Loading...
HomeMy WebLinkAbout20100266 Ver 2_Riparian Buffer Authorization Application_20190118Buffer Authorization Application Form, 15ANCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b), .0259 (8)(b),.0267 (11)(c), .0607 (e)(2) Buffer AAhorization Online Form - Update 10/23/2018 Original Submittal 1/18/2019 A. Owner/Applicant Information General Information Primary Contact Email:* temairs@gmail.com Rease list the contact person's email for questions or payrrent on this project if needed. Who is submitting the application?* r1 Owner F- Applicant other than Owner F- Agent Is there an agent working on this application r Yes but not submitting it?* r No 1. Property Owner Information: 1a. Name on Recorded Deed:* Brian P Kearney 1b. Responsible Party: n/a (for Corporations) 1c. Mailing Address:* Street Address 288 River Road Address Line 2 aty State / Province / Pegion Arapahoe NC Rbstal / Zip Code Country 28510-9501 Us 1d. Telephone:* 917-698-0409 1e. Email Address:* temairs@gmail.com B. Project Information and Prior Project History 1. Project Information 1a. Name of Project:* Brian Kearney Residence - 288 River Road (Subdivision, facility, or establishment narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1d. Subdivision Name: n/a 1e. Nearest Arapahoe Municipality: 1f. Property Size: 0.80 acres A 1g. County (or Counties) where the project is located:* Pamlico 1h. Property ID# Date of Purchase 6465431262000 12/4/2009 Tax RN or Parcel id 1 i. Deed Information Type of Book Book#IF Page# Deed 538 142 Map IL 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent Plat from 1954.pdf 3.01 MB FDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Latitude * 34.974910 Longitude 11. Is the project located in any of North Carolina's twenty coastal counties? r Yes r No 76.782605 1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * 2b. Water Quality Classification of nearest receiving water:* 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 118 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: A single family residence and garage exist on the two lots. Both have been damaged by Hurricane Florence. Residential single family residence adjoin the property in all directions. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. t. Click the upload button or drag and drop files here to attach docurrent Topo Map.pdf 67.97KB FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docurrent Soil Map.pdf 161.12KB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* The hurricane damaged house will be moved from it's current position to a more centrally located position of the lot and elevated to 8 -feet above ground surface. The purpose of moving the house and lifting it is to protect the structure from future storm events. Equipment to be used will include jacks, tractors and carpentry tools. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent Existing and Proposed.pdf 601.73KB FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* r Yes C No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 6b. List any permits/approvals that have been requested or obtained for this project in the past. Application Date Date Issued Permit Type 4/8/2010 7/7/2010 Minor Variance 6c. Please explain and detail according to "help file" instructions.* A minor variance was issued to Mr. Kearney for the installation of a double wide trailer to impact 750 square feet of Zone 2 on the existing lot. 7. Future Project Plans ^ 7a. Is this project a phased project?* r Yes F No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 028.0243) r Randleman Lake Watershed (15A NCAC 026.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r Jordan Lake Watershed (15A NCAC 026.0267) r Goose Creek Watershed (15A NCAC 0213.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer !11 Impact Type * Zone 1 Zone 2 B2 (deck) Neuse River Permanent Allowable 0.00 120.00 Nbp label (e.g. Finad (P) Square Square Grossing 1) FermorTerrp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 180.00 Total Buffer Impacts: 180.00 Comments: This house will be elevated to 8 -feet above the ground surface and have gutters that will collect stormwater to be routed outside the buffer and diffuse via a splash pad back through the buffer. The attached deck will be uncovered slat Wold construction with grass underneath. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* This will be a decrease of the overall riparian buffer impacts by utilizing the existing garage footprint for the new location of the house. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* This will be a decrease of the overall riparian buffer impacts by utilizing the existing garage footprint for the new location of the house. In addition, the house will be raised 8 -feet and the attached deck will be uncovered slat wood construction with vegetation underneath it. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* I— Level Spreader r Vegetated Conveyance (lower SHWT) F- Wetland Swale (higher SHWT) r- Proposed project will not create concentrated stormwater flow through the buffer rJ Other SCM that removed minimum of 30% nitrogen 1b. Describe how diffuse flow will be maintained:* The stormwater generated on the portion of the house encroaching within the buffer, stormwater will be collected via guttering and directed outside the buffer and then diffuse back through the buffer. B1 (House) Neuse River Permanent Allowable 0.00 60.00 K/hp label (e.g. Fbad (P) Square Square Grossing 1) Perm orTerrp Feet Feet B2 (deck) Neuse River Permanent Allowable 0.00 120.00 Nbp label (e.g. Finad (P) Square Square Grossing 1) FermorTerrp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 180.00 Total Buffer Impacts: 180.00 Comments: This house will be elevated to 8 -feet above the ground surface and have gutters that will collect stormwater to be routed outside the buffer and diffuse via a splash pad back through the buffer. The attached deck will be uncovered slat Wold construction with grass underneath. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* This will be a decrease of the overall riparian buffer impacts by utilizing the existing garage footprint for the new location of the house. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* This will be a decrease of the overall riparian buffer impacts by utilizing the existing garage footprint for the new location of the house. In addition, the house will be raised 8 -feet and the attached deck will be uncovered slat wood construction with vegetation underneath it. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* I— Level Spreader r Vegetated Conveyance (lower SHWT) F- Wetland Swale (higher SHWT) r- Proposed project will not create concentrated stormwater flow through the buffer rJ Other SCM that removed minimum of 30% nitrogen 1b. Describe how diffuse flow will be maintained:* The stormwater generated on the portion of the house encroaching within the buffer, stormwater will be collected via guttering and directed outside the buffer and then diffuse back through the buffer. 1c. Diffuse Flow Documentation* F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach docurrent Existing and Proposed.pdf 601.73KB FDF only 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes r No 2b. Is this an after -the -fact buffer authorization application? r Yes F No G. Additional Information I h ......... ......... ......... ......... .........__ ......... ......... ......... ......... ......... ......... Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FDF only Additional Comments: H. Sign and Submit ^ By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the application form." Print Name:* Brian Kearney Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process? r Yes r No Is this project a public transportation r Yes project?* r No ID#* 20190086 Version: Select Reviewer: Select Reviewing Office* Has payment been received?* lil Anthony Scarbraugh:eads\adscrabraugh1 Washington Regional Office - (252) 946-6481 r No Payment Needed r Fee Received r Need Fee - send electronic notification 5 2-14 w I ZA did fN fl Q3w, I g / SY I pry S G`� f -i (711 r 1 Ir I'lil'l lflExLdG 1 VIII I III ZI II IIII II �3I1 II 114 II I 1 1�1 SI Tp -r. I 1 Ifi /� s l f 1 2 l l l O l 6 B! II�IIIIIIIIIIIII1111�1111IIIII�IIIIIIIII II III II I�lllllllllll;lllllll�i ISI i�ii�i s ll111i151:11111911111�IsllI II II Izll 11 ll�ll 11 11 11 l�lll' 5 2-14 w I ZA did fN fl Q3w, I g / SY I pry S G`� f -i (711 r *j cj ej Igo. LaVLrQ - 34.DaW, -70.7737 L-ltjPl—dL,,F.- Tl�N.S—IPAp