Loading...
HomeMy WebLinkAboutWQ0039490_Application (FTSE)_20190117Central Files, APS SWID 12/17/2018 R., _ Mumnbch- WQ0039490 Perrnit Permit Tracking Slip Proam Category gr Status Project Type Non-discharge In review Major modification Permit Type Version Permit Classification Gravity Sewer Extension: Pump Stations, & Pressure Sewer Extensions B Individual Primary Reviewer Permit Contact Affiliation dean.hunke Coastal SWRLde Permitted Fiow 26)000 FOMn cififig y Facility Name Major/Minor Region Market Street at Greenview Drive Sewer Extension Minor Wilmington County Location Address New Hanover Facility Contact Affiliation Owner Name Owner Type Cape Fear Public Utility Authority Government - Municipal Owner Affiliation James R. Flechtner PE 235 Government Center Dr Dates/Events Wilmington NC 28403 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 10/13/2017 12/17/2018 Regulated Activities Requested /RecE)i-Aved Events Wastewater collection Additional information requested Additional information received z6_R, FREELAND and KAUFFMAN, INC. ENGINEERS • L4ND3CAPEARCHITECT3 RECE I VEMIC DEN R/DWIR September 10, 2018 DEC 17 2018 Wilmington Regional Office -Water Quality Section, Attn: Dean Hunkele 127 Cardinal Drive Extension Wa -er Quality Regional Operations Section , NC 28405 Wilmington, Wilmington Regiona-1 Office g 910-796-7380 Subject: AAA Car Wash — 106 Oak Ridge Lane In regards to the subject project, this cover letter is provided in order to communicate a brief description of the site as well as the items of modification. The site is located at 106 Oak Ridge Lane, Wilmington NC 28411 and will be re -developed to include a AAA Car Wash along with a future AAA Car Care Center. The site was initially approved to serve a 650 seat full service restaurant with 26,000 gallons per day, permit dated 10/ 13/2017 (WQ0039490). Since then the site use has changed and will now be a AAA Car Wash & a future Car Care Center. Changes to the permit include the flow from the site due to the change in use along with the location/length of the extension due to NCDOT road widening. Please see submitted application with updated information along with attached utility plan for new location/lengths of the extension. Please do not hesitate to contact me at 864-672-3426 should there be any questions or a need for additional information. Regards, Todd Simmons 209 West Stone Avenue • Greenville, South Carolina 29609 • Telephone 864-233-5497 • Fax 864-233-8915 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 &SUPPORTING DOCUMENTATION Application Number: (Jac a3� L( YO (to be completed by DWR ) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Cape Fear Public Utility Authority (company, municipality, HOA, utility, etc.) 2. Applicant type: El Individual Z Corporation El General Partnership El Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Matthew Tribett per 15A NCAC 02T .0106(b) Title: Engineering Managerk."! 4 IN 4. Applicant's mailing address: 235 Government Center Drive': { City. Wilmington State: NC Zip: 28403-1670 DEC 17 2018 `4 5. Applicant's contact information: RVu Phone number: (910) 332-6626 Email Address: matthew.tribett(a c$ua. org II. PROJECT INFORMATION: 1. Project name: Market Street A Greenview Drive Sewer Extension 2. Application/Project status: El Proposed (New Permi -�°`� ® Existing Permit/Proj ct If a modification, provide the existing permit number: W 0039490 and issued date: 10/13/17 If new construction but part of a master plan, provide the ie 3. County where project is located: New Hanover 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.28' Longitude: -77.81 ° 5. Parcel ID (if applicable): R03 618-002-001-000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Todd Simmons License Number: 033322 Firm: Freeland & Kauffman, INC Mailing address: 209 West Stone Avenue City . Greenville State: SC Zip: 269 4 '�'���� p 411- Phone number: (864) 672-3426 Email Address: tsimmons(a fk-inc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Northside V`TWTP Permit Number: NCO023965 Owner Name: CFPUA V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W 0038275 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): CFPUA FORM: FTA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? E]Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes EJNo ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? D Yes []No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ® Car Wash ❑ Residential Leased ❑ Retail with food preparation/service El' Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities [:J Swimming Pool /Clubhouse ❑ Food and drink facilities El Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home [:] Other (Explain in Attachment) 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) Is there a Pretreatment Program in effect? El Yes Z No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes Z No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01140 Daily Design Flow a,b No. of Units Flow Car Wash 1200 gal/bay 1 1200 GPD Retail Area 125 gal/plumbing fixture 6 750 GPD Car Care Center 250 gal/plumbing fixture 5 1250 GPD gal/ GPD, gal/ GPD gal/ GPD Total 3200 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 3200 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected El Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 225 C-900 8 52 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDIT) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) I Length (feet) I Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)�1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or El Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes ❑ No 1 SA MCAC 09T (1lni f1 r.nntnine minimum cPnarntinne that chn11 hi- nrmAde.d fnr cPwPr cvctPmc- Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains(horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines(horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class H impounded reservoirs used as a source of drinkingwater 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305 g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305 fl or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes [:1 No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or El Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.010(additional permits/certifications)? Z Yes [:1 No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? 2 Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 0000MM _ W I, ®Vz+i 4z� t1y 0 *,-Obattest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. ...................................................................................... North Carolina Professional Engineers seal, signature, and date: e A- s ,. Vs� � � y A Q dr �� `,✓V `� OriF.11 Ile d. � 33 lop 41.1 ;.................. . '�.... :........................... 3. Applicant's Certification per 15A NCAC 02T .0106(b): t I, J rq attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 6t Signature. Date: 1 I FORM: FTA 04-16 Page 5 of 5 State of North Carolina. r' = Department of Environmental Quality F Division of Water Resources Di vision .r Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: ONB Properties A, LLC Project Name for which flow is being requested: AAA Car Wash- Oak Ridge Lane More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for allpump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: James A. Loughlin (Northside) WWTP b. WWTP Facility Permit #: NPDES NC 0023965 All f lows are in MGD c. WWTP facility's permitted flow 16.000 d. Estimated obligated flow not yet tributary to the WWTP 2.679 e. WWTP facility's actual avg. flow 10..661 f. Total flow for this specific request 0.003200 g. Total actual and obligated flows to the facility 130343 h. Percent of permitted flow used 8304% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** 79 0.720 0.288 0.186 0.044 0.231 0.057 89 11.444 4.577 4.493 1.367 5.860 -1.282 w -t-ne r-irm Lapacity of any pump station is aennea as the maximum pumpea snow tnat can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. * A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority Downstream Permit Number: WQ0038275 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Matthew Tribett, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature NO re Page 2 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 23% total flow. % and 5.860 MGD of the Available Capacity (E) in Pump Station 89 ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Smith Creek PS Upgrade is in design or under construction with planned completion in 3rd quarter 2018 ; and/or d. The following applies: A second funded capital project, namely the Blue Clay Road Force Main, will also provide additional capacity at Pump Station 89 by diverting existing flow that is currently tributary to Pump Station 89 directly to Northside Wastewater Treatment Plant. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature YaTe Page 3 of 6 FTSE 04-16 r SURMIZE TABLE Hf4* DOMESTIC WATERLINE ENTRY. 12E- ARICA FOR EXACT LOCATION A 37.36 3ZE 0 32JB ISO PAD MOLINITED TRANSFORMER PDJOW UJO= ENEIM UTILITY COMPANY REVIEW 332 CD) ©LEGEND CT CAMET FC12 ELECTRICENTRY,•• FOR ID=T LOCATION001 3119m3336 0 (D 7 DOMESTIC WATER MEYER ... ®1 39.74 ... ... 43b2®" • •. WTHN WIN. © m 44.00am •r,M p6 SANITARY SEK5?FEAR RRC UTILITY ALITWOQTTY SPECIFICATIONISCAP WAS444JDO __j4C5OCW 4 SANITARY SEWS? LINE PER CAPE FEAR PILIC UTILITY AMOQITY SPECIFICATIONS C04 00 . • rr. .. C• COMPANIES SIEVETAPPING r VALVE pSEE DETAILS ©I Vr QPZ :••r• o SEE DETAILS • - :... • COMPANIES Rrll ELEVATIONS, OF NEW SITE LIGHTIG TO E MAN40LES TO MATCH COORDNATEED WITH EXISTNG GRADE UTILITY CONPANT CONTRACTOR TO PROVIDE (D TWO DES16N•BLILD RRGATION SYSTEMS (CAR CARE STTE E CAR WASH STEI COORDINATE LMLTS WITH OW U MIST PAY SOUS FOR IRRIGATION METER LARGER THAN 516 Shops Sign // I Height-6.1' TIE TO EXIST 8' To EA f �/ 55 MAWOLE 1 f a Sonilory MH\•' Rim3• �,•` '' ',, Inv NW=31 97 Inv NE=31..92 92 4:() .,` CLCB I a TG-35.85 o"' '•''• ' Inv SW=31.62 Inv NE-31.30 B' SS = EXTBSON /, VICINITY MAP SCAL.E- FVOP05E D 25' Q" I I ' ' I I' 2000, SEWER EA55MENT (4591 SF) 1 I I SITE UTILITY NOTES ;,,,,?,,;'•;f ' VII ; L ALL SITE YOM SHALL E DOE N ACCORDANCE WITH THE PANS PIZEPARED BY FQMAAD E KALFFMAN INC. TOE CIAENT TEOREAENTS TIF CITY OF WIMlGTCK TIE APPLICABLE SECTIONS OF M NCDOT ROADWAY DESIGN WaMJM• AND ALL OTHER PE RTNENT FEOH2AL AND STATE LAMS 1 a 2 THE CONTRACTOR SHALL COMPLY AT ALL TEES WITH APPLICABLE F05ZAL. STATE AND NEW N000T :':.: { 1 I U I I b' LOCAL LAWS, PROVISIONS• AND POKES GOVERNING SAFETY AND HEALTH, NGL(DNG THE ROW LINE ° P�F/AR'J6OFTt�T.E29 WQIATII SAFETY 6 0 C A IICNAL SALAW FETY AND ERAL g�(3LATION xVL FOR CCWRLCTI ON. AND 9.BSEOLENT PLELIATIONS LFUATNIG THESE REGLUTIONS. -B' WATER LINE BASED ON EOG e• l.,' :.` II `� I TI-E CONTRACTOR SHALL BE RESPONSBlE FOR EXAMINING TH: AREAS AND CONDITIONS PLAN BY OTHERS E SHOULD FIBER OPTIC LINE BASED ON MAP BE FEU) VERIFIED PRIOR TO C PROVOM BT ATT E SHOULD BE START OF CONSTRUCTION a 15" RCP orke, FELD VERM PRIOR TO START OF ° Inv RCP 15" CMP w Inv-37.25 15" CMP OpNSjRUOj{01J 15' CMP w Inv=37.19 Ik I v-37.a9 - 15� CMP wu Inv= 37.44 Inv=37.54 h� ire Inv=36.89 qos OTPED - - Crime - - - Watch MPH P gt= ugl o., Sign Sig 16n 16n '1b7UD - '1M LINT 'lw• M [LIMN fTS OjI EASI MENi AROIDD IB' INSIDE ROW 12' RCP 12' RCP 16' Distribution Main METgR BOA Q L =1P,$.4 nv= wlr wtr wlr wtr v,t FOorC er wtr° wlr wtr wtr lr ru ° i6n 16n 16n N 10 C07 I T X)' PLaIC UTILITY EAS 7vENT COB CO2 511 Sign P O S IRRIGATION LINE TO BE J J F STLI3BED FOR CAU 6" PVC l� 8' PVC D= Sanitary MH j G Rim=4 },J I25 nv=}5.25 FiII with Water •••,•,,,,,•+•» Per owner. + n'tnr .onilory MH Ywlr gym_ Ir -'•" -» fewer installed for - c Inv=34.86 roes development. -••- Paled with Does not oppeor t0 Water [,!/ •1•rM 4t• qm . Ceti - l,M be active. ` I ,a� 7 =qu A rM MO aftm � wee ao•aa R/n CALLOW a1 rare t1e n`i"�i"Lou � m IILO -Il�t• O O «• rt��l ~ G I CAR CAM CONTRACTOR TO----- 4hy, Y BASIN QiE, QU L°U•- PROVIIk r l>Jru2r FROM ED<PNENT 9 L ROOK TO CANOPY R XO' note (�� /�� Sign XIO' CFRJA 20 MPH O Few LAW EASEAENT ARIXhD ' Sign g2 AK (45' PRNAIE W" _ 0 • w{r ru wt' wlr rtn wtr ru wtr Mr wlr ru, 15" RCP - Inv=39.57 811 Sign mod. iQ1n 1 ° LN7Hi WHCH TIIE PROJECT 6 TO BE COM6TRUCTED PRIOR TO TI-E SLOWS90N OF A BO. ;opP 7:$$.••; o`' ED�TNG J•�SLEINS90N OF A BD 94ALL BE CONSTRLED TO MEAN THE: CONTRACTOR HAS REVIEWED �: 3, j•,• I THE SITE AND 6 FAMILIAR WITH CONDITIONS AND CONSTRAINTS OF TIE SITE CCB 4, BEFORE EXCAVATM ALL UNOERGRCLIND UTILITIES 94ALL BE LOCATED N THE FED BY o TG= 9.43 TIE PROPEL AUTHOIM THE CONTRACTOR SHALL NOTIFY 'CALL BEFORE YOU DIG AT 81, ¢CIO Inv W=33 93 TIE LOCATION OF ALL UTWES AND LMERGROLND STaZIL E5 ARE APPROXIMATE AND Itnv W=3 88 MAY NOT ALL E SIM IT IS TEE RESPOSBI.ITY OF THE CONTRACTOR TO DETEWM Inv NE=3 .56I TIE DOSTBJCE AND EXACT LOCATION OF ALL UTILITIES AND UNDERGROLM STRUCTLRES. 5. IT 6 THE RESPOISWT OF THE CONTRACTOR TO BD AND PERFORM ALL UTILITY WOQC B N COMALIAACE TO ALL APPLICABLE LOCAL. AT STATE CODES AND REGUATION6. EXTENSION PROPOSED 6 TI-E CONTRACTOR 514ILL BE RESPCNSELE FOR ALL FEES ASSOCIATED WITH TIE ` OPEN CUT INSTALLATION, INSPECTING TESTING AND FINAL ACCEPTANCE OF ALL PRCPoSED UTILITIES °p ignw1 SEWER MAN TO CONSTRI.Crai strefj( 1E DP LINDER 7. CONTRACTOR 94ALL COORDINATE PATH THE APPROPRIATE UTILITY COMPANY ON TIE Siq c ROAD CROSSING ADDITION 2 MOVAL AND/OR RELOCATION OF UTLITES AND UTILITY POLES AND TI-E s ❑B EXTENSION OF ALL PROPOSED UTILITIES TO AAA STOLE I 4s ALL UTILITIES SHALL BE INSTALLED N ACCOMACC= WTH THE SPECIFICATIONS OF THE CO RESPECTIVE UTILITY COMPANY. IT 6 M RESPONSIBILITY OF TIE CONTRACTOR TO ENSLRE ALL UTILITIES ARE INSTALLED CORRECTLY TO MEET PROJECT W-G REMENPS VW ER Area at P62FOAED BY TIE CONTRACTOR OR NOT. ` Thro =36.8 ' Inv= .33 9. AN AS -BAT DRAWING OF NEW UTILITY SERVICES 94ALL BE PREPARED BY THE a CC MCT012 AND SEA/TTEO TO 1HE OWNER LPON CO1613ETION OF TIE PROJECT. ' 10. UTILITY COMPANIES AND CONTACTS ARE LISTED ON COVER SHEET. L COMW LOCATIONS TO PYLON SIGNS AND SITE LGHT POLES TO E COORDINATED WITH AAA 12 CONTRACTOR SIHALL COORDINATE WITH AAA ON TYPE AND 92E OF THE GREASE TRAP. ALL SANITARY SEWER PPE SPECFICATION PROVOEO EIMWERE. 1 l3 CONTRACTOR SHALL COORDINATE WITH AAA ON CONDLIT ROUTE TO STORE FROM THE: I TRANSFORMER AND/OR SERVICE UTILITY POLE FOR TELEPHONE AND ELECTRCAL. SERVICES It CONTRACTOR 94ALL REFER TO OTl•62 PANS NTHN TINS CONSTRUCTION SET FOR OTIV PERTINENT NFOAIATION 6. ALL FILL MATEIZAL IS TO E N PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED U rI ITES 16 CONTRACTOR SHALL NOTIFY M UTLTY AUTNORITES IFiECTORS 72 HOU2S BEO E CCNECW TO ANY DOSTM LINE. UTILITY COMPANIES AND CONTACTS ARE LISTED ON ti THE COVER SHEET. D. SANTA12Y SRO PPE SWILL LE N A00020MICE MT14 GIPL1A SPECS C273L a� IB WATER LINES SHALL LE N ACCORDANCE VM CFPUA SPECS 02660 B. MNLLAC 1REh1Ca WDTH SHALL BE 2 I$T. C 20. WATT32 AND SL3NHi LASS S4W BE KEPT TEN 00.1 APART PARAU81 OR Na OF7 CROSSING 6' VERTCAL CLEARANCE (OLIVE EDGE OF PPE TO OUTSIDE EDGE OF PPR EOOSTNG DARN SIN TO 8 CONTRACT(R 3WLL MAINTAIN A MNMAI OF 3'•9 COVER ON ALL WATERLINES. 3' BE PROCATED l$JTSDE OF 2Z N THE EVENT OF A VERTICAL �ITVG LESS THAN U BETWEEN WATERLTNE'a AND- CFRIA SEW62 EASEMENT. SANITARY LINES IEXSTING AND PROPOSEDL THE SANITARY LINE SHALL LE DLICTLE RON PIPE ° COORDINATE WITH OWNER WITH M 504AWAL JONTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING. TIE { WAMI E SHALL HAVE MECIWJCAL JONTS WRH APPROPRIATE THRLIST BLO06VG AS ' PRECON WW?ED PRDR REOXED. MiE£TNG REOLIPEMENTS OF 96 A2IO OR ANSI 21 (AWWA C-150 CLASS 50). TO CONSTRUCTION FEES TO E PAD PRIOR TO PE -COI OR 23 LINES LPOERGROU'D SHALL E INSTALLED, INSPECTED AND APPROVED SORE AT TIME OF SLIMING 13ACKFLLPG a CONTRACTCR SHALL PINT APPAJCATION 24. TOPS OF E(E5TM MAN40LES S4N1 E ADISED AS NECESSARY To E R 154 WITFL COORDNATE WM4 P20MO PAVEMENT BEVATIONS AND TO E ONE FOOT ABOVE FINS-ED GROIAD AR(l1TECTlRAI AND EXFTAG WATET2 AND ELEVATIONS WITH WATER TK3{T LDS Inv- C78 ' EO,PAM DRAWINGS FOR 5EW R SERVICES TO BE 256 ALL CORCJETE FOR ENCASEMENTS SHALL WAVE A MNILM 28 DAY COMPRESSION ' NLN852 AND LOCATIONS PROPERLY ABANDONED ON CONOUTS STRENGTH AT AT 3000 PSt S eat 'O gn Busin s 26 25:82 TO NT62KV RJAPIAG DRAWINGS FOR TE-N OF ALL UTLES. IT Sign T lla O GAT10N LAE TO BE II LANDSCAPE II `I ' Stop pII 3 15" RCP Inv= 9.08 wl CP wir Inv=3 .36 EXISTING HYDRANT / 1 / h I EXISTING PROPOSED DESCRIPTION ❑ ■ STORM DRAW INLET < - STORM DRAIN PIPE wv WATER LIPS we -is UNDERGROUND ELECTRIC LINE or* OVERHEAD ELECTRIC LINE we -tJr LNDEWGROLND TELEPHONE LINE oa, a GAS LINE u BB SANITARY SEWER LINE �s MANHOLE LIMITS OF DISTURBANCE UTILITY PLAN w DRAIM! LRS CI -ECHOED SITS DATE B/1/I8 SCALE AS NOTED DRAY" 21 n r, n I ' � EXISTING WATER EX6TNG SIRFACE I ' I T E)L6TNG 8' WATER LNE I I I III I i I I '8 52 LF. OF 8' DP • OA51 a D(ISTIJG Tf3ff41C�E LNE GAS LhE 177 LF. OF 8' PVC • 0.451 I i I I II I i zz Nt� XEARQM=M cQvmActm m Pmme OW�Hi G w�Iroi.9 48 LF. OF �I 8'PVC •0.451� 1 zl TE Toj EXISTNG MANaOLE I zl 25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 SANITARY SEWER EXTENSION _ (Cm cm- n n con ca cao cog coa col i I I I I I I I I II 1 - — J - SIRFACE I I I _ s LaFacE IG L9M A20H1 IIF. OF ; ; C • a% 6 LF. OF 4' PVC • L851 i ' � I 18 LF. OF 4' PVC • L853 W4' WATER U1E I , I I 1 — II LF. OF 6 PVC • 1851 I tr APPROXMA EXI OPXX�E TELEPF CONTRA CTOR T1 E E DEPTH PQAR ORDUM MAT CQNECT T PROPOSED WHOLE C I i NO LF. CF 6' PVC • 01 27 LF. OF 6' PVC • L851 zU 2 z� 20 LF. OF 6' PVC • 01 v-r vv vTJv ITVV IT...JV LTVV LTJV .Jtl.lV .]tJV Itt UL/ SANITARY SERVICE LINE CAR CENTER - C n n I i PROPOSED 2' WATER LW'— , I — — PROPOSED WACE — I I I I lu ENTRT ARCH) LF. OF PVC • 4.06t � i ; 92 LF. DF 6' PVC . PROPOSED IW STORM DUN 3.981 I 2 EXISTNG SL12FACE PROPOSED IF STORM DRAIN 1 � ` 0XIMAT NG KS 13 T6T-IOAE UCTORt�E, POTTO WLEA 4 VERFY DEPTH PROR TO oaoL3al4 ANY MATERIALS L.F. OF IC • 3501 I I I 89 LF. OF 6' PVC • 1001 I ' 137 LF. OF -7' 6 PVC • LO01 47 LF. 6' PVC OF • 1001 ' \ `COMECT TO PRCPOSM MAN40LE C 6 lF. OF 6' PVC LOOS I I I c�lli � chi a�l'i a�i rl0 Gig� I I O � a� .. IG t9 cYi G I 1 f l� I I 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 SANITARY SERVICE LINE CAR WASH - C v SEWER PROFILES REVISIONS BY Z Z � O q sppa p o� U Y 6c oLocn o�N Ncn D J �U)'� • C o ai y 0 .> W � W SE w � z . 2 U 6 a UQ°� LU Z I—�NO N Q Z001 OO of � a°o QO i0=C U Olt o� Q Q 0 Q `O� v DRAVW L.RS CI-IECKED BTS DATE 8/I/18 SCALE AS NOTED DRAY" 24