDITION
, NDITION,
SHT. C19)
B, v
'
50'x50' STAGING AREA
- PROVIDE s
✓ t I
ALTERNATE - STA. 178+59
TO 178+99, INSTALL 40'-
I
- -SIR BESL ON
-
f ,�
/— I
��
P6R DETAILS - -
-
-
(SEE -DEL SHT® CW - -
INCLU
ING HARD
CK. IT SHALL
-
DRILLER
— BERRY
HEA
BY
-
80
IiV
—wood 9—
—ALTERNATE-STA.
ALTERNATE - STA.178+42,
INSTALL 20"45' BEND
a
ALTERNATE -STA. 179+22,
PROVI
ING IMMEDIATE
INFORMATION
WITH RES. FITTINGS
FOOL FACE,
INSTALL 20" 45` BEND WITH
RIZ. DIRECTIO
),
ALTERNATE - STA. 178+64, /
INSTALL 20" 45` BEND /
WITH RES. FITTINGS
®
RES. FITTINGS
ALTERNATE - STA. 179+15,
500
impact Area
AI PACT SITE 3
INSTALL 20"45* BEND
I 20 F/80OSF
WITH RES. FITTINGS
AND I
CLINATION (VERT.
174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00
Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE,VA24540
PHONE: 434.797.4497
FAX: 434.797.0.941
NCBELS # F -0W9
0
z
J Z >
Cl) J J Z Z
w M w 0 0
wEr<0Q0
Q mH
> C� 0Y
0Q O
Z U0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
1 1TV' MWC COMMENTS
No. DATE BY Description
REVISIONS
DRAWN BY MWC
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C8
SHEET NO. OF
NOTE
1. CO
TRACTORS
LL PROVIDE
AN ELECTR
NIC WALKOVER
TRACKING
SYSTEM OR
L
505
MAGN
NTF'P
C GUIDANC
AQ.F qHAl I lip
SYSTEM (MCS)
I lqrn TO
PROBE
Ppnvinr
R PROVEN
YROSCOPIC
JNID ACCU
ROBE. THE
7 OCATION
505
THE
RILL HEAD CURING
THE DRILLING
OPE
ATION. THE
UIDANCE SI -ALL
BE CAPABLE
OF TRACKING
AT
L DEPTHS LP
TO FIFTY
-EET AND IN
ANY SOIL CONDITION
, NDITION,
INCLU
ING HARD
CK. IT SHALL
ENABLE TIE
DRILLER
0 GUIDE THEDRILL
HEA
BY
PROVI
ING IMMEDIATE
INFORMATION
OF THE
FOOL FACE,
AZIMUTH (HO
RIZ. DIRECTIO
),
500
AND I
CLINATION (VERT.
DIREC
ON). THE G
IDANCE SYST7M
SHALL BI
ACCURATE
kND
500
SENSI
IG POSITION
AT DEPTHS
P TO FIFTY
FEET ANDA
CURATE TO
FEET HORI
.
733LF
20" HDP
SDR -9 ATER MAIN
2. TH
CONTRACT
R SHALL SUPPLY
ALL CO
PONENTS A14D
MATERIA
TO INSTALL
(INSTALLED
BY
DIRECTIONAL BORE
495
DI
ECTIONAL C
OSSING ENTRY
AND
OPERATE,
AND MAI
THIN THE GUIDANCE
SYS
EM.
495
Q
IST POINT W
S DEI -ERMINED
BY
DIRECTION
L CROSSING
ENTRY AND
1,
U
2000'
ING A 8' ENTRY
RADIUS
OR EXIT
DF CURVATU
ANGLE,
E, &
z1
USING A
ENTRY OR
EXIT ANGLE,
AND
OPERATED BY
PERSONNEL
TRAINED AND
EXPERIENCE
D WITH THE
SYSTEM. THE
M
INTAINING 1
MIN. DEPT
UNDER
IMPACT
2000' RA
IUs OF CU
ATURE, &
OPERATOR
SUCH
SHALL
INFLUENCES
E AWARE 0
IN THE OPERATION
ANY GEO-
OF THE
AGNETIC AN
GUIDANCE
MALIES AND
SYSTEM.
SHALL CONSIDER
/
C
EEK BED (EXACT
LOCATI
N TO
ar SI
E 3
MAINTAINI
G 15' MIN.
EPTH UNDE
/
490
B
DETERMINE
IN FIELD)
��
CREEK BE)
(EXACT L
TION TO
IMPACT
J
—
490
WL = 488.p,
EXISTI G�
SPRNE
485
Al
GRAD
°
ptWN j
485
STREAM
RESTORATION
li LWL
480.50'
\
PEF
DETAILS
z
+-
m
480
K
Z
w
20" WATERLINE
w
480
SEPARAT
ON BETWEEN
Qw
tai
BTT.
OF CREEK
AND TOP
m z
F CONIC. E
CASEMENT
/
zz w
> w
1
in
475
ALTERNATE
- STA. 178
59
F
475
o'
TO 178+9
INSTALL 40'
3
\
m v
OF CONCR
E ENCASEMENT
a w
g
(SEE DET.
HT. C18)
woo
z
w
/
a
zk
z
470
\
. m
a
a
m
470
m
z ¢
�>
¢am
w
v
+
+
+
+
:�
+
¢
m
Z�
Z�fw/1
dao
�p
°J
N na
n0
-
Xao
O
Z_N
Xm
O
465
v nm
In omz
m
wF
O
Fmz
z lO
F
z Fm
z z.
Fmz
wF
M
�z
a
wF
465
2 nz
nOUw�z
zw
zNrri
z
rn Z�r
z�rri
Zw
-
1,
ma
zw
460
¢o
�=
¢wz
Innom
��
J.�
����
t
wNwwm�
! Jww
-!z
��_v
>
�zl
w
460
z
¢zm
¢z3
v°
a6
174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00
Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE,VA24540
PHONE: 434.797.4497
FAX: 434.797.0.941
NCBELS # F -0W9
0
z
J Z >
Cl) J J Z Z
w M w 0 0
wEr<0Q0
Q mH
> C� 0Y
0Q O
Z U0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
1 1TV' MWC COMMENTS
No. DATE BY Description
REVISIONS
DRAWN BY MWC
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT NO. 50046462 / 50102913
C8
SHEET NO. OF
EI
D
C
B
A
1 2 I 3 1 4 I 5
i
1 O }
Lu
1 zm
Dewberry®
Dewberry Engineers Inc.
- PINEY FOREST ROAD
DANVILLE, VA 245 CO
PHONE: 434.797.9497
FAX: 434.797.0.941
NCBELS # F -0W9
THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
I REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
I
KEY PLAN
NOT FOR CONSTRUCTION
520
WOOD FENCE 06, a
DRAWN BY
RSE
I
�J 1
`�
T' LW F -Wt- _— , I
AA
Ni-
CHECKEDBY
^,
12 SOUPQ� 9i 0 �O�' y
/ b6D� - - - teq
(r , / -9pS� g0
fyls
`-
I U
�
—
— -F L
— 966
GMP_�goLIARD
-
FM
—_ � -- r
�� —L-� �FM �
-Z'5
— D-=--
w
>—_—_ —
—
Y HILL — — — — — —
�—�M
520
z
o
— — s
—
NU. _ _ — — _�
-
Lu
—
_
=
z
—
4�EGp y� fps SO2 ZOS- -
�O — 3H
—_� 13.00—
�- �-
J
z z
WOOD FENCE
h �a
PROVIDE STREAM
RESTORATION PER
A67 2
'SeR- —e_` - - - -
.� o — sta- — — ��+Qn — ——Ea=YOLF
m "A66o "�"' �ys� �Po�
_
— — — mT(2°
(�
I O Lu
Q Q
i LLI 0
m
p67A STA 206+32, INSTALL
DETAILS
STA. 208+00, INSTALL AIR
RELEASE VALVE ® HIGH
,n$ 5 TMP•
53e m1 �.
ILL.I
z
C3 Ljj LU ()
Lu Q
N I
20" - 45' BEND
WITH RES. FITTINGS
STA. 207+02, INSTALL
20" - 45' BEND
POINT (EXACT LOCATION TO
STA. 211+48, INSTALL 20"
BV WITH RES. FITTINGS
I =
W Q U LL.
Q 0 Q
w
STA. 206+40, INSTALL
WITH RES. FITTINGS
BE DETERMINED IN FIELD)
(TURN UP TRACING WIRE)
STA. 211+50, INSTALL
=
= _
m
FIRE HYDRANT ASSEMBLY
FIRE HYDRANT ASSEMBLY NOTES:
U
Q m 0- 0
fn
Al
STA. 206+50, INSTALL
STA. 206+83, INSTALL
20" - 45' BEND
WITH RES. FITTINGS
1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL
PRODUCT OR SOD ON ALL DISTURBED DITCHUNES STEEPER
Q
> U z
O
n
20" - 45' BEND IMPACT SITE 5
THAN 2.00 SLOPE. ALL DISTURBED AREAS ARE TO BE
Q O Y
WITH RES. FITTINGS
10' PERMANENT
MULCHED AND SEEDED PER THE SPECIFICATIONS WITHIN 7
Wz
STA. 206+55 TO 206+75,
EASEMENT
DAYS OF ACHIEVING FINAL GRADES.
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL
0
Ir
INSTALL 20' OF CONCRETE
ENCASEMENT (SEE DIET.
WETLANDS AND STREAMS UNLESS OTHERWISE DIRECTED ON
THE PLAN. IF CONTRACTOR DOES DISTURB WETLANDS, THEY
��
SHT. C18)
MUST BE RESTORED TO ORIGINAL CONTOUR, AND ALL EXCESS
EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED FROM
I
SEAL
THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL
I REGULATIONS REGARDING WETLANDS FOR THIS PROJECT.)
I
KEY PLAN
NOT FOR CONSTRUCTION
520
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKEDBY
DATE
JANUARY, 2019
520
515
515
510
/
510
��
_
EXTEND FIR
HYDRANT
FROM LOW
LINE BLOW
iPOT FOR
OFF
rn
z
PROVIDE STREAM
w <
/O
505
X. GRADE
z
RESTORATION
PER
a o
/
505
QI
—
500
IMPAC
SITE 5
500
I
p5\(NE
�z
S
IAW OPE
-az
495
SLOPE TO A
IVE
ZV
z r
495
20" WATERIL
E
VE
~
qa 3
MAINTAIN MIN.
3'-0"
MAII,ITAI
T� A¶RV
<a w
SE
ARATION B
WEEN BIG T.
SLOP
POSITIVE
MAINTAIN PO
ITIV
490
F CREEK AND
CONC. ENCASEMENT
TOP OF
MAINTA
'10
o
490
TO
RV
5b
TA. 206+5
TO 206+75
ro
INSTALL 20'
F CONCRET
z
485
NCASEMENT
(SEE DET.
p
a
o
485
HT. C18)
a
Jx
a�
Jm
aw
JW
<o:Q=
JW
J16 JLpm
0o3
JN
Jm
zo
zGo
z�
z�
z� z®z�?
480
o�
mU
w
3
3
3
�+�zr''
F
mU
480
wF
m� oz
oo
�a
no
No o
my
o
wF
o^
m�
1oa
k mo
�w
+vi
mw
n"' m
oza
�0
3m
r,�
+vi
a�
Z�
o
N
or
I Nx
omin
N.
U oa
omin
N.
omin owJ�o
N. u N
I-
UD=Z
�x
NC
�>
Nx
Zw
QQ
How
H�
On
NZ QII¢wj
z
NZ
NZ
N
475
h'W
K
V
NK
I u:�z
�
I Il
� I Ilm m�"o��
�z
475
og
Lo$a°m'
a�
a°�'
a
vm
N$Lo16
202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00
SCALE
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
✓REV PER USACE
1 1�10�19 MWC COMMENTS
No. DATE BY Description
!IONS
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT No. 50046462/50102913
C10
SHEET NO. OF
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKEDBY
DATE
JANUARY, 2019
TITLE
20" WATERLINE
PLAN AND PROFILE
PROJECT No. 50046462/50102913
C10
SHEET NO. OF
E
7
C
B
A
1
2
FIRE HYDRANT ASSEMBLY
00Q
O
3 4
5
Z
0
T
LAB
�1
ImpactA�2.
<
ISEAL
I
NOTE
Dewberry®
KEY PLAN
o on
O
NOT FOR CONSTRUCTION
CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT OR
540
\
SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE. ALL
/
DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE
SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES.
l
\
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND
STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR
i
Dewberry Engineers Inc.
(
mwZ
DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL CONTOUR,
I
eel PINEYFORESTROAD
ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY REMOVED
NVIAND
PHONELE, VA2 9
PHONE4797 9].449]
FROM THE WETLANDS. (REF. NATIONWIDE 12 PERMIT FOR ALL REGULATIONS
FAX: 436.]9].0.A41
NCBELS # F -0W9
\
REGARDING WETLANDS FOR THIS PROJECT.)
3. CONTRACTOR SHALL LOCATE BOTH EXISTING 12" WATERLINES AND
z
Stream SD
TIE-IN EXISTING SERVICES TO NEWER D.I. LINE CLOSEST TO ROAD. EXISTING
12" CAST IRON WATERLINE TO BE ABANDONED IN PLACE. COORDINATE WITH
CIN OF EDEN FOR LOCATION OF METERS, VALVES, AND TIE-INS.
— —
535535
a,
IMPACT SITE 6
Z
SCALE: 1"=20'
-- — ---_—
_ --
Lf)
HE I�J 6HE_-- PP
\ \ GMP p
\
\
/ P
a
Np0
/
Zwz
GMP
-/
GMP --
--
_ _ — — — —
GMP'r--
I
—
—
W
Lu
ZW
GMP
— — °
--
N.C. HWY. 770 —
— \ \ _
lk —
6
�—
_
2
0
— _
PROVIDE STREAM —
—
E. MEADOW RD.
- -- —
_—
—
_- —._--- _
_ORECP�
�- 3z1.pp +
(Y)
z
W
TORATION
DETAILS TEL PE
—
�= —
— — P `
W _ — \W — �TYP. \ L _'
�� —
—� �
W
W
%Q
J `_
W
W-__
W $ FH---
W
ct RECP�
Ir
OD
C=—J wz
�W'0
{ECP
ONF USGS MAINTAIN MIN. 5'-0" MAX
GAS Rw F 4C
w
I Z
Q >_ LJ,J X � 0 0
�trS� W
OFF E.O.P. (TYP.)
GAS WRNi
c
J
U
V (n Q
~
\DITCHUNE
530
STA. 263+27, INSTALL 20"
BV WITH RES. FITTINGS
IMPACT SITE 7�
MAINTAIN MIN. 12'-0"IU
\
�mo
=
W Q U 0
c Q 0
TURNOUT
STA. 263+25, INSTALL
OFF E.O.P. (TYP.)
f-
Q
C W = _ _
Q m 0-
STA. 263+00, INSTALL AIR RELEASE
VALVE 0 HIGH POINT (EXACT
LOCATION TO BE DETERMINED IN
FIELD) (TURN UP TRACING WIRE)
STA. 262+23, INSTALL
20" - 45' BEND WITH
STA. 261+55, INSTALL RES. FITTINGS
20" - 45' BEND WITH STA, 261+89, INSTALL
RES. FITTINGS 20" - 45' BEND WITH
STA. 261+60, INSTALL RES. FITTINGS
20" - 45' BEND WITH IMPACT SITE 7� STA. 261+88, INSTALL
RES. FITTINGS FIRE HYDRANT ASSEMBLY
STA, 261+70 TO 261+85,
INSTALL 15' OF CONCRETE
ENCASEMENT (SEE DET.
SHT. CIE)
540
00Q
O
0
0U
RSE
Z
0
T
LAB
CHECKED BY
CE
ISEAL
I
JANUARY, 2019
KEY PLAN
NOT FOR CONSTRUCTION
540
MWC
DRAWN BY
w
RSE
APPROVED BY
T
LAB
CHECKED BY
DATE
JANUARY, 2019
540
Z
<a
i
mwZ
�
\
z
— —
535535
Z
Z
535
\
\
a
Np0
Zwz
w0
¢
ZW
wz
_
O_
o
wz
OD
�W'0
mZZ
i
r
530
\
�mo
wa
WF
0 w
F
az
oww
F
530
\\
�w
F
3
�Q
wXo
zw�
¢tea
wwo
IMPACT
ITE7
/
525
Op
N
TO ST
PROVIDE STREAM
w
a
a
zoo
a o
o
zooRABLI
~
K /
525
a
RESTORATIO
PEk
wo
z m
m D_
•
RESTORATIO
k>
a
EX. G
E
N 00
0._.-
,�
\
m
0
\
—
V
520
\ i
520
o
IMPA
T SITE 6
515
MAINTAI
MIN. 3'-0
�Ne
515
_
p
SEPARATIO
BETWEEN B
TT.
p
OF CREEK
AND TOP
F
MAI NT
IN POSITIVE
SLOPE
ITIVE
P 0
OPE
CONC.
ENCASEMENT
SLO
E TO ARV
ARV
0'S
510
STA_ 32U+70
TO 261
�85
20 I'NFT
I
I
1
1
510
INSTALL 15'
OF CONC
ETE
z
ENCASEME
T (SEE DET
wQ
SHT. C18)
�-'ZDoz
IEo
505
z
z
wL
a
- 0^
W
a<505
=��
N¢
F3
; �w
¢3
F3
Jho'-'-
Fx Qw3
mJ J
fJ
mania
z
w
N
X
m
m
W
N
om-
Co
m
v
z
0
O Z
N
Z D
Z
+
O
Z ®D Z
J
UqQ
m N N
a Z 2
U
Z
X
m
m X
w
O
X
m
X z
w
N
500
WF
U
Opp
nN
m
Wp
NM-
W N
W N
mU mZ
W
Ot m� N
Mm0
W
; W
OJUZF
F� r
WF
U
N
x 0
H
O
f` ^O
O
WF
t j
mNZ
500
Stn
UF
NM
N
NN
f4,
t0
Qk
tpz
^
+a-
N<
M Www
tow
++^_-
�O
i(1�
NII
NII
NII
NILL
ILL NS
t0
NIIi NII
t0
NIIi
NMF -OZ
�M
2N N��
�QO
N
II NII
�p
N�a
O
ary
¢�
K
4>
Z
4�
Z
Z
Q'
f/1
N K
fn Qw
N K In
i
How Q
How
HWOW 2
w
x
h'W
H9w
H
W
>
a
495
F
to
t-
m
to
495
vN
ay
258+00 259+00 260+00 261+00 262+00 263+00 264+00 265+00 266+00 267+00 268+00 269+00 270+00 271+00 272+00
SCALE
0' S0' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
✓ REV PER USACE
1 1�10�19 MWC COMMENTS
No. I DATE I BY I Description
IONS
TrrLE
20" WATERLINE
PLAN AND PROFILE
PROJECT No. 50046462/50102913
C14
SHEET NO. OF
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKED BY
DATE
JANUARY, 2019
TrrLE
20" WATERLINE
PLAN AND PROFILE
PROJECT No. 50046462/50102913
C14
SHEET NO. OF
E
r.
C
B
P
1
0
z
NOTES:
1. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT
OR SOD ON ALL DISTURBED DITCHLINES STEEPER THAN 2.00% SLOPE.
ALL DISTURBED AREAS ARE TO BE MULCHED AND SEEDED PER THE
SPECIFICATIONS WITHIN 7 DAYS OF ACHIEVING FINAL GRADES.
2. CONTRACTOR SHALL REFRAIN FROM DISTURBING ALL WETLANDS AND
STREAMS UNLESS OTHERWISE DIRECTED ON THE PLAN. IF CONTRACTOR
DOES DISTURB WETLANDS, THEY MUST BE RESTORED TO ORIGINAL
5 .3SI ® CONTOUR, AND ALL EXCESS EXCAVATED MATERIAL MUST BE COMPLETELY
I _ 'S6\l\ I / Ii REGULATIONS REGARDING WETLANDS FORATHISWPROJECT.)ERMR FOR ALL
jREMOVED FROM THE WETLANDS. (REF.
3. CONTRACTOR SHALL LOCATE BOTH EXISTING WATERLINES AND
TIE-IN EXISTING SERVICES TO NEWER D.I. LINE CLOSEST TO ROAD.
EXISTING 12" CAST IRON WATERLINE TO BE ABANDONED IN PLACE.
COORDINATE WITH CITY OF EDEN FOR LOCATION OF METERS, VALVES, AND
TIE-INS.
W tland WAri�
D ( IMPACT _PP
nOHE \ – sse
_ – _ _ GW– --6 OHE
E: IGT Z NC 770
M 4_ — IMPACT SITE 8
Cl)_ — — — _ 3+84
M APPROX. LOCATION OF EX.
m 16" WATERLINE CONTRACTOR
SF �RE TO FIELD LOCATE VERT. AND
U) STA. 303+1SPALL HORIZ. EX. 16" WATERLINE
= 20" - 45' BEND WITH / PRIOR TO CONNECTING NEW
M RES. FITTINGS 16" WATERLINE. CONTRACTOR
M ISTA. 303+24, INSTALL SHALL TIE-IN TO WITH NEW
20" - 45' BEND WITH 16" WATERLINE, 16" TAPPING
RES. FITTINGS TEE AND 16" GV, i6"X20"
INCREASER, (2) 45' BENDS
I MAINTAIN MIN. 12'-0" WITH RES. FITTINGS (REF.
OFF E.O.P. (TYP.) DET. THIS SHT.)
STA. 303+63, INSTALL
PROVIDE STREAM 20" - 45' BEND WITH
RESTORATION PER RES. FITTINGS
DETAILS STA. 303+52, INSTALL
I 20" - 45' BEND WITH
RES. FITTINGS
I STA. 303+50, INSTALL
FIRE HYDRANT ASSEMBLY
STA. 303+26 TO 303+36,
INSTALL 20' OF CONCRETE
ENCASEMENT (SEE DET.
SHT. C18)
545
— O UGW�–�--��
DRAWN BY
REF. DET. SHT. C19
EX. 12" °
RSE
APPROVED BY
da
Wetland WA—/
a 4 d
° 16"z16"TAPPING SLEEVE
CHECKED BY
545
DATE
SA: 10LF/120SF
i ..
SCALER"=20'
EX. 16"
EX. 16"
16" GATE VALVE W/ RES.
EXTEND FIE
HYDRANT
FOR LOCATION AND
RATED BOX (REF. BE
LAYOUT THIS SHT.
SHTS. C18 AND C19)
FROM LOWSPOT
FOR
Z
LINE BLOW
OFF
540
EX. GF
AIDE
z
IMPACT SITE
8, i 540
535
PROVIDE
STREAM
535
/
DETAILS
MgINTAI
I
530
SLOP
PO
TO SITIVE
ARV
1
530
20"WATERLINE-/\
MAINTAIN WIN.
3'-0"
-APPROX.
LOCATION
OF EX.
S
PF N B
EEN BOTi
16
WATERLINE
ONTRACTOR
525
CRE A4D
O CONC. EN
TOP 0F
ASEMENTOK
TO
FIELD LOCATE
VERT. AND
525
PRI
DR TO CONN
CTING NEW
16
WATERLINE.
CONTRACTOR
SH
LL TIE -INT
WITH NEW
16
WATERLINE,
16" TAPPING
520
TEq
AND 16" Gy,
16"X20"
520
WIT
RES. FITTI
GS (REF.
DE1.
THIS SHT.)
—,A
303+26 T
303+36,
515
1
INS
ALL 20' OF
CONCRETE
515
SH
.018)
510
7
1
510
J H J
F3 r3
H
J 00 J
rN �3
H
H
3
m
U
zozo
— Z —
Z
za zo
— —
Z
0
Z
505
amt a
m;
o z c4
m;
505
woak
oak
o� oak
ak
O
M I M
MS M
I
I
500N�
d vi d
�N��
vi
¢ w d .
�R�
vi
vi
R�
500
300+00 301+00 302+00 303+00 304+00 305+00
A
----�
3\\02+00
— O UGW�–�--��
DRAWN BY
REF. DET. SHT. C19
EX. 12" °
RSE
APPROVED BY
da
Wetland WA—/
a 4 d
° 16"z16"TAPPING SLEEVE
CHECKED BY
0 IMPACT SITE 8
DATE
SA: 10LF/120SF
SB: 10LF/20SF
SCALER"=20'
-,ZA-zz
Stream
rl
Impact Area
G\
z\p
303+8/-
(Stream SA)
20"x16" REDUCER W/ ------
RES. FITTINGS (REF.
DET. SHTS. C19)
(2) 20" 90" BENDS W/
RES. FITTINGS (REF. °
DET. SHTS. C19)
Q ° a
°4a
NEW 20" \ 9 Q THRUST BLOCKING
REF. DET. SHT. 019
" o a
THRUST BLOCKING
a 00 REF. DET. SHT. C19
0
WATERLINE CONNECTION DETAIL
SCALE: 1/2" = 1'-0"
Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24500
PHONE: 434.]9].9497
FAX: 434.]9].0.941
NCBELS # F -0W9
0
Z
J Z >
J J Z Z
w M w 0 0
wEr<0Q0
Q m H
~�°C 0
O
0Q O YU
Z 0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 1' 2' 4'
0009
SCALE: 1/2" = l'- 0"
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
REV PER USACE
1 1�10�19 MWC COMMENTS
No. DATE I BY I Description
REVISIONS
THRUST BLOCKING
DRAWN BY
REF. DET. SHT. C19
EX. 12" °
RSE
APPROVED BY
da
a 4 d
° 16"z16"TAPPING SLEEVE
CHECKED BY
a W/ RES. FITTINGS (REF.
DATE
DET. SHT. C19) FIELD
VERIFY PIPE TYPE PRIOR
d TO INSTALLATION
EX. 16"
EX. 16"
16" GATE VALVE W/ RES.
50't REF. SITE PLAN
FITTINGS AND TRAFFIC
FOR LOCATION AND
RATED BOX (REF. BE
LAYOUT THIS SHT.
SHTS. C18 AND C19)
20"x16" REDUCER W/ ------
RES. FITTINGS (REF.
DET. SHTS. C19)
(2) 20" 90" BENDS W/
RES. FITTINGS (REF. °
DET. SHTS. C19)
Q ° a
°4a
NEW 20" \ 9 Q THRUST BLOCKING
REF. DET. SHT. 019
" o a
THRUST BLOCKING
a 00 REF. DET. SHT. C19
0
WATERLINE CONNECTION DETAIL
SCALE: 1/2" = 1'-0"
Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24500
PHONE: 434.]9].9497
FAX: 434.]9].0.941
NCBELS # F -0W9
0
Z
J Z >
J J Z Z
w M w 0 0
wEr<0Q0
Q m H
~�°C 0
O
0Q O YU
Z 0
Ir
SEAL
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
0' 1' 2' 4'
0009
SCALE: 1/2" = l'- 0"
0' 50' 100'
SCALE: 1" = 50'
VERT. 1"=5'
HORIZ. 1"=50'
REV PER USACE
1 1�10�19 MWC COMMENTS
No. DATE I BY I Description
REVISIONS
TITLE
20" WATERLINE
'LAN AND PROFILE
PROJECT No. 50046462/50102913
C17
SHEET NO. OF
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKED BY
DATE
JANUARY, 2019
TITLE
20" WATERLINE
'LAN AND PROFILE
PROJECT No. 50046462/50102913
C17
SHEET NO. OF
E
C
C
E
O O_ NCDOT NO 7 OR
8STTONE BEDDING
III 111111' 11-1111111
12" PLACE CONC. BLOCK ASTM C-139, OR POUR
1T. 8' CONC. RING FOOTING TO SUPPORT
CHAMBER, BUT LEAVE OPENING BELOW PIPE.
FILL SPACE INSIDE RING W/ CLEAN GRAVEL
FOR DRAINAGE. ELIMINATE CONIC. FOOTING
IF SOLID ROCK IS ENCOUNTERED.
AIR RELEASE VALVE DETAIL
NOT TO SCALE
NOTES:
1. CONTRACTOR SHALL COORDINATE WIENGINEER AND
OWNER FOR PLACEMENT OF AIR RELEASE VALVES AT
ALL LOCATIONS AIR RELEASE VALVES SHALL BE
PLACED BEHIND GUARDRAILS AND DITCHES, AND NOT
IN FILL SLOPES OR CUT SLOPES.
2. PROVIOEBASKWASHACCESSORIES ASSEMBLED TO
VALVE CONSISTING OFA90- EL., A SHUT OFF VALVE,
CLFARWATER INLET VALVE, RUBBER SUPPLY HOSE
AND QUICK DISCONNECT COUPLINGS.
SAW TO NEAT EDGE (TYP.)
EXISTING PAVEMENT —
21A OR B 6
6"
COMPACTED 21A BACKFILL
TO 95% DENSITY AT OPTIMUM
MOISTURE CONTENT
i
PLACE STONE UP TO
SPRING LINE FOR D.I. 4" IN SOIL 6" IN ROCK
OR PVC PIPE
COMPACTED STONE
SOIL BEDDING MATERIAL ROCK
TRENCH UNDERCUT
24"+O.D. MAX. MINIMUM 6" BELOW
20"+O.D. MIN. BARREL OF PIPE IN
ROCK
PIPE LAYING CONDITION
NOT TO SCALE
'NOTE: USE NO. 25 / NO. 26 STONE FOR BEDDING MATERIAL.
2" MIN. OVERLAY ASPHALT
CONCRETE SURFACE COURSE
TYPE (SM -2A)
EXISTING PAVEMENT
— TYPE I SIZE 21A OR B AGG.
COMPACTED TO 100% MAX.
DENSITY AT OPTIMUM MOISTURE
CONTENT
6" BENCH (TYP.)
.D. PIPE
O.D.+24"(") f MIN. TRENCH WIDTH TO
SUPPORT TRENCH BOX
ASPHALT DRIVEWAY REPAIR DETAIL
NOT TO SCALE
I
A
v 2 COURSES OF BRICK
Q AS SHOWN WATER MAIN
A A VALVE BOX ®°
p CONCRETE COLLAR
6" 6"MIN.
VALVE
S, ° PLAN
PIPE ON NCDOT RAN RECESS TOP 4" MIN.
O.D. 6" MINIMUM OTHERWISE, EXISTING OR PROPOSED CAST IRON COVER
0
ALL AROUND GRADE CONCRETE
PIPE 3000 PSI
COLLAR
PLAN / SECTION
t PIP6
TYP. ODETYPNOTES: \ p
1. CONTRACTOR SHALL \/\\ \ SCREW TYPE
PROTECT PIPE JOINTS 6„ TYP. ADJUSTABLE C.I. VALVE O
AS NECESSARY FOR BOX W/ BASE m
PORTIONS ENCASED.
2. CONTRACTOR SHALL i
USE VIBRATORY METHOD
TO ENSURE COMPLETE4 / PIPEO.D. MORTAR
ENCASEMENT. w
��. SUPPORT BOX W/ MIN.
3. FLOTATION OF THE PIPE / 2 COURSES OF BRICK
DURING CONCRETE p ,
PLACEMENT SHALL BE
PREVENTED. D / 6" TYP. BOTTOM OF TOP BRICK TO BE
NON -TRAFFIC RATED SNAKEPIT TRACER WIRE
TERMINATION BOX, INSTALL EVERY 500' (DO NOT
INSTALL IN DRIVEWAYS, ROADS, OR HEAVY
TRAFFIC AREAS.
MIN -
4'' MAX MAX.
MARKER TAPE 12" ABOVE
MAIN
12 AWG TRACER WIRE 3"
,,--ABOVE MAIN
MAIN
TYPICAL TRACING WIRE NOTE: NON -TRAFFIC RATED SNAKEPIT
TRACER WIRE TERMINATION BOX AT
ACCESS BOX DETAIL EVERY500'AND/OR TERMINATE INTO
NOT TO SCALE AIR RELEASE VALVE BOX
METER BOX
W1 COVER
2 1/2" BRASS NSFT DISCHARGE
r4W-CAP
Ir— OPERATING NUT 3, COCK WING
\ /\ EVEN W/ TOP OF BONNET MORTAR
BOLT FLANGE JOINT
SECTION A-A\/� CARRIERPIPE
COMPACTED BACKFILL TO
NATURALGROUND
CONCRETE ENCASEMENT DETAIL
NOT TO SCALE CONCRETE SUPPORT
SECTION
TYPICAL VALVE SETTING DETAIL
SCREW TYPE
NOT TO SCALE
6" OR SAME THICKNESS BALL VALVE W/ AUTOMATIC WEEP
AS EX. CONCRETE DRIVE. 5000 PSI AIR -ENTRAINED
WHICHEVER IS GREATER "HIGH -EARLY' CONCRETE
SAW TO NEAT EDGE (TYP.) 6"x6" W.W.F. SEE DETAIL THIS SHEET
EXISTING ASPHALT EXPANSION JOINT 2" FOR BLOCKING REQ'D.
WATER MAIN
6" x 2" (SEE PLAN &
TAPPED PLUG PROFILE FOR SIZE)
6" ABC STONE EXISTING CONCRETE
a a6" 6" BENCH (TYP.) MJ TEE
COMPACTED BACKFILL MAIN SIZE x 6"
1 cu. R. CLEAN GRAVEL
CONC. THRUST BLOCK
O.D.+O.D. PIPE MIN. TRENCH WIDTH TO TYPE "C" BLOW OFF/
2q^(")
SUPPORT TRENCH BOX HIDDEN FLUSHING HYDRANT
CONCRETE DRIVEWAY REPAIR DETAIL N.T.S.
NOT TO SCALE
4'-6" MIN. OR AS SHOWN ON PLANS
I
2-1/2" HOSE CONNECTION
I
SEE TYP.
DRAWN BY
EQUAL TO TOWN OR
TRACING WIRE
NATIONAL STANDARD
TO FACE STREET
1. PROVIDE TAR PAPER BETWEEN
ACCESSBOX
AT 90' ANGLE
BLOCKL
DET. FOR TAPE
2. HRUST BLOCKS & SUPPORT-
TYPICAL FIRE HYDRANT
ORIGINAL GRADE
AND WIRE
BREAK RING
MANHOLE FRAME & COVER TO BE MODEL USE
N.T.S.
GROUND OR
STREET SURFACE
386 RING AND J COVER BY U.S. FOUNDRY &
MFG. CORP. OR ENGR. APPROVED EQUAL
FINISHED GRADE
SLOPE AS REQUI ED
(STAMPED: WATERCITYOF EDEN -VALVE)
WWWT
ADJUSTABLE C.I.
0.
VALVE BOX w/BASE
z o
APPROVEd BACKFILL _
ADDITIONAL SECTION OR
a
SPACERS AS REQUIRED
r DUCTILE OR C.I. MECH.
w w
AlR VALVE AS DETAILED
4 _VENT PIPE W/DOWNWARD
..
PIPE O.D.
IN SPECIFICATIONS
(SEE NOTE)
ELBOW AND SCREEN
WALLS SHALL BE SLOPED
— STD. 4' PRECAST
AND/OR SHEETING PROVIDED
BALL VALVE
r NIPPLE FLATTOP MANHOLE
AS PER OSHA REQUIREMENTS
TAPERED COUPLING
OR CORP. STOP —
—w'ATERMAIN
1'W' GRAVELTOTOPOFMAIN
HAND PLACED CAREFULLY
I
COMPACTED To 90%DENSTY
-
,$
AT OPTI MUM MOISTURE
�/
��
D ¢P 0 -GRAVEL BASE
L' 1
DOTO. ] OR
CONTENT IN 6" LI FTS
�� 12"
<
— B
TONE/\�\//
O O_ NCDOT NO 7 OR
8STTONE BEDDING
III 111111' 11-1111111
12" PLACE CONC. BLOCK ASTM C-139, OR POUR
1T. 8' CONC. RING FOOTING TO SUPPORT
CHAMBER, BUT LEAVE OPENING BELOW PIPE.
FILL SPACE INSIDE RING W/ CLEAN GRAVEL
FOR DRAINAGE. ELIMINATE CONIC. FOOTING
IF SOLID ROCK IS ENCOUNTERED.
AIR RELEASE VALVE DETAIL
NOT TO SCALE
NOTES:
1. CONTRACTOR SHALL COORDINATE WIENGINEER AND
OWNER FOR PLACEMENT OF AIR RELEASE VALVES AT
ALL LOCATIONS AIR RELEASE VALVES SHALL BE
PLACED BEHIND GUARDRAILS AND DITCHES, AND NOT
IN FILL SLOPES OR CUT SLOPES.
2. PROVIOEBASKWASHACCESSORIES ASSEMBLED TO
VALVE CONSISTING OFA90- EL., A SHUT OFF VALVE,
CLFARWATER INLET VALVE, RUBBER SUPPLY HOSE
AND QUICK DISCONNECT COUPLINGS.
SAW TO NEAT EDGE (TYP.)
EXISTING PAVEMENT —
21A OR B 6
6"
COMPACTED 21A BACKFILL
TO 95% DENSITY AT OPTIMUM
MOISTURE CONTENT
i
PLACE STONE UP TO
SPRING LINE FOR D.I. 4" IN SOIL 6" IN ROCK
OR PVC PIPE
COMPACTED STONE
SOIL BEDDING MATERIAL ROCK
TRENCH UNDERCUT
24"+O.D. MAX. MINIMUM 6" BELOW
20"+O.D. MIN. BARREL OF PIPE IN
ROCK
PIPE LAYING CONDITION
NOT TO SCALE
'NOTE: USE NO. 25 / NO. 26 STONE FOR BEDDING MATERIAL.
2" MIN. OVERLAY ASPHALT
CONCRETE SURFACE COURSE
TYPE (SM -2A)
EXISTING PAVEMENT
— TYPE I SIZE 21A OR B AGG.
COMPACTED TO 100% MAX.
DENSITY AT OPTIMUM MOISTURE
CONTENT
6" BENCH (TYP.)
.D. PIPE
O.D.+24"(") f MIN. TRENCH WIDTH TO
SUPPORT TRENCH BOX
ASPHALT DRIVEWAY REPAIR DETAIL
NOT TO SCALE
I
A
v 2 COURSES OF BRICK
Q AS SHOWN WATER MAIN
A A VALVE BOX ®°
p CONCRETE COLLAR
6" 6"MIN.
VALVE
S, ° PLAN
PIPE ON NCDOT RAN RECESS TOP 4" MIN.
O.D. 6" MINIMUM OTHERWISE, EXISTING OR PROPOSED CAST IRON COVER
0
ALL AROUND GRADE CONCRETE
PIPE 3000 PSI
COLLAR
PLAN / SECTION
t PIP6
TYP. ODETYPNOTES: \ p
1. CONTRACTOR SHALL \/\\ \ SCREW TYPE
PROTECT PIPE JOINTS 6„ TYP. ADJUSTABLE C.I. VALVE O
AS NECESSARY FOR BOX W/ BASE m
PORTIONS ENCASED.
2. CONTRACTOR SHALL i
USE VIBRATORY METHOD
TO ENSURE COMPLETE4 / PIPEO.D. MORTAR
ENCASEMENT. w
��. SUPPORT BOX W/ MIN.
3. FLOTATION OF THE PIPE / 2 COURSES OF BRICK
DURING CONCRETE p ,
PLACEMENT SHALL BE
PREVENTED. D / 6" TYP. BOTTOM OF TOP BRICK TO BE
NON -TRAFFIC RATED SNAKEPIT TRACER WIRE
TERMINATION BOX, INSTALL EVERY 500' (DO NOT
INSTALL IN DRIVEWAYS, ROADS, OR HEAVY
TRAFFIC AREAS.
MIN -
4'' MAX MAX.
MARKER TAPE 12" ABOVE
MAIN
12 AWG TRACER WIRE 3"
,,--ABOVE MAIN
MAIN
TYPICAL TRACING WIRE NOTE: NON -TRAFFIC RATED SNAKEPIT
TRACER WIRE TERMINATION BOX AT
ACCESS BOX DETAIL EVERY500'AND/OR TERMINATE INTO
NOT TO SCALE AIR RELEASE VALVE BOX
METER BOX
W1 COVER
2 1/2" BRASS NSFT DISCHARGE
r4W-CAP
Ir— OPERATING NUT 3, COCK WING
\ /\ EVEN W/ TOP OF BONNET MORTAR
BOLT FLANGE JOINT
SECTION A-A\/� CARRIERPIPE
COMPACTED BACKFILL TO
NATURALGROUND
CONCRETE ENCASEMENT DETAIL
NOT TO SCALE CONCRETE SUPPORT
SECTION
TYPICAL VALVE SETTING DETAIL
SCREW TYPE
NOT TO SCALE
6" OR SAME THICKNESS BALL VALVE W/ AUTOMATIC WEEP
AS EX. CONCRETE DRIVE. 5000 PSI AIR -ENTRAINED
WHICHEVER IS GREATER "HIGH -EARLY' CONCRETE
SAW TO NEAT EDGE (TYP.) 6"x6" W.W.F. SEE DETAIL THIS SHEET
EXISTING ASPHALT EXPANSION JOINT 2" FOR BLOCKING REQ'D.
WATER MAIN
6" x 2" (SEE PLAN &
TAPPED PLUG PROFILE FOR SIZE)
6" ABC STONE EXISTING CONCRETE
a a6" 6" BENCH (TYP.) MJ TEE
COMPACTED BACKFILL MAIN SIZE x 6"
1 cu. R. CLEAN GRAVEL
CONC. THRUST BLOCK
O.D.+O.D. PIPE MIN. TRENCH WIDTH TO TYPE "C" BLOW OFF/
2q^(")
SUPPORT TRENCH BOX HIDDEN FLUSHING HYDRANT
CONCRETE DRIVEWAY REPAIR DETAIL N.T.S.
NOT TO SCALE
4'-6" MIN. OR AS SHOWN ON PLANS
Y�
2-1/2" HOSE CONNECTION
PRECAST BLOCK
DRAWN BY
EQUAL TO TOWN OR
(2 REQ'D.) W/STAINLESS AGAINST 6 SQ. FT. UNDISTURBED
NATIONAL STANDARD
TO FACE STREET
1. PROVIDE TAR PAPER BETWEEN
CLEAR OF CONC.
AT 90' ANGLE
BLOCKL
3000 PSI
2. HRUST BLOCKS & SUPPORT-
TYPICAL FIRE HYDRANT
CONIC. COLLAR
BREAK RING
ASSEMBLY DETAIL
N.T.S.
�I 12"
1
FINISHED GRADE
TYP
WWWT
ADJUSTABLE C.I.
0.
VALVE BOX w/BASE
z o
1/2 CU. YARD
NO. 57 STONE
U
a
r DUCTILE OR C.I. MECH.
w w
JOINT TEE W/6" BRANCH 6" GATE VALVE
..
6" PLAIN END D.I.P.
Y�
VALVE SUPPORT
PRECAST BLOCK
DRAWN BY
5/8" G.S. TIE RODS CONIC. THRUST BLOCK BEARING
(2 REQ'D.) W/STAINLESS AGAINST 6 SQ. FT. UNDISTURBED
NOTE:
STEEL NUTS & WASHERS SOIL, DRAIN HOLES SHALL BE
1. PROVIDE TAR PAPER BETWEEN
CLEAR OF CONC.
HYDRANT & HYDRANT THRUST
BLOCKL
JANUARY, 2019
2. HRUST BLOCKS & SUPPORT-
TYPICAL FIRE HYDRANT
ING CONC. IS 2500 PSI
ASSEMBLY DETAIL
N.T.S.
ft Dewberry®
Dewberry Engineers Inc.
S61 PINEY FOREST ROAD
DANVILLE, VA 24540
PHONE: 034.]9].449]
FAX 430.]9].0341
NCBELS # F-0929
U
a z
LLI
U J J Z Z
Q>_L.I..IM w 00
a m
~a°C U
O Y
0a O U
Z O
Ir
SEAL
IARO��h
4�
A`•, 14
It41A'�
f'••. Ngl NC`�Q`p't
�J T,EH
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
AS NOTED
No. I DATE I BY Description
REVISIONS
MWC
DRAWN BY
RSE
APPROVED BY
LAB
CHECKED BY
DATE
JANUARY, 2019
TITLE
WATERLINE
DETAILS
PROJECT NO. 50046462/50102913
C18
SHEET NO. OF
E
E
I
10"MIN.
!xP
TVP.CONIC. THRUST 16i/4BARS
COLLARMIASINTOMAT ON 3 SIDES TYP. MJ BEND W
RESTRAINER GLANDS
6"IN.
° / °THRUST �6" MIN. TRENCH BOTTOM
BLOCK (TYP.) "A
AUNDISTURBED
X� A NOTESSOIL(TYPJ1.FORVERT. BENDDOWNINEXCESSOFI IWANCHORAGESHALL
PLAN BENDS LAN TEES BERECOMMENDEDBV ENGINEER.
NIS. NTS 2. .......... BEND UPWARD, BLOCKING TO BE SIMILAR TO THAT
FOR HORZ. BEND. RES. FITTINGS MAY NOT BE SHOWN ON THE
PLANS, CONTRACTOR SHALL INSTALL RES. FITTINGS PER
18" MIN: 10"DIA. & LESS ENGINEERS RECOMMENDATION OR SPEC. 333313.
24" MIN: 12"DIA. & GREATER
45° 3. GLAND$ & BOLT$ SHALL BE PROTECTED FROM CONC. WHEN
B POURING THRUST BLOCKS
4. ALL THRUST BLOCK & SUPPORT CONIC. SHALL BE 4,000 psi
CONCRETE, REF. SPEC. 033000.
B
SECTION - VERT. BEND
SECTION X -X
BENDS & TEES
NT..
18"
MIN.
CS < D Q.
PLAN & ELEV. PLUGS
THRUST BLOCK DETAILS
PPE BEND 45° BEND 221/2° BEND 11 1/4 BEND TEE PLUG
SIZE 90°
N.T.S.
WR CONCRETE BLOCKING DETAIL
N.T.S.
DRY BORED & JACKED WELDED 8" BRICK BULKHEAD AT EACH END
STEEL CASING PIPE.OF CASING PIPE (WATER TIGHT p 6" TYP. 'moi I'� 6" TYP.
GROUT AS REQ'D.) B
CARRIER PIPE 6" TVP. CLASS B
GONG. CRADLE
SECTION B -B
D.I. CARRIER PIPE
(SEE PLANS FOR SIZE) CONIC. CRADLE EXTEND FROM END
B OF CASING TO FIRST JOINT OF
SPIDER SUPPORT & SPACER BY SPIDER MFG.
CARRIER PIPE (MIN. 5 LF)
INC. DURHAM N.C., OR APPROVED EQUAL
3000 SERIES (TYP.) (OR EQUAL)
(3 REQUIRED PER 18' JOINT OF PIPE)
1/4 CU. YD. CRUSHED STONE Qa
STARGRIPSERIES4000OR
MEGALUG SERIES 2000 PV BY
WEEP HOLE
EBAA IRON (TYP.)
PROVIDE 3/4" COPPER OR PVC WEEP
11 V4 BEND 221/2 BEND 46 BEND 90 BEND DEAD �
HOLE IN BULKHEAD Q LOW END OF
BEND U/L
CASING PIPE, EXTEND INTO CRUSHED
4
STONE.
BORING DETAIL (GREATER THAN 4" CARRIER)
NOT TO SCALE
41717'
PE/ MJ TRANSITION ASSEMBLY
DIMJ W/ MEGA LUG
CONCRETE THRUST COLLAR
ONE SECTION OF DUCTILE
IRON PIPE
HDPE PIPE DIMJ_ • PVC
REDUCER PIPE
3/4" RODS
2 PER CONNECTION
TRANSITION GASKET - BOLTED STEEL
COUPLING, ROMAC STYLE 501 OR
APPROVED EQUAL FOR
TRANSITIONING DUCTILE IRON PIPE
TO PVC PIPE
TYPICAL DIRECTIONAL DRILL PIPING
CONNECTION ASSEMBLY DETAIL
NOT TO SCALE
DIRECTIONAL DRILL PIPING
CONNECTION ASSEMBLY DETAIL (TYP.)
3', MIN
ONE 20' SEI
OF DIP
q
A
NOTES:
1. THRUST RESTRAINT SHALL BE INSTALLED ON DUCTILE IRON "DIP" AND PVC FORCEMAINS AND WATERLINES IN THE MANNER
SHOWN PER THIS DETAIL. SEE STANDARD THRUST BLOCK DETAIL FOR ADDITIONAL RESTRAINT CRITERIA.
2. RE STRAINING DEVICES SHALL CONFORM TOANSI/AWWAC111/A21.11 AND ANSI/AWWAC153IA21.53OF LATEST REVISION.
3. COMPACT FITTINGS ARE ACCEPTABLE FOR USE WITH IRON RETAINING GLAND M.J. RESTRAINT.
4. THE MINIMUM LENGTH OF RESTRAINT INDICATED SHALL REQUIRE ALL JOINTS WITHIN THAT DISTANCE BE RESTRAINED.
5. RESTRAINT SYSTEMS SHALL BE INSPECTED AND APPROVED PRIOR TO BACKFILLING.
8. RESTRAINT SYSTEMS MAY VARY BASED UPON THE ENGINEERS DESIGN AS SHOWN ON THE PLAN AND PROFILE SHEETS.
7. MAKE ANY JOINT DEFLECTION NECESSARY BEFORE TORQUING THE T -HEAD BOLTS.
8. TIGHTEN T -HEAD BOLTS, BOTTOM FIRST, THEN TOP, SIDES AND REMAINDER.
9. REPEAT NOTE I. UNTIL ALL T -BOLTS ARE PROPERLY TOURQED.
10TI
GH TWIST -OFF NUTS SO THAT ALL WEDGES FIRMLY CONTACT PIPE.
TGHTEN TWIST -OFF NUTS IN ALTERNATING MANNER, SHEARING OFF NUTS.
12. MEGALUG, STARGRIP, (OR APPROVED EQUAL) MAY BE RESET OR REUSED BY ASSEMBLY AS DESCRIBED ABOVE AND TORQUE
WEDGE BOLTS TO 90 FT LBS.
13. AN V PLACE A RESTRAINED FITTING IS CALLED OUT ON THE DRAWINGS THE ADJOINING PIPE JOINTS SHALL ALSO BE RESTRAINED
TO A DISTANCE IN BOTH DIRECTIONS FROM THE DESIGNATED FITTING AS INDICATED IN THIS TABLE.
NOMINAL NUMBEROF NUMBEROF RATED
PIPE SIZE TWIST -OFF T -BOLTS PRESSURE
(INCHES) NUTS
GAS ET 0 �
O O
0 0
MECHANICABIDE VIEW FRONT
JOINT BELL VIEW
EBAA IRON MEGALUG RESTRAINING
DEVICE OR APPROVED SUBSTITUTE
IRON RETAINING GLAND M.J.
RESTRAINT
CALCULATION CONDITIONS:
TRENCH = TYPE 3
SOIL TYPE= ML
DEPTH = 3 FEET
TEST PRESSURE = 150 PSI
SAFETY FACTOR = 2.0
RESTRAINED PIPE DE"
NOT TO SCALE
3' M
15MIN EX. STREAM
ONE 20' SECTION
D
VARIES
TYPICAL DIRECTIONAL DRILL FOR
STREAM/WETLAND CROSSINGS DETAIL
NOT TO SCALE
NCDOT SPECIAL PROVISIONS FOR DIRECTIONAL DRILLING
5
GRADE
UPPER "U"
I
/ �O
UPPER
45°
LOWER LOWER'L"
45°
VERTICAL RESTRAINT
EL FLG.
FELT
90° EL M.J. W/ CONCRETE
BLOCK NG(REF. CONCRETE
BLOCKING DET) AND RES.
FITTINGS REF. TABLES THIS
DET. (COVER RES. W/
RD RAP PRIOR TO
POURING CONCRETE
r C900 OR
DI PIPE
`VALVE FITTING I
OR DEAD END
C9000R
DI PIPE
RESTRAIN MJ JOINTS WITH IRON M.J.
RESTRAINT RETAINING GLANDS - STARPIPE
JOINT RESTRAINT TABLE - PVC
3000 SERIES (TYP.) (OR EQUAL)
DIP RESTRAINT
RESTRAIN MJ JOINTS WITH IRON M.J.
STARGRIPSERIES4000OR
MEGALUG SERIES 2000 PV BY
RESTRAIN ALL JOINTS WITHIN THESE LENGTHS. OF EA SDE OF RANG)
EBAA IRON (TYP.)
PIPE SIZE O
11 V4 BEND 221/2 BEND 46 BEND 90 BEND DEAD �
REDUCER
BEND U/L
6"
4
8
17 41 99
6'x8"54'
41717'
8"
6
11
22 53 129
8'x12"97'
54722'
12"
8
15
31 73 182
12"x18"99'
78731'
16"
10
19
39 93 233
16"x20"99'
97'/39'
20"
11
22
46 111 282
20•x24.99'
117746'
24"
13
28
53 127 328
-
136753'
JOINT RESTRAINT TABLE - DIP
RESTRAIN ALL JOINTS WITHIN THESE LENGTH& OF EA SDE OF
FITTING)
PIPE SIZE
11 V4 BEND 22 V2 BEND 45 BEND BO BEND DEAD
ALV w
REDUCER
VER`17. 45
BED U/L
6"
3
6
13 30 54
6"x8" 54'
23713'
8"
4
8
17 39 70
8'x12'97'
29717'
12"
6
11
23 55 98
12"x16"99'
41723'
16"
7
14
29 69 126
16"x20"99'
52'/29'
20"
9
17
35 83 152
20'x24'99'
63'/35'
24"
10
1 19
40 96 177
-
73740'
CALCULATION CONDITIONS:
TRENCH = TYPE 3
SOIL TYPE= ML
DEPTH = 3 FEET
TEST PRESSURE = 150 PSI
SAFETY FACTOR = 2.0
RESTRAINED PIPE DE"
NOT TO SCALE
3' M
15MIN EX. STREAM
ONE 20' SECTION
D
VARIES
TYPICAL DIRECTIONAL DRILL FOR
STREAM/WETLAND CROSSINGS DETAIL
NOT TO SCALE
NCDOT SPECIAL PROVISIONS FOR DIRECTIONAL DRILLING
5
GRADE
UPPER "U"
I
/ �O
UPPER
45°
LOWER LOWER'L"
45°
VERTICAL RESTRAINT
EL FLG.
FELT
90° EL M.J. W/ CONCRETE
BLOCK NG(REF. CONCRETE
BLOCKING DET) AND RES.
FITTINGS REF. TABLES THIS
DET. (COVER RES. W/
RD RAP PRIOR TO
POURING CONCRETE
r C900 OR
DI PIPE
`VALVE FITTING I
OR DEAD END
C9000R
DI PIPE
RESTRAIN MJ JOINTS WITH IRON M.J.
RESTRAINT RETAINING GLANDS - STARPIPE
ANCHOR RING RINGS REQUIRED
3000 SERIES (TYP.) (OR EQUAL)
DIP RESTRAINT
RESTRAIN MJ JOINTS WITH IRON M.J.
STARGRIPSERIES4000OR
MEGALUG SERIES 2000 PV BY
RESTRAINT RETAINING GLANDS - STARPIPE
3100P SERIES (TYP.) (OR EQUAL)
EBAA IRON (TYP.)
STARPIPE SERIES 1100 (TYP.)
(OR EQUAL)
(OR EQUAL)
RFSTRA/NFD
�1NED
R�51
WC
PVC
PVC
we
DUCTILE IRON RESTRAINED
JOINT FITTING (TVP.)
CONCRETE THRUST
a 4-0" f1 B COLLAR (3,000 P.S.I.)
A 1
ANCHOR
RING C WATER MAIN
a
— SECTION
REINFORCING
UNDISTURBED
SOIL NOTE:
6" TO 16" MAINS = 12–NO. 7 BARS
ANCHOR RING S CONCRETE THRUST 20" TO 36" MAINS = 12–NO. 8 BARS
EBAA IRON WORKS _COLLAR (3,000 P.S.I.) BARS PLACED AS SHOWN
1100SDB OR _ _
APPROVED EQUAL11=111-1 I —1 11-
MID—SPAN PIPE
RESTRAINT
WATER TRENCH WALL
MAIN
TRENCH °° TAMPED BACKFILL
WALL
DIRECTIONAL DRILLING METHODSHAVE NOT BEEN GIVEN STATEWIDE APPROVAL FOR USE ON NCDOT RIGHT OF WAY. UNDER NO CONDITION SHALL JETTING ALONE OR
WET BORING WITH WATER OF UTILITY PIPELINES BE ALLOWED. DIRECTIONAL BORING USING JETTING WITH A BENTONITE (OR EQUIVALENT MATERIAL) SLURRY IS
APPROVED AT A MI1NIMUM DEPTAND FIVE(H OF TEN (10') FEET BELOW THE PAH LINE V/EMENT SURFACE [FIFTEEN (15') FEET BELOW THE SURFACE OF PARTIAL AND/OR FULL CONTROL
OF BORINGEISSALLOWED BENEATH EMBANKMENT FEET LM TERIAL OW ANY DINCNATURALLY AND/OR
SOILCREEK L.. ANY. DIRECTIONAL
PARALLEL IINSTALLATIONBORING IS T UTILIZING THE METHOD
ALLOWED IN EDIRECTIONAL BORING MBANKMENT MATERIAL.
CTIONAL
SHALL
BE MADE AT A MINIMUM DEPTH OF FOUR (4') FEET (COVER) BELOW THE GROUND SURFACE AND OUTSIDE THE THEORETICAL 1:1 SLOPE FROM THE EXISTING EDGE OF
PAVEMENT EXCEPT WHERE THE PARALLEL INSTALLATION CROSSES A PAVED ROADWAY. ALL DIRECTIONAL BORES SHALL MAINTAIN TEN (1EQ FEET MINIMUM (CLEAR)
HORIZONTAL DISTANCE FROM THE NEAREST PART OF ANY STRUCTURE, INCLUDING BUT NOT LIMITED TO BRIDGES, FOOTINGS, PPE CU LVER S OR BOX CULVERTS. ALL
DIRECTIONAL BORES SHALL MAINTAIN TEN (10'1 FEET MINIMUM (CLEAR) VERTICAL DISTANCE FROM THE NEAREST PART OF PIPE CULVERTS OR BOX CULVERTS.
DIRECTIONAL BORES ARE NOT ALLOWED BENEATH BRIDGE FOOTINGS, CULVERT WINGWALL FOOTINGS OR RETAINING WALLS, THE TIP OF THE DRILL STRING SHALL HAVE A
CUTTER HEAD. DETECT109 WIRE SHALL BE INSTALLED WITH NON—FERROUS MATERIAL. ANY CHANGES SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR APPROVAL
PRIOR TO CONSTRUCTION. FOR MULTIPLE CONDUIT INSTALLATIONS (INCLUDING PERPENDICULAR AND PARALLEL INSTALLATIONS), INSTALL CONDUITS WITH FIVE (5') FEET
MINIMUM (CLEAR) HORIZONTAL SEPARATION BETWEEN EACH CONDUIT OR INSTALL MULTIPLE CONDUITS WITHIN A SINGLE DUCT.
ALL DIRECTIONAL DRILLED PIPING FOR SEWER FO(RC)E MAINS AND WATERLINES SHALL BE A MINIMUM OF SDR-9.AN )
GREATER OVERBORE
TOHAN THEL NOT DIAMETER OF THE PIPEBE MORE THAN TWO OR ENCASEMET INCHES GREATER BE CONSIDEREDI IF TER OF THE PIPETHE ENCROACHMENT AGREEMENT EIINCL DEOVERBORE STAATEMENT ESIDGING NEDTAND (S )ALEDHES
BY
TO ALLOW TENSIONAL STRESSES TO RELAX.
PLAN UNDISTURBED
SOIL
SCHEDULE
PIPE DIAMETER CONCRETE THRUST COLLAR
ANCHOR RING RINGS REQUIRED
A
B
C
6",8",12" 3'-0"
V-0"
2" ONE
TYPICAL THRUST COLLAR
INSTALLATION DETAIL
NOT TO SCALE
ff Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24590
PHONE: 434.797.4497
FAX434.797.4341
NCBELS # F-0929
U
z
J Z
J J Z Z
LU Ir w 0 O
wEr Er<0Qp�
Q mL
OoLu 7-
~C 0
0a O
Z O
(r
SEAL
o��H CAROB/Y
2 FES 3/ 9
),E
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
AS NOTED
N, I DATE I BY Description
REVISIONS
DRAWN BY MWC
APPROVED BY RSE
CHECKED BY LAB
DATE 'ANUS• 2019
TITLE
WATERLINE
DETAILS
PROJECT NO. 50046462/50102913
C19
SHEET NO. OF
M
Pemtsnant Seedir10 --7-4&--Z-
dpRIJ- / _ Section 6.11
CDellinitio
i
onk.11nngf Iru ff an..iterosion W, tlistabod rims.by
soblishng perennial vegetative cover with seed.
To reduce erosion antl decrease setlimeni yiatl from disturbed
as, to pemane.Uy stabilize such areas in a manner that
is scat adapts to site wrulitions, and allows selection
drheam�phop- priers plant materials.
�� tlApplies
o which Remanent, long -liven Vegetative
Ro_is the most PracUcel or most effective mIUgd of
stabilizing the soil. Permanent seeing may also be used on
roughgRIMMI arae, that will not be brought to final gratle
for a year or more.
Areas b be stabil¢ea with permanent vegetation must be
seeded or planed within 15 working days or 90 camas,
days after final gratle is reached, unless temporary
stabilization is applied
V .
e tatiofBilOrD
Vegeetation controls erosion by protecting bare ,it surfaces
from raintlrop impact and by retluflng the velocity antl
volume of ovetlantl now.
The most common antl economical means of stabilizing
tliseurbetl soils is by Beetling grasses antl legumes. The
ativantages of seeding over other means of establishing planta
indutls the smaller initial cost, lower labor input, and greater
flexibility of mord- TM1e dis-rang., of seeding include:
potential for erosion coming the establishment stage,
the need to reseed areas that fail k, establish,
anal limitations on suitable seeding dares, antl
neetl for water
and app.p,iam temperatures do I,
germination and early growth.
The probability of successful plant esoblisM1mwt can be
lost through gZd planning, knowledge of the Soil
charaaerisbcs (Table 6.111), selection of suitable plant
m.orials For the site, good P.Minetl preparation, adequate
ISlmlrg anE redlli¢aprlon. air iMimney plen_ 4 rxl maintenance.
Climate, snits, and topogsephy are the.ajar tailors affecting
the suitability d ryplant, for a p uccol u site. All three of
these factors va wid.l a ss No. Carolina with the most
sg eld,ro hic mgm accurriog .-N the three major
physiographic regions of to ,tare --Mountains, Piedmont, and
Coastal plain (Figure 6.1 f a).
mi simplify plane selection, a Kay b PT,man ...
.. ding Mixores is pr for A , in Table 6.11 b. this
seeding
specifications for a specific., X follow this key through the
different sbeps--region, abpe, soil, antl maintenance
IeveP-b the appropriate Beetling number. SeMing mixtures
nam 1M here are design for general use antl are well
proven in practical field situations
sWMsookeessubse=luwr i-ixowe•Wion
csm• esruq
LH 4sa. 4.s
uwme F•emn
•a1Ftta0eb
_ .m A5.10 4.nt
do
wworouq, -
44#,# WtlM,d •Age,e
•
Too nays In us
Tw n.n mend
p -tom)
fdenMa Pit---
la dmwneep
�m ah4a mm
n.J
mare
a.enm(mn+mwodl ens >1e
•w
tlwmydrym as-se,M-cos). dwlo.ri M.asa.n on, III cal sate as,
••m1 M I.O, Me sac his, sv W. is Is rM hk .d Ivan He
14 days
Vemx M.'NekL '
tam xumv{u®Aapa.lMa
AN Other areas with steps, narler Man 4:1
Coastal Plain
Mountains Pladmom type kHbdN Lowe
4 diiwee
rw..n.srsrsr.rax+er...m.w.rr+..n.
(Tables 6.11, through 6.1 1,F They are designed to produce
maximum stabilization and minimize the amount of
eintenan. antl repair Until-
Land
ntil tl.Land use is a primary consideration in planning permanent
.easings. For this purpose land use, whether residentlal,
indusoal, mmmemial, or recreational, can be divides! info two
general categories:
High-malnUm,Xa areas are mowed frequently, limed and
fedi umd regularly, and either (1) receive intensive use (e.g.,
athletic fields) or (2) require maintenance to an aesthetic
staam rm(e.g., ham. lawns). Grasses usetl For tires. sh-
am long-lived perennials that fomn a tight sotl and are
fin.4..WKI and Mri In appearance. They must be
well-M.pkod to the geographic area where they are planotl
and able b endure Me stress of frequent mowing. Sites
where high -maintenance Vegetative cover is d.elraN. Include
homes, intludnal parks, schools, churches, and recreational
ness
aLow-maintenance areas are mowed Infrequently or not at all,
antl tlo n.t,.wwe lime ..it orliliz.r on a regular basis.
Plants must persist cosh 10, maintenance over long periods
of time. Grass and legume mixtures are favored for these
sins beta... legumes are .soume Df it nitrogen. Mixetl
.i.bI are also more resistant b adverse dude ,ns. Sites
suitable forh.n,.lntenan .vegetation include steep slopes,
stream or manna banks, some commeroial properlies, and
"utiliry'tud areas such as roaebanks.
SEEDBED PREPARATION
TM1e Soil on a disoMeL .ds must be...XOMI to provide an
optimum environment tar seed germination antl seething
growth. The surface sdl must be loose enough tar water
infiltration and root penetration. The pH (acidity or alkalinity)
of the soil must be such that it is not toxic antl minimie
veilable-preosebly between 6.0 and 6.5. Sufficient
nuthente-added as feNlizer--must be present.
Itt. asm` D.M to add It.. as to Mr! feniliz., Lima I.
usetl pnme,ily as a pH, o, acidity m drfiW, bota also
Supplies calcium antl magnesium, which are important plant
nutrients. By increasing soil pH, it also makes other nutrients
Tom"
o plants. At Ma same time, it prevent
aluminum toxicity by decreasing Me solubility of Soil
aluminum. Many Soils in No. Carolina are high in aluminum,
--hr, plant growth.
After "" o ein place, it most be promised! win, a muto
hole moisturend modify temperature extremes, whirlch
preventing erosion during... Unix estooli,iss m.
STEEP SLOPES
The aperomn of equipment is resected on slopes steeper
than 3:1, severely limiting Me quality of the Seedbed that can
be prepared. The soil cannot be sumclendy worked antl
amendments cannot be thoroughly intro-OmaL.
Provisions for establishment of VN,UMon on steep slopes con
be made during final grading. In comanucrlom of fill stapes,
for example, the last 46 inches might be Iefl mcmn,eck d.
A box, rough seedbed is essential. large clods antl stones
prodde inegulamiries Mat hold seetl, and fertifloW. Cut slopes
Should be M,ghemsd (Practice 6.03, Sudace Roughening).
Where steepness prohibits the use of form famadhm,y, seatling
.-.it as,
ha IlRnM to broadcast or hytlroseetling, win
hytlroseetling giving the most dependable results. Vegetation
chosen for Mese stapes must not require mowing or he,
ands, nonanca. Using a hydraulic sMuns, seed
fedilim , wwtl fiber mulch, and a tacking agent can be
applied in one operation.
Good mulching preaices IS crMcel to protect egeind erosion
on steep es elopWhen using straw, anchor with netting or
asphalt. On stapes steeper Man 2:1, a rolled erosion control
product may be required to protect the slope.
SPE'U cation.
SEEDBED REQUIREMENTS
Establishment of vegetation should not be afferumul on saes
that are unsuitable due to In,pp,,pd,m soil texture (Table
6.11 a), poor drainage, wncentmted -Hand flow, or
steepness of slope until measures have been taken to coned
these problems.
To maintain a good stand of vegetation, the soli most meet
certain minimum requirements IS a O -h UnM ium. The
existing soil should have these criteria:
Enough fine -gamed (silt antl clay) material to maintain
adequate moisture antl nutrient supply (available water
capacity of at I ... t.05 inch,, of water to 1 inch of sollf.
Sufficient pore space to pemft mot p.mmotim,
S.reaela depth of sal to Provide an M.q.at. roof no.
The depth to rock or impermeable layers such as hardpans
should be 12 inches Dr mare, except on slopes steeper than
2:1 where the addition of soil is not feasible.
A favorable pH range for plant growth, usually 6.0-6.5.
Freedom from large mats, branches, stones, large cods of
earth, or rash of any kind. Clods and stones may be left on
Slopes steeper than 3:1 If they are to be hyaroo.M..
If any of the above criteria are not me[-i.e., if the PAsti,g
soil is too coarse, tlense. shallow, or aatlic to foster
vegetation -special amendments are required. The coil
con litimWns it.... betl below may be beneficial or, preorably,
topsoil may be applied in acwhi,noo with Practice 6.04,
Topsoiling.
SOIL CONDITIONERS
In oMe, to improve the structure or dainage characteristics
of a soil, the iolbwing materials may be added. These
endments shoultl only Ina necessary when its M1ave
limitations Mat make them poor for plant growth or for fine
turf establishment (see Chapter 3, Vegetative Considerations).
Peat-AppmpnEa types are sphagnum moss peal, hWnum
x peal, reea-seems,
go Peat, or peat huuall from
hesh-water sources. Peat shoultl be sh-dcd and condid.ned
s'n aoage piles for at least 6 months after excavation.
and --clean and free of toxic materials.
Vermiculite-4wnir.m.l grade and fro. of toxic substances.
R,Uetlmanure SLN, or cattle manure not containing undue
aunts of straw or other Mding materials.
Thoroughly Flood a.sawdust-free of sones amts debris. Add 6
to of nitrogen to each cubic yard.
Sludge -Treated sewage antl industrial sludges are available
in us homes; these should be uses only in accordance
'th IIncel, State, and Toneral regulefism,
SPECIES SELECTION
Use Me Kay to Permanent Seeding Mixtures (Table 6.11 b) to
select the most appropriate seatling mixture is given
on the
general site and maintenance factors. A listing of species,
including scientific nmc
names and -onstics, in
Appendix 8.02,
SEEDBED PREPARATION
Install necessary mechanical erosion and sedimentation control
practices before seatling, and complete grading -Ding to
the opm,M plan.
Lime and feblize, need. should be determined by soil tests.
Soil testing IS pMorned hes of charge by the North Carding
Deparlmem of Agncullure sail besting labosebry. Directions,
ample canons, and information Sheets are available through
o-, Agricultural Extension offices, or frons NCDA. Bemuse
the NCDA soil teeing lab requires 1-6 weeks for sample
turn -around "'PI ing most be planned well in ad ... ce d
finalgratling. Testig 1111.tdoneby commercialgestedorn
When sail tests are not available, fallow setas suggested an
the ile, 6.11 specification sheet for the nretling mix chosen
the holt wing through 6.11 V). Application ares usually fall into
the following ranges:
Grounds9 ,idi limesn.
Light -sad,:
Lightured, q Sandy soils: i-1 12 hons/ecre
Heavy -textured clayey wile: 2-3 tons/aae
Fenilize,.
Gsesses: 600-120016/acre of 10-10-10 (or the equivalent)
Grass- legume rd.... 800-1200 IWacre of 5-10.10 (or
the equivalent)
Apply Iime and lemliZe, evenly and incomoate into the top
46 inches of ..it by disking or he, suitable means.
0, to machinery on the contour. When using a M1ytlroseetler,
apply lime and random, to a rough, loose Surface.
Rougher, ..do.. .-Ming to Practice 6.03, Sudace
Raugh.One.
Complete es bM preparation by breaking up large clod. antl
mak in Into a smooth, i mr, th sudace (stapes ass Man cast.
Fill in into, fror IVEIeshly
shlylo en d!xaMbt can collhat wafer Broadnot
ei
seetl rib a freshly loosenetl seetlbee that has rid been
sealetl by anLell.
SEEDING
Seeding dates given in the seatling mixlum speconc d.nX
(Table 6.11. through 6.11 v) are designated as "best" or
'possible'. SIMON. properly caned out within the "best"
dome have a high probability of Soccer. It i, also possible
to have satisfacory establishment when seeding outside Mese
dates. However, as you a.A.. from them, the pebabiltty of
felt.. mcm..ea rapidly. Beach mg on the last data Shown
under "possible" may reduce cbanas d success by 30.50%.
Always oke this int. account in schetlding lantldisorbing
.c"...
Use cedn.d wed for permanent seeding whenever possible.
CetMed seetl is inspem.tl by the ... Carolina Crop
Improvement AswciAtin. It meets published NOM Carolina
Standa- and shoultl bear an ofichil "Cemfi,d Seetl" label
(Figure 6.11 b).
Figure 6.11b label displayed on all North Carolina cenified
seed.
labeling of So int irifinseat is also require, by ow. Labels
m
Soan important information on seetl purity germination, dna
presence seeds. Swed! must meat Soo oa
smdms for
content of nDio,xbus wW not swept seetl containi,g
"prohibft8 ous woodenoxiween seed.
Inoculeo legume seed with the Rhizobium beotena appropna[e
to the species of legume (Chapter 3, Vegetative
Consideretioms).
Apply seetl mirormly with a cyclone sooner, MOP -type
.Preen., drill, wftipsck.,..aa.,, or hyaros.M., on a OUT,
Mable s.db.d.
When using a drill or wltipacker seeder, plant small gains no
ore than 1 inch deep, gasses and legumes no more than
- inch. Equipment m.Id be calibseotl in the Laid for the
t wires seeding rata.
When using broodca-seding methods, subdivide the area
ino workable sections antl Sdemine the amount of seetl
needed tar...h section. Apply one-half the seetl while
moving back and fodh across the area, making a uniform
paffem; than apply the s.nd fief in the same way, but
moving at right angles to the first pass (Figure 6.11cT
Figure 6.11c Suggested patten for broadcasting seed and
ferlilber (soume: NCAES Bulletin AG -69).
Cover b.Mcast seetl by roking o, chain dragging; than On,
the sudace with A roller or cuMpacker to provide good seed
vented.
Mulch all plantings immediately after seeding pnecdce 6.14,
Mulching).
HYDROSEEDING
Sudace roughening Is p1MCULerIy Important when
hydm... ding, as a ro.ghen,d slop. will p.id. sem. m dool
sage for time, feMlizer, antl seed The sudace shwld not
be compacted or smooth. Fine ..bad preparation Is not
ranse.,r, Or, hytlroseeding op.,ti.n,; lag. clotla, stones,
and imagulanties provide cavities in which seeds con lodge.
Rao of wood fiber (c.11 -se) application shoultl be at least
2,000 IWacre.
Apply legume inoculank al four times the recommended ,ate
when adding inowlant o e hydraseeder slurty.
If a machinery breaktlown of 12 b 2 hours occurs, antl
50%more seed b the Leek, bases on the proportion of the
slurry remit ning. This shoultl comp.nsae far damage to seetl.
Beyontl 2 hours, a full rate of new seed may b, necessary.
Lime Is not normally applied with a hydraulic seeder because
it is abrasive. It can be blown onto smN elapse in by form.
9
TABLE 6.11, SEEDING NO. 5P
FOR: GRASS -LINED CHANNELSPrOCdCe SJatdardS and Sp¢cifl-tiOnf
Seeding mixture
Telllfesc'ac. 200(4.5 61,000112)
Nur89 planta
Between May 1 and Aug. 15 add 15 Macre Sudangass or to WaoreGer-
man millet Before May 1, or after Aug. 15. add 40 Macre rya (grain).
Seeding dates
Best Aug. 25 -Oct.
Possible: Feb. - Apr. 15
Avoid..adirg Iron Nov. to Jan. If seeding must be done at this time, atltl
40 Wave rye grain and use a channel lining that offers m ulmum protea
Von.
Soil amendments
Apply lime and fertilizer according iD ..11 Msts. on apply 4,000 IWacre
grounds fl ofturallimestonaarM1.000ba..10-10-10fegirl-I.Operete
tillage equipment across the waterway.
Mulch
Use jobs, e,ceisior marling, or Whet effecave channel lining material M
:"wer the bottom of channels and ditches, and staple socurely. The lining
Should Extend above the highest Calculated depth of flow. Onchans.1Old.
slopes above this height, and in drainages not requiring temporary linings,
raw
apply 4,000IWacm grain stand anchor straw by stapling netting over
theta .
p
Mulch and anchoring materials most not be allowed M wash down sloped;
an clog drainage
where they c rigdevices.
Maintenance
Insp.m and repair mulch frequently. Rated
i6ze, in tate Winter d the follow.
JOB year; use soil Msta or apply 150 Mecre 10-10.10. Maw regularly to a
height of 2-4 inches.
1Rafer W Appendix 8.02for botanical names.
TABLE 6.11 K
SEEDING NO. IP FOR STEEP
p1 -tic¢ Standards andSpecifications
SLOPES OR POOR SOILS. LOIM
MAINTENANCE
Seedingmill
e
5 acbet I
p Pale (D aero)
Tell ..la. faD
Kobe I.Itndle. a 30
Kobe lespedeza 10
Seeding notes
t.In common
mon9nPiedmontadd a Macre Pensacola raheonly sorra ft Is
moronecome a past. UseccmmonBermudagraeaanywhereahun-
2.Mely Mbug.15 apest.
2. After Aug. 15 use unsceritled Serlcoa I.M.
3. Where a mud appearance is contend, snit ..1 .. and sub acute 40
Wacre BMlagraea .1 16 Macre Bermudagreas.
4. To extend spring ...ding data. into June, add 15 Macre hullod Ber-
mudaBmnt. However, N is profenble to seed temporary cover and aced
fescue In Sept.
Nurse plants
Between May 1 and Aug. 15, atltl tO IWacre German millet Or 151Wacre
Sudangrio s. Prior to May 1 or after Aug. 15, add 401Waae rye (grain).
Seeding dates
Bast PoesMla
Fall: Aug. 25- SEPIA 5 Aug. 20-Odt. 25 1.
Let. winter: Feb. 15 -Mer. 21 Feb.t - Apr. 16
Fall is beat for tan floods and late winter for lespedazas. OVeneecirg of
Kobelesped... oveffall-seadedoff fewue is ctiva. very e8eUse unhulbd
1 Benmudsgrass seed In fall.
1 Soil amendments
Apply firm and fenillzer soothing to soil teats, or appy 4,000 IWacre
ground agrieuhuml ftmoetmo and 1.000 Mase 10-1 0.10 mnJ'Izer.
Mulch
Apply 4,000-5,000 IWacre gain straw, or equivalent cover of anmher
suitable mulching material. Anchor mulch by tacking with asphalt, roving,
or netting. NeMng Is the preferred anchoring method on steep elopes.
Maintenance
Refedif a in the Second year unless growth is fully adequate. May be
mowed once orOwes, a year, but mowing is not necessary. Reseed, forth.
@e, and much damaged areas Immediately.
'Refer to App.ndix R02for botanical names,
W.
1
O
Planting rapid -growing annual grasses, small grains, or
legumes to provide initial. temporary cover for erosion control
on d1du..d areas.
Pigrpose
To temporarily, stabilize denuded areas that will not be
brought to final gratle for a period of more than 21
c.I.naar Lays.
TemporaryBeetling controls ronai antl erosion until
PWmwem vegetation or other erosion control measures can
be i stabliel�ed. In addition, it provides residue tar soil
protection end seedbed preparation, and reduces problems of
mud and dust production from bare sail surfaces during
construction.
Conditions VVhM
10S APP
0. .any c1, herr, onV gPSdM, or sparsely Vegetated soil
sudace where vegetative cover is needed for less than 1
year. Applications of this prectice Includ, diversions, tlams,
temporary sediment basins, temporary road banks, and mown
sbckpiles.
CaMdoatlor
Annual plants, which sprout antl grow rapidly antl survive for
only one ...on, are sutlable he .-bli.hing
empo.,...di Initial e
temporary vega,,iva cover. Temporary seeding preserves de,
integrity deadhen Sedimentn,,control dSMfiUXsuchas Sikes,
Siversbns, and the banks of tlams antl setlimenr basins. It
n also reduce the amount of mainten.nca aseociatetl with
these devices. For example, the frequency of sediment basin
cleenou5 will be induced If watershed areas, outside the
active construction zone, are ambilizec.
Proper seedbed preparation, selection of appropriate species.
and use of quality seetl are S Important in this Practice as
in Prodica 6.11, Permanent Seeding. Failure to allow
established guidelines and recommendations corafully may
-ft In anInadequate or short-lived stand a vegetation
thatwill not com"I emaks,
Temporary seeding provides protection for no more than 1
year, hang which fine permanent dabilizath m should be
Insisted.
spoc
Compbtteoagrziding before preparing ISMIDeds, and install all
Beery erosion wmml proctice, such as, dikes, wanewSyl.
and basins. Minimise ateep slo es becouse they make
scorbetlprepare tion dlffic.. ..Increase the...In, hazard.
f soils became wmpaceetl during grading, Iwaen them toPREPa
de th of 8-6 inches usin harrow, or chisel plow.
SEEDBEDz"-ud F�ATI N
Good seedbed prepaation i, essential to successful plant
estabnshmeM. A good seedbed is well -pulverized box, and
unlfortn. Where hydUreesdirg methods are used, Me surface
may be Iefl with a more irregular sudace of Inge clod, and
sones.
Liming -Apply Iime a U ing b soli test recommend,ti,n,. If
Me pH taciaily) of the Me i, not known, an application of
ground agriculbal limesbne at the
6.10
a
to of 1 to 1 1/z bwa,re on w1,.e-bxwrea cons dna
2-3 tonsacre on fine -ox sal soils is usually sUmcmm.
Apply limestone uniformly antl incomorate into the top 46
inches of soil. Sells won a pH of 6 or higher need nor be
inner.
Femlize,-Base aIOP li-.O rotes on soil tests. When these
re nal possible, apply a iritha 10 gratle fshoulem e
inc,rp000IWacre. Both fedilb c and Iime shouts be
c do, I. us into do
top . inches of soil. If a hydraulic
scads] is usetl, tlo lrot mix seetl and onilizer more Man 30
urface before application.
Surface Suro henin -If recent tills a op eratbve ns haresutletl
u9 9 9
n a hose surface atlditional. u henin m no[ be
g 9 aY
Is
except to break up lags clone. If rainfall causes
the sudace b become sealeS F, o
crosted Iwsen it just prior
To
seatling by aiskirg, inking, owing, or other suitable
melhotls. Groove or
IF, furrow dopes steeper Man 3:1 on the
cpoLnfouNrrb 8 re seeding (Practice 6.03, Sudace Roughening).
.elect an appropriate ,pati,, or species mixture from Table
6.101 for seeding in late winter and eddy sprang. Table 6.10b
or summer, antl Table fi.10c or ell.
In the Mountains, December and January xetlin o M1ave Poor
chances of success. When U is necessary to plant at these
times, use reweeanaations for fall end a swurey tad:.a
SEch.
EDING
Evenly apply seetl using a cy.l.m. xM.r (broaticast), dnt,
cuts P'
seetl,F or hydroseeder. Use SIMON rotes g van in
Tables 6.10a610o Broadcast seeding and hydroseedng are
appmpmda for de.p slopes where equipment cannot be
tlnven. Hantl broadcasting is not rewmmentletl because of
Me diRculty in achieving a uniform disobution.
Smarr grams should be pl.maa no mare then 1 inch deep,
and gasses antl legumes no more than 12 inch. Broaacost
seed mud be=d by raking or chain dINSI g, antl then
highly firmed with a eller or cultip.cksr. Hymoseeded
fixtures should include a woul fiber (cellulose) mulch.
MULCHING
TM1e use of an appropriate SMI,h will help enure
..bbl shm.m under norma condition., and is essential to
eedino euweas under harsh site conditions (Practice 6.14,
Mulchirgl. Harsh site conditions include:
eseding in fall for winter cover (wood fiber mulches are
not considered adequate for this use),
slopes steeper Than 3:1,
ivwase
ely hot or dry w.sw,
MM- ails (shallow, rocky, or high in clay or sonch,
and areas receiving concentrated flow.
It the area to be mulches is subject to concentrated
wmemow, as in flannels, anchor mulch with nMng (Practice
6.14, MulchingF
6.10.2
Practiolly Standards andSpecMketlore
Reseed and mulch areas where seedling emergence is poor,
r where erosion occurs, as soon as po.sbl.. Do not mow.
Protect from treffic as much as possible.
References
Sita Preparation
6.03, Sunace Roughening
6.04, Topsoiling
Sunace Sobilized..
4, 1, Permanent Soaring
Mulching
6�1
Ap, dix
8.02, Vegetation Table,
SPECIAL SLOPE SEEDING
*SLOPE PROTECTION SHALL REQUIRE IMMEDIATE STABILIZATION OF ALL DENOTED GRADED SLOPES IN
ACCORDANCE WITH THE SEEDING SPECIFICATION. STABILVATION AND SEEDING SHALL OCCUR IMMEDIATELY
AFTER THE GRADING OF THE SLOPE. MULCH AND ANCHOR SHAU- BE APPLIED AT THE RATE SPECIFIED.
SURFACE ROUGHENING FOR CUTS, FILLS, AND GRADED SUOPES
MAKE -ED SUOPES NO STEEPER THAN 2 1 UNLESS INDICATED
RI TO SHALLOW GR011EI I N=L TILLING, D.G IN., I-DURROAMING, OR USE OR
.U==�_E THE FINAL PASS OF �_ TILI.AGE IMPLEMENT ON THE CONTIOUR.
MAKE GROOVES ED BY SUCH IMPLEMENTS CLOSE TOGETHER I- THAN 10 INCHES) AND NOT
LESS THAN 1 INCH DEEP.
ROUGHENING WORT TRACKED MACHINERY
LIMIT ROUGHENING WITH TMCKED MACHINERY TO SANDY SOILS TO AVOID UNDUE COMPACTION OF THE
SOIL SURFACE.
OPERATE TRACKED MACHINERY UP AND DOWN THE SLOPE TO LEAVE HORIZONTAL DEPRESSIONS IN THE
SOIL DO NOT BACK6IAOE DURING THE FINAL GRADING OPERATION,
SEEDING- IMMEDIATELY SEED, AND MULCH, AND ANCHOR ROUGHENED AREAS TO OBTAIN OPTIMUM SEED
GERMINAT ON AND GROWTH.
MAINTENANCE.
HE ES FOR THE On C'LIANL GRADE, THEN RESEED AND MULCH ASLSGON AS POSSIBLE.L THESE AREAS aLIGHTLYABOVE
A
NCDEKtmxwnUwm _s,
NEW STABILIZATION TIMEFRAMES
IEnectlre AuOe, aM1)
SIZE AREA DESCRIPTION
BTAEIUMATION
TIMEFRAME EXCEPTIONS
OPerimeter dikes, sweles, ditches, slopes
Ido-
None
High --a, Water lHoye Zones
7days
None
.lopes steeper Man 1:1
r days
If slopes are 10' or less in length antl are
not sleeper than 2:1,14 d,ys are,lik-M.
slopes 3:1 or natter
14 days
7 days for stripes greater than 60'1, length.
AN Other areas with steps, narler Man 4:1
14 days
None, except for perimeters and HOW zones.
TYPICAL STABILIZATION TIMEFRAMES
NOT TO SCALE
SEEDBED PREPARATIONS
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL MINIMUM
4INC HES DEEP OVER ADVERSE SOIL CONDITIONS,
2, RIP THE ENTIRE AREA TO A DEPTH OF 6 INCHES.
3. REMOVE ALL LOOSE ROCK. ROOTS, AND OTHER DEBRIS LEAVING
APPLYSURFACE REASONABILY SMOOTH AND UNIFORM,
AGRICULTURE LIME. FERTILIZER, AND SUPERPHOSPHATE
UNIFORMLY AND MIX WITH SOIL. (SEEBELOW)
UNIFORM B=,l
6, SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED
LIGHT -Y WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING,
7, MULCH IMMEDIATELY AFTER SEEDING, ANCHOR MULCH AGAINST WIND.
S. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR
SH BE -'URI AMACEOSRE ESi-I SH FOLowINc OR cINAL
LIME, FERTILIZER, AND SEEDING RATES,
0 IONIULTIONSFERTIU.RAFTERPERMANENT COVERIN-NTE IS ESTABLISHED. TREATMENT AND
APP - RE is TONS/ACRE IN CLAY SOILS)
FERTLIZER-1.w0 LBS.IACRE OF 10.10.10
SUPERPHOSPWITE -500 LBS./ACRE AT 20%ANALYSIS
MULCH -
TONSIACRE OF SMALL GRAIN STRAW
ANCHOR- ASPHALT
EMULSION AT 0.1 GAUSY (10 GAL50. EFT
r,
Definition
VARIES IS' NI
STAY WIRE
1� GAUGE Is or
WA
STEEL POST
I- 3'-0"MIN.WIDTH
o FILTER FABRIC
FILL SLOPE
H GROUND LINE
ANCHOR FILTER
N FABRIC MIN. B' DEEP
4• &4"FORWARD ALONG
THE TRENCH
SECTION
GENERAL NOTES:
1. SI LT FENCE SHALL BE INSTALLED OUTSIDE TOE OF EARTHFILL EMBANKMENTS. MAY
ALSO BE INSTALLED AROUND ALL STORM DRAIN INLETS, & MANHOLES AS DIRECTED.
2. WIRE SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL HAVE A MAXIMUM MESH
SPACING OF &%
3.
FILTER FABRIC SHALL BE A MINIMUM OF 36- IN WIDTH AND SHALL BE FASTENED
SECURELY TO THE WIRE.
STEEL POSTS SHALL BE 5'-0' IN HEIGHT AND BE OF SELF -FASTENER ANGLE STEEL TYPE
NOTE:
THE FILTER FABRIC SHALL MEET THE FOLLOWING REQUIREMENTS:
A) EOS IS NOT LARGER THAN U.S. STANDARD SIEVE NO.30
B) GRAB STRENGTH W-120 LB
MAINTENANCE:
1. INSPECT SILT FENCE ONCE PER WEEK AND AFTER EVERY RAINFALL.
2. PERIODICALLY REMOVE ACCUMULATED SEDIMENT AND REPAIR ANY DAMAGE TO
FENCE.
SILTFENCE
TOP VIEW
,,V,, 000 gi,",
V
rt
mal
11 MIN
STONE CROSS SECTION
4'
VIEW
FRONT VIEW
DITCHLINE TURNOUT DETAIL
N.T,6.
1. NOTE: STRUCTURAL STONE SHALL BE
(CLASS "B") STONE FOR EROSION
CONTROL PURPOSES.
2. SEDIMENT CONTROL STONE SHALL BE
N0.5 OR NO. 57 STONE.
SILTFENCE
SEEDING SCHEDULE IN PIEDMONT AREAS
1 To BE APPLIED FERTILIZE
SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION of THESE MATERIALS. THE KINDS OF MATERIALS
TEMPORARY SEEDING FERTILIZER
DATE TYPE 1-10 BLEND LIMESTONE STRAW MULCH
YE(GRAIN)120 E 750 LBS./ACRE 2000 LBS./ACRE 4000 L.B.C.
JAN.1 MAY 1 KOBE LESPEDCA' SO LBB-NE
MAY 1 -AUG. 15 GERMAN MILLET" 40 LBS./ACRE 75D LBS./ACRE 2000 LBS.IACRE 4000 LBS./ACRE
AUG 15 - DEC. So RYE(GRAIN) 120 UsE-PE 10M LBS./ACRE 2wO UIEJACRE 4000 LB./ACRE
PERMANENTSEEDING FERTLIZER
DATE TYPE TING RATE 10.10-10BLEND MESTON MULCH
L.B.C.TA-LEESCUE
E 10M LBS
AUG. 20 OCT. 25 ESPE20 LBSIACRE./ACRE 4000 LBS./ACRL.B.0
FEB.1 APR. 15 SERICEA LESPEDEZA 60 LBS/ACRE
OMIT KOBE LESPEDEZ4 WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE.
QUANITIY OF FERTILIZER AHDr ESHALL BE CONFFMED BY SOILS TESD AT A MI T. LB ACRE.
2, SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. VISIBLE
4. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION, USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC
5 ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. OF
APPUONd E. ETEEPSLOPESAREA IHAUL BE , FIT 11AREASAPDI_TET.
.)BREAPPLY
CPOLYMERIFIER PAs NECESSARY
TO PREVENT ERosIONEDURIrvG VEGEI�ATIory EN. siABus MEM S
6, PROVIDETTEMPORARY SEEDING WITHIN SEVENTY-TWO(72) HOURS AFTER CLEARING AND GRVBBINGOP 1100N IF RIEAREA ISTOREMA LIDS1STURBED FOR
MORE THAN FIFTEEN (15) WORKING DAYS OR THIRTY (30) CALENDAR DAYS. WHICHEVER IS LESS, PROVIDE TEMPORARY SEEDING WRTiIN SEVENTY-TWO (72)
HOURS OF ESTABLISHING FINAL GRADES. PROVIDE PERMANENT SEEDING WITHIN FIFTEEN (15) WORKING DAYS OR SIXTY ix) CALENDAR DAYS. WHICHEVER IS
LESS, OF ESTABLISHING FINAL GRADES SLOPES SHALL BE SEEDED WITHIN -NE (21) CALENDAR DAYS.
S. CONTRACTOR.HALL WARRANT VEGEATION GROMTH FOR ONE YEAR CISH VEGETATION.
ft Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24540
PHONE: 434.797.4497
FAX: 434.797.4341
NCBELS # F-0929
U
Q Z
�_ J Z >
J J Z Z
�_-O LL.IZ)
Q Ir
(DLU Ir w O
LU Er CA Q 11-- LU LL
�Er=U Q OQ
m�2 3: L_
i� � UZ
0 Q 0U
Z O
SEAL
o��N •CARO(/y
•a .a
A 1, )75(A 'h >
ENS
w.we•�
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
AS NOTED
N, I DATE I BY I Description
REVISIONS
DRAWN BY MWC
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
EROSION AND
SEDIMENT
CONTROL
DETAILS
PROJECT NO. 50046462/50102913
2
C 0
SHEET NO. OF
Rolled eri!e Control Rad11LNa EORECP� Sedi.n 6.n
Defniti0n Rolled a control products o anurac"" or fabdcoled into tulle
dvigmd o nduw adl a and .vial in ue grown, eaobliahment and protection
of vegetation. Examples of RECP'. are bonketa, nets, and maWng.
Purpose Erosion control mats and blankets are'mtendetl 10 prooct ,it and hold seed antl
mulch in place on slopes and In channels so Nat vegetation can become well established. Turf
ein(onement mals can be used to permanently reinforce ..Sir drainage ways during hi,h
flows. Nets are made of high tensile material woven into an open net Which ..days mulch
materials. Blankets are m,do of interlocking fibers, typically hent together by a biodegradable
or ph"clegredable n,UiW (for example, Wholkm Or straw blankets). They generally have
lower tensile strength than nets, but cover the ground more completely. Coir (coconut fiber)
Conditions Where Practice Applies Rolle Erosion C,himl Product. (RECP'.)
no^be od1ua 1 o.ked ant when
tlomage.
RECP'..-0 b. uvd o .o In pert,
mmol
ecv oPceoyk ca^ oeM z Re/u..
vk
meOaN.
hear three. of the d.oOi
Maintenance
Ireped I._Erown Control Product. ch least weekly and after -.h sign -
i/2 inch o, greater) in On event repair immedia0ely.
z. Gone c.rOct with th. ground moat be maintalnea. antl ii -in must not occur
beneath the RECP.
3. My areae of u. RECP that aro eomog.e or not in cloy contact with the grouts
shall beNEcntl and stapled.
4. N eo a In ..n due IP PcPry c.ntrolld drainage, u. problem shall be fxed ant
th..rodee area Pntected.
5. Monitor and repair the RECP ae necevary unfl groune cover v -but-d.
e\• �y
mm"
18'OVERLAP *
ANCHOR NETTING JOIN STRIPS BY ANCHORING
IN A 6' TRENCH. AND OVERLAPPING.
MAINTENANCE REQUIREMENTS:
1. CONTRACTORSHALL INSPECT MULCHES PERIOD ICALLY,ANDAFTER
RAINSTORMS CHECK FOR RILL EROSION. WHERE EROSION IS OBSERVED,
APPLY ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR SLOPE GRADE,
RESEED, AND REINSTALL MULCH AND JUTE MATTING. CONTINUE
INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED.
B.
A.
- PLACE STAPLES
1.5' TO 3' APART
AS REQUIRED TO
KEEP THE MAT
FIRMLY PRESSED
INTO THE SOIL.
F. PRESS ENDS OF
_ - MAT 4'INTO THE
SOILAROUND
RES
��• STRUCTURES AND
STAPLE SECURELY.
(� DETAIL FOR STABILIZING CHANNEL
1110.5• WITH EXCELSIOR MAT
I I A BURY
1.5"�If THE TOP ENREmGE MAT
AA
TRENCH 4' OR MORE IN DEPTH, IN
TYPICAL STAPLES S. TAMP THE TRENCH FULL OF SOIL. SECURE
lyre ITH A ROW OF STAPILls, DOWN FROM THE TRENCH, 4'
C. OVERLAP -BURY UPPER END OF LOWER STRIP
ASIN-A AND
STRIP 4' AND STAPLERLAP ENOOFTOP
D. EROSION STOP -FOLD OF MAT BURIED IN
SILT TRENCH
OF STAPLES. AND TAMPED, DOUBLE ROW
CHECK DAM 0V G
Fix Ery SMALL TEMPORARY STONE DAMS CONST NNELEBYARESTRICTING11AIAEWAY
PUPVELOCITY OF FLLOW NTO REDUCE EOSION ITHECHANNELL�
CONDITIONSWHERE THIS PRACTICE MAY BE USED AS A TEMPORARY OR EMERGENCY
PRACTICEAPPLIES =NOEES.0LITITo=GE T02ACRESOR LESS IN SMALL OPEN
LIMDO NOT USE CHECK CAME IN LIVE STREAMS.
111111UITION 1, PLACE STONE AT THE LOCATION SHOWN ON THE PLAN ON A FILTER
sPEciHCA ...C FOUNDATION.
2FKEEP THE CENTER STONE SECTION AT LEAST 9INCHES BELOW
NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL
56EDKI(PIG.
.836) TO KEEP ERF
VLOW WATER FROM UNDERCUTTING THE DAM
AS IT RE RS
E Tov OFNTHE LowEF DAM IS THE ASSURE TIE TOE ELEVATTIION T
FROM THE LOWEST CHECK
AM, CONSIDERING THAT OF THE UPPER GAM
5. PROTECT THE CHANNEL DOWNSTREAM
WILI
FLOW OVER AND AROUND THE
DAM
ShMAKE AMIE SURELTA e TTHEcIUNNEL REACH ABOVE THE MOST UPSTREAM
7. ENSURE TWIT CHANNEL APPURTENANCES, SUCH AS CUL
ENTRANCES BELOW CHECK DAMR,
E NOT SUBJECT TO DAMAGE OR
BLOCKAGE FROM DISPLACED STONES,
MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND
AFTER EACH SIGNIFICANT UcC OR GREATER) FAINFALL EVENT
TaoaileiEa oeeaEs TMiIA�i cCOLD cioc THE CHANN'ELW era NEEDEDAN. EROSION FROM HIGH FLOW. AROUN.THEE.GEBOF THE_
ANT PATE SUBMERGENCE AND DEPOSITION MOVE THE CHECK 'AM
CORRECTAU_ DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION AM
OCCUas BETWEEN DANS,ADDITIONALMEASURES CAN BETAKEN
SUCH AS
OF THE CIWNNELING APROTECTIVE RIP RAP LINER IN THAT PORTION
REMOVE 'EII"ENT ACCUMULATED HEIAMI AS NEEDED To
PREVENT DMAGE To ALLOW THE
TO DRAIN THROUGH TIE STONE CHECK DAM. AND PREVENT LARGEE
FLOWS FROM CARRYINGISEDIMENT OVER THE DAM. ADD STAN
CROSSONES TOSECTION
NS AS NEEDED TO MNTAIN DESIGN HEIGHT
q
PLAN VIEW
9' MINIMUM 1.5'
MIN.
FILTER FABRIC
4ffi7 WASHED STONE
NOTES: CROSESECTION VIEW
1. ROCK CHECK DAMS SHALL BE INSTALLED IN DITCH
LINES IMMEDIATELY BELOW DISTURBED AREAS.
2. HEIGHT AND WIDTH DETERMINED BY EXISTING
TOPOGRAPHY.
3. KEY RIP RAP INTO THE DAM FOR STABILIZATION.
TYPICAL CHECK DAM DETAIL
(TEMPORARY)
N.T.S.
CROSS'UNDISTURBED AREA
D AREA
IT DOWN SLOPE STAKE
IMATTING
•
,CHANNEL BOTTOM WIDTH?
PLAN VIEW
SEE INSETS
AANDB
r(i)gs
1. USE MINIMUM 12 INCH. DIAMErER
EXCELSIOR WATTLE.
2. USE 2 Fr. WOODEN STAKES WITH A 2 IN.
NOMINAL CROSS SECTION.
3. ONLY INSTALL WATTLE TO A HEIGHT IN
DITCH SO FLOW WILL NOT WASH AROUND
THE WATTLE AND SCOUR DITCH SLOPES AND
AS DIRECTED.
4. INSTALL A MINIMUM OF 2 UP SLOPE STAKES
AND 4 DOWN SLOPE STAKES AT AN ANGLE
STAKE STAPLE TO WEDGE WATRE TO BOTrOM OF DITCH.
INSETA INSET B 5. PROVIDE STAPLES OF 0.125 IN. DIAMETER
STEEL WIRE FORMED INFO A U SHAPE NOT
LESS THAN 12 IN. IN LENGTH.
6. INSTALL STAPLES APPROXIMATELY EVERY 1
LINEAR FOOT ON BOTH SIDES OF WATRE
AND AT EACH END TO SECURE R TO THE
SOIL
TYPICAL WATTLE WATTLE DETAIL (TEMPORARY)
NOT TO SCALE
EYySfHGStOAB
STEP SEQUENCE
A
Temporary Gravel
Conshlictlon Entrance/Exit CE Section 6.06
DefinRion
A graveled area or pad located at points where vehicles
enter and leave a construction site.
Purpose
To provide a buffer area where vehicles can drop their
mud and sediment to avoid transporting it onto public
roads, to control erosion from surface runoff, and to help
Control dust.
CondtUM Where
Practice Applies
Wherever traffic will be leaving a construction site and
moving directly onto a public road or other paved off-site
area. Construction plans should limit traffic to properly
constructed entrances.
Design Coterie
Aggregate Size --Use 2-3 inch washed stone.
Dimensions of gravel pad --
Thickness: 6 inches minimum
Width: 12 -feat minimum or full width at all points of the
V
ehicular entrance and exit area, whichever is greater
Length: 50 -feet minimum
Location --Locate construction entrances and exits to limit
sediment from leaving the site and to provide for
maximum utility by all construction vehicles (Figure 6.G6a).
Avoid steep grades, and entrances at curves in public
roads.
6.06.1 mw
KI
E,L,ER SIDE ELEVATION
I (
1
(dtta
Washing -If conditions at the site are such that most of
the mud and sediment are not removed by vehicles
traveling over the gravel, the tires should be washed.
Washing should be done on an area stabilized with
crushed stone that drains into a sediment trap or other
suitable disposal area. A wash rack may also be used to
8=ore more convert ent and effective
Constntcdon
Sp tions
1. Clleareer the
he entrance and exit area of all vegetation,
roots and other objectionable material and properly grade
it
2. Place the gravel to the specific grade and dimensions
shown on the plans, and smooth it.
3. Provide drainage to carry water to a sediment trap or
other suitable outlet.
4. Use geotextile fabrics because they improve stability of
the foundation in locations subject to seepage or high
water table.
'Mannttainthe ra
he gravel pad in a condition to prevent mud or
sediment from leaving the Construction site. This may
require periodic topdressing with 2 -inch stone. After each
rainfall, inspect any structure used to trap sediment and
clean it out as necessary. Immediately remove all
objectionable materials spilled, washed, or tracked onto
Ref, 9.
Runoff Conveyance Measures
6.30, Grass -lined Channels
Sediment Traps and Barriers
6.60, Temporary Sediment Trap
6.06.2
DP TYPICAL INLET/OUTLET PROTECTION
NOTE: NOT TO SCALE
I. FOR OUTLET TYPE "B', PLACE RIP -RAP FROM TOP OF BANK
TO TOP OF BANK IN RECEIVING CHANNEL.
aO0 C�ouoO0 oO0 CHANNEL
3Do DD �OQOrrQ`)W BOTTOM ao.
OO(gQr�U`6, O°OrU-\6'a PLAN
PLAN OQ�opCTO�(x p0 O
^� QC
H LG La
SECTION
O��y_,� O�� � o0
O O
O OaOO d
__FILTER LAYER -FILTER FABRIC OR SECTION 0
6" •5 WASHED STONE
FILTER LIVER - FILTER FABRIC OR
6" /5 WASHED STONE
TYPE A - PIPE OUTLET TO FLAT AREA TYPE B - PIPE OUTLET TO DEFINED CHANNEL
WITH NO DEFINED CHANNEL
RIPRAP OUTLET PROTECTION:
�KADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES PND GRADES SHOWN IN
THE PLAN. COMPACT MY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED
MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL SHALL BE FILLED BY INCREASING THE RIPRAP
THICKNESS.
2. THE RIPRAP AND GRAVEL FILTER SHALL CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS.
3, FILTER CLOTH. WHEN USED, MUST MEET DESIGN REOUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR
TEARING DURING INSTALLATION, REPAIR MY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF
FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FOOT. IF
THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH,
4, RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AV010 DAMAGING THE FILTER.
5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE AS SPECIFIED IN THE SCHEDULE.
6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, MOULAR, HIGHLY
WEATHER -RESISTANT AND WELL GRACED.
7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFPLL AT THE END, MAKE THE TOP OF THE RIPRAP AT THE
DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT.
B. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT
THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF
THE APRON.
9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION.
MAINTENANCE- INSPECT RIPRAP OUTLET STRUCTURES ONCE PER WEEK AND AFTER EACH RNNFALL EVENT 11/2 INCH OR
GREATER) TO SEE IF MY EROSIONAROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN
DISLODGED, IMMEDIATELY MAKE ALL NEEDED REPPIRS TO PREVENT FURTHER IMAGE.
r
RODk Pbe YY9t Pro 0-6_E-8.55
DWOM
A h S,hoe shap,d rock do. structure at a pipe inlet With
ssediments .areaaround theoutside perimeterofthe
tructure.
P"i
To prevent sediment from entering, accumulating In and Wing
transferred by a culvert or storm drainage system ph., o
stabilization of the disturbed drainage area. This pro ioo
allows Gary use of the sou drainage system.
Rockntift!Oerinulet p M PriitaCUb�e used al�pe with a
IsMircul diameter of 36 inches. This inlet protection may be
usetl o supplement adit... I sediment tsps or basins a1
the pipe outlet, or used in combination with an excavated
sediment storage area o sane as a rempoary sediment
trey. Pipe inlet protection should be provided o protect the
storm drainage system and downstream areas from
sedinhh-Kn until Dermanenr stabilization of the dloNrbed
tlrainage area.
Do not install this measure in an ints-M.M or perennial
stream.
When
penningtruc�d
dononn, pprooirerect reaches A stage where
culverts and otherSohn drainage sndu , are Installed and
any areas are brought N Ne tlesiretl grhur, there S a
need o protect the poixS Where runoff can leave the site
through culverts or storm drains. Similar to drop antl curb
inlets, culverts receiving runOflrrom tlI,kSaareas can
nvey larye amounts of seme
tlint to lakes,, or streams. Even
if the pipe discharges into a sediment trap or basin, the
pip. m pipe syslem itself may clog with setliment.
Crift
WWh.h uuA.d u co�mbinano. with an excavated sediment
storage area to serve as a temporary sediment trap, the
design criteria for tshi setliment traps must be
satisfed. The maximum drainage area -1d ::5 5 acres,
nd 360D cubic feel of setliment sora.. par acre of
disturbetl drainage area should Be provided.
The minimum On, height should be 2 feet, Witt, UO slopes
no steeper Dan 2:1. Th. sone'ho rseshos" around the pipe
olet.homd W constructed of Class B or Class I riprap, WNt
e nuhhhu. creih width Df 3 feet. Th. DUl face of th.
riprap Should be wvetl With a 12 -inch thick layer of #5 or
#57 washed due.
In preparing plana or rock pipe Win Protection, it is
impodant to protect the embankment over the pipe from
verioppirg. The top of the stone should be a minimum of 1
Oct below the top of th. fill over the pipe. Th, stone ahuultl
tie into the fill on both sides of the pipe. The inside too of
the stone shouts be no closer than 2 Feet from the curved
opening o allow passage of high I-
Th, sediment somge area should be excavated upstream of
the rock pipe inlet protectlon, with a minimum depth of 18
inches be. Brad..
CLASS B RIPRAP_ RIPRAP
V
�00 OO
�ODO 00 00 O
5 or NC
W /
W i #57SmepaT gTpgAyE ,,�,g,y � waNetl alone
�J
INVERT OF PIPE
ePRAP HEADWALL
1' MIN. IEICiiT
FRdI ROAD SHWLDER
AREAS TO BE DISTURBED PIPE INVERT NATURAL
(CUT. FILLED. ETC.)
11 1 2 I
�0 y� B�O� ego 0Oo FLOW
L
cl
CLASS B RIPRAP
ROBOT t'5 OR B57 WASHED STONE
Figure 6.55. Rots pipe inlet protection plan view and
cross-section vlaw
1. Clear the ion of all d oaKhat might hintler excavation
end disposal of spoil.
2. Install the Class B or Class I riprep in a semicircle
round the pipe oral. The atone should be built up highs, on
each ..it where it des Ino the embankment. The minimum
crest width of the riprap Should be 3 feet. With a minimum
bottom width of 11 feet. The minimum height shouts be 2
feel, but also 1 foot lower than the shoulder Of the
embankment or divereions.
3. A 1 Oct thick layer of NC DOT #5 or #57 sone should
be lacetl an the Our,id. sI. of the ri r .4. The
P should
P P
sediment storage area shouts be inch. b - n.t the
outside of the aorta horseshoe 18 inches below naNral
grade.
5. WM1en the contribu Ub drainage area has been stabilized,
fill depression and stabil sh that grading elevations, compact
arta properly,.. stabilize with gmuntl cover.
Imp- rockkp,ppeinlet protectlon at least weekly
and after sack S,ifcont (''/. Inch or greater) rainfall event
and repair immediately. Remove sediment and restore the
sediment storage area rO its Drii,ird dirt -ions when the
setliment h.. accumulatetl to one-half the dough depth or
the U.P. Place the sediment that is removed in the
do grated dispos.l area antl repl.c. the conominakid part
of the gravel (acing. Check the structure or damage. Any
riprap displaced from the stone horseshoe must be replaced
'mmetliately. After all the setliment-Producing .re.s hate
been permanently stabilizetl. remove the structure antl all the
unstable sediment Smooth th.... to bond with the
adluini........ provide permanent gmuntl rover (Sur ics
Sthbilization).
Meterences
Stout prooction 8.52, Bock and Gavel Inlet Protection (Tempoary)
South
n[ Trep antl Bamere 6.fi0, Temporary setliment Trep Surface
.15,6.15,
6Riprep darn Carolina Delmas. r of Tren Nbur ut
Erosion 8 Sedimenta8on Guidelines for Division Maintenance
Opeatlon, 1993. Virginla Erosion and Sediment Control
Hantlboak. 1992. STD 8 SPEC 3.08, Curved Inlet Prorech.r.
pages I IIA6 -11151 (Culvert Inlets Sediment Trap).
Dewberry®
Dewberry Engineers Inc.
Set PINEY FOREST ROAD
DANVILLE, VA 24540
PHONE: 434.797.4497
FAX 434.797.4341
NCBELS # F-0929
U
Z
J Z
J J Z Z
�_-0 LuZ)
Q>_ LIr Ir 00 ULUt��=U Q LLI C)
OQ
Qin 2
>�_ C[: 0Z
0Q O U
Z O
Ir
SEAL
o�NN CARO//Y
2F ESS/ 9
f'••. Ng 19
�T1NEN�
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
AS NOTED
N, I DATE I BY I Description
REVISIONS
DRAWN BY MI
APPROVED BY RSE
CHECKED BY LAB
DATE MUARY, 2019
TITLE
EROSION AND
SEDIMENT
CONTROL
DETAILS
PROJECT NO. 50046462/50102913
C21
SHEET NO. OF
I
STD & SPEC 325
UTILITY STREAM CROSSING USC
NOTE: FOR STREAMS LESS THAN 10' WIDE, CONTRACTOR SHALL USE THE FLUME CROSSING METHOD. FOR STREAMS GREATER
THAN 1P IN WIDTH, CONTRACTOR SHALL USE THE COFFERDAM METHOD. REF. EROSION SEDIMENT CONTROL HANDBOOK
SECTION 3.25.
FLUME PIPE CROSSING
1. CONSTRUCTION SHALL LAST LESS THAN 72 HOURS.
2. THE FLUME PIPE CROSSING MUST BE MADE OPERATIONAL PRIOR TO THE START OF CONSTRUCTIONJ.
3. THE MATERIALS USED (CULVERT(S), STONE AND FILTER FABRIC MUST MEET THE PHYSICAL CONSTRAINTS OF THOSE USED
IN VEHICULAR STREAM CROSSING, STD. & SPEC. 3.24
4. A LARGE FLUME PIPE (OR CULVERT) OF AN ADEQUATE SIZE TO SUPPORT NORMAL WATER CHANNEL FLOW (SEE TABLE
3.24-A) SHALL THEN BE INSTALLED IN THE STREAM BED ACROSS THE PORPOSED PIPELINE TRENCH CENTERLINE. NCDOT #1
COARSE AGGREGATE (MIN. SIZE) OR RIP -RAP SHALL BE PLACED CLOSE TO EACH END OF THE FLUME PIPE SO AS TO DAM OFF
THE CREEK FORCING THE WATER TO FLOW THROUGH THE FLUME PIPE (SEE PLATE 3.25-3.
S. THE ENTRAPPED WATER CAN THEN BE PUMPED FROM THE CREEK WITHIN THE DAMMED OFF AREA AND IN THE PROPOESD
TRENCH CENTERLINE INTO AN APPROVED DEWATERING STRUCTURE (SEE STD. & SPEC.3.26). THE TRENCH CAN THEN BE DUG
UNDER THE FLUME PIPE. AFTER PIPE SECTIONS ARE INSTALLED, THE DITCH WILL BE BACKFILLED AND RESTABLIZATION SHALL
BE CARRIED OUT,
6. RESTABILZATION SHALL CONSIST OF THE INSTALLATION OF UNDERGROUND RIP -RAP ON ALL DISTURBED STREAMBANK
AREAS (OR ON THE AREA 6 FEET ON BOTH SIDES OF THE CENTERLINE OF THE UTILITY TRENCH, WHICHEVER IS GREATER)
WITH SLOPES OF 3:10 GREATER. REFER TO STD. & SPEC. 3.19, RIPRAP, FOR INSTALLATION REQUIREMENTS. FOR SLOPES OF
3:1 OR LESS, VEGETATIVE STABILIZATION MAYBE USED, PENDING APPROVAL BY THE PLAN -APPROVING AUTHORITY OR
INSPECTION AUTHORITY. STABILIZATION OF IT'S STREAMBED AND BANKS AND THE APPROACH AREAS SHOULD OCCUR
IMMEDIATELY FOLLOWING THE ATTAINMENT OF FINAL GRADE.
7. AFTER COMPLETION OF BACKFILLING OPERATION AND RESTORATION OF THE STREAM/CREEK BANKS AND LEVELING OF
STREAM BED, THE FLUME PIPE CAN THAN BE REMOVED. THE GRAVEL CAN BE REMOVED OR SPREAD IN THE STREAM BED
DEPENDING ON PERMIT REQUIREMENTS. SEDIMENT CONTROL IN APPROACH AREAS SHALL NOT BE REMOVED UNTIL ALL
CONSTRUCTION IS COMPLETED IN STREAM/CREEK CROSSING AREA. ALL GROUND CONTOURS SHALL BE RETURNED TO THEIR
ORIGINAL CONDITION.
FLUME PIPE CROSSING
1 8
B _ AP ... ADAS
z
FLUME PIPE
V - n H oaF�s
TPONH
DRCIDH 1-1174
Pm�MTISURFS TO TIE
PLAN VIEW
SECTION "A -A" SECTION "B -B"
9
GENERAL CONSTRUCTION NOTES.,
1. GRADING OF THE STREAM BANK SHALL BE CONDUCTED ABOVE THE NORMAL FLOW ELEVATION, WHICH ASSURES NO DISTURBANCE AT OR BENEATH
WATER LEVEL.
2. ANY DEPOSITION OF EXCAVATED MATERIALS IN UPLAND AREAS AND ALL EARTHWORK OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER AS TO
PREVENT THE EROSION OF THESE MATERIALS AND PRECLUDE THEIR ENTRY INTO STATE WATERS. RESTORED STREAMS SHALL BE PROTECTED FROM
SEDIMENTATION FROM DISTURBED BANKS BY THE INSTALLATION OF SILT FENCING OR TEMPORARY EARTHEN BERMS WITH ROCK CHECK OUTLETS
ALONG THE TOE OF THE BANK SLOPE ABOVE NORMAL WATER FLOW LEVEL. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE PRIOR TO
CLEARING AND GRADING AND SHALL BE MAINTAINED IN GOOD WORKING ORDER TO MINIMIZE IMPACTS TO STATE WATERS IN ACCORDANCE WITH THE
CURRENT EDITION OF THE "VIRGINIA EROSION AND SEDIMENTATION HANDBOOK. BANKS SHALL BE IMMEDIATELY STABILIZED PER PLANTING
REQUIREMENTS AND SPECIFICATIONS INDICATED ON THESE PLANS.
3. STREAM BANKS TO BE RESTORED SHALL BE GRADED AS SHOWN ON PLANS.
4. EXCAVATION EQUIPMENT WILL AVOID WORKING WITHIN THE STREAM. WHEN THE NEED IS UNAVOIDABLE, DIVERSION DIKES, PORTABLE DAMS AND
PUMPS WILL BE UTILIZED. NO EXCAVATION EQUIPMENT WILL BE ALLOWED TO OPERATE WITHIN A FLOWING (LIVE) STREAM.
5. TRENCHES SHALL REMAIN OPEN ONLY DURING WORKING HOURS. TRENCHES WILL NOT BE LEFT OPEN OVER NIGHT
6. A MINIMUM OF THE TOP 6 INCHES OF A TRENCH IN WETLAND AREAS SHALL BE BACKFILLED WITH TOPSOIL FROM THE TRENCH.
7. TIMBER CONSTRUCTION MATS SHALL BE USED FOR OPERATING EQUIPMENT IN WETLAND AREAS TO MINIMIZE COMPACTION.
8. RESTORATION AND SEEDING SHALL BE IMPLEMENTED PER THE PLANTING NOTES AND TABLES ON THIS SHEET.
9. WHILE CROSSING CASCADE CREEK, THE STREAM MAY BE CROSSED UTILIZING A COFFERDAM AND MODIFIED PUMP AROUND OF
MAIN CHANNEL. CONTRACTOR SHALL UTILIZE SUMP PUMP WITH A SCREEN ON THE INTAKE HOSE.
.canxutawesslon r,M
SILT BAG TOP VIEW
TO CHECK DAM
TO CHECK DIM C. -C H -C
LEVEL caourvo
EL
LEVEL GROUND
NBll �es�e ue.l Drore w$IWT BAG PROFILE VIEW;7�
'^^P�
SOURCE: Va. DSWC PLATE. 3.25-3
COFFERDAM UTILITY CROSSING
1. CONSTRUCTION SHALL BE PERFORMED IN LOW FLOW PERIODS.
2. CROSSING SHALL BE ACCOMPLISHED INA MANNER THAT WILL NOT PROHIBIT THE FLOW OF THE STREAM.
3. AS WITH ALL UTILITY LINE CROSSINGS, APPROACH AREAS MUST BE CONTROLLED WITH MEASURES SUCH AS SILT FENCE OR
STRAW BALES.
4. REMOVE LARGE ROCKS, WOODY VEGETATION, OR OTHER MATERIAL FROM THE STREAMBED AND BANKS THAT MAY GET IN
THE WAY OF PLACING THE RIP -RAP, SANDBAGS, SHEET METAL PILINGS. OR WOOD PLANKS OR INSTALLING THE UTILITY PIPE
OR LINE.
5. FORMA COFFERDAM BY PLACING THE RIP -RAP (OR OTHER NON -ERODIBLE MATERIALS) INA SEMICIRCLE ALONG THE SIDE
OF THE STREAM IN WHICH THE UTILITY INSTALLATION WILL BEGIN. IT MUST BE SURROUNDED AND UNDERLAIN WITH FILTER
CLOTH AS SHOWN IN PLATE 3.264. THE HEIGHT OF AND AREA WITHIN THE DAM WILL DEPEND UPON THE SIZE OF THE WORK
AREA AND THE AMOUNT OF STREAM FLOW IS SUCCESSFULLY DIVERTED BY THE COFFERDAM, DEWATER THE WORK AREA AND
STABILIZE IT WITH AGGREGATE (NCDOT #57 OR #68 COARSE AGGREGATE) OR SAND. MAKE SURE TO DISCHARGE THE WATER
INTO A SEDIMENT TRAPPING DEVICE (SEE DEWATERING STRUCTURE, STD. & SPEC. 3.26).
6. INSTALL THE UTILITY PIPE OR LINE IN HALF THE STREAMBED AS NOTED IN PLATE 3.25-0. REMOVE THE RIP -RAP OR OTHER
MATERIALS AND BEGIN PLACING THEM ON THE OTHER SIDE OF THE STREAM.
COFFERDAM CROSSING
DH (w I
'/2 w
A<
A1E61u I6LE
TxEx �
I(D7
\\\ � nLTEa cLOTx A=ECATE SIR
PLAN C - 111C DONEE, SEE STD. a SPEC. 3.24
I/2 w
MINIMUM DISTANCE TO
BE 25% OF TOTAL
WIDTH (W) OF THE
STREAM. SECTION A -A
RM.-HFITHS TOR VACE OF RIP PAR
vroaKAaEA (Fa MNT D
OR
O
I�
CLEAN WATER
-777777777
PLAN VIEW
NOTE: ESTIMATED MINIMUM PUMP SIZE NEEDED FOR BASE
FLOW IS 2" PUMP. CONTRACTOR IS RESPONSIBLE FOR SIZING
SECTION A -A PUMP AND MAINTAINING WORK "IN THE DRY".
CROSS SECTION OF SANDBAG DIKE
NOTE: CONTRACTOR MAY UTILIZE A PORTABLE DAM IN LIEU
OF SAND BAGS IF DESIRED.
TEMPORARY PUMP AROUND
N.T.S.
12'
CABLE TIES
12"X12" TIMBER -I
CONNECTIONS
_L EJ -
12" MAX.
TIMBER MATTING DETAIL
NOT TO SCALE
NORTH AMERICAN GREEN C125BN
BIODEGRADABLE EROSION CONTROL
BLANKET OR EQUAL UPSTREAM MAT
SHALLOVERLAP DOWNSTREAM
MAT BY 1'-0"
NOTES:
1. BRING THE MATERIAL TO THE STREAM BANKS EDGE BEFORE TERMINATING THE
INSTALLATION. TURN THE END UNDER V AND STAKE AT 12• INTERVALS.
2. CONTRACTOR SHALL SEED BEFORE EROSION CONTROL BLANKET IS PUT IN PLACE
6' RIP -RAP CLASS
ROCK DUMPED IN PLACE
3'-0" 1 (�
MINIMUM THICKNESS
AT TOP -18•
SLOPE NOT TO EXCEED
1.112:1
MINIMUM THICKNESS AT
3'0" BOTTOM -Z'0"
MIN
ORIP -RAP PLACEMENT DETAIL
NOT TO SCALE
SLID
BIODEGRADABLE EROSION BLANKET
INSTALLATION DETAIL
N.T.S.
CONTRACTOR SHALL PROVIDE
SAW 18" WOODEN ANCHOR
STAKES.
1-DILk A 12"L
WOODEN DOWEL
GLUED IN PLACE
A
rl
PLANTING NARRATIVE
THE FIRST STEP OF THIS PLAN INVOLVES THE TEMPORARY SEEDING OF ALL DISTURBED AREAS FOR THE PURPOSE OF PROVIDING A
QUICK MEANS OF EROSION AND SEDIMENT CONTROL FOR THE ENTIRE SITE. SEE THE SECTION TITLED "SEEDING" ON THIS SHEET FOR
TEMPORARY SEEDING SPECIFICATIONS. BECAUSE THE TEMPORARY SEEDING TYPICALLY ONLY LASTS ONE SEASON, IT IS NECESSARY
TO APPLY PERMANENT SEEDING BEFORE THE END OF THE FIRST SEASON.
THE PERMANENT SEEDING PROVIDES A MORE PERMANENT VEGETATIVE LAYER OVER ALL DISTURBED AREAS FOR EROSION &
SEDIMENT CONTROL PURPOSES AND FOR THE BENEFIT OF HABITAT. REFER TO THE SECTION TITLED "SEEDING" BELOW FOR
PERMANENT SEEDING SPECIFICATIONS. THE SEED MIX SPECIFIED WAS CHOSEN TO SPECIFICALLY ADDRESS BOTH EROSION CONTROL
AND HABITAT GOALS.
SEEDING
1. TEMPORARY SEEDING. A TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED ON DISTURBED AREAS BY SEEDING WITH
APPROPRIATE RAPIDLY GROWING PLANTS. SELECT PLANTS APPROPRIATE TO THE SEASON FROM TABLE 6.1 OA -C LISTED ON THIS
SHEET. THE SEED MIX WAS OBTAINED FROM THE "NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL" FOR THE PIEDMONT REGION. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH POLYMER OR A MULCH
ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. APPLY 2DOO
LBS/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE 10-10-10 FERTILIZER.
' USE WINTER AND SUMMER MIX DUE TO TIME OF YEAR.
PERMANENT SEEDING
2. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN THE SEEDING
TABLE BELOW. THE SELECTED SEED MIX IS BASED ON THE EXISTING CONDITIONS AND TAKES INTO CONSIDERATION SUN/SHADE
TOLERANCE AND HYDROLOGIC TOLERANCE. NOTE THAT THIS MIXTURE IS THE PREFERRED SEED MIX OF SPECIES. IF ANY OF
THESE SPECIES ARE NOT AVAILABLE FOR ANY REASON, CONTACT THE RESIDENT ENGINEER FOR SUBSTITUTE SPECIES. SEED MIX
RATE SHALL BE 75 POUNDS PER ACRE. APPLY 300 LBS/ACRE 10-10-10 FERTILIZER
PERMANENT SEED MIXTURE - STABILIZATION SEED MIX
TABLE 6.10A 6.1013 & 6.10C
COMMON NAME
% OF MIX
TEMPORARY SEEDING RECOMMENDATIONS
ORCHARDGRASS
PLANTING DATES
SPECIES
RATE UWACRD
AUG. 15 -DEC. 31
RYE(GRAIN)
120
JAN. 1 -APR. 15
RYE (GRAIN)
120
5
ANNUAL LESPEDEZA(KOBE)
50
APR.15-AUG.15
GERMAN MILLET
40
' USE WINTER AND SUMMER MIX DUE TO TIME OF YEAR.
PERMANENT SEEDING
2. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN THE SEEDING
TABLE BELOW. THE SELECTED SEED MIX IS BASED ON THE EXISTING CONDITIONS AND TAKES INTO CONSIDERATION SUN/SHADE
TOLERANCE AND HYDROLOGIC TOLERANCE. NOTE THAT THIS MIXTURE IS THE PREFERRED SEED MIX OF SPECIES. IF ANY OF
THESE SPECIES ARE NOT AVAILABLE FOR ANY REASON, CONTACT THE RESIDENT ENGINEER FOR SUBSTITUTE SPECIES. SEED MIX
RATE SHALL BE 75 POUNDS PER ACRE. APPLY 300 LBS/ACRE 10-10-10 FERTILIZER
PERMANENT SEED MIXTURE - STABILIZATION SEED MIX
SCIENTIFIC NAME
COMMON NAME
% OF MIX
DACTYLIS GLOMERATA
ORCHARDGRASS
5
ANDROPOGON GLOMERATUS
BLUESTEM
5
SCIRPUS CYPERINUS
WOOLGRASS
5
ELYMUS VIRGINICUS
VIRGINIA WILDRYE
5
SORGHASTRUM NUTANS
INDIAN GRASS
15
CHASMANTHIUM LATIFOLIUM
RIVER OATS
5
PANCIUM CLANDESTINUM
DEERTONGUE
30
PANCIUM VIRGATUM
SWITCHGRASS
30
TOTAL
100
GENERAL PLANTING NOTES:
1. AFTER THE AREA HAS BEEN SEEDED, EROSION CONTROL PROTECTION WILL CONSIST OF STRAW MULCH UNLESS OTHERWISE
SPECIFIED.
2. THE SOIL SURFACE SHALL BE SCARIFIED APPROXIMATELY 1 TO 31NCHES BELOW THE SURFACE PRIOR TO TEMPORARY SEEDING.
GENERAL PLANTING NOTES
INTRODUCTION
1. THE GOAL OF THE PLANTING PLAN IS TO STABILIZE THE STREAM BANK.
2. TEMPORARY SEEDING AND MATTING OF DISTURBED AREAS SHALL BE REQUIRED TO PROVIDE SEDIMENT AND EROSION CONTROL
PURPOSES AND FOR THE BENEFIT OF HABITAT.
3. PERMANENT SEEDING SHALL BE ESTABLISHED BY PLANTING THE SELECTED SEED MIX DESCRIBED IN PERMANENT SEEDING
MIXTURE PROVIDED HEREIN. IF ANY SPECIES, ON THE PERMANENT SEEDING MIXTURE IS NOT AVAILABLE, CONTACT THE
CONSTRUCTION MANAGER FOR SUBSTITUTE SPECIES. THE SEEDING SHALL BE COVERED WITH COIR MATTING BELOW BANKFULL
AND STRAW MULCH, OR APPROVED REPLACEMENT, ABOVE BANKFULL TO THE LIMITS OF DISTURBANCE. MULCH IS TO BE SPREAD
BY HAND, BLOWER, OR OTHER SUITABLE EQUIPMENT AND ANCHORED INTO THE TOPSOIL WITH POLY DURING BLOWING, OR BY
DISCING.
4. BARE ROOT SEEDLINGS, LIVE STAKES OR PLUGS WILL BE PLANTED AFTER THE TEMPORARY SEED MIXTURE HAS BEEN APPLIED.
5. TREES, SHRUBS, LIVE STAKES, BARE ROOT SEEDLINGS AND PLUGS SHALL BE PLANTED IN A MANNER TO ENSURE THEIR SURVIVAL.
CONTRACTOR SHALL PLANT INTACT ROOTS, PLANT AT PROPER DEPTH, PROVIDE PROPER BACKFILLING, AND PROVIDE WATERING.
6. PLANT MATERIALS SHALL BE STORED IN A MANNER TO PREVENT DESICCATION OF THE ROOT SYSTEM. PROTECT PLANTS AT ALL
TIMES FROM SUN AND DRYING WINDS. PLANTS THAT CAN NOT BE PLANTED IMMEDIATELY SHALL BE KEPT IN THE SHADE AND WELL
WATERED. PLANTS NOT PLANTED WITHIN TWO DAYS SHALL BE PROVIDED WITH ADEQUATE IRRIGATION AND ON-SITE PROTECTION
FROM THE ELEMENTS.
7. PLANTS SHALL NOT BE HANDLED BY THE STEMS DURING TRANSPORT TO PLANTING SITE OR DURING PLANTING.
8. IF AN EROSION CONTROL BLANKET IS PRESENT, A CIRCULAR OPENING SHALL BE CUT IN THE BLANKET PRIOR TO EXCAVATION OF
THE PIT.
9. NON -BIODEGRADABLE MATERIAL SURROUNDING THE EARTHEN BALL OF THE PLAN SHALL BE REMOVED PRIOR TO BACKFILLING OF
THE PIT.
10. TO SET THE PLANTS, PREPARE ALIGNMENT OF INDIVIDUAL TREE SAPLINGS PLUMB AND STRAIGHT AND PROVIDE ALLOWANCE
FOR SETTLEMENT.
11. BACKFILL THEPLANTING HOLES WITH IN-SITU SOIL MATERIALS REMOVED FOR PLANTING.
12. AFTER BACKFILLING, WATER TO THE POINT OF SOIL SATURATION AND TAMP TO COMPACT THE BACKFILL MIXTURE. ADD
EXISTING SOIL TO BRING THE FINAL GRADE IN THE PLANTING HOLE TO THE SURROUNDING SOIL SURFACE. RAKE THE UNUSED
SOIL OUTSIDE THE PLANTING HOLES, TAKING CARE NOT TO MOUND THE SOIL OR TO SIGNIFICANTLY ALTER THE EXISTING
GRADES.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING 80% SURVIVABILITY THROUGH THE FIRST YEAR AFTER
CONSTRUCTION. AS -BUILT, VEGETATIVE MONITORING AND GEOMORPHOLOGICAL MONITORING WILL BE COMPLETED WITHIN 60
DAYS AFTER CONSTRUCTION COMPLETION.
14. TREES, SHRUBS AND LIVE STAKE PLANTING IS TO OCCUR BETWEEN NOVEMBER 15 AND MARCH 15, DURING DORMANCY. LIVE
STAKES SHOULD ONLY BE USED WITHIN THE AREA WHERE ADEQUATE DRAINAGE AND SOIL SATURATION WILL INDUCE
ADEQUATE ROOT GROWTH. LIVE STAKES SHALL HAVE A MINIMUM DIAMETER OF 1/2 INCHES AND A MINIMUM OF LENGTH 24
INCHES. SOAK THE STAKE FOR 24 HOURS. CUT ENDS AT A 45° ANGLE PRIOR TO INSTALLATION. DRIVE STAKE INTO THE
GROUND TO 3/4 OF ITS LENGTH, AT A 45° IN THE DOWNSTREAM DIRECTION.
15. THE SUPPLIER OF ALL SEEDS AND/OR VEGETATION SHALL CERTIFY THAT THE ORIGIN OF THE SEEDS FROM WHICH THE PLANTS
OR SEEDS WERE PRODUCED IS FROM HARDINESS ZONES 7A AND 713, EAST OF TENNESSEE, AND AS DIRECTED BY THE SPECIAL
PROVISIONS.
16. ALL PLANTS SHALL BE CONSERVATION GRADE FIRST CLASS REPRESENTATIVES OF THEIR SPECIES NURSERY GROWN
ACCORDING TO GOOD HORTICULTURE PRACTICES AND GROWN IN A CLIMATE SIMILAR TO THE PROJECT AREA. PLANTS SHALL
BE VIGOROUS, HEALTHY AND FREE OF DISEASE, INSECTIVOROUS PESTS, DECAY, INJURIES AND ALL FORMS OF OBJECTIONABLE
DISFIGUREMENTS. TRUNKS AND BRANCHES SHALL BE FREE OF CUTS AND ABRASIONS. PLANTS SHALL CONFORM TO ALL
ASPECTS OF THE CURRENT EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1) FOR CONSERVATION
GRADE PLANT MATERIAL.
17. TREES AND SHRUBS SHALL BE PLANTED ON 10 FT CENTERS. LIVE STAKES SHALL BE PLANTED IN GROUPS WHERE PLANS SHOW
ON 4 FT CENTERS.
A COMBINATION OF BARE ROOT AND PLUG PLANTS SHOULD BE PLANTED IN CONJUNCTION WITH THE APPLIED WETLAND VARIETY
SEED MIX IN ORDER TO CREATE A NATURALIZED STREAM BANK AND TO ESTABLISH ADEQUATE VEGETATIVE COVER TO PREVENT
SLOUGHING AND EROSION OF THE BANK.
18. THE SELECTED WETLAND SEED MIX SHALL BE SURFACE SOWN AT THE RATE OF 150 LBS/ACRE TO ALL DISTURBED AREAS ALONG
THE EASEMENT.
19. ALL BARE ROOT SEEDLINGS OR PLUGS SHALL BE PLANTED IN SUCH A MANNER AS TO ENSURE THEIR SURVIVAL. THIS SHALL
INCLUDE THE PLANTING OF INTACT ROOTS, PLANTING AT PROPER DEPTH, PROPER BACKFILLING AND WATERING.
20. IN AREAS WHERE THE RESTORATION DESIGN REQUIRES SLOPES TO BE CUT BACK AND GRADED, SLOPES SHALL BE SCARIFIED
APPROXIMATELY 4 TO 6 INCHES BELOW THE SURFACE PRIOR TO PLANTING. BIODEGRADABLE EROSION CONTROL MAT SHALL
BE USED IN ALL AREAS. AN OPENING SHALL BE CUT IN THE MAT FOR EACH PLANTING PRIOR TO INSTALLATION. BARE ROOT
SEEDLINGS OR PLUGS SHALL BE PLANTED AND THE ENTIRE AREA SHALL BE TOP DRESSED WITH A WETLAND SEED MIX.
21. BARE ROOT SEEDLINGS OR PEAT POTS THAT ARE TO BE SELECTED FROM THE PLANTING SPECIES LIST ON THIS SHEET SHALL
BE PLANTED IN MONOSPECIFIC GROUPS USING A 2 -FOOT ON CENTER SPACING WITHIN THE GROUP TO A MAXIMUM NUMBER OF
50 PLANTS PER GROUP. THE PLANTS TO BE LOCATED NEAREST TO THE BANKFULL ELEVATION SHOULD BE FACULTATIVE WET
(FACW).
22. BARE ROOT/PLUG PLANTS DIMENSIONS ARE MAXIMUMS, PLANTINGS SHALL BE RANDOM.
It Dewberry®
Dewberry Engineers Inc.
551 PINEY FOREST ROAD
DANVILLE, VA 24548
PHONE: 434.797.4497
FAX: 434.797.4341
NCBELS # F-0929
U
Z
J Z H
J -
� -_ J Z Z
Q LU Ir Ir 0U
ujw=U Q OQ
Qm 2
UZ
0 Q O U
Z O
Ir
SEAL
o��N CAROB/Y
2FESS/ 9
A1, 4iiP9:•h"
aE
KEY PLAN
NOT FOR CONSTRUCTION
SCALE
AS NOTED
REVISIONS
DRAWN BY MI
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
STREAM AND
WETLAND
DETAILS
PROJECT NO. 50046462/50102913
C22
SHEET NO. OF
1 1/10/19 MWC
REV PER USAGE
COMMENTS
No. DATE BY
Description
REVISIONS
DRAWN BY MI
APPROVED BY RSE
CHECKED BY LAB
DATE JANUARY, 2019
TITLE
STREAM AND
WETLAND
DETAILS
PROJECT NO. 50046462/50102913
C22
SHEET NO. OF