Loading...
HomeMy WebLinkAboutNCG030229_Renewal COC Request_20190208 1:38:20 PM'rl n NORTH CAFOLINA Emlre -.1 Qd Wy Permit COC NCG030229 Number * Enter the Certificate of Coverage (COC) number, not the General Fbrmt number (e.g., NCGO30222 is the COC, not NCG030000) M-ST BEGIN WTTH CAPITAL "NCG' Name of Person Dustin LaClair Obtaining COC* First and LastNbrra Phone Number* 3362904744 Email * dustinlaclair@eaton.com The COC will be e-rrailed to this contact. Additional Email JoshLPigman@eaton.com (Optional) Enter an additional errail address to whom to send the COC Please review the information below for accuracy before submitting. If there are inconsistencies, please contact Bethany Georgoulias at (919) 707-3641 or bethany.georgoulias@ncdenr.gov. M aste r Ge ne ral NCG030000 Permit No. COC No. NCG030229 Permittee Eaton Corporation Facility Name Eaton Corp -Transmission Div Address 744 S Battleground City Kings Mountain County Cleveland Waterbody Long Branch Classification WS-III River Basin Broad RENEWAL STATUS Active Issuance Date * 10/29/2018 Effective Date 11/01/2018 1 hereby request a copy of the Certificate of Coverage (COC) entered above. I understand that the COC e-mailed as a result of this request will serve as the Permittee's record of renewed coverage under the General Permit, and that this record must be maintained with the Permittee's NPDES Stormwater Permit records. Signature * Date * 02/08/2019