From: Westphal, Anneliese
Sent: Thursday, February 14, 2019 1:15 PM
To: Lane, Stephen; Shaver, Brad E CIV USARMY CESAW
(USA); Steenhuis, Joanne
Cc: Herndon, T. Mason; janet.russell@volkert.com; Farrell,
Sean C
Subject: Onslow Bridge 11 turbidity
Attachments: End Bent 2jpg; End bent 2 H pile.JPG; Existing end
bent 2 before H pile removaljpg
AI I,
The contractor is in the process of removing the existing structure on Onslow Bridge 11
(17BP.3.R.56) on SR 1423 Belgrade Swansboro Rd. When some of the existing H piles at
the existing end bent were pulled out, they noticed water flowing out from the void left
by the H piles. Although the turbidity curtain is presently containing most of the
turbidity, and the amount of water coming out seems to have slowed, there is still water
flowing out. They are going to try wattles to try to contain some of the turbidity. We
have also asked them to make sure the curtains are correctly tied into the bank so that
no turbidity escapes. They will continue to monitor the situation.
I have attached 3 pictures. One shows what the end bent area looked like before
construction started.
If you have any comments or suggestions, please don't hesitate to contact us.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
d���^�d:��IVmnd�Il�i�irn�aa���d:.�����
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
������ .
£�� �� •
���� � ��.:.
�k ��.
, � : � � � �.�v.
� ry� �� � '
�. � ;�:% :
���„� � � ����: :`
�� �� x �
}�x� � ;� �`; �,
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,