Loading...
HomeMy WebLinkAbout20190104 Ver 1_B-4916 Email from Div_onsite detour_20190219Rivenbark, Chris From: Sent: To: Cc: Subject: Chris, Hobbs, Barry Tuesday, February 19, 2019 11:13 AM Rivenbark, Chris Byrum, Gretchen A; Gillespie, Allyn K; Shook, Ryan L; Cashin, Gordon E; Abel, John S; Bridgers, Clemmon W B-4916 - Bertie County Bridge #57 Per our previous conversation, the proposed off-site detour route for replacement of Bridge #57 is primarily SR 1315 (Sally Freeman Rd.). Based on the NCDOT Pavement Condition survey, this road currently varies in width from 18-20' and carries an estimated 700-800 vehicles per day. If US 13 were detoured onto this roadway, it would have to carry an estimated 3,500 vehicles per day with a relatively high percentage of truck traffic. It's narrow width presents a safety concern, given the truck traffic and use by school buses. Additionally, like most secondary roads in Division One, this route has limited pavement structure and would significant strengthening to accommodate the truck traffic anticipated if used for a detour route. For these reasons, the Division is not in favor of detouring traffic onto SR 1315 and requests an on-site detour be used for construction of this project. If you have questions or need additional information, please let me know. Thanks, Barry Hobbs, PE Division Project Team Lead NC Department of Transportation 252 482 1862 office 252 312 5380 mobile bhobbs(a�ncdot.aov 113 Airport Drive Edenton, NC 27932 ., , �'' � f - .- _ ,�� { ,- '. w •.. ��� �*,, ,,�•,,x Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.