Loading...
HomeMy WebLinkAbout20190123 Ver 1_R-5812 Roadway Right-of-Way Plans 2018-11-16_20190128VICINITY MAP (NOT TO SCALE) PROJECT BEGIN PROJECT END D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN 0 00 CONTRACT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NANCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_TSH.dgnDWAINWRI11/21/2018NCDOT_pdf_color_eng_50.plt11:33:48 AMNCDOT_pshpfl.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 50 25 50 100 50 25 50 100 10 5 10 20 Prepared by the Office of: 2040 DUAL 5%) STATEWIDE TIER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. N.C. SHEET 1 N/A P.E. TOTAL SHEETS TIP PROJECT:09/08/99See Sheet 1A For Index of Sheets See Sheet 1B For Conventional Symbols 0.000 MILES NCDOT CONTACT K R-5812 R-5812TYPE OF WORK: LOCATION: 2018 STANDARD SPECIFICATIONS 258 GREENE COUNTY GRADING, PAVING, DRAINAGE, SIGNALS 2019 12,750 17,300 60 (* TTST 7% + 12 55 8 MINOR ARTERIAL DOMINIC WAINWRIGHT, PE T. NATHAN BEDENBAUGH, PE 1247 1255 1421 1162 1155 1154 1422 1173 1174 1172 1104 1104 1254 1400 I N D UST RI AL D R W GREENE STNW SECOND STSE SECOND STW HARPER ST F OUR WAY RDH U N TER S TR C ESE FOURTH STHW Y 13 BYPASS S E THI RD STK INGOLD BLVD SE SECOND STB E A M A N O L D C R E E K R D DRPARKWOODD R P R OFESSI O N AL RD G REEN RIDGE Snow Hill Hill View 13 91 13 58 58 HULL RD258HULL RD903 1255 1421 1444 C ontentnea Creek 5813 KI NGOL D B L VDCity Limits City LimitsCity Limits Cit y Li mit sCit y Li mit s City Limits NO. 20 BRIDGE TO S NOW HI LLTO GOLDSBOROTO SNOW HILLT O S N O W HILL 4 5 6 7 8 -L- STA. 45+44± TIE TO EXISTING BRIDGE -L- STA. 48+85± TIE TO EXISTING BRIDGE CREEK CONTENTNEA 1.137 MILES 1.137 MILES LENGTH ROADWAY TIP PROJECT R-5812 = LENGTH STRUCTURE TIP PROJECT R-5812 = TOTAL LENGTH TIP PROJECT R-5812 = TO FARMVILLETO WALSTONBURG-L- STA. 10+36.85 BEGIN TIP PROJECT R-5812 -L- STA. 73+83.06 END TIP PROJECT R-5812 -Y1- STA. 17+50.00 END CONSTRUCTION 46981.1.1 JUNE 18, 2019 City Limits US 13 BYPASS FROM NC 58 (KINGOLD BOULEVARD) TO NC 91 APPROACH SLABS DO NOT DISTURB CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. A PORTION OF THIS PROJECT IS WITHIN THE TOWN OF SNOW HILL. -L- STA. 10+06.12 BEGIN CONSTRUCTION 25% APPROVED PLANSCASEY WHITLEY, PE NOVEMBER 16, 2018 46981.2.1 N/A R/ W & UTILITIES PROPOSED TRAFFIC SIGNAL UPGRADERIGHT-OF-WAY PLANS(MLK JR. PKWY) US 13 BYPASS (KI NGOLD BLVD)NC 5 8 NC 91US 258(KI NGOLD BLVD)NC 58/ US 13(NW S E COND S T) S R 1255 -L- -Y1--Y1SPUR--L-PARKWOOD DRINDUSTRIAL DRPROFESSIONAL DRPROFESSIONAL DRTOWN LI MI TS TOWN LIMITS TOWN LIMITS (HARPER ST) NC 903 (HULL RD)SR 1104 NAD 83/NA 2011 PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_TSH.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:33:47 AMTIME:NCDOT_pshpfl.tblExisting Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access C F Existing Easement Line HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ;zvW K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal U/G Telephone Cable Hand Hole R }Tp Q l ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower WATER: Water Manhole Water Meter Water Valve Water Hydrant 4 I H a TV: TV Pedestal TV Tower U/G TV Cable Hand Hole | I ] GAS: Gas Valve Gas Meter n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box ? CONC CONC WW vvDrainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M W W S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW *S.U.E. = Subsurface Utility Engineering WLB EIP BECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. SHEET NO.PROJECT REFERENCE NO. Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland TUE DUE AUE CRProposed Curb Ramp CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring C A HPBExisting Historic Property Boundary U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) P U/G Telephone Cable LOS B (S.U.E.*) U/G Telephone Cable LOS C (S.U.E.*) U/G Telephone Cable LOS D (S.U.E.*) T U/G Telephone Conduit LOS B (S.U.E.*) U/G Telephone Conduit LOS C (S.U.E.*) U/G Telephone Conduit LOS D (S.U.E.*) TC U/G Fiber Optics Cable LOS B (S.U.E.*) U/G Fiber Optics Cable LOS C (S.U.E.*) U/G Fiber Optics Cable LOS D (S.U.E.*) T FO U/G Water Line LOS B (S.U.E*) U/G Water Line LOS C (S.U.E*) U/G Water Line LOS D (S.U.E*) W U/G TV Cable LOS B (S.U.E.*) U/G TV Cable LOS C (S.U.E.*) U/G TV Cable LOS D (S.U.E.*) TV U/G Fiber Optic Cable LOS B (S.U.E.*) U/G Fiber Optic Cable LOS C (S.U.E.*) U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO U/G Gas Line LOS B (S.U.E.*) U/G Gas Line LOS C (S.U.E.*) U/G Gas Line LOS D (S.U.E.*) G SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) SS Forced Main Line LOS D (S.U.E.*) FSS Utility Unknown U/G Line LOS B (S.U.E.*) U/G Test Hole LOS A (S.U.E.*) STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS Note: Not to Scale UST Contaminated Site: Known or Potential Known Contamination Area: Soil Potential Contamination Area: Soil Known Contamination Area: Water Potential Contamination Area: Water Primary Horiz Control Point Primary Horiz and Vert Control Point Secondary Horiz and Vert Control Point Exist Permanent Easment Pin and Cap New Permanent Easement Pin and Cap Vertical Benchmark New Right of Way Line Concrete or Granite R/W Marker New Right of Way Line with Concrete C/A Marker New Control of Access Line with New Control of Access New Temporary Construction Easement New Temporary Drainage Easement New Permanent Drainage Easement New Permanent Drainage / Utility Easement New Permanent Utility Easement New Temporary Utility Easement New Aerial Utility Easement12/2/2016Computed Property Corner RIGHT OF WAY & PROJECT CONTROL: New Right of Way Line with Pin and Cap 1BR-5812 S DI 12 " CM P CI 8" CMP 8" CMP 8" CMP CI 8" CMP 8" CMP CI 8" CMP8" CMP CB 8" CM P8" CMP CICI CI CI CI CI CI WITH RIP RAP NOT FOUND OUTFALL PIPE COVERED (NOTE) 8" C MPCI 24" RCP 24" RCP INV OUT=61 .35'INV IN=62 .58'CB CB CB CB15" RCPDI 24" RCP 24" RCP 24" CMP 18" RCP 18" RCP 18" RCP 18" RCP 18" RCP 24" RCP 24" RCP 15" RCP24" RCP 18" CMP 12" CMP CB CB 18" RCP TOP=64 .44' 24" RCP INV=105 .03'CBTRENCH DRAINDIJBPOSSIBLE18" RCPINV=63 .93'DI15" RCP 15" RCPCBDI CB CB6" TCFOOT BRIDGE WOODEN 15" RCP END UNKNOWN 15" CMP 54" RCPCI CB LOG CAB IN 1 S APARTMENT1SBKCANOPYMTLBK BUS 1 S CONCCONCCONC(END NOT FOUND)BSTBSTBSTBSTBSTBST1 S MTL BUS48" CONC SI DE WALK60" CONC SI DE WALK48" CONC SI DE WALK48" CONC SI DE WALK60" CONC SI DE WALK60" CONC SI DE WALK60" CONC SI DE WALK60" CONC SI DE WALK32' BST32' BST24' BST42' BST32' BST32' BST 26' BST 33' BST 27' BSTBSTINV=82 .29' TO ROOF DRAIN )(NO INV CONNECTS RCP 18" CONC CONC CONC CONC CONC CONC CONC CONC CONC CONC CONC CONC C O N C CONC CONC CONC CONC CONC CONC SI DE WALK48" CONCFES CMP 18" 54" RCP WOODS WOODS WOODS WOODS WOODS WO O DS WOODS WOODS WOODS WOODS WOODS WOODS WOODSWOODSWOODS WOODSCONC CONC 8" CMP28' PAVED ROADWAYPROFESSIONAL DR. BST24" R C PPAVED ROADWAYPROFESSIONAL DR. 28' 26' PAVED ROADWAYINDUSTRIAL DR. 8 " HDP E28' PAVED ROADWAYPARKWOOD DR. WOODS 28' PAVED ROADWAYJORDAN AVE 15" RCP FES BSTBSTCONC HW CONC HW CONC HW TO SNO W HILLTO GOLDSBOROUS 13 & NC 58 (KI NGOLD BLVD. ) TO SNOW HI LLN W 2 N D ST. US 13 BYPASS (M .L .K . JR . PKWY ) BY1-1GPS-1BY1-2(RANDOLPH 1976)BY1-3BL -1 TBM -A BL -2 BL -3 BY2-1 BL -5 BL -4 (MARK 1976 )- E Y2--EL -NC GRID NAD 83 NA 2011 -EY1-PCPCPOTPOTPCPTS 52°10'26.2" E134.43S 60°09'26.1" E336.00N 53 °32'25 .7 " E4075 .77 MATCH SHEET 1C-2MATCH SHEET 1C-2SEE SHEET 1C-3 FOR FURTHER ALIGNMENT DETAILS SHEET NO.PROJECT REFERENCE NO.6/2/9909-JAN-2018 08:17Z:\CAD\2017\170124A_NCDOT_R5812_CON-SUE_Greene\DELIVERABLES\redlined-resent\R5812_ls_1c.dgnrpoythress AT TKEENY-PCLocation and Surveys W/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION NOTES: IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL 2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. SURVEY CONTROL SHEET R-5812 R-5812 1C-1 POT=POC DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY USGS FOR MONUMENT "MASSEY 1976" WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF NORTHING: 625449.400(ft) EASTING: 2395652.600(ft) ELEVATION: 49.764(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999882453 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "MASSEY 1976" TO -L- STATION IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 DI48" RCP48" RCP CB 5 4 " RCP24" RCPS 8" CMP 8" CMP 18" RCP FES FES CI CI CI CI CI CI CI CI CI CI CI CI CI 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP CIINVERT ONLY C I DESTROYED (NOTE) PIPE NOT FOUND WITH RIP RAP OUTFALL PIPE OUTLET COVERED (NOTE) I NV=3 7. 7 3' INV=37.57' 24" RCP CO N C GARAGE MTL HW CONC CONC CONC CONC WOODS WOODS WOODS WOODS WOODS WOODS 15" RCP INV=41.24'24" RCPUS 13 BYPASS (M.L.K. JR. PKWY)US 258 TO SNOW HILLNC 91 TO FARMVILLETO WALSTONBURGW/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION SURVEY CONTROL SHEET R-5812 BL -6 BL-7 (MASSEY 1976) BL-8 TBM-B GPS-2 -EL- NC GRID NAD 83 NA 2011 PCPTPCPTPCPTPCPTPTN 51°27'33 .6 " E 21 .67 N 42°21'03.8" E 1237.66 -EL-N 42°21'03.8" E109.56110.50MATCH SHEET 1C-1MATCH SHEET 1C-1-EY3--EY4-SEE SHEET 1C-3 FOR FURTHER ALIGNMENT DETAILS SHEET NO.PROJECT REFERENCE NO.6/2/9929-DEC-2017 09:39Z:\CAD\2017\170124A_NCDOT_R5812_CON-SUE_Greene\DGN\WORK\ALIGNMENT-R5812\WORK_LS_1c.dgnrpoythress AT TKEENY-PCLocation and Surveys W/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION NOTES: IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL 2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. SURVEY CONTROL SHEET R-5812 R-5812 1C-2 BASELINE SHEET NO.PROJECT REFERENCE NO.6/2/9929-DEC-2017 09:45Z:\CAD\2017\170124A_NCDOT_R5812_CON-SUE_Greene\DGN\WORK\ALIGNMENT-R5812\WORK_LS_1c.dgnrpoythress AT TKEENY-PCLocation and Surveys W/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION NOTES: IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL 2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. SURVEY CONTROL SHEET R-5812 1C-3 21 BY2-1 623850.1443 2394273.5770 47.21 A3 BL-3 623543.2929 2393199.7040 49.47 ------------ ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION BY2 32 GPS-2 626227.8181 2396380.0997 49.36 8 BL-8 (MASSEY 1976) 625449.4000 2395652.6000 49.76 7 BL-7 624999.1964 2395192.3040 50.56 6 BL-6 624595.3174 2394690.2520 51.08 5 BL-5 624297.5924 2394287.5398 51.56 4 BL-4 (MARK 1976) 623896.9638 2393773.1536 51.28 3 BL-3 623543.2929 2393199.7040 49.47 2 BL-2 623104.3234 2392700.7282 63.19 1 BL-1 622674.9568 2392098.6669 87.37 31 GPS-1 622206.8114 2391542.6023 110.08 ------------ ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION BL 13 BY1-3 (RANDOLPH 1976) 621573.0944 2392616.5031 93.22 12 BY1-2 621842.9871 2392047.0551 99.03 A31 GPS-1 622206.8114 2391542.6023 110.08 11 BY1-1 622580.7816 2390984.9626 109.60 ------------ ---------------- ---------------- ---------------- ---------------- POINT DESC. NORTH EAST ELEVATION BY1 **************************************** TBM-A CHISELED "X" BONNET BOLT FIRE HYDRANT N 623039 E 2392722 100 ELEVATION = 68.38 **************************************** **************************************** TBM-B CHISELED "X" BONNET BOLT FIRE HYDRANT N 626011 E 2396047 101 ELEVATION = 45.48 **************************************** R-5812 SHEET NO.PROJECT REFERENCE NO.6/2/9929-DEC-2017 09:42Z:\CAD\2017\170124A_NCDOT_R5812_CON-SUE_Greene\DGN\WORK\ALIGNMENT-R5812\WORK_LS_1c.dgnrpoythress AT TKEENY-PCLocation and Surveys W/ EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION NOTES: IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 1. IF FURTHER INFORMATION REGARDING PROJECT CONTROL 2. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. 1C-4 EL POINT N E BEARING DIST DELTA D L T R POT 622222.573 2391445.078 LINE N 53°32'25.7" E 4075.77 PC 624644.617 2394723.125 CURVE N 52°29'59.7" E 236.09 02°04'52.1"(LT)00°52'53.3"236.10 118.06 6499.99 PT 624788.337 2394910.424 LINE N 51°27'33.6" E 21.67 PC 624801.842 2394927.376 CURVE N 46°54'18.7" E 893.21 09°06'29.8"(LT)01°01'07.1"894.15 448.02 5624.66 PT 625412.087 2395579.618 LINE N 42°21'03.8" E 1237.66 POT 626326.760 2396413.397 EY1 POINT N E BEARING DIST DELTA D L T R POT 622625.285 2390882.104 LINE S 52°10'26.2" E 134.43 PC 622542.844 2390988.287 CURVE S 56°09'56.2" E 797.69 07°59'00.0"(LT)01°00'00.0"798.33 399.81 5729.58 PT 622098.696 2391650.886 LINE S 60°09'26.2" E 336.00 POT 621931.495 2391942.331 EY2 POINT N E BEARING DIST DELTA D L T R PC 623503.622 2393178.877 CURVE N 70°42'37.4" E 1127.60 34°20'23.3"(RT)03°00'00.0"1144.66 590.10 1909.86 PT 623503.622 2393178.877 EY3 POINT N E BEARING DIST DELTA D L T R PC 626327.064 2396204.904 CURVE S 19°59'10.8" E 61.71 06°10'24.8"(LT)10°00'00.0"61.74 30.90 572.96 PT 626269.074 2396225.995 LINE S 23°04'23.2" E 109.56 POT 626168.279 2396268.932 EY4 POINT N E BEARING DIST DELTA D L T R POT 626168.279 2396268.932 LINE S 23°04'23.2" E 110.50 PC 626066.618 2396312.238 CURVE S 21°07'16.1" E 39.03 03°54'14.1"(RT)10°00'00.0"39.04 19.53 572.96 PT 626066.618 2396312.238 SURVEY CONTROL SHEET R-5812 R-5812 HDR Engineering, Inc. of the Carolinas 555 Fayetteville St., Suite 900 Raleigh, N.C. 27601 N.C.B.E.L.S. License Number: F-0116 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER PAVEMENT DESIGN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R2 2'-6" CONCRETE CURB AND GUTTER R3 SHOULDER BERM GUTTER R1 5" MONOLITHIC CONCRETE ISLAND (KEYED IN) T EARTH MATERIAL U EXISTING PAVEMENT 2A-1 R-5812 W VAR. DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAILS) ALL PAVEMENT SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. PRELIMINARY PAVEMENT SCHEDULE PROP. APPROX. 3.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, C1 D1 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, D2 GREATER THAN 4" IN DEPTH. DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, E1 PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO THAN 5.5" IN DEPTH. BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE2 /// /// /// /// U Detail Showing Method of Wedging C SURVEY L 2.5" MIN.2.5"MIN. S 4" CONCRETE SIDEWALK C2C1 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD IN EACH TO TWO LAYERS. D2 D1 E2E2 NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_TYP.dgnDWAINWRI11/21/2018NCDOT_pdf_color_eng_50.plt11:33:56 AMNCDOT_pshpfl.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:1.5" MIN. -L- STA 14+50 RT -L- STA 15+72 LT -L- STA 20+40 LT -L- STA 21+32 RT -L- STA 24+88 LT & RT 6" 6" 10'-0"4'-0" 7" R2 2'-6" C&G TIE TO EXISTING 2'-6" CURB AND GUTTER NOSE DOWN DETAIL EDGE OF TRAVEL -L- PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH. C2 3"MIN.3" MIN. U CL GRADE POINT 12'-0"12'-0"8'-0" W 0.02 0.080.02 8'-0" FDPS 0.08 C1C1 THIS LINE GRADE TO 4'-0" TYPICAL SECTION NO. 4 T D1 -L- (US 13 BYPASS) E1 D1 E1 11"11" FDPS 4'-0" CODE DESCRIPTION C1 3" S9.5C D1 4" I19.0C T U W EXISTING PAVEMENT WEDGING EARTH MATERIAL SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER PAVEMENT DESIGN6/2/99NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_TYP.dgnDWAINWRI11/21/2018NCDOT_pdf_color_eng_50.plt11:33:57 AMNCDOT_pshpfl.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas 555 Fayetteville St., Suite 900 Raleigh, N.C. 27601 N.C.B.E.L.S. License Number: F-0116 C2 0.020.02 PAVEMENT SCHEDULE PRELIMINARY S 4" CONC. SIDEWALK 2A-2 R-5812 R2 R3 CONC SBG CONC MONOLITHIC ISLAND CONC 2'-6" C&G 0.02 EX. U T GROUND EXISTING 5'-0" S EX.EX. CL-L- (US 13 BYPASS) TYPICAL SECTION NO. 1 -L- STA 10+06.12 TO 10+36.85 * -L- STA 25+65.00 TO STA 45+44+/- (EX. BRIDGE) -L- STA 48+85+/- (EX. BRIDGE) TO STA 71+24.04 E1 4" B25.0C D2 R1 E2 VARIABLE DEPTH S9.5C VARIABLE DEPTH I19.0C TYPICAL SECTION NO. 3 U CL GRADE POINT 12'-0"12'-0"8'-0" W 0.02 0.080.02 8'-0" FDPS 0.08 CUT SECTION C1C1 THIS LINE GRADE TO 4'-0" T D1 -L- (US 13 BYPASS) 14'-0" E1 D1 E1 11"11" FDPS 4'-0" 0.020.02 GROUND EXISTING GROUND EXISTING 4:1 S 5'-0" 0.02 2'-0" 6:1 5'-0" CUT SECTION GROUND EXISTING GROUND EXISTING 4:1 4:1 S 5'-0" 0.02 2'-0" 6 :1 5'-0"18'-0" 3:1 12'-0"18'-0"12'-0" -L- STA 14+13.50 TO STA 25+65.00 THIS LINE GRADE TO W GRADE POINT R1 12'-0"VARIES 0'-0" T0 12'-0" 0.02 7'-0"VARIES 7'-0" T0 0'-0" CL-L- (US 13 BYPASS) VARIES 12'-0" T0 21'-0" 0.02 W 0.08 8'-0" FDPSC1 4'-0" T D1 E1 0.02 CUT SECTION GROUND EXISTING GROUND EXISTING 4:1 4:1 S 5'-0" 0.02 2'-0" 6 :1 5'-0"18'-0" 3:1 12'-0" 11" 8'-0" 0.08 CUT SECTION C1 D1 E1 11" FDPS 4'-0" 0.02 GROUND EXISTING GROUND EXISTING 4:1 S 5'-0" 0.02 2'-0" 6:1 5'-0"18'-0"12'-0" TYPICAL SECTION NO. 2 -L- STA 10+36.85 TO 14+13.50 GROUND EXISTING GROUND EXISTING 30'-0" FILL SECTION 6 :1 VARIABLE SLOPE3:1 MAX* 6:1 10'-0"6'-0"18'-0" CUT SECTION 6 :1 SLOPES VAR. GROUND EXISTING 4:13:1 MAXD1 E1 FDPS 7'-8" 10'-0" 0.04 T R32'-4"GROUND EXISTING3:1 MAXC1 6" VARIES 0'-0" T0 12'-0" 2'-0"4:1 D1E1 FDPS 7'-8" 10'-0" 0.04 T R32'-4"C1 6" GROUND EXISTING 0.02 CL-W_L- 4'-0" 5'-6" -L- STA. 39+00 TO 42+50 LT. TYPICAL SECTION NO. 4A * TOP WALL RETAINING SHOULDER BERM GUTTER DETAIL SEE PLANS FOR LOCATION OF SBG U S E E X -S E C T IO N S VA R . 3 :1 TO 5 :1S E E X -S E C T IO N S VA R . 3 :1 TO 4:1S E E X -S E C T IO N S VA R . 3 :1 TO 4 :1VARIABLE DEPTH B25.0C -L- STA. 48+85 TO 50+00 LT. -L- STA. 42+21 TO 44+50 LT. -L- STA. 34+50 TO 35+50 LT. -L- STA. 30+50 TO 35+00 RT. WITH GEOTECHNICAL ENGINEER. STEEPER THAN 3:1 REQUIRING COORDINATION NOTE: SEE CROSS SECTIONS FOR SLOPES 0.02 BOTTOM WALL RETAINING BENCH U CL GRADE POINT 12'-0"12'-0" W 0.020.08 12'-0" CUT SECTION TYPICAL SECTION NO. 7 GROUND EXISTING -Y1- (NW 2ND STREET) 0.02 10'-0" FDPS 13'-0" 0.04 4:1 3:1 MAX24'-0"VARIES 0.08 0.02 4'-0" FDPS FILL SECTION TYPICAL SECTION NO. 8 0.02 10'-0" 3:1 MAX 3'-0"VARIES GROUND EXISTING CL-Y1SPUR- (NW 2ND STREET) W R1 U 4'-0" FDPS 8'-0"12'-0" CUT SECTION GROUND EXISTING 3:1 MAX 6 :1 4'-0" T0 28'-0"12'-0" MIN. 4'-0" GRADE POINT 0.020.02 -Y1- STA 16+53.16 TO 17+50.00 U CL 8'-0" 0.08 6:1 10'-0"6'-0"18'-0" CUT SECTION C1 THIS LINE GRADE TO TYPICAL SECTION NO. 5 6 :1 SLOPES VAR. GROUND EXISTING 4:1 -L- (US 13 BYPASS) D1 E1 11" FDPS 0.023:1 MAXEXISTINGVARIES -L- STA 71+24.04 TO STA 73+83.06 0.08 C1 T D1 E1 0.02 11" D1 E1 11" 0.02 C1 THIS LINE GRADE TO U CL GRADE POINT 12'-0" W 0.02 TYPICAL SECTION NO. 6 -Y1- (NW 2ND STREET) -Y1- STA 12+81.07 TO 16+53.16 D1 E1 FDPS 7'-8" 10'-0" 0.04 T R32'-4"GROUND EXISTING3:1 MAXC1 6" 2' 11" 0.04 6:1 CUT SECTION 6 :1 SLOPES VAR. GROUND EXISTING 4 :13:1 MAX0.02 FILL SECTION 10'-0"6'-0"18'-0"8'-0" FDPS 4'-0" SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER ENGINEER PAVEMENT DESIGN6/2/99NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_TYP.dgnDWAINWRI11/21/2018NCDOT_pdf_color_eng_50.plt11:33:58 AMNCDOT_pshpfl.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas 555 Fayetteville St., Suite 900 Raleigh, N.C. 27601 N.C.B.E.L.S. License Number: F-0116 PAVEMENT SCHEDULE PRELIMINARY R-5812 2A-3 CODE DESCRIPTION C1 3" S9.5C D1 4" I19.0C T U W EXISTING PAVEMENT WEDGING EARTH MATERIAL C2 S 4" CONC. SIDEWALK R2 R3 CONC SBG CONC MONOLITHIC ISLAND CONC 2'-6" C&G E1 4" B25.0C D2 R1 E2 VARIABLE DEPTH S9.5C VARIABLE DEPTH I19.0C -Y1PUR- STA 10+18.00 TO 12+20.55 6'-6" T0 0'-0" C2C2 EX. PS VARIES 4'-0" T0 0'-0" W FDPS 7'-8" 10'-0" 0.04 T R32'-4"GROUND EXISTING3:1 MAXC1 6" FILL SECTION E111" 1'-0" D1 ** -Y1- STA. 13+68 TO 16+50 RT. WITH GEOTECHNICAL ENGINEER. STEEPER THAN 3:1 REQUIRING COORDINATION NOTE: SEE CROSS SECTIONS FOR SLOPES THIS LINE GRADE TO THIS LINE GRADE TO VARIABLE DEPTH B25.0C EXIST.EXIST. MIN. 1.5" 6/21/00DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA COMPUTED BY: CHECKED BY:DATE: DATE:11/21/2018...\Roadway\Proj\R5812_RDY_SUM.dgnREVISIONSIN CUBIC YARDS WASTEBORROWLOCATIONEXCAVATION UNCLASSIFIED SAY SUMMARY OF EARTHWORK SUBTOTAL 25,039 15,764 8,815 17,958 EMBANK.+25% SUBTOTAL 22,768 15,102 23,039 15,322TOTAL PROJECT TOTAL 25,039 17,103 EST. 5% TO REPLACE TOP SOIL ON BORROW PIT 0 0 0 0 0 0 SHEET NO.PROJECT REFERENCE NO. HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 3B-1 09/ 11/ 18 paid for at the contract lump sum price for "Grading." Breaking of Existing Pavement, and Removal of Existing Pavement will be Note: Approximate quantities only. Unclassified Excavation, Fine Grading, Clearing and Grubbing, GRAND TOTAL SUBTOTAL WASTE IN LIEU OF BORROW -219-219 -L- STA. 10+36.85 TO STA. 45+44 (BEGIN BRIDGE)6,949 7,004 6,287 7,666 -Y1- STA. 15+65.00 TO STA. 17+50.00 271 271 0 -Y1SPUR- STA. 10+18.00 TO STA. 11+00.00 219 0 0 219 219 0 0 219 7,936 219 7,936 7,936 -L- STA. 48+85 (END BRIDGE) TO STA. 73+86.85 R-5812 T.N. BEDENBAUGH 717 51 220 51 220 855 D.M. WAINWRIGHT 10/26/2018 MATERIAL FOR SHOULDER CONSTRUCTION 2,0002,000 7,940 17,960 AREA AREA AREA REMAINING REMAINING RT.LT. EASE. CONST. PERM. DRAIN. EASE. TEMP. DRAIN. EASE. TOTAL ACREAGE TAKEN PROPERTY OWNERS NAMES NO. RIGHT OF WAY AREA DATA PARCEL PERM. EASE. UTILITY 1 4 2 PERM. DRAINAGE / EASE. UTILITY DAVID C. MADURES - - - - - - - - - 3 ---- 5 6 7 JOSIAH EXUM, II MARY H. HARRELL CHRIS PARKER BEAMAN BOBBY GLENN HAM HARRISON & SHELTON, LLC TRADE LAND COMPANY, LLC -- - - - ----- ------ ------ 2588 SF127.38 AC - 127.38 AC 32.69 AC 32.69 AC 9.53 AC 9.53 AC 1995 SF 239 SF2.33 AC 2.33 AC 575 SF1.63 AC 1.63 AC 2607 SF45.57 AC 45.57 AC 0.11 AC 1039 SF 525 SF - - 0.33 AC52.70 AC 52.70 AC DATE:PROJECT REFERENCE NO. SHEET NO. DATE:R-5812 3B-2 STRAIGHT SHOP CURVED DOUBLE FACED APPROACH END TRAILING END APPROACH END TRAILING END APPROACH END TRAILING END XI AT-1 GREU TL-3 M-350 TYPE III CAT-1 B-77 IAU TL-3 Term End Section GNG -L- 26+50 39+93 RT 1375 27+50 10 13 50 1 1 -L- 40+13 45+45 RT 637.5 112.5 45+45 10 13 1 -L- 48+85 63+75 RT 1500 48+85 62+50 10 13 50 1 1 1 -L- 28+00 35+73 LT 775.00 28+00 10 13 50 1 1 1 -L- 36+10 45+45 LT 937.5 45+45 10 13 11 -L- 48+85 63+00 LT 1412.5 61+75 48+85 10 13 50 1 1 1 -L- 26+50 39+93 RT 1,373 -L- 40+12 45+44 RT 734 -L- 48+86 62+94 RT 1,413 -L- 26+82 45+43 LT 1,831 -L- 48+86 63+05 LT 1,414 6637.5 112.5 AT-1 0 @ 6.25' =0 GREU TL-3 4 @ 50' =200 TYPE III 4 @ 18.75' =75 CAT-1 2 @ 6.25' = 12.5 B-77 0 @ 22.875' =0 IAU-TL3 0 @ 21.0' =0 TOTAL 6350 112.5 442 6,765 SAY 10 ADDITIONAL GUARDRAIL POSTS LESS ANCHOR DEDUCTIONS TOTAL LENGTH WARRANT POINT SURVEY LINE BEG. STA. END STA. LOCATION DMW COMPUTED BY: CHECKED BY: "N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL TOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT. FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL TNB 8/29/18 10/26/18 REMARKS G = GATING IMPACT ATTENUATOR TYPE 350 NG = NON-GATING IMPACT ATTENUATOR TYPE 350 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS FLARE LENGTH W ANCHORS GUARDRAIL/GUIDERAIL SUMMARY IMPACT ATTENUATOR TYPE 350TOTAL SHOUL WIDTH DOUBLE FACED CABLE GUIDERAIL GUIDERAIL ANCHOR UNITS REMOVE EXISTING GUARDRAIL "N" DIST. FROM E.O.L. TIE END GUARDRAIL TO EXIST. GUARDRAIL TIE BEGIN GUARDRAIL TO EXIST. GUARDRAIL RAL-CND5190H5J,3/3/2016,c:\pwworking\tpa\d0628007\R-2250_RDY_ROWParcels.xls PROJ. REFERENCE NO. SHEET NO. R-5812 3P-1 PARCEL INDEX SHEET PARCEL No. SHEET No. PROPERTY OWNER NAME PARCEL No. SHEET No. PROPERTY OWNER NAME 1 5, 6 David C. Madures 2 5, 6 Josiah Exum, II 3 6 Mary H. Harrell 4 6, 7, 8 Chris Parker Beaman 5 8 Bobby Glenn Ham 6 8 Harrison & Shelton, LLC 7 8 Trade Land Company, LLC STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS S15" RCPDI 24" RCP 24" RCP24" CMP18" RCP18" RCP 18" RCP 18" RCP 18" RCP 24" RCP 24" RCP 24" RCP LOW WIRE=127.69'12" RCPCBTRENCH DRAI NDI 15" RCP 1 5 " RCPTOP=110.94'CBDI CB CB6" TCEND UNKNOWN15" RCP END UNKNOWN 8" TCP8" PVC8" PVC4" PVC 4" PVC 8" PVCCB 1 0 " TCP8 " TCPSGATE7 2 " CHL W/ 3 SBW7 2 " CHL W/ 3 SBWGATEGATEGATE7 2 " CHL W/ 3 SBW7 2 " CHL W/ 3 S BWGR S SARBOR S SI GNMT L SI GNMT L POLE FLAG SCANOPYMTLVENTS2-GASBK BUS 1 S SBKLTLTLTLT LTLTLTLTLTLTBSTBSTBSTBSTBST1 S MTL BUS30" C&G30" C&G30" C&G30" C&G30" C&G30" C&G30" C&G3 0 " C&G3 0 " C&G3 0 " C&G3 0 " C&G3 0 " C&G3 0 " C&G4 8 " CONC S I DE WALK6 0 " CONC S I DE WALK4 8 " CONC S I DE WALK6 0 " CONC SI DE WALK6 0 " CONC SI DE WALK60" CONC SI DE WALK6 0 " CONC SI DE WALK30" C&G30" C&G30" C&G30" C&G24" C&G 3' PAVED SHOULDER 3' PAVED SHOULDER 3' PAVED SHOULDER 3' PAVED SHOULDER 3' PAVED SHOULDER 7' PAVED SHOULDER32' BST32' BST24' BST42' BST26' BST 33' BSTTO GOLDSBOROCONC ISLCONC I SL6" CURB6" CURB6" CURBVINYL48" CONC CONC CONC CONC CONC CONC CONC CONC CONCCONC CONC CONC CONC CONC CONC FES 2 4 " C&GWOODS WOODSBY1-1GPS- 1 BL-1 18" CMPPAVED ROADWAYPROFESSIONAL DR. 28' 26' PAVED ROADWAYINDUSTRIAL DR. 8" H D P E28' PAVED ROADWAYPARKWOOD DR. WOODS 15" RCP 40' PAVED ROADWAY SR 1104 HULL RD. FES CONC LTUS 13 & NC 58 (KI NGOLD BLVD. ) 40' PAVED ROADWAYUS 1 3 & NC 5 8 (KI NGOLD BLVD.) 4 0' P AVED ROADWAYUS 13 BYPASS (M.L.K. JR. PKWY) 25' PAVED ROADWAYSTSSSSS STTCTTT S CHHHHHH HH THHHH HH6" PVC1 0 " UNKNOWN10" UNKNOWN4" PVC 6" UNKNOWN 10" PV C 6" UNKNOWN10" PVC2" PLASTI C4" PLASTIC2" PLASTIC UNKNOWN 10" PVC 10" UNKNOWN UNKNOWNUNKNOWNUNKNOWN 6 " UNKNOWN10" UNKNOWN4" PVC 4" PVC 10" PVC 10" UNKNOWN 6" UNKNOWN6" UNKNOWN CONDUIT CONDUITCONDUITENDS UNKNOWN CONDUIT CONC HW CONC HW CONC HW GREENE COUNTY BOARD OF EDUCATION DB 367 PG 161 PB 5 PG 36 ROBERT E. McAUTHUR, ET UX DB 436 PG 359 PB 23 PG 45 ROBERT BIZZELL, ET UX DB 573 PG 452 PB 23 PG 45 DB 714 PG 796 DB 398 PG 291 PB 16 PG 28 GREENE COUNTY GOVERMENT YAMCO, LLC DB 609 PG 766 PB 10 PG 43 GREENE COUNTY HEALTH CARE, INC. DB 473 PG 577 PB 23 PG 88 N 23°56'40" E 244.40' N 53°30'44" E 148.93' EIP ECM EIP EIP EIPEIPEIP EIP EIP EIP DB 367 PG 79 PB 22 PG 270 S 40°28'25" E150.62' N 23°56'40" E 99.26'0.11' EIP TO R/W0.17' EIP TO R/W0.18' EIP TO R/W0.06' EIP TO R/W 0.03' EIP TO R/W200.00'EXISTING R/W EXISTING R/W EXI S TI NG R/WEXI S TI NG R/WEXI STI NG R/W125'X110'125'X110'TOWNSEND RIDGE PROPERTI ES, LLC60.00'EXI STI NG R/WEXI STI NG R/WN 6 6°0 6'4 9" W13 4.8 8' S 65°22'31" W 22.58' 50.00' 60.00'EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W5 0.0 0' EXISTING R/W EXISTING R/W 30' CP&L POWER LINE EASEMENT N 36°39'50" W131.04'24" C&G 24" C&G 32' BST PCMH MANAGEMENT, INC D/B/A CONC BST C&G 30" 6" CURB C&G 30" R/WEXISTING BST NAD 83/ 201115 20 -L- POT Sta. 10+00.00 02020202CR CR CR CR CR CR CR CR CRCR -L- POT Sta. 10+06.12 BEGIN CONSTRUCTION -L- POT Sta. 10+36.85 BEGIN TIP PROJECT R-5812 -L-02020202+74 2'-6" C&G TIE TO EXISTING CR CR CR CR CR CR CR CR CRCR +00 2'-6" C&G TIE TO EXISTING -L- POT Sta. 10+06.12 BEGIN CONSTRUCTION -L- POT Sta. 10+36.85 BEGIN TIP PROJECT R-5812 BEGIN 2'-6" C&G END 2'-6" C&G BEGIN 2'-6" C&G END 2'-6" C&G END 2'-6" C&G BEGIN 2'-6" C&G BEGIN 2'-6" C&G C&G END 2'-6"12'14'12'PROP. 5' SIDEWALK PROP. 5' SIDEWALK 30'R 30'R 230' FULL STORAGE 7'143' TAPER 12'14'12'12'12'21'+147'R 28' 27' 27'4'4'4'4'PROP. 5' SIDEWALK PROP. 5' SIDEWALK 43'R 43'R 30'R 25'R 25'R 25'R 30'R 30'R 40'R 40'R 33'28'32' MONOLITHIC ISLAND 10'10'10'10'10'10'10'10'2GI RCP-III 24" CB-E CB-E CB-E 0403 0412 0404 0413 0406 0414 RETAIN RETAIN RETAIN RETAIN 0401 0408 CB-E 0402 0409 0410 CB-E CB-E 24" RCP-III RCP-III 24" 24" RCP-III 24" RCP-III 24" RCP-III R E T AI N 24" RCP-III 2GI(A) 2GI(A)2GI(A) 2GI(A) 0405 2GI(A) REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE RETAIN 18" RCP-III 18" RCP-III RETAIN RCP-III 24" REMOVE RETAIN CHANNEL REMOVE CONCRETE 2GI(A) 0416 0415 w/MH JB FS 24" RCP-III REMOVE CB REMOVE RCP-III 24" TIE TO STR. 0415 EXIST. 18" CMP REMOVE 50 LFFLOW LINE PROPOSED DITCH TIE OUTLET TO EXIST. 8" HDPE REMOVE 7.5 LF RCP-III 24" W/ ELBOWS 24" CSP HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PSH04.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:34:15 AMTIME:NCDOT_pshpfl.tbl R-5812 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 4 MATCHLINE -L- STA. 22+00, SEE SHEET 5SEE SHEET NO 9 FOR -L- PROFILE DRIVEWAY RADII 50' UNLESS OTHERWISE NOTED 2040 2019 1 1 1 1 AADT YEAR (VOLUME IN 100s) 173 127 161 118 NC 58 NC 58 (-L-) BY-PASS US 13 259 191 135 99 37 271 1DRIVE COMMERCIAL C FFFF FF F F F F F F F FF FCCCCC C C C CCCC C C 8" CMP CB 8 " CM P 8" CMP C ICICI CI WITH RIP RAP NOT FOUND OUTFALL PIPE COVERED (NOTE) 24" RCP 24" RCP CB CB CB CB 15" RCP24" RCP 18" CMP 12" CMP CBCB 18" RCP 24" RCP 15" CMP 5 4 " R C P MTL MTL MTL MTL MTL 8" P VC 8" PVC 8" PVC 8" PVC8" PVC 8" P VC 8" PVC 2-PILES OF TELEPHONE POLES S30" C&G30" C&G30" C&G 8' PAVED SHOULDER 4' PAVED SHOULDER 8' PAVED SHOULDER 7' PAVED SHOULDER 3' PAVED SHOULDER 3' PAVED SHOULDER 27' BST GR 12' RCP 18" CONC CONC CONCCONC CMP 18" WOODS WOODS WOODS WOODS WOODS CONC CONC TBM-A BL-2 BL-3 8" CMP 28' PAVED ROADWAYPROFESSIONAL DR. BST 24" RCP CONC US 13 BYPASS (M.L.K. JR. PKWY) 26' PAVED ROADWAY T T T T HH HH HH1" UNKNOWN10" PVC 6" UNKNOWN 4" PVC10" UNKNOW N12" DI 12" HDPE12" DI UNKNOWN10" UNKNOWN CONDUIT CONDUIT CONC **************************************** TBM-A CHISELED "X" BONNET BOLT FIRE HYDRANT BL STATION 19+46.00 65 RIGHT N 623039 E 2392722 100 ELEVATION = 68.38 **************************************** DB 398 PG 260 DB 486 PG 276 DELMAS EDWARD MINSHEW, JR.GREENE COUNTY DB 625 PG 2 DAVID C. MADURES DB 617 PG 663 DB 473 PG 577 PB 23 PG 88 DB 624 PG 295 PB 23 PG 88 AND FINANCIAL SERVICES, LLC ROBERT G. HEATH, JR. INSURANCE FRANK H. HARPER, ET UX DB 451 PG 621 JOSIAH EXUM, II N 53°27'58" E 130.22'N 6 4°12'0 3" W9 1.19'N 23°06'57" W189.69'N 53°30'43" E 145.09'S 43°49'03" E114.08' EIP EIP EIP EIP PB 22 PG 270 PB 23 PG 88N 36°32'02" W359.22'S 27°22'50" E 19.99'0.19' EIP TO R/WS 38°21'35" E150.16'0.23' EIP TO R/WN 49°33'10" W96.29'0.34' R/W TO EI P200.00'EXISTING R/W EXISTING R/W C&G 30" CONC CONC N 53°30'44" E 147.91' 50.00'EXISTING R/WEXISTING R/WN 53°03'29" E 182.02' HEALTH CARE, INC. GREENE COUNTY 46.97' S 53°32'34" W64.85'S 36°27'24" ES 44°16'03" E45.53'S 44°16'03" E65.43' TOWN OF SNOW HILL DB 713 PG 663 3' PAVED SHLDER CONC CONC NAD 83/ 20110605040302-Y1- PC Sta. 10+60.00 25 30 35 -L- POT Sta. 32+79.78 (18' RT) -Y1- POT Sta. 10+00.00 = 02020202+00 CAT-1,+73 GREU TL-3, +10 CAT-1, +50 GREU TL-3, CR CR -L-060504030230' TYP.02020202+06 BEG. SBG +00 CAT-1, +23 END SBG +73 GREU TL-3, +10 CAT-1, +50 GREU TL-3, +00 BEG. SBG CR CR BEGIN 2'-6" C&G END 2'-6" C&G BEGIN 2'-6" C&G END 2'-6" C&G12'14'12'12'14'12'12'14'12'12'12'12'12'12'12'PROP. 5' SIDEWALK PROP. 5' SIDEWALK 35'R 25'R 12'12'12'12'14'4'14'8:1 8:1 10'4'4'11'11'4'4'4'4'60' 27' 27'10'10'10'10'& EX. R/ W 110.00' LT +47.00 & EX. R/ W 110.00' LT +24.00 1 2 EX. R/ W 100.00' LT +28.00 & EX. R/ W 115.00' RT +65.00 & EX. R/ W 115.00' RT +00.00 15" RCP-III 15" RCP-III 15" RCP-III RCP-III 15" 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 2GI w/ FG 2GI w/ FG 2GI w/ FG 2GI w/ FG 2GI w/ FG 2GI w/ FG 2GI w/ FG RETAINRETAINw/ FG 2GI 0508 0506 0501 0502 0504 0509 0510 0511 0512 0503 0515 0514 0513 RC P -III 15 "w/ FG 2GI EST. 3 TONS CLASS 'I' RIP RAP 7 SY GEO-TEXTILE REMOVE REMOVE REMOVE w/ FG 2GI REMOVE REMOVE REMOVE REMOVE REMOVE AND EXTEND COLLAR HW 54" RCP-III 0516 0517 w/ FG 2GI CB-E CB-E CB-E CB-E FS RETAIN 0524 0532 0533 0525 0526 0520 0530 0531 0521 0522 0535 w/MH JB 0536w/MH JB EST. 15 TONS CLASS 'I' RIP RAP 30 SY GEO-TEXTILE 36" RCP-III RCP-III 36" EST. 11 TONS CLASS 'I' RIP RAP 22 SY GEO-TEXTILE RETAIN 24" RCP-III RCP-III 24" 24" RCP-III 2GI(A) 2GI(A) 2GI(A) 2GI(A) 0534 0528 0529 REMOVE REMOVE REMOVE 30" RCP-III RCP-III 30" RCP-III 24" REMOVE DITCH REMOVE CONCRETE CHANNEL REMOVE CONCRETE w/MH JB FS RCP-III 30" REMOVE CB REM. 30" RCP - III 24" RCP-III CB REM. CB REM. REMOVE REMOVE DITCH CONCRETE RETAIN To JB w/MH Conv. CB RETAIN 0527 SLOPE=0.50%) (MAX. PIPE 36" RCP-III EXIST. 54" RCP REMOVE 12 LF 24" RCP-III SLOPE=6.1%) (MAX. PIPE W/ ELBOWS 15" CSP 30" CSP REMOVE HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PSH05.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:34:25 AMTIME:NCDOT_pshpfl.tbl R-5812 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 5 MATCHLINE -L- STA. 22+00, SEE SHEET 4MATCHLINE -L- STA. 36+00, SEE SHEET 6SEE SHEET NO 12 FOR -Y1- PROFILE SEE SHEET NO 9 FOR -L- PROFILE DRIVEWAY RADII 50' UNLESS OTHERWISE NOTED PI Sta 15+50.18 D L = 957.16' T = 490.18' R = 1,800.00' -Y1- e = 0.06 Lr = 180' F F C C C C C F F F F F F F F F F F C C F FC C C C C 8" CMP CI INVERT ONLY CI DESTROYED (NOTE) DI 12" CMP CI 8" CMP 8" CMP 8" CMP CI 8" CMP 8" CM PCI8" CM PC ICI CI PIPE NOT FOUND WITH RIP RAP OUTFALL PIPE OUTLET COVERED (NOTE) 8" CMPCI FOOT BRIDGE WOODEN 5 4 " R C P M TLMTLMTLCI MTLMTLMTL MTL MTL MTL MTL MTL MTL LOG CABIN 1 S 2-PILES OF TELEPHONE POLES CONTENTNEA CREEKRAP RIP RAP RIP RAP RIP 3' PAVED SHOULDER 5' PAVED SHOULDER 1 0' PAVED SHOULDER1 0' PAVED SHOULDER10' PA V ED SH O U LD E R N W 2N D ST. 18' PA V ED R O A D W A Y US 13 BYPASS 29' PAVED ROADWAY ISL CONC NW 2 ND ST. 2 5' PAVED ROADWAYTO SNOW HI LL54" RCP WOODS WOODS WOODS WOODS WOODS WOODS W OODSWOODSWOODS GR 12' 12' GR 6" CURB6 " CURB6" C U R B 6" CURB B Y2-1 BL-5 CRE E KCONT E NT NE A BL-4 (MARK 1976)HHHH10" UNKNOWN 12" HDPE CONDUI TCONDUIT CONDUIT CONDUIT JOHN MILTON BEAMAN DB 587 PG 375 MARY H. HARRELL PB 4 PG 9 PB 27 PG 101 200.00'EXI STI NG R/WEXISTING R/ W EXISTING R/WEXI S TI NG R/WEXISTING R/W EXISTING R/W EXISTING R/W N 19°14'32" E 782.69' BRIDGE #20 CONC DAVID C. MADURES DB 617 PG 663 DB 393 PG 489 DB 398 PG 260 JOSIAH EXUM, II CONTENTNEA CREEK CHRIS PARKER BEAMAN DB 663 PG 96NAD 83/ 20110440604030201 00 01 02 02 0101 02 40 45 -Y1- PT Sta. 20+17.16 20 15 -Y1SPUR- PC Sta. 10+79.73 -Y1SPUR- POT Sta. 10+00.00 -L- POT Sta. 39+18.07 = -Y1SPUR- PT Sta. 12+20.55 -Y1- POC Sta. 17+35.66 = -L- STA. 45+44± TIE TO EXISTING BRIDGE -L- STA. 48+85± TIE TO EXISTING BRIDGE 0202+10 CAT-1,0202TYPE III TYPE III TYPE III TYPE III APPROACH SLAB DO NOT DISTURB 05APPROACH SLAB DO NOT DISTURB -Y1- POC Sta. 17+50.00 END CONSTRUCTION -W_L- OFFSET 33.48' LT -L- POT Sta. 42+49.99 -W_L- POT Sta. 10+00.00 = BEGIN RETAINING WALL -W_L- PI Sta. 10+90.00 OFFSET 35.00' LT -L- POT Sta. 39+00.00 -W_L- POT Sta. 13+50.00 END RETAINING WALL -L-0440604030201 00 01 02 02 0101 02 24'TYP.21'TYP.+39 +77 30'TYP. -L- STA. 45+44± TIE TO EXISTING BRIDGE -L- STA. 48+85± TIE TO EXISTING BRIDGE +16 BEG. SBG +26 END SBG +26 END SBG0202+10 CAT-1,0202TYPE III TYPE III TYPE III TYPE III +57 BEG. SBG APPROACH SLAB DO NOT DISTURB 05APPROACH SLAB DO NOT DISTURB -Y1- POC Sta. 17+50.00 END CONSTRUCTION +05 BEG. SBG +05 END SBG12'12'12'12'12'12'12'12'14'35'R 360'+5910'10'10'4'4'97'R +1924'19'24'12'12'10'OFFSET=18' & 12' 120-65-180 & EX. R/ W 118.00' LT +60.00 EX. R/ W 100.62' LT +85.00 -Y1- 1 3 2 4 127.00' LT +77.00 EX. R/ W 100.00' LT +05.00 EX. R/ W 100.00' LT +28.00 & EX. R/ W 108.00' RT +64.00 -L- & EX. R/ W 118.00' LT +61.00 & EX. R/ W 123.00' LT +92.00 18" R C P-III 18" RCP-IV 18" RCP-IV 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 2GI w/ FG 2GI w/ FG 2GI w/ FG 2GI 2GI w/ FG 2GI w/ FG 54" RCP-III w/MH JB RETAINRETAINw/ FG 2GI w/MH TB JB 15" RCP-III RC P -III 15 "0618 0614 0616 0617 0619 0601 w/ FG 2GI 0602 0608 0603 0605 0606 0607 0612 0611 0610 0613 0609 0620 0621 EST. 4 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE EST. 7 TONS CLASS 'I' RIP RAP 15 SY GEO-TEXTILE EST. 4 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE REMOVE REMOVE REMOVE 12" CMP REMOVE REMOVE RETAIN RETAIN REMOVE w/ FG 2GI 2GI w/ FG 0513 EST. 45 TONS CLASS 'I' RIP RAP SEE DETAIL C (ON BANKS ONLY) 70 SY GEO-TEXTILE 15" RCP-III 15" RCP-III 0604 w/ FG 2GI 0615 w/ FG 2GI 15" RCP-III 15" RCP-III 0622 w/ FG 2GI 0623 w/ FG 2GI w/ FG 2GI REMOVE CI w/ FG 2GI ( Not to Scale) PIPE OUTLET CHANNEL DETAIL C FROM STA. 36+42 TO STA. 36+92 LT -L- Ground Natural Ground Natural (Variable) CHANNEL BED Est.= 45 Tons of Class I Rip-Rap d= 4 Ft. Length= 30 Ft.EXI STI NG BANKEXISTING BANK d GEOTEXTILE 1.5' Ft.Flatter6:1 or D6:1( Not to Scale) SPECIAL CUT DITCH FROM STA. 13+19 TO STA. 15+65 -Y1- LT DETAIL D Min. D= 1 Ft. Ground Natural SEE DETAIL 'D' SPECIAL CUT DITCH W/ ELBOWS DRAIN PIPE 18" SIDE W/ ELBOWS DRAIN PIPE 18" SIDE 15" RCP-III W/ ELBOWS 18" CSP REMOVE CI FILL WITH FLOWABLE FILL FILL WITH FLOWABLE FILL FILL WITH FLOWABLE FILL FILL WITH FLOWABLE FILL w/ FG 2GI REMOVE CI HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PSH06.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:34:34 AMTIME:NCDOT_pshpfl.tbl R-5812 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 6 MATCHLINE -L- STA. 36+00, SEE SHEET 5MATCHLINE -L- STA. 50+00, SEE SHEET 7SEE SHEET NO 12 FOR -Y1SPUR- PROFILE SEE SHEET NO 12 FOR -Y1- PROFILE SEE SHEET NO 10 FOR -L- PROFILE MONOLITHIC ISLAND RETAINING WALL #1 Slope Ditch Front PI Sta 15+50.18 D L = 957.16' T = 490.18' PI Sta 11+58.67 D L = 140.82' T = 78.94' -Y1--Y1SPUR- R = 1,800.00'R = 125.00' e = 0.06 Lr = 180' e = 0.02 Lr = 48' 2040 2019AADT YEAR 173 127 167 123 (VOLUME IN 100s) (-L-) BY-PASS US 13 (-L-) BY-PASS US 13 NW SECOND ST (-Y1-) 1 1 7 5 8 6 F F F F F F F F FF F F F F F F F F F F F F F CCC 8" CMP 8" CMP 18" RCP FES FES CI CI CI CI CI CI CI CI CI CI CI CI CI 8" CMP 8" CMP 8" CMP 8" CMP8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP 8" CMP MTL MTL MTL MTL MTL MTL CULTIVATED RAP RIP RAP RIP RAP RIP RAP RIP RAP RIP BILLBOARD US 13 BYPASS 24' PAVED ROADWAY 4' PAVED SHOULDER 4' PAVED SHOULDER CONC CONC CONC WOODS WOODS WOODS BL-6 BL-7 RIP RAP HH 10" UNKNOWN 12" HDPE 12" HDPE 12" HDPE 10" UNKNOWN 12" HDPE 12" DI 10" UNKNOWN CONDUIT CHRIS PARKER BEAMAN DB 663 PG 96N 02°14'12" E564.99'200.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXIS TI NG R/W135.00' EXISTING R/W BL-8 (MASSEY 1976) S 06°50'26" W 246.90' CHRIS PARKER BEAMAN DB 663 PG 96 CHRIS PARKER BEAMAN DB 663 PG 96 CHRIS PARKER BEAMAN DB 663 PG 96 POND CHRIS PARKER BEAMAN NAD 83/ 2011 030302020100010202030302020100010202-L- TS Sta. 50+14.91 -L- SC Sta. 52+14.91 55 60 -L- CS Sta. 61+28.08 -L- ST Sta. 63+28.08 GREU TL-3,+00 GREU TL-3,+75-L-03030202010001020203030202010001020235' TYP. 35' TYP. +10 END SBG +50 END SBG GREU TL-3,+00 GREU TL-3,+7512'12'12'12'4'4'8:1 8:111'12'12'10'12'12'4'10'10'11' EX. R/ W 100.26' RT +36.82 EX. R/ W 71.00' LT +99.57 63.00' LT +65.00 95.00' RT +28.00 EX. R/ W 75.15' RT +28.03 & EX. R/W & 68.00' LT 76.00' LT +00.00 & EX. R/W 76.00' LT +62.00 80.00' LT +00.00 116.00' RT +83.00 EX. R/ W 100.00' RT +79.00 EX. R/ W 100.24' RT +87.00 & EX. R/ W 115.00' LT +48.00 & EX. R/ W 115.00' LT +54.00 4 4 4 4 EX. R/ W 78.00' RT +91.34 EX. R/ W 99.66' RT +65.00 EX. R/ W 99.44' RT +50.00 105.00' RT +10.00 & EX. R/ W 123.00' LT +73.00 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 2GI w/ FG 2GI w/ FG2GI w/ FG RCP-III 18"RCP-III 18" AND EXTEND COLLAR AND EXTEND COLLAR w/ FG 2GI 2GI w/ FG18" RCP-IV RETAINW/ FG 2GI 0713 0701 0712 0704 0706 0707 0708 w/ FG 2GI0703 0705 0710 0711 0715 0716 0714 0717 0709 EST. 4 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE 0702 EST. 4 TONS CLASS 'I' RIP RAP 10 SY GEO-TEXTILE EST. 3 TONS CLASS 'I' RIP RAP 7 SY GEO-TEXTILE REMOVE REMOVE REMOVE REMOVE CB REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE W/ELBOWS 15" CSP w/ FG 2GI w/ FG 2GI EST. 3 TONS CLASS 'B' RIP RAP 10 SY GEO-TEXTILE 15" RCP-III LATERAL 'V' DITCH ( Not to Scale) D b 1"/Ft. DETAIL B Ground Natural ( Not to Scale) D B b LATERAL BASE DITCH 1"/Ft. DETAIL A Ground Natural RCP-III 15" RCP-III 15" 3:1 1.0'2:1( Not to Scale) ROCK FILL IN POND FROM STA. 57+80 -L- TO STA. 58+15 -L- LT DETAIL E SEE DETAIL 'E' ROCK FILL IN POND EST. 30 TONS CLASS 'B' RIP RAP EST 3 CY DDE SEE DETAIL 'B' LATERAL 'V' DITCH EST 437 CY DDE SEE DETAIL 'A' LATERAL BASE DITCH W/ ELBOWS 18" CSP W/ ELBOWS 18" CSP FILL WITH FLOWABLE FILL REMOVE CI FILL WITH FLOWABLE FILL REMOVE CI FILL WITH FLOWABLE FILL REMOVE CI FILL WITH FLOWABLE FILL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PSH07.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:34:43 AMTIME:NCDOT_pshpfl.tbl R-5812 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 7 MATCHLINE -L- STA. 50+00, SEE SHEET 6MATCHLINE -L- STA. 64+00, SEE SHEET 8SEE SHEET NO 10 FOR -L- PROFILE Slope Fill 3:13:1 b=5 Ft. Min. D=0.75 Ft. FROM STA. 62+17 TO STA. 62+48 LT -L- b=5 Ft. B=2 Ft. Min. D=1 Ft.3:13:1 FROM STA. 59+50 TO STA. 62+00 RT -L- Slope Fill Proposed Existing Earth Fill Elev.=32.5' 5' CLASS B RIP-RAP Elev.=31.5' N.W.S. PIs Sta 51+48.25 F Ls = 200.00' LT = 133.34' ST = 66.67' PI Sta 56+72.47 D L = 913.17' T = 457.56' R = 5,700.00' PIs Sta 61+94.74 F Ls = 200.00' LT = 133.34' ST = 66.67' -L- e = 0.03 Lr = 105' F F F F F F F F F F F F F F F F F F F TOP=47.76' DI48" RCP48" RCP CB 54" RCP24" RCPS24" RCP CULTIVATED S CO NC72" CHL W/3SBW 72" CHL W/3SBW FALLOW FALLOW FALLOW GARAGE MTL BILLBOARD HW CONC 30" C&G 4' PAVED SHOULDER 4' PAVED SHOULDER 4' PAVED SHOULDER US 13 BYPASS 36' PAVED ROADWAY US 13 49' PAVED ROADWAY CONC ISL CONC ISL ISL CONC 6" C U R B 6" CURB 6" CURB WOODS TBM-B GPS-2 15" RCP 30" C&G SS S S S HHHH 12" PVC12" DI 12" PVC10" PVC UNKNOWN , (ABANDONED )UNKNOWN10" PVC 12" PVC CONDUIT CONDUIT CONDUIT CONDUIT 10" PVC 12" PVC C&G30" 24" RCPDB 484 PG 64 DB 484 PG 64 TRADE LAND COMPANY, LLC DB 685 PG 60 HARRISON & SHELTON, LLC DB 685 PG 508 PB 18 PG 84 BOBBY GLENN HAM DB 484 PG 64 BOBBY GLENN HAM BOBBY GLENN HAM EIP EIP EIP ECM PB 4 PG 56 E XISTI NG R/WEXISTING R/W EXISTING R/W 120.00'EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WTO FARMVILLE S 06°50'26" W 71.82' S 79°55'16" E 341.75' S 08°47'04" W 149.77' S 08°58'11" W 91.33' S 81°00'45" E 456.83' ; ;;;;;;;**************************************** TBM-B CHISELED "X" BONNET BOLT FIRE HYDRANT BL STATION 64+25.00 96 LEFT N 626011 E 2396047 101 ELEVATION = 45.48 ****************************************US 258 54' PAVED ROADWAYTO SNOW HILLTO WALSTONBURG4' PAVED SHOULDERCHRIS PARKER BEAMAN DB 663 PG 96 ROADWAY51' PAVEDNC 91NAD 83/ 2011 65 70 -L- POT Sta. 74+65.36 0202169' +95 142' +43 RETAIN END CONSTRUCTION -L- POT Sta. 73+83.06 END TIP PROJECT R-5812 RETAIN RETAIN 125' +68 150' +16 END CONSTRUCTION 30"C&G RETAIN DISTURB FENCE DO NOT -L-0202169' +95 142' +43 RETAIN END CONSTRUCTION -L- POT Sta. 73+83.06 END TIP PROJECT R-5812 RETAIN RETAIN 125' +68 150' +16 END CONSTRUCTION 30"C&G RETAIN DISTURB FENCE DO NOT12'12'12'12'OFFSET=15' 0-55-120 4'4'4'12'4'4'+24+2612'12'4'12'12'+0012'4'4'OFFSET=14' 0-60-240 8:1 4'65.00' RT +50.00 EX. R/ W 60.00' RT +50.00 EX. R/ W 60.00' RT +20.00 EX. R/ W 65.00' LT +82.00EX. R/ W 88.00' LT +67.85 EX. R/ W 65.00' LT +56.30 65.00' LT +75.00 70.00' LT +50.00 EX. R/ W 60.00' RT +50.00 EX. R/ W 70.00' RT +81.71 4 6 5 5 7 5 RETAI NRETAIN RETAIN SYSTEMRETAIN HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PSH08.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:34:52 AMTIME:NCDOT_pshpfl.tbl R-5812 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 8 MATCHLINE -L- STA. 64+00, SEE SHEET 7OF WATER AROUND CONCRETE ISLANDS CONTRACTOR TO PRECLUDE PONDING SEE SHEET NO 11 FOR -L- PROFILE 2040 2019 1 1 31 23 AADT YEAR (VOLUME IN 100s) 202 149 NC 91 US 258 (-L-) BY-PASS US 13 (-L-) BY-PASS US 13 56 41 11 8 167 123 90 65 105 77 F F F F F F F F F F F F F F F SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R-5812 REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PFL09.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:35:00 AMTIME:NCDOT_pshpfl.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 PROPOSED GRADE EXISTING GROUND PI = 12+72.50 EL = 107.53' (-)1.3973% ( - )3 .5420% VC = 335' K = 156 EL. = 110.82' -L- STA. 10+36.85 BEGIN GRADE V = 60 MPH PROPOSED GRADE EXISTING GROUND PI = 29+13.00 EL = 49.42' ( - )3 .5420%(+)0.3000% VC = 650' K = 169 V = 65 MPH 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 50 60 70 80 90 100 110 120 130 140 50 60 70 80 90 100 110 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 -L- 9 -L- SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R-5812 REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PFL10.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:35:07 AMTIME:NCDOT_pshpfl.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 EXISTING GROUND PROPOSED GRADE PI = 40+86.00 EL = 52.94' (+)0.3000%(-)0.3131% VC = 350' K = 571 PI = 44+35.00 EL = 51.85' (-)0.3131%(+)0.0000% VC = 180' K = 575 (+)0.0000% PI = 49+90.00 EL = 51.41' VC = 170' K = 567 V = 80+ MPHV = 80+ MPHV = 80+ MPH EL = 51.85' -L- STA. 45+26 +/- TIE TO EXIST APPROACH SLAB END GRADE EL = 51.41' -L- STA. 49+05 +/- TIE TO EXIST APPROACH SLAB BEGIN GRADE (+)0.3000% = 105.2 = 50 = 126.00 = 35.78 = 146.00 = 36.43 = 500+ = 383.95 = 51.51 RETAIN AND EXTEND 54" RCP Sta. 36+09 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION PIPE HYDRAULIC DATA AC YRS YRS CFS CFS CFS FT FT FT EXISTING GROUND PROPOSED GRADE (+)0.3000% PI = 52+45.00 EL = 52.17' (+)0.3000%(-)0.3022% VC = 200' K = 332 PI = 57+00.00 EL = 50.80' (-)0.3022%(+)0.3000% VC = 500' K = 830 PI = 60+66.00 EL = 51.90' (+)0.3000%(-)0.3000% VC = 232' K = 387 V = 75 MPH V = 80+ MPHV = 80+ MPH PI = 49+90.00 EL = 51.41' VC = 170' K = 567 V = 80+ MPH ELEV. 38.80STA. 62+48 LTELEV. 36.17STA. 59+50 RTELEV. 36.96STA. 61+17 RTELEV. 37.21STA. 62+00 RTDITCH @ 0.47% LATERAL 2' BASE DITCH @ 0.30% LATERAL 2' BASE ELEV. 38.68STA. 62+17 LT@ 0.39% LATERAL 'V' DITCH RETAIN AND EXTEND 18" RCP Sta. 62+00 DRAINAGE AREA DESIGN FREQUENCY DESIGN DISCHARGE DESIGN HW ELEVATION 100 YEAR DISCHARGE 100 YEAR HW ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE OVERTOPPING ELEVATION = 39.38 = 500+ = 29.09 = 48.00 = 1.93 = 39.34 = 1.72 = 50 = 0.3 PIPE HYDRAULIC DATA YRS AC CFS FT CFS FT YRS CFS FT 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 10 20 30 40 50 60 70 80 90 70 10 20 30 40 50 60 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 10 20 30 40 50 60 70 80 90 10 20 30 40 50 60 70 80 90 -L- 10 100 -L- 100100 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R-5812 REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PFL11.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:35:16 AMTIME:NCDOT_pshpfl.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 EXISTING GROUND PROPOSED GRADE PI = 65+82.00 EL = 50.35' (-)0.3000%(+)0.0277% VC = 180' K = 549 V = 80+ MPH EL. = 50.50' -L- STA. 71+24.04 MILL AND RESURFACE INTERSECTION END GRADE EL. = 49.88' -L- STA. 73+83.06 END INTERSECTION RESURFACING 10+50.0011+00.0011+50.0012+00.0012+50.0052.25'52.31'52.35'52.34'52.29' 44.27' 43.34'43.49'43.66' 44.81'45.67' EXISTING GROUND RETAINING WALL #1 EL. = 52.14' -L- STA. 42+49.99 (33.48' LT) -W_L- STA. 10+00.00 = BEGIN RETAINING WALL 13+00.002. 2: 1 3:152.20' TOP OF WALL BOTTOM OF WALL EL. = 44.12'STA. 13+26.19EL. = 44.92'STA. 10+15.87APPROXIMATE WALL FACE AREA = 2632 SQ.FT. EL. = 52.06' -L- STA. 39+00.00 (35.00' LT) -W_L- STA. 13+50.00 = END RETAINING WALL (GRADE ELEVATION) 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 10 20 30 40 50 60 70 80 90 70 10 20 30 40 50 60 11 -L- 100 10+00 11+00 12+00 13+00 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 -W_L- SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R-5812 REVISIONS PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\Proj\R5812_RDY_PFL12.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:35:23 AMTIME:NCDOT_pshpfl.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND PI = 10+90.00 EL = 50.42' (+)0.3000%(-)0.6966% VC = 180' K = 181 PI = 12+90.00 EL = 49.03' (-)0.6966% VC = 180' K = 181 PI = 15+20.00 EL = 49.72' (+)0.3000%(-)0.3000% VC = 180' K = 300 EL. = 50.15' -L- STA. 32+79.78 (18' RT) -Y1- STA. 10+00.00 = BEGIN GRADE V = 60 MPH V = 65 MPH V = 70 MPH EL. = 49.03' -Y1- STA. 17+50.00 END GRADE ELEV. 46.91STA. 15+65 LTELEV. 48.53STA. 13+19 LT@ 0.66% SPECIAL CUT DITCH PROPOSED GRADE EXISTING GROUND PI = 10+75.00 EL = 51.70' (-)0.6670% (- )3 .0562% PI = 11+45.00 EL = 49.56' (-)0.6476% VC = 90' K = 37 EL. = 52.08' -L- STA. 39+18.07 (18' RT) -Y1SPUR- STA. 10+18.00 = BEGIN GRADE K = 21 VC = 50' V = 30 MPH V = 30 MPH EL. = 49.07' -Y1- STA. 17+35.66 -Y1SPUR- STA. 12+20.55 = END GRADE 10 20 30 40 50 60 70 80 90 70 10 20 30 40 50 60 12 -Y1- 100 -Y1SPUR1- 10+00 11+00 12+00 13+00 10 20 30 40 50 60 70 80 90 100 30 10 20 40 50 60 70 80 90 100 16+0015+0014+0013+0012+0011+0010+00 20+0019+0018+0017+00 8/23/99PROJ. REFERENCE NO.SHEET NO.PENTABLE:FILE:NCDOT\2015_NCDOT_East_Reg_Div_Planning_Design_LSA\NCDOT-R-5812_US_13_Widening\6.0_CAD_BIM\6.2_Work_In_Progress\R-5812\Roadway\XSC\R5812_RDY_XPL_INDEX.dgnUSER:DWAINWRIDATE:11/21/2018NCDOT_pdf_color_eng_50.pltPLOT DRIVER:11:44:10 AMTIME:xpl_eh_v8.tblDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS CROSS SECTION INDEX OF SHEETS X-34-Y1SPUR- X-32 AND X-33-Y1- X-1 THRU X-31-L- X-1R-5812 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:18 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/16110 110 100 100 10+00.00 110 110 120 120 100 100 10+50.00 110 110 120 120 100 100 11+00.00 110 110 120 120 100 10011+50.00 110 110 120 120 100 10012+00.00 110 110 120 120 100 10012+50.00 X-2R-5812 -L- 5 10 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 111.54 110.94 109.93 0.0200.0204:13:1105.95 6:1 4 :13:1 105.99 6 :1 108.85 0.0200.020 4 :13:13:1 105.23 105.26 6:1 6 :14:1 107.97 0.0200.0204:1 4 :13:13:1 104.34 104.37 6:1 6 :1 106.89 0.0200.0204:14 :13:13:1 103.30 103.32 6:1 6 :1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:21 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/16110 110 100 100 13+00.00 110 110 100 100 13+50.00 100 100 110 110 90 90 14+00.00 100 100 110 110 90 90 14+50.00 100 100 110 110 90 9015+00.00 100 100 110 110 90 9015+50.00 X-3R-5812 -L- 5 10 105.63 0.0200.0204:1 4 :1 4:13:1 102.09 102.11 6:1 6 :1 104.27 0.0200.0204:1 4:14:13:1 100.73 100.75 6:1 6 :1 102.72 0.0200.0204:1 4:1 4 :13:1 99.20 99.18 6:1 6 :1 101.00 0.0200.0204:1 4:1 97.46 6:1 DRIVEWAY 99.24 0.0200.0204:1 4:1 4:1 3:1 95.69 95.69 6:1 6 :1 97.44 0.0200.020 4:13:1 93.92 6 :1 92.15 6:15 :1 4:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:24 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/16100 100 110 110 90 9015+72.00 100 100 90 90 16+00.00 90 90 100 100 80 80 16+50.00 90 90 100 100 80 80 17+00.00 90 90 100 100 80 80 17+50.00 90 90 100 100 80 8018+00.00 X-4R-5812 -L- 5 10 96.65 0.0200.020 4 :1 3:1 93.14 6 :1 DRIVEWAY 95.64 0.0200.0204:1 4:1 5 :1 3:1 92.15 92.15 6:1 6 :1 93.85 0.0200.0204:1 4:1 4 :1 3:1 90.38 90.38 6:1 6 :1 92.15 0.0200.0204:1 4 :188.61 6:1 DRIVEWAY 90.43 0.0200.020 4:1 4:1 4:13:1 86.84 86.84 6:1 6 :1 88.59 0.0200.020 4 :14 :13:1 85.07 85.07 6:1 6 :13:14:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:27 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1690 90 100 100 80 8018+50.00 90 90 80 80 19+00.00 80 80 90 90 70 70 19+50.00 80 80 90 90 70 70 20+00.00 80 80 90 90 70 70 20+50.00 80 80 90 90 70 7021+00.00 X-5R-5812 -L- 5 10 86.72 0.0200.0204:183.29 6:13:1DRIVEWAY 84.94 0.0200.0204:14 :13:1 81.52 81.52 6:1 6 :13:183.27 0.0200.020 4 :13:1 79.75 79.75 6:1 6 :13:14:1 81.50 0.0200.020 4 :13:1 77.98 77.98 6:1 6 :13:14 :179.74 0.0200.020 4 :13:1 76.21 6 :1 DRIVEWAY 77.98 0.0200.0204:1 4:1 3:13:1 74.44 74.44 6:1 6 :1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:30 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1680 80 90 90 70 7021+32.00 80 80 90 90 70 7021+50.00 80 80 70 70 22+00.00 70 70 80 80 60 60 22+50.00 70 70 80 80 60 60 23+00.00 70 70 80 80 60 60 23+50.00 X-6R-5812 -L- 5 10 76.88 0.0200.0203.3:13:173.31 6:1 DRIVEWAY 76.26 0.0200.0203:14:1 3:13:1 72.67 72.67 6:1 6 :1 74.45 0.0200.0203:14:1 3:13:1 70.90 70.90 6:1 6 :1 72.61 0.0200.0203:14:1 3:13:1 69.13 69.13 6:1 6 :1 70.86 0.0200.0203:14:1 3:13:1 67.35 67.35 6:1 6 :1 69.14 0.0200.0203:14:1 3:13:1 65.58 65.58 6:1 6 :1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:32 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1670 70 80 80 60 6024+00.00 70 70 80 80 60 6024+50.00 70 70 60 60 25+00.00 60 60 70 70 80 80 50 50 25+50.00 60 60 70 70 80 80 50 5026+00.00 X-7R-5812 -L- 5 10 67.35 0.0200.0203:14:1 3:13:1 63.81 63.81 6:1 6 :1 65.47 0.0200.0203:14:1 3:13:13:1 62.04 62.04 6:1 6 :1 63.64 0.0200.020DRIVEWAY DRIVEWAY 61.8661.86 6 :16:1 0.0200.020 3:1 4:1 58.5058.503:14:160.10 6 :16:1 56.7556.76 4:14 :10.0200.020 6 :16:1 56.754:13:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:35 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1660 60 70 70 50 5026+50.00 60 60 70 70 50 50 27+00.00 50 50 60 60 70 70 40 4027+50.00 40 40 50 50 60 60 70 70 30 30 28+00.00 X-8R-5812 -L- 5 10 58.34 6:1 4:1 55.09 6 :1 0.0200.020 3:1 4:1 54.86 56.75 6:1 6 :1 53.58 0.0200.020 6 :156.5855.214:1 0.0200.020 55.216 :1 53.86 0.0200.020 4:1 4:153.99 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:38 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 70 70 30 30 28+50.00 40 40 50 50 60 60 30 3029+00.00 40 40 50 50 60 60 30 3029+50.00 40 40 50 50 60 60 30 3030+00.00 X-9R-5812 -L- 5 10 52.69 3:1 0.0200.02052.923:152.9251.77 3:13:1 0.0200.020 52.0052.0051.09 3:13:1 0.0200.020 51.2351.2350.68 3:13:1 0.0200.020 50.6050.60 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:41 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3030+50.00 40 40 50 50 60 60 30 3031+00.00 40 40 50 50 60 60 30 3031+50.00 40 40 50 50 60 60 30 3032+00.00 X-10R-5812 -L- 5 10 50.37 3:13:1 0.0200.020 50.1250.1250.14 3:1 0.0200.02049.792:149.7950.04 3:1 0.0200.02049.602:149.4850.03 3:1 0.0200.02049.572:149.31 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:44 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3032+50.00 40 40 50 50 60 60 70 70 30 3033+00.00 40 40 50 50 60 60 70 70 30 3033+50.00 X-11R-5812 -L- 5 10 50.03 3:1 0.0200.02049.672:149.2850.09 0.027 EL. =50.20 -Y1- Sta.10+20.21 3:1 0.0200.02049.822:149.4850.18 0.043 EL. =50.22 -Y1- Sta.10+70.21 3:1 0.0200.02049.972:149.28 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:47 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 70 70 30 3034+00.00 40 40 50 50 60 60 70 70 30 30 34+50.00 40 40 50 50 60 60 70 70 30 3035+00.00 X-12R-5812 -L- 5 10 50.31 0.060 EL. =50.11 -Y1- Sta.11+20.00 3:1 0.0200.02050.122:148.8450.45 0.060 EL. =49.86 -Y1- Sta.11+70.00 3:1 0.0200.02050.272.3:148.5950.60 3:10.060 48.25EL. =49.53 -Y1- Sta.12+20.00 0.0200.020 2:1 50.42 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:50 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 70 70 30 30 35+50.00 40 40 50 50 60 60 70 70 30 3036+00.00 40 40 50 50 60 60 70 70 30 30 36+50.00 X-13R-5812 -L- 5 10 50.72 3:10.060 48.03EL. =49.30 -Y1- Sta.12+70.00 0.0200.020 2:1 6 .1 :150.87 3:10.060 47.94EL. =49.22 -Y1- Sta.13+19.00 6.1:1 0.0200.020DRIVEWAY 48.53 51.06 3:16:1 0.060 47.99EL. =49.26 -Y1- Sta.13+68.00 3:1 0.0200.02050.8748.21 9.8:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110 110 120 120 130 130 140 140 150 150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:53 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 70 70 30 30 37+00.00 40 40 50 50 60 60 70 70 30 3037+50.00 40 40 50 50 60 60 70 70 30 3038+00.00 X-14R-5812 -L- 5 10 160 170 180 190 200 160 170 180 190 200 51.28 6:1 0.060 EL. =49.41 -Y1- Sta.14+19.00 3:1 0.0200.02051.022.5:148.1447.87 11.6:1 51.46 6:1 0.060 EL. =49.54 -Y1- Sta.14+68.00 3:1 0.0200.02051.172:148.2647.55 13.3:1 51.57 6:1 0.060 EL. =49.58 -Y1- Sta.15+16.00 3:1 0.0200.02051.322:148.3147.23 15.1:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110 110 120 120 130 130 140 140 150 150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:56 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3038+50.00 40 40 50 50 60 60 30 30 39+00.00 30 30 40 40 50 50 60 60 20 2039+50.00 30 30 40 40 50 50 60 60 20 2040+00.00 X-15R-5812 -L- 5 10 160 170 180 190 200 160 170 180 190 200 51.71 6:1 0.060 46.91 EL. =49.55 -Y1- Sta.15+65.00 3:1 0.0200.02051.472:148.2716.9:1 51.79 Y1SPUR0.0200.020 3:1 52.05 Y1SPUR0.0200.020 52.14 Y1SPUR0.0200.020 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:44:59 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 2040+50.00 30 30 40 40 50 50 60 60 20 2041+00.00 30 30 40 40 50 50 60 60 20 2041+50.00 X-16R-5812 -L- 5 10 52.22 3:10.0200.020 52.30 5 .9 :1 0.0200.020 51.9152.37 4 . 3 :1 0.0200.020 51.87 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:01 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 42+00.00 30 30 40 40 50 50 60 60 20 20 42+50.00 30 30 40 40 50 50 60 60 20 20 43+00.00 30 30 40 40 50 50 60 60 20 20 43+50.00 X-17R-5812 -L- 5 10 52.33 3.7:10.0200.020 51.8152.19 3:10.0200.020 51.7051.702.2:1 52.03 4 .3 :1 0.0200.020 51.5651.562.5:1 52.04 4 .4 :1 0.0200.020 51.4251.422.5:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:04 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 44+00.00 30 30 40 40 50 50 60 60 20 20 44+50.00 30 30 40 40 50 50 60 60 20 20 45+00.00 30 30 40 40 50 50 60 60 20 2045+26.00 X-18R-5812 -L- 5 10 51.99 0.0200.02051.3151.313:12.5:1 51.95 0.0200.020 3.8:151.242.6:1 51.2451.88 0.0200.020 7 .1:151.213.1:1 51.2151.85 3:13:1 0.0200.020 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:07 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 45+44.00 30 30 40 40 50 50 20 20 45+50.00 30 30 20 20 46+00.00 30 30 20 20 46+50.00 30 30 20 20 47+00.00 30 30 20 20 47+50.00 30 30 40 40 20 20 48+00.00 X-19R-5812 -L- 5 10 51.84 BEGIN BRIDGE 47.27 32.00 29.52 30.37 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:10 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 20 20 48+50.00 30 30 40 40 50 50 60 60 20 20 48+85.00 30 30 40 40 50 50 60 60 20 20 49+00.00 30 30 40 40 50 50 60 60 20 20 49+05.00 X-20R-5812 -L- 5 10 35.95 51.54 END BRIGE 0.0200.020 3:12:1 51.44 3:10.0200.020 2:1 51.41 0.0200.020 4 .8 :150.772:1 50.77 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:13 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 49+50.00 30 30 40 40 50 50 60 60 20 20 50+00.00 30 30 40 40 50 50 60 60 20 20 50+50.00 30 30 40 40 50 50 60 60 20 20 51+00.00 X-21R-5812 -L- 5 10 51.61 0.0200.020 3.7:150.792.7:1 50.7951.57 0.0200.020 3.2:150.8550.853:1 51.60 0.0170.020 50.993:150.953:1 51.62 0.0030.02051.1051.313:1 3:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:16 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 51+50.00 30 30 40 40 50 50 60 60 20 20 52+00.00 40 40 50 50 60 60 30 30 52+50.00 40 40 50 50 60 60 30 30 53+00.00 X-22R-5812 -L- 5 10 51.57 0.0110.02051.253:1 3:151.49 0.0260.02651.293:1 3:151.44 0.0300.03051.263:1 3:151.37 0.0300.03051.223:1 3:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:19 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 30 53+50.00 30 30 40 40 50 50 60 60 20 20 54+00.00 30 30 40 40 50 50 60 60 20 20 54+50.00 30 30 40 40 50 50 60 60 20 20 55+00.00 X-23R-5812 -L- 5 10 51.34 0.0300.03051.103:1 3:151.33 0.0300.03050.953:13:1 51.24 0.0300.03050.793:13:1 51.20 0.0300.03050.663:1 3:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:22 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1630 30 40 40 50 50 60 60 20 20 55+50.00 40 40 50 50 60 60 30 30 56+00.00 40 40 50 50 60 60 30 30 56+50.00 40 40 50 50 60 60 30 3057+00.00 X-24R-5812 -L- 5 10 51.17 0.0300.03050.553:1 3:151.09 0.0300.03050.483:13:1 51.05 0.0300.030 3:1 50.433:151.04 0.0300.030 3:1 50.423:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:25 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3057+50.00 40 40 50 50 60 60 30 30 58+00.00 40 40 50 50 60 60 30 3058+50.00 40 40 50 50 60 60 30 3059+00.00 X-25R-5812 -L- 5 10 51.01 0.0300.030 3:13:1 50.4350.97 0.0300.030 3:13:1 50.4750.92 0.0300.030 3:13:1 50.5550.87 0.0300.030 3:13:1 50.65 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:28 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3059+50.00 40 40 50 50 60 60 30 30 60+00.00 40 40 50 50 60 60 30 30 60+50.00 40 40 50 50 60 60 30 30 61+00.00 40 40 50 50 60 60 30 30 61+50.00 X-26R-5812 -L- 5 10 50.83 0.0300.030 3:13:1 50.7936.17 50.78 0.0300.030 3:13:1 50.9150:1 3:13:1 36.41 50.73 0.0300.030 3:13:1 50.9650:1 3:13:1 36.64 50.71 3:13:1 50.950.0300.030 50:1 3:136.88 3:1 50.60 3:13:1 50.9550.60 0.0240.024 50:1 3:137.06 3:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:30 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 30 62+00.00 40 40 50 50 60 60 30 30 62+50.00 40 40 50 50 60 60 30 30 63+00.00 40 40 50 50 60 60 30 30 63+50.00 40 40 50 50 60 60 30 30 64+00.00 X-27R-5812 -L- 5 10 50.52 0.0090.020 3:13:1 50.8650.52 50:1 3:137.21 3:1 50.4750.473:1 0.0050.020 4:1 50.3850.38 4:1 0.0190.020 4 :1 50.3450.34 4:1 4:1 0.0200.020 50.3450.3450.34 4:1 4:1 0.0200.020 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:33 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 30 30 64+50.00 40 40 50 50 30 30 65+00.00 40 40 50 50 30 30 65+50.00 40 40 50 50 30 30 66+00.00 40 40 50 50 30 30 66+50.00 40 40 50 50 60 60 30 30 67+00.00 X-28R-5812 -L- 5 10 50.3150.3150.31 4:14:1 0.0200.020 50.2450.2450.24 4:14:1 0.0200.020 50.1850.1850.18 4:14:1 0.0200.020 50.1250.1250.12 4 :14:1 0.0200.020 50.1050.10 4:14:1 0.0200.020 50.1250.12 4 :14:1 0.0200.020 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:36 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1650 50 60 60 40 4067+50.00 50 50 60 60 40 4068+00.00 50 50 60 60 40 4068+50.00 50 50 60 60 40 40 69+00.00 50 50 60 60 40 4069+50.00 X-29R-5812 -L- 5 10 50.1950.19 4:1 4:1 0.0200.020 50.1850.18 4:14:1 0.0200.020 50.1850.18 4:14:1 0.0200.020 50.2450.24 4:14:1 0.0200.020 50.2350.23 4:14:1 0.0200.020 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:39 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1650 50 60 60 40 4070+00.00 50 50 60 60 40 40 70+50.00 50 50 60 60 40 4071+00.00 50 50 60 60 40 4071+24.04 50 50 60 60 40 4071+50.00 50 50 60 60 40 4072+00.00 X-30R-5812 -L- 5 10 50.2350.23 4 :14:1 0.0200.020 50.2450.24 4:14:1 0.0200.020 50.2350.23 4 :14:1 0.0200.020 50.23 0.0200.020 4:1 4 :1 50.234:1 50.224:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_L.dgn11:45:42 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1650 50 40 4072+50.00 50 50 60 60 40 4073+00.00 50 50 60 60 40 4073+50.00 50 50 40 4074+00.00 50 50 40 4074+50.00 X-31R-5812 -L- 5 10 50.17 50.15 49.99 4:1 49.82 49.68 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_Y1.dgn11:45:51 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3015+65.00 40 40 50 50 60 60 70 70 30 3016+00.00 40 40 50 50 60 60 30 3016+50.00 40 40 50 50 60 60 70 70 30 30 17+00.00 X-32R-5812 -Y1- 5 10 49.05 0.060 0.020 2:148.2846.91 6:15 :1 49.11 EL. =50.33 -Y1SPUR- Sta.11+21.91 0.004 49.1149.11 0.060 48.200.020 49.1149.11 2:16:1 49.10 EL. =49.88 -Y1SPUR- Sta.11+42.58 5.98:1 0.006 49.1049.10 3:10.060 48.0549.10 EL. =49.30 -Y1SPUR- Sta.11+85.51 0.023 49.1049.10 5 .9 :1 0.060 47.905.98:1 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_Y1.dgn11:45:53 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 3017+50.00 40 40 50 50 30 3018+00.00 X-33R-5812 -Y1- 5 10 49.0349.0349.03 3:10.0500.044 47.9549.01 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 11/21/2018c:\pwworking\east01\d0411069\R5812_RDY_XPL_Y1SPUR.dgn11:46:03 AMPROJ. REFERENCE NO.SHEET NO.0 6/23/1640 40 50 50 60 60 30 30 10+50.00 40 40 50 50 60 60 30 30 11+00.00 X-34R-5812 -Y1SPUR- 5 10 51.0351.0351.03 6:1 0.0150.015 0.015 11.9:1 50.28 0.0120.0126:1 0.020 46.91 6 .6 :1