HomeMy WebLinkAbout20190090 Ver 1_PCN Form Submission_20190118D1�VR
�irlslan af Water Resources
Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned * Version#"
20190090 1
Is a payment required for this project?*
f No paymentrequired
� Fee received Reviewing Office *
f Fee needed - send electronic notification Central Office -(919) 707-9000
Select Project Reviewer"
Rob Ridings:eads\rgridings
Information for Initial Review
1a. Name of project:
Louis Stephens Drive EMension (SR 1632) from O'Kelly Chapel Road (SR 1628)/Little Drive (SR 2153) in RTP to Poplar Pike Lane in Morrisville AND Louis Stephens Drive (SR 1632)
and McCrimmon Parkway (
1a. Who is the PrimaryContact?*
Chris Murray
1 b. Primary Contact Email: * 1 c. Primary Contact Phone:"
cmurray@ncdoLgov (919)220-4633
Date Submitted
1 /18/2019
Nearest Body of Water
UT to Kit Creek
Basin
Cape Fear
Water Classification
26-41-1-17-2-(0.7); Class WS-IV NSW
Site Coordinates
Latitude: Longitude:
35.84645 -78.87935
I A. Processing Information
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?"
� Yes r No
Is this a NCDOT Project?"
� Yes r No
(NCDOT only) T.I.P. or state project number:
U-5827
WBS # (?)
44400.1.1
h
1a. Type(s) of approval sought from the Corps:
I7 Section 404 Permit (�,tietlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
rJ Nationwide Permit (NWP)
� Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
C' Yes r No
Nationwide Permit (NWP) Number:
14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
rJ 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
� Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Er,�ress
�J Riparian Buffer Authorization
1f. Is this an after-the-fact permit application?"
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
G Yes �' No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
U-5827 - Division 5- RW - CF 02.pdf
1h. Is the project located in any of NC's twenty coastal counties?
C' Yes r No
1j. Is the project located in a designated trout watershed?
f Yes r No
B. Applicant Information
1d. Who is applying for the permit?
fJ Owner I� Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
� Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Varioius owners of parcels and NCDOT
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
2612 N. Duke Street
Address Line 2
�Y
Durham
Fbstal / Zip Code
27712
S[ate / Rwince / Region
NC
Country
USA
72.06KB
*
C' Yes r No
C' Yes r No
�I
2e. Telephone Number:
(919)220-4633
2g. Email Address:*
cmurray@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(rf appropriate)
1 c. Nearest municipality / town:
Morrisville
2. Project Identification
2a. Propertyldentification Number:
0736616463,0736713404,0736701666,
0736707655,0736708167,0736800190,
0745182017 and 0745181338
2c. Project Address
SVeet Address
near 6361 Louis Stephens Drive
Address Line 2
�ty
Morrisville
Postal / Zip Code
27560
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:"
UT to Kit Creek
3b. Water Resources Classification of nearest receiving water:*
26-41-1-17-2-(0.7); Class WS-IV NSW
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
0303002
4. Project Description and History
2f. Fax Number:
2b. Property size:
S[ate / Awince / Region
NC
Cauntry
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Existing use is described as wooded land, developed roadways, utiliry easements and grassed shoulders.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
� Yes r No � Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS Topo Map Figure 1.pdf 3.71 MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil Survey Figure 1.pdf 2.65MB
Soil Survey Figure 2.pdf 720.66KB
4f. List the total estimated acreage of all existing wetlands on the property:
0.4 ac
4g. List the total estimated linear feet of all existing streams on the property:
100 perennial
4h. Explain the purpose of the proposed project:"
Construction of Louis Stephens Drive 6c[ension from e�sting Louis Stephens Drive near Little Drive to e�tisting Louis Stephens Drive near Gray Marble Road AND improvements to
McCrimmon Parkway and Louis Stephens Drive intersection.
4i. Describe the overell project in detail, including indirect impacts and the type of equipment to be used:*
Construction of Louis Stephens Drive 6c[ension from e�sting Louis Stephens Drive near Little Drive to exsting Louis Stephens Drive near Gray Marble Road AND improvements to
McCrimmon Parkway and Louis Stephens Drive intersection. Equipment may indude grader. crane, excavator. bobcat, paver, etc.
_;
�
4j. Please upload project drawings for the proposed project.
U5827_Rdy_90% Plans_12-21-18.pdf
5. Jurisdictional Determinations
17.04 MB
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?*
F Yes �' No C' Unknown
Comments:
Sb. If the Corps made a jurisdictional determination, what type of determination was made?*
G Preliminary f Approved C' Not Verified C' Unknown C' WA
Corps AID Number:
SAW-2017-01171
Sc. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Varioius
Agency/Consultant Company: see below
Other:
Sd. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
Delineated by Chris Burkhardt of Falcon Engineering in December 2015 and Additional study area by delineated by Nathan Howell and Chris Sheats in September 2017. Original PJD
provided on December 2Q 2017 and Revised PJD to cover additional study area on May 24, 2018.
Sd1. Jurisdictional determination upload
NCDOT_U-5827_Louis Stephens Drive 6ctension_PJD.PDF 1192KB
18-05-24_PJD_Expanded study area_NCDOT_LL5827_SR1632_Louis Stephens Drive EMension_Wake
118.61 KB
County_DivS.pdf
6. Future Project Plans
6a. Is this a phased project?*
C' Yes r No
Are any other NWP(s), regional generel permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
,r! Wetlands I17 Streams-tributaries fJ Buffers
r Open Waters I� Pond Construction
2. Wetland Impacts
Site #* (�) 2a1 Reason (�) 2b. Impact type *(') 2c. Type of W. * 2tl. W. name * 2e. Forested *�f. Type of 2g. Impact
Jurisdicition*(') area*
� Excavation P Headwater Forest Wetland B No Both 0.110
(acres)
� Mech. Clearing P Headwater Forest Wetland B No Both 0.030
(acres)
� Fill P Headwater Forest Wetland C No Both 0.030
(acres)
� Excavation P Headwater Forest Wetland C No Both 0.090
(acres)
� Mech. Clearing P Headwater Forest Wetland C No Both 0.070
(acres)
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.000 0.330
2g. Total Wetland Impact
0.330
2h. Comments:
Wetland sites were reviewed by Eric Alsmeyer.
3. Stream Impacts
❑ 3a. Reason for impact (') 3b.lmpact type * 3a Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact
(�) Jurisdiction" length"
k stabilization
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
15
3i. Total stream and ditch impacts:
34
3j. Comments:
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
� Neuse
r Catawba
r Goose Creek
r Other
3i. Total temporary stream impacts:
19
r Tar-Pamlico
� Randleman
rJ Jordan Lake
1� 15
Average (feet) (linear feel)
1�19
Average (feet) (linear feet)
I6b. Impact Type Il6c. Per or Temp II6d. Stream name Il6e. Buffer mitigation required? II6f. Zone 1 impact II6g. Zone 2 impact I
Site 1 allowable P Utto KitCreek No 1,353 1,147
6h. Total buffer impacts:
Zone 1
Total Temporary impacts: 0.00
Total Permanent impacts:
Total combined buffer impacts:
6i. Comments:
Zone 1
1, 353.00
Zone 1
1,353.00
Supporting Documentation
U-5827_Wetland and Surface Water Impacts Permit Drawings FINAL.pdf
U-5827_Buffer Impacts Permit Drawings FIPIP,L.pdf
E. Impact Justification and Mitigation
Zone 2
0.00
Zone 2
1.147.00
Zone 2
1,147.00
3.97MB
2.31 MB
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Stream impacts w�re reduced to the minimum required length along streambank to provide long-term stability. Fill slope in wetland areas are reduced
to 2:1 to minimize impact.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
Division 5 Environmental Supervisor or CEI employee will be on site during conshuction to identify methods to minimize wetland impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes �' No
2c. If yes, mitigation is required by (check all that apply):
Stabilization UT to Kit Creek Perennial
[erinq UT to Kit Creek Perennial
�
r �wR
I17 Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank �J Payment to in-lieu fee I� Permittee Responsible
program Mitigation
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached.
G Yes r No
4b. Stream mitigation requested:
Qinear feet)
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non-riparian wetland mitigation requested:
(acres)
4c. If using stream mitigation, what is the stream temperature:
4e. Riparian wetland mitigation requested:
(acres)
0.34
4g. Coastal (tidal) wetland mitigation requested:
(acres)
4h. Comments
Mitigation is proposed for wetland only impacts this projecL Previous conversations with Eric Alsmeyer indicate 1:1 mitigation ratio at Wetland Site 1
and 2:1 mitigation ratio at Wetland Site 2.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
G Yes � No
What type of SCM are you providing?
r Level Spreader
fJ Vegetated Conveyance (lower SHWT)
r Wetland Swale (higher SMNT)
r Other SCM that removes minimum 30 % nitrogen
r Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
U-5827 SWMP.pdf
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
G Yes r No
Comments:
Project is in compliance with NPDES permit.
G. Supplementary Information
1. Environmental Documentation
130.15KB
�
�I
1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental PolicyAct (NEPAISEPA)?"
� Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
C' Yes r No
Comme nts: *
Review not required.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
� Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality? *
f Yes r No
3b. If you answered "no," provide a short narrative description.
There are no plans to provide additional widening of the roadway facilities.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWRfor this project?*
r Yes r No r WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat7 *
r Yes �' No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
F Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
Sd. Is another Federal agency involved?*
f Yes r No
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
�' Unknown
S. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
See information attached to U-5827 Environmental summary for USACE.
Consultation Documentation Upload
U-5827 Environmental summary for USACE.pdf
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
C' Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Available mapping
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
127.04KB
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? *
f Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Coordination with NCDOT HEU unit.
7c. Historic or Prehistoric Information Upload
16-04-0014_NoSurveyReq for LSDE mainline hist arch.pdf
AR16-04-0014NoSurvey for LSDE mainline archaeology.pdf
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?"
� Yes r No
8b. If yes, explain how project meets FEMA requirements:
Mapping
Sc. What source(s) did you use to make the floodplain determination?"
SWMP
Miscellaneous
Comments
Miscellaneous attachments not previouslyrequested.
4.74MB
4.3MB
.
Signature ^
�J By checking the box and signing below, I certify that:
• I have given true., accurate., and complete information on this form;
. I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Siatutes (the "Uniform Electronic Transactions AcY');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Chris Murray
Signature
crf�,:s ytuj2�,4r
Date