HomeMy WebLinkAbout20090734 Ver 1_Other Agency Comments_20090731D--TV
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action ID. 200901432 County: Chatham USGS Quad: n/a
OPY
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
0
Property Owner / Authorized Agent: Progress Energy?? n
Address: ATTN: Gavle Lanier, VP Corporate Services JUl U
410 South Wilmington Street 3 1 2009
Raleigh, NC 27602 DENR VyATER QUALITY
N+ETIANDS AND STpRMWATER BRANCH
Telephone No.: 919-546-5200
Size and location of property (water body, road name/number, town, etc.): The project site is located on Buckhorn
Creek at Progress Energy's Buckhorn Generating Facility, an old power-generating plant not currently in use
The site coordinates are Latitude 35.53120 and Longitude -78.97526.
Description of projects area and activity: This permit verifies impacts to Buckhorn Creek and it's adiacent wetlands
and 2 unnamed tributaries during the removal of the generating facility and restoration of the Creek. Total
permanent impacts include 1537 linear feet of stream channel impact and 0.16 acre of permanent wetland impact
No mitigation beyond the proposed monitoring is required.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
? Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number:
Nationwide Permit Number: 27
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the
permittee to a stop work order, a restoration order and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified,
suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or
modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of
the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the
activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are
under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the
activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA),
prior to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Monte Matthews.
Permit Conditions: 1) All construction and monitoring methods as described in your Technical Report (attached to the
permit application) shall be implemented as presented.
Corps Regulatory Official: Monte Matthews Date: 07/30/2009
Expiration Date of Verification: July 30, 2011
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at our website at http://reizulatory.usacesurvey.com/ to complete the survey
online.
Page 1 of 2
Determination of Jurisdiction:
? Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area.
This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
( Reference 33 CFR Part 331).
? There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section
404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
? The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued . Action ID
Basis of Jurisdictional Determination: evidence of an ordinary high water mark and use of the 1987 Wetlands Delineation
Manual.
Appeals Information (This information applies only to approved jurisdictional determinations.)
Attached to this verification is an approved jurisdictional determination. If you are not in agreement with that approved jurisdictional
determination, you can make an administrative appeal under 33 CFR 331. Enclosed you will find a Notification of Appeal Process
(NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA
form to the following address:
District Engineer, Wilmington Regulatory Division
Attn: Jean Manuele, Project Manager,
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by September 30, 2009.
**It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official:
Date July 30, 2009
a..L
Expiration Date July 30, 2014
SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE
ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE.
Copy Furnished:
Eric Kulz, DWQ
Page 2 of 2
Action ID Number: 200901432 County:Chatham
Permittee: Progress Energy
Date Verification Issued: July 30, 2009
Project Manager: Monte Matthews
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
RALEIGH REGULATORY FIELD OFFICE
3331 HERITAGE TRADE DRIVE, SUITE 105
WAKE FOREST, NORTH CAROLINA 27587
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. If you fail to comply with this permit you are subject to permit suspension,
modification, or revocation.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date
NOTIFICATION OF AllN1INISTRATJVE APPh,AI_OPTIONS AND PROCLSS AND
REQL EST FOR APPEAL
Applicant: Progress Energy File Number: 200901432 Date: July 30, 2009
Attached is: See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of
permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding ?an administrative appeal of the above
decision. Additional information may be found at http://www.usace.armv.mil/inet/functions/ew/cecwo/reg or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the
permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the pen-nit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer
within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision If you only have questions regarding the appeal process you
and/or the appeal process you may contact: may also contact:
Monte Matthews Mr. Mike Bell, Administrative Appeal Review Officer
3331 Heritage Trade Drive, Suite 105 CESAD-ET-CO-R
Wake Forest, NC 27587 U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 9M15
Atlanta, Georgia 30303-8801
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any
government consultants, to conduct investigations of the project site during the course of the appeal process. You
will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site
investigations.
Date: Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Jean Manuele, Project Manager, Raleigh
Regulatory Field Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, North Carolina 27587
For Permit denials and Proffered Permits send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell,
Administrative Appeal Officer, CESAD-ET-CO-R, 60 Forsyth Street, Room 9M15, Atlanta, Georgia
30303-8801