Loading...
HomeMy WebLinkAbout20090839 Ver 1_CAMA Application_20090804 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary August 3, 2009 MEMORANDUM 090 83 9 TO: Cyndi Karoly Environmental Biological Supervisor Division of Water Quality FROM: Doug Huggett Major Permits Processing Coordinator t? r= ?E%10W'619 I AUG 4 2009 DEW - WATER QUALITY VIIETLANDS AND sToRMWATER BRANCH SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Donald J. Riley, Jr. Project Location: 909 Morgan St., Elizabeth City, adj. Charles Creek, Pasquotank County Proposed Project: Bulkhead, Fill, Pier, Platform, Accessory Storage Building Please indicate below your agency's position or viewpoint on the proposed project and return this form by 08/24/09 to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252-264-3901 1 FAX: 252-264-3723 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer NortliCarolina Naturally DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Donald J. Riley 2. LOCATION OF PROJECT SITE: 909 Morgan St., Charles Creek, Pasquotank County Photo Index - 2006: 237-7742(D,12) 1989:127-10(E,6) 1984:1121-749 (T,3) State Plane Coordinates - X: 91,000 Y: 935,000 EC Quadrangle (middle,left) GPS: D060815B 3. INVESTIGATION TYPE: CAMA, D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - June 8, 2009 Was Applicant Present - yes 5. PROCESSING PROCEDURE: Application Received Complete - July 22, 2009 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Elizabeth City Land Classification From LUP - Conservation, transitional (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing - central sewer system Planned -none (F) Type of Structures: Existing - 2 unit residential home Planned - storage building (G) Estimated Annual Rate of Erosion: 6"-10"/year Source - applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER 3,150 sq. ft. (A) Public Trust Shoreline (B) Public Trust Area 420 sq. ft. 200 sq. ft. shaded (C) vegetated wetlands 1,500 sq. ft. (D) Total Area Disturbed: 5,070 sq. ft. (E) Primary Nursery Area: no (F) Water Classification: SW Open: no 8. PROJECT SUMMARY: Construct a bulkhead along 210 feet of shoreline including 50 feet of bulkhead waterward of jurisdictional wetlands and fill behind the bulkhead. Construct a 10 ft x 4 ft pier with a 4 ft x 40 ft platform and a 30 ft x 45 ft accessory storage building 30 ft from NWL. Field Investigation Report Page 2 Project Setting The site of the proposed development is at 909 Morgan St (off SR 1164), Elizabeth City, Pasquotank County on Charles Creek. The tract is approximately 18,664 sq ft and is approximately 2 ft above NWL. Vegetation on this tract includes cypress trees along the shoreline both above and below NWL, pine trees and lawn grasses. There is a wetland area in the northeast corner of the property which is vegetated with cypress trees and typical wetland plant species. Existing structures on this site consist of a 2 unit residential home. There are remnants of a damaged bulkhead along the shoreline approximately 3-4 ft warterward of NWL. The site is surrounded by undeveloped city owned property on one side and a residential home on the other side. No submerged aquatic vegetation was observed. The waters of Charles Creek are closed to shellfish harvesting and are classified as SW waters by the Division of Environmental Management. Water depths in Charles Creek along the area of the applicant's property range from 2 ft to 6 ft further offshore. There are no known archeological sites of geologic formations associated with the applicant's property. Development Proposal The applicant proposes to construct 210 ft. of vinyl bulkhead and construct a 10 ft. by 4 ft. pier with a 4 ft. by 40 ft. floating platform. The proposed bulkhead alignment is an average of 2 ft waterward of NWL and a maximum of 4 ft. waterward of NWL. Along 160 ft of the proposed bulkhead the shoreline has a wetland fringe and along 50 ft. of the proposed bulkhead there are jurisdictional wetlands which extend approximately 30 ft landward of NWL. Shorelines on adjoining properties on either side are currently unstabilized. The proposed pier and platform will extend 14 ft. out into the creek which is approximately 70 ft. wide. Water depth at the end of the proposed pier is approximately 3'/2 ft. Anticipated Impacts The proposed development will stabilize 210 ft. of natural shoreline, and fill approximately 420 sq. ft. of public trust area, 3,150, sq. ft. of public trust shoreline, 1,500 sq. ft. of wetlands, and shade 200 sq. ft. of public trust area. Temporary water turbidity will occur in the area of the construction. SUBMITTED BY: Kelly D. Russell Date: July 30, 2009 09'0 83 9 11cm MP-1 APPLICHION for NK DEC 2 3 2008 t.. . Mayor Development Permit . TAL M,,NAe--r. (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information L bs " S.,% Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name 1 7' 19 Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State F ZIP 2,7q 6 Country ttSA Phone No. 2SS - 7.22L- ,z39?ext. FAX No. Street Address (if different from above) City State ZIP Ma /G 27869 Email CA P -15 K c)/?ac, 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 ext. Phone No. 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 52-808-280 .. 1-39 - RCOAS$ „ au*a ?.asr + :ssi a3aa e erg>. ?:t Form DCM MP-1 (Page 2 of 4) APPLICATION, for Major Development Permit 3. Project Location County (can be multiple) rsress State Rd. # 1h t? e_Q5MA_'1 5F. Subdivisi n Name City State Zip Phone No. Lot No.(s) (if many, attach additional page with list) ?? G? -7i 2Z- 34) l ext. 24,8 <7 S?1 /U 06 - I 7` a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project ' -e-f- c. Is the wafer bod. tified n b) above, natural or manmade? RaAAel2- A eAt* d. Name the closest major water body to the proposed project site. w IQNatural a, p --? AcrgmlvT'n ,8ym?ti?t3o's ' '(ap e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed P<es ?No work falls within. U C, :92 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 00 /mod, 6(441 sq -?t- c. Size of individual lot(s) t4 a ?.? ?3 j` Xl l d. Approximate elevation of tract above NHW (normal high water) or (If m l i l t tt h dditi l ith li t NWL (normal water level) ?NHW O/NWL any o s zes, p ease a ac a ona page w a ) s or e. Vegetation on tract CV,, iOtaS ";2? Z 61214,54 f. Man-made features and uses now on tract ?eS/OS?vC?' -' ?/?..?oi? ?rl?I?e•?n ? ?i,?. ?e-/???JVA?1'? ?O???LG?.?e g. Identify and describe the existing land uses adjacent to the proposed project site. G r Tk/ PQn.JC_oA,-1 A/! S h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? 7 _ 7 ' (Atta h zoning compliance certificate, if applicable) (4)-06, 4 ? Yes ?No ?NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes o k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ?No A If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes o ?NA National Register listed or eligible property? <Form continues on next page> 5 2-808-2 803 1 -8843-4C:'rr. , s°re8aa?^rit. e Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? EJ?es E]NNo (ii) Are there coastal wetlands on the site? ?Yes 9 o (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes 2 o (Attach documentation, if available) n. Describe existing wastewater treatment facilities. 5; ?oI FR7) 0 L/'vim i' o. Describe existing drinking water supply source. Il?t,7uLlr 1 y '. '";'+' a c17',V 4?47-25,f- p. Describe existing storm water management or treatment systems. , ?,?X?? ?' L- < ,?l/LaicX- /11,1V C%?e 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government Vrivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. e.? o rsn? - ??, ??o7e, e2vs csti c r : - Adze0X,7 V >M?PW'be- ?a yrnewT oF??ep?? ?v,?o??????Gr,/- c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. d. List all dev ment activities you propose. 04 inn S?Qr T el 0 / ' e. Are the proposed activities maintenance of an existing project, new work, or both? f. What is the approximate total disturbed land area resulting from the proposed project? Sq.Ft or ?Acres ?/ y?j /.?iff?-?? AE!A-A, %v-v ia%r c h?? 'J.7 /V Tu LtJI_ g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes o ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. , AVe,e7-- To M,7719ly7-e- 4e45.Jo7L11;0k iX'7 //?fr0 ?l an7, Cj?tJ?' i. Will WWtewater or stormwater be discharged into a wetland? ?Yes o ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No [ANA j. Is there any mitigation proposed? 3 Al es No ?NA If yes, attach a mitigation proposal. <Form continues on back> 2S2-303-2806 .. 1-888-4 C A T .. rass?aa. roc a# f s a 9 >? # Form DCM MP-1 (Page 4 of 4) APPLICATION for. Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e_ The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name rG4 GSOf?? C/l? J G?Tya c?Vt?jQ11P Phone No. Ci Address RO ,6 A-- 3Y7 zSZ -33<? "3 J-f`61, Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. C_1MA rte a I fi h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name D641A4'O s A' 4r-f Signature r _ DEC 2 3 2008 Please indicate application attachments pertaining to your proposed project. ?DCM MP-2 Excavation and Fill Information ?DCM MP-5 Brid es and Culverts QASTAIL tVU;(ViG;`?A f4?? ?DCM MP-3 Upland Development ?DCM MP-4 Structures Information 1 252-808-2808 ,. 1-888-4RCO A T Form DCM MP-2 EXCAVATION and FILL 4 - 200 (Except for bridges and culverts) jC UZCbeth City Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL stabilization Length Width Avg. Existing Depth NA NA Final Project Depth NA NA 1. EXCAVATION This section not a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of the excavation in these areas: d. High-ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? ?Yes ?No ?NA (ii) If no, attach a letter granting permission from the owner d. (i) Will a disposal area be available for future maintenance? ?Yes ?No ?NA (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ?Yes ?No ?NA (ii) If yes, how much water area is affected? or7 4 ' 3. SHORELINE STABILIZATION []This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Typaof shoreline stabilization: b. Length: Bulkhead ?Riprap []Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: ' zAfIfL Width: d. Maximum distance waterward of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 mon s? (es ?No ?NA (ii) If yes, state amount of erosion and source of erosion amount information. MI. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap 3RIV,? 44I `/ /? Breakwater/Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES his "section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? L JYes LJNo LJNA b. If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill (i) vvm tin materiai oe piacea in coasiai wetianasimarsn tt,vv), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL []None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? 22 C. (i) Will navigati al aids be required as a result of the project? []Yes to ?NA (ii) If yes, explain what type and how they will be implemented. Date AApplicame e Project Name d. (i) Will wetlands be used in transporting equipment to project site? []Yes No ?NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. t Form DCM MP-3 l?'ti a., 6 ., r? 4J DrC 2 3 2000 UPLAND DEVELOPMENT ?A3T;kLty?,?J?t{ > ? ? > (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT' a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. ZJ (j, /? ,r?CCt? ?? -rte c. Density (give the number of residential units and the units per acre). (,Z) L//t7'S JgXL 1/'U? y d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land-disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ?Yes ?No Qf4A f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. 51 C'a? (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways 0-wrking. - r_V E, h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ?Yes ?No &3lA i. Give the percentage of the entire tract to be covered by impervious (ii) If yes, list the date submitted: and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. CO(x:? S A 91 o r PAO po5zv( X9 e c e5;,(??j`7&-4I ?? Q/n n tt F?Fi9? SiR,uc?tz. ?aZ` 71 / a j. Describe proposed method of sewage disposal. k. Have the facilities described in Item (i) received state or local approval? ? 17G( ?rDiYl i i101? L l?,c; i S ??Q ?Yes ?No 26 y`?GL?ib R?/S?1S?? A_1, If yes, attach appropriate documentation. Sjzl.c?? 1. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). .6-'6A,1Cy , m. Does the proposed project include an innovative stormwater design? ?Yes ?No [INA If yes, attach appropriate documentation. 252-808-28082 :, 1-888--4RCOAST : www.nccoasfa_tmana ement.net revised: 12126106 Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) n. (i) Will water be impounded? ?Yes ?No , JA (ii) If yes, how many acres? o. When was the lot(s) platted and recorded? p. If proposed development is a subdivision, will additional utilities be installed for this?uplaan development? ?Yes ?No ;? A+? L0o9 Appli Sig, atur 1 252-808-2808 ° 11-888-4111COA v7" ;. kvw?t.nr_coas">atrnar"at?ess??nf.n?? revised; 12126106 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) 1? _8 M Ic-jizabeth City Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: b []Commercial []Public/Government nvate/Community c. (i) Dock(s) and/or pier(s) (ii) Number_ i (iii) Length (iv) Width (v) Floating Yes ?No e. (i) Are Platfor ms included? WYeS ?No If yes: (ii) Number (iii) Length T (iv) Width (v) Floating es ?No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siting: ? Land cut and access channel []Open water; dredging for basin and/or channel N0 en water; no dredging required []Other; please describe: k. Typical boat length: f m. (i) Will the facili ave tie pilings? []Yes o (ii) If yes number of tie pilings? []This section not applicable (i) Will the facilit e open to the general public? []Yes to d. (i) Are Finger Piers included? []Yes Leo If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes ?No f. (i) Are Boatlifts included? []Yes Dwo If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ? Full service, including travel lift and/or rail, repair or maintenance service ? Dockage, fuel, and marine supplies ? Dockage ("wet slips") only, number of slips: ? Dry storage; number of boats: ? Boat ramp(s); number of boat ramps: ? Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter ats, sail boats, mixed types). 1. (i) Will the facility pen to the general public? []Yes LVNo ajcz '3iu" (y „••?. n". ?•-°ns<.3 ?'. ..t, ..,,t# "ev`3se.$"i"x 1121127` 06 MI D'C'i I N! °3-4 ruc11urc. , Pages :Z of 4) 2. DOCKING FACILITY/MARINA OPERATIONS This section not applicable L a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: ; Location: ? Showers ? Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote Doat oasin nusnng r 1. If this project is an expansion of an existing marina, what types of services are currently provided? ??2 ?o3-2803 - d-883-aTF'COAS s -- - - nDvi d: I'" 27,'06 3' ts, a T'- z-,Muc` jre.s, page: 3 of ;4T, m. Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ?No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ?No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic uvejellbotiom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Government ?Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.,) his section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) his section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 16. MOORING PILINGS and BUOYS XThis section not applicable a. Is the structure(s): ?Commercial ?Public/Government ?Private/Community b. Number c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing d. Description of buoy (color, inscription, size, anchor, etc.) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 50'+ Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body WiC) b. Proximity of structure(s) to adjacent docking facilities. nLn nearb-] d. Water depth at waterward end of structure at NLW or NWL ?4- , e. (i) Will navigatio aids be required as a result of the project? ?Yes to MNA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ?°This section not applicable a. Give complete description: Dafte? Project Na e ?Z16 (7, Applicar4Name Applicant Sig tare Capt. Donald J. "Skip" Riley P.O. Box 8187 Honolulu, Hawaii 96830 252.722.2399 captskiprilevnaol.com March 17, 2009 North Carolina Dept. of Environment and Natural Resources Mr. Frank A. Jennings, III, District Manager 1367 U.S. 17 South Elizabeth City, N. C. 27909 Tel. (252) 264-3901, Fax (252) 264-3723 www.nccoastalmanagement.net RE: "909 Morgan St. Shoreline Stabilization Permit application information Dear Mr. Jennings, Page 1 of 2 4 PJ ??? ?3 ? f ,J ? AEI Thank you for your letter of December 28, 2008 outlining the initial screening of my shoreline stabilization application. Pursuant to your request to provide additional application information I telephoned field representative Kelly Russell. The purpose of my call was to let your office know that I had been delayed in Honolulu due to a medical procedure. Fortunately, the procedure has been successful. To this end I will be able to return in mid May this year to meet with your office. With regards to your requests, I have reviewed your letter, the returned application and site map. I have endeavored to provide correctly the information you requested. I have attempted to follow the step by step requests under item #I and #2. Item #3, a narrative is addressed as follows: Item #3: The shoreline stabilization projects in mind at 909 Morgan St. are Inclusive of the following: a) To reconstruct an old and remnant bulkhead around the periphery of the property. The remnant bulkhead is readily observable from mid to low water. Its position and location confirms the natural erosion of which has occurred over the years. The replacement bulkhead is depicted in the attached proposal diagram. b) To provide a short, along the bulkhead pier at the West side for small boat tie up. This pier is depicted on the sites map attached. c) To provide fill material in the wet land area behind the bulkhead around the periphery of the property. The justification of the fill is to regain the lost land area. d) To provide fill material within the NW side of the property. This area is approx. 1,200 square. Ft. or 40 ft. x 30ft... I have recently cleared the area of old stoves, car parts, tires, poison ivy, shingles vines etc... The justification of this project is to provide the fill necessary to reclaim the lost land area eroded and misused over the years; to beautify the area in line with the City of Elizabeth City Page 2 of 2 beautification projects concurrent in the area. To be able to use the area as open space. The fill will also discourage the transit of water snakes, some of which may be poisonous. The fill area is small and will impact the existing environment little if at all. The project will improve and enhance this recreational-park like environmental. e) The project will indirectly enhance the infrastructure. It will enhance property values in the area. The costs of this project will provide jobs for duration of the project. f) Construction of an accessory structure of which may encroach slightly into the required CAMA 30% setback. *Though any encroachment will attempt to be avoided, it appears that an encroachment of a maximum of four ft by five ft. (4'x5' or 20 sqe. ft.) may be required in order to gain the footprint for the proposed structure. Permits for the structure will be gained through the City of Elizabeth City building department and will conform to their required setback of 7 ft. on the other side (North side). However, any encroachment as noted will attempt to be avoided. *Please note should the bulkhead be constructed the CAMA setback will then conform at 30ft. Justification of the accessory structure encroachment of approx. 20 sqe. ft. is to be able to use and enjoy the unique benefits and qualities of this creek side residential property. I hope the preceding meets the requirements of item #3 of your December 28, 2008 letter. Please advise me should additional information be required. With regards to Item #4 I will provide copy of a personal property tax document or copy of the deed as I can dig these up. Likely, I will have to provide these to you in person when I return in May. Item #5 has already been submitted. Mr. Rich Olson, City Manager of the City of Elizabeth City has already signed off as the riparian land owner for this project. The City of Elizabeth City owns all of the surrounding property. Please check your file. This document submitted in December 20, 2008 was not returned to me. I hope it remains in your possession. Item #6, a check for $250.00 is enclosed. Thank you for your informative letter. I hope my application and corrected sites maps provide the information your office seeks to be able to proceed with this permit process. Please do let me know how I can continue to make your efforts easier to this matter. I look forward to meeting with you in May. -lit 014 ' K Oft wool% I ? Y CT` `?fI 2 3 2000 lit P,0,4) WATEXARCAT, 7?1Z?o%nJ 13 Y ?. ,T Y<lL? CITY C.14PA-LE5 CREE4- C w ppyz?- ) - pArz? ?kN- '- a `i i ' ? L 74 y .N J MAIL X0J ii.A • T.A. o?0(=? v05-qxwr6z, . `ZM Ckorle.s Crtck r r[PL;-, ?ui?,? - C-A ?. .r 4?. t F 'o. ) t-- 4 Q t -5 ?G ?G j u ," , ter, "'?? X V Z?x -1-2 0 v ?J ? Ar J u I ? ?x 1 ?I II I .n Ole- u? twx f t? J ? 3 20tj,?? d aj N ' ily Y ? Flo GEC z 3 2308, U.S. DEPARTMENT OF HOMELAND SECURITY ELEVATION CERTIE1CAT o? B No. 1660 0008 Federal Emergency Management Agency 1?=rk ±v` j Expires February 28. 2009 Nat ona' Flood Insurance Program Important: Read the instructions on pages 1-8. SECTION A - PROPERTY INFORMATION For Insurance Company Use: =,'. Bu ;d,^g O,.vner's Name Z'1_A"4L.0 C1 ? 1 LL A7, Policy Number A2. Building Street Address including Apt., Unit, Suite, and or Bldg. No.) or P.O. Route and Box No. Company NAIC Number 7? , .t w J a _ city State ZIP Code '?' -Z' , C • i'7?? Al, (-' A4 A5 A6 A7 A8 Building Use (e.g., Residential, Non-Residentitiall,, Addition, Accessory, etc.) l Latitude/Longitude: Lat. - v t 7, ?C . Long. _ 76 •° i Horizontal Datum: Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. Building Diagram Number 17 NAD 1927 ? NAD 1983 For a budding with a crawl space or enclosure(s), provide; A9. For a building with an attached garage, provide: a) Square footage of crawl space or enclosure(s)sq ft a) Square footage of attached garage --?"" sq ft b) No. of permanent flood openings in the crawl space or b) No. of permanent flood openings in the attached garage enclosure(s) walls within 1.0 foot above adjacent grade walls within 1.0 foot above adjacent grade c) Total net area of flood openings in A8.b ?-"?- sq in c) Total net area of flood openings in A9.1b sq in SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B 1. NFIP Community Name 8 Community Number 82. County Name B3. State B4. Map/Panel Number B5. Suffix B6. FIRM Index B7. FIRM Panel B8. Flood B9. Base Flood Elevation(s) (Zone l J Date Effective/Revised Date Zone(s) AO, use base flood depth) 810. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item B9. ? FIS Profile v' FIRM ? Community Determined ? Other (Describe) B1 1. Indicate elevation datum used for BFE in Item 69: ? NGVD 1929 ??rNAVD 1988 ? Other (Describe) B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ? Yes No Designation Date ?CBRS ? OPA SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) C1. Building elevations are based on: ? Construction Drawings' ? Building Under Construction' Finished Construction •A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations -Zones Al-A30, AE, AH, A (with BFE), VE, V1-V30, V (with BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO. Complete Items C2.a-9 below according to the building diagram specified in Item A7. Benchmark Utilized ? "6, Lilly km 17 Vertical Datum A, 'C'- V9 Conversion/Comments Check the measurement used. a) Top of bottom floor (including basement, crawl space, or enclosure floor) C.?_t J feet ? meters (Puerto Rico only) b) Top of the next higher floor r a LU feet ? meters (Puert Ri l c) Bottom of the lowest horizontal structural member (V Zones only) 144 feet o co on y) ? meters P Ri l t d) Attached garage (lop of slab) v(?? feet ( uer o co on y) ? meters (Puerto Rico only) e) Lowest elevation of machinery or equipment servicing the building [ feet ? ? meters (Puerto Rico only) (Describe type of equipment in Comments) ???TTTT? 0 Lowest adjacent (finished) grade (LAG) . 'tG'_ feet ? meters (Puerto Rico only) g) Highest adjacent (finished) grade (HAG) ?L_afeet ? meters (Puerto Rico only) bLU I JUN D - 5URVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by-law to certify elevation information. I certify that the information on this Certificate represents my best efforts to interpret the data available II understand that any false statement may be punishable by fine or imprisonment under 18 U. S. Code, Section 1001. L_J Check here if comments are provided on back of form. Certifiers Name License N tuber ,. 'E F Civrr'1 r-vI rr1 0 1 -a 1, reoruary zvub See reverse side for continuation. Replaces all previous editions T;tle ,yy Company Name v /x729 '4=Li4_ C`trJtO & , C' IMPORTANT: In these spaces, copy the corresponding Information from Section A. For Insurance Company Use: Building Street A dress (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. Policy Number >v- L ii ??. 7 {? City State ZIP Code Company NAIC Number SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building o5rrier- '-- •• Comments TL 2 3 200 r ?r' Date Signature ? Check here if attachments SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE) For Zones AO and A (without BFE), complete Items E1-E5. If the Certificate is intended to support a LOMA or LOMR-F request, complete Sections A, B. and C. For Items E1-E4, use natural grade, if available. Check the measurement used, in Puerto Rico only, enter meters. E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent grade (HAG) and the lowest adjacent grade (LAG). ? ? below the HAG. a) Top of bottom floor (including basement, crawl space, or enclosure) is _ ? feet ? meters above or b) Top of bottom floor (including basement, crawl space, or enclosure) is _ ? feet ? meters ? above or ? below the LAG. E2. For Building Diagrams 6-8 with permanent flood openings provided in SectiqnA Items-8 and/or 9 (see We 8 of Instructions), the next higher floor (elevation C2.b in the diagrams) of the building is . _ ? feet meters ? above or L_J below the HAG. E3. Attached garage (top of slab) is ? feet ? meters ? above or ? below the HAG. E4. Top of platform of machinery and/or equipment servicing the building is . _ ? feet ? meters ? above or ? below the HAG. E5. Zone AO only: if no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance? ? Yes ? No ? Unknown. The local official must certify this information in Section G. SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA-issued or community-issued BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge. Property Owner's or Owner's Authorized Representative's Name Address City State ZIP Code Date Telephone Signature Comments ? Check here if attachments SECTION G - COMMUNITY INFORMATION (OPTIONAL) The local official who Is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A. B, C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below. Check the measurement used in Items G8. and G9. G1. ? The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) G2. ? A community official completed Section E for a building located in Zone A (without a FEMA-issued or community-issued BFE) or Zone AO. C;3. ? The following information (Items G4.-G9.) is provided for community floodplain management purposes. G4. Permit Number G5. Date Permit Issued G6. Date Certificate of Compliance/Occupancy Issued G?. This permit has been issued for: ? New Construction ? Substantial Improvement feet ? meters (PR) Datum G8. Elevation of as-built lowest floor (including basement) of the building: 11 G9. BFE or (in Zone AO) depth of flooding at the building site. ? feet ? meters (PR) Datum Local Official's Name Community Name Signature Comments Title Telephone Date ? Check here if attachments FEMA Form 81-31, February 2006 Replaces all previous editions QUOTE MERCO, INC. 60 MERCO ROAD WELLSBURG, WV 26070 Phone: (800) 396-3726 Fax: (304) 737-3008 Date 01/20/09 QUOTE No. 12487 Req. Date: 01/20/09 Page: 3 11 Ship to/Remark SKIP RILEY 2-8'X20' WOOD DOCK SECTIONS P.0. BOX 1066 BUILT-2"X8" SIDE STRINGERS ELIZABETH CITY, NC 27909 & CORRECT DECK COMPOSITE 252-722-2399 DECKING 4'X20' WALKWAY zv `Xyo, Via FOB Terms Your# Rep. TRUCK WELLSBURG CASH IN ADVANCE VBL JIM Description Quantity Unit Price Extended Item Number Measure Discount % THIS DOCK WOULD BE BUILT & READY TO DROP IN THE WATER. LEAD TIME ON THIS DOCK IS ABOUT 3WEEKS. IF YOU HAVE ANY QUESTIONS, FEEL FREE TO GIVE ME A CALL. THANKS FOR CONSIDERING MERCO MARINE FOR YOUR DOCKING NEEDS. Sub-Total 9114.27 Tax 0.00 Freight 0.00 Total 9114.27 r -?l o 0 3 SC tZn 3 wCD $ o3 0 ODmOam D C) O 00 ?O X CrIj N ., ® ° O o g m O ? N o ? M o rn co x ? v 3 3° ? _ ? n M to 0 U C v O N 3 C7 o Z o o g m 0 3 MAJOR PERMIT FEE MATRIX Applicant: V° N A C'D J, R BEY, s R Selection Development Type Fee DCM % (14300 1601 435100093 1625 6253) DWQ % (24300 1602 435100095 2341) 1. Private, non-commercial development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas: Ill. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 3490 (See attached can be applied: III(B). Public or commercial development, if General $400 100%($400) 0%($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or open water areas: