Loading...
HomeMy WebLinkAbout20190123 Ver 1_PCN Form Submission_20190128D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190123 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Garcy Ward:eads\gpward Information for Initial Review 1a. Name of project: US 13 Bypass from NC 58 (Kingold Boulevard) to NC 91 1a. Who is the PrimaryContact?* Jay Johnson 1b. PrimaryContact Email:* jbjohnson@ncdot.gov Date Submitted 1 /28/2019 Nearest Body of Water Contentnea Creek Basin Neuse Water Classification C; Sw, NSW Site Coordinates Latitude: 35.457458 A. Processing Information County (or Counties) where the project is located: Greene Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: R-5812 WBS # (�) 46981.1.1 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 Reviewing Office * Washington Regional Office - (252) 946-6481 1c. PrimaryContact Phone:* (252)439-2521 Longitude: -77.677177 :: fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? r Nationwide Permit (NWP) rJ Regional General Permit (RGP) � Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? C' Yes r No Regional General Permit (RGP) Number: 198200031 - NCDOT Bridges, Widening Projects 2015 RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: r 401 Water Quality Certification - E�ress rJ Riparian Buffer Authorization x C' Yes R No C' Yes G No 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? F Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment R-5812 - Division 2- STR - RW - Buffer - NS 03.pdf 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? � Yes r No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: fWA 2c. Responsible party: WA 2d. Address Street Address 1037 W. H. Smith Blvd. Address Line 2 �Y Greenville Fbstal / Zip Code 27535 2e. Telephone Number: (252)439-2821 S[ate / FYovince I Region NC Cauntry Greene 2f. Fax Number: (252)830-3352 116.82KB �, 2g. Email Address:* jbjohnson@ncdot.gov C. Project Information and Prior Project History " I 1. Project Information 1b. Subdivision name: (if appropriate) WA 1c. Nearest municipalityl town: Snow Hill 2. Project Identification 2a. Property Identification Number: N/A 2c. Project Address Street Address Address Line 2 �ty Postal I Zip Code 2b. Property size: 50 State I Rovince I f�gion Country 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Contentnea Creek 3b. Water Resources Classification of nearest receiving water:* C; Sw, NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202030702 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project vicinity consists primarily of rural and commercial. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No C' Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 02_R5812_topographic map.pdf 5.62MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) R-5812 Soil Map.pdf 197.42K6 4f. List the total estimated acreage of all existing wetlands on the property: 6.5 4g. List the total estimated linear feet of all existing streams on the property: 904 4h. Explain the purpose of the proposed project:* To reduce congestion and improve traffic flow and safety along the US 13 Bypass. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project will improve US 13 Bypass, eMending from NC 58 (Kingold Blvd) to NC 91. The proposed US 13 cross section will add a center turn lane as well as a 5' pedestrian sidewalk on each side of the road to the west of Contentnea Creek. The existing bridge on US 13 over Contentnea Creek will be retained. The project is approximately 1.1 miles in length, and standard road building equipment will be used induding Uucks, bulldozers, and cranes. 4j. Please upload project drawings for the proposed project. R-5812 Roadway Right-of-Way Plans 2018-11-16.pdf 9.08MB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* F Yes �' No r Unknown Comments: Sb. If the Corps made a jurisdictional determination, what type of determination was made?* G Preliminary r Approved C' Not Verified C' Unknown C' WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas? Name (if known): Sara Easterly Agency/Consultant Company: HDR Other: Sd. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR PJD submitted 9/5/2018. Sd1. Jurisdictional determination upload R-5812_Prelim_JD_Package_Unsigned_Combined_9_5_2018.pdf 8.13MB 6. Future Project Plans 6a. Is this a phased project?" � Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�I? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): fJ Wetlands fJ Streams-tributaries CJ Open Waters � Pond Construction fJ Buffers 2. Wetland Impacts 2a. Site #* (�) 2a7 Reason (?) 2b. Impact type *(�) 2c. Type of W. * 2d. W. name * 2e. Forested * Zf. Type of 2g. Impact Jurisdicition*(') area* Site 2 Fill P Riverine Swamp Forest WC Yes Corps 0.010 (acres) Site 3 Fill P Riverine Swamp Forest WA Yes Corps 0.080 (acres) Site 4 Fill P Riverine Swamp Forest WC Yes Corps 0.010 (acres) Site 6 Fill P Riverine Swamp Forest WC Yes Corps 0.020 (acres) Site 7 Fill P Riverine Swamp Forest WC Yes Corps 0.160 (acres) Site 8 Fill P Riverine Swamp Forest WB Yes Corps 0.470 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.750 2g. Total Wetland Impact 0.750 2h. Comments: Site 2 will have less than 0.01 acres of inechanized clearing. Site 3 will have less than 0.01 acres of permanent fill, less than 0.01 acres of excavation, and 0.06 acres of inechanized clearing. Site 4 will have less than 0.01 acres of inechanized clearing. Site 6 will have 0.02 acres of inechanized clearing. Site 7 will have 0.07 acres of permanent fill, and 0.09 acres of inechanized clearing. Site 8 will have 0.32 acres of permanent fill, and 0.15 acres of inechanized clearing. 3. Stream Impacts Reason for impact (:�) 3b.lmpact type" 3c. Type of impact" 3d. S. name" 3e. Stream Type" 3f. Type of 3g. S. width" 3h. Impact (�) Jurisdiction* length* Roadwa Widenin Permanent Fill SA Intermittent Cor s 3 54 S1 Y 9 p Average (feet) (linear feet) 32 Roadway Widening Temporary Fill SA Intermittent Corps � 14 Average (feet) (linear feet) Roadwa Widenin Permanent Fill SB Intermittent Cor s 5 56 S3 Y 9 P Average (feet) (linear feet) Roadwa Widenin Permanent Bank Stabiliration SB Intermittent Cor s 5 28 S4 Y 9 p Average (feet) (linear feet) SS Roadway Widening Temporary Bank Stabilization SB Intermittent Corps 5 11 Average (feet) (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 13S 25 3i. Total stream and ditch impacts: 163 3j. Comments: Permanent exsting channel impacts at Site 1 are expected to be 54 feet, with 14 feet of temporery impacts. S5 will have a 54" RCP Extension, with permanent impacts of 56 feet. The bank stabilization of S5 is 28 feet of permanent impacts and 11 feet of temporary impact. 4. Open Water Impacts 4a. Site # I4a1. Impact Reason II4b. Impact type I4c. Name of waterbody II4d. Activitytype Site 9 Roadway P PB 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.01 4h. Comments: Less than 0.01 acres of permanent impacts are expected for the rock fill in of the pond. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. fJ Neuse � Catawba � Goose Creek r Other Impact Type 1 2 6h. Total buffer impacts: Zone 1 Total Temporary impacts: 0.00 Zone 1 Total Permanent impacts: 3,358.00 � Fill 4g. Total permanent open water impacts: 0.01 r Tar-Pamlico � Randleman � Jordan Lake creek Zone 2 0.00 Zone 2 3,675.00 Zone 1 Zone 2 Total combined buffer impacts: 3,358.00 3,675.00 6i. Comments: Site 1 impacts are allowable, totaling 3015 square feet. Site 2 impacts are mitigable, totaling 4018 square feet. Supporting Documentation R-5812_Permit Drawings Combined_20181030.pdf Per or Temp II6d. Stream name Waterbodytype I�4f.lmpactarea Buffer mitigation required? I�6f. Zone 1 impact ��6g. Zone 2 impact 5.8SMB 272 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project has been designed to minimize wetland and stream impacts along the project corridor. Steepened reinforced 2:1 fill slopes have been implemented in wetland and sUeam areas in order to minimize impacts. Some grass swale Ueatment will be provided by roadway ditches at the beginning of project. Drainage has been designed to discharge outside of the riparian buffers and avoid direct discharge into wetlands. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices will be followed as well as those for Sedimentation and Erosion Control. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? G Yes r No 2c. If yes, mitigation is required by (check all that apply): fJ DWR 117 Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank �J Payment to in-lieu fee I� Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. F Yes r No 4b. Stream mitigation requested: (linear feet) 110 4d. Buffer mitigation requested (DWR only): (square feet) 4018 4f. Non-riparian wetland mitigation requested: (acres) wa, 4h. Comments 4c. If using stream mitigation, what is the stream temperature: warm 4e. Riparian wetland mitigation requested: (acres) 0.75 4g. Coastal (tidal) wetland mitigation requested: �acres) wa 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. G Yes �' No Zone 2 Roadway Fill 6f. Total buffer mitigation required 7935 2,746 1.5 4,119 6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed? F Yes r No 6h. Attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. R-5812 - Division 2- STR - RW - Buffer - NS 03.pdf 6j. Comments: See attached letter from DMS 116.82KB � F. Stormwater Management and Diffuse Flow Plan (required by DWR) " 6b. If yes, then identify the square feet of impact. 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? F Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lowar SHWf) � Wetland Swale (higher SFNVf) r Other SCM that removes minimum 30 % nitrogen fJ Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: See attached Stormwater Management Plan G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* r Yes r No �I 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environme ntal Policy Act (NEPAISEPA)? * � Yes r No Comme nts: * Project has an approved Minimum Criteria Determination Checklist (MCDC) 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * C' Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * � Yes r No 3b. If you answered "no," provide a short narrative description. The project is a level of service improvement and will not be opening more land for development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes r No r fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * f Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?" � Yes r No Sd. Is another Federal agency involved?" � Yes r No � Unknown Se. Is this a DOT project located within Division's 1-8? G Yes r No Sj. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The USFWS county list and NCNHP database were consulted for Greene County. Also, the project v✓as surveyed on March 15-16, 2018 for the red- cockaded woodpecker (RCW). Habitat for RCW was not found in the study area. The biological conclusion was No Effect. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Natlonal Marine Fisherles Service (NMFS) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* C' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* North Carolina State Historic Preservation Office 7c. Historic or Prehistoric Information Upload R-5812 Greene No Archaeological Survey Required Form.pdf 18-03-0021 NoSurvey.pdf 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 2.87M6 2.87MB Sb. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit determined at the 7/2/2018 R-5812 Hydraulics Pre-Design Meeting that this project would not require FEMA coordination since there is no impact to the effective floodway. Sc. What source(s) did you use to make the floodplain determination?" NC Floodmaps Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * �J By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP'); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Casey Whitley Signature [ �r��� l�1%lrcz2'�� ^ � � Date 1 /28/2019