HomeMy WebLinkAbout20080737 Ver 10_Project Losses Following Recent Rains_20180813Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Joanne,
Price, Gregory W
Monday, August 13, 2018 11:02 AM
Steenhuis, Joanne
Rerko, James J; Sarah.E.Hair@usace.army.mi)
FW: [External] Project Losses Following Recent Rains
Fayetteville Outer Loop received approximately 4 inches of rain through last
night. Below is summary of losses sent from Scott. The crews are in process of
removing lost sediment. Let me know if you need anything else. Thanks.
Gregory W. Price, PWS
Division 6 Environmental Specialist
North Carolina Department of Transportation
910 364 0835 office
919 914 1200 mobile
qwprice2(a�ncdot.qov
1000 Transportation Drive
Fayetteville, NC 28302
� ���
� � ��x;.
� �� xi ���; .
�
3h ' c
„i "�' ,' � .'hx§ '�S � ,,. Yx .
� ���x
� � ::� °.
� � �� �
}.� � x�.� :
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: Hardison, Scott [mailto:Scott.Hardison@mbakerintl.com]
Sent: Monday, August 13, 2018 10:49 AM
To: Price, Gregory W<gwprice2@ncdot.gov>; Rerko, James J<jjrerko@ncdot.gov>
Cc: Tim Kincaid-Conti <tkincaid@conticorp.com>; tfancher@conticorp.com;
rphillips@contienterprises.com; greynolds@conticorp.com; Blackman, Troy J
<TJBlackman@mbakerintl.com>; Bennett, Allen W <Allen.Bennett@mbakerintl.com>;
McLean, Jonathan <Jonathan.McLean@mbakerintl.com>; Gregson, Jonathan
<Jonathan.Gregson@mbakerintl.com>; Davis, Cecil <Cecil.Davis@mbakerintl.com>;
McDonald, CJ <CJ.McDonald@mbakerintl.com>; Lester, Taylor
<Taylor.Lester@mbakerintl.com>; Smith, Timothy <Timothy.Smith@mbakerintl.com>;
rwaltman@conticorp.com
Subject: [External] Project Losses Following Recent Rains
Greg/Jim,
As earlier discussed, the project received 3.998" of rainfall end of week through
last night. Crews are pursuing sediment removal operations, repairs/maintenance
and corrective actions throughout the project today. Temporary Seeding is also
being performed today, as well as spot seeding/touch ups after crews exit areas
that were disturbed or damaged by equipment due to corrective actions or
dressing of washed areas. See below for listing of Losses Beyond Project Limits:
Losses Bevond Proiect Limits
l. L STA. 54+00 LT (Double 48 RCP's) 3 CY Combined
@ Outlets
2. New Chicken (Y4REV
Splash Pad
3. L STA. 860+00 RT
SF)
4. L STA. 853+00 RT
Failure)
5. L STA. 848+00 RT
(Topped HW/SF)
6. L STA. 810+00 RT
(Topped SF/HW)
Thanks,
Scott Hardison
72" RCP Outlet
3 CY End of
-0.5 CY (Topped
-0.5 CY (HW
-20 Gallons
-20 Gallons
Erosion & Sediment Control TT III
Michael Baker International
Fayetteville Outer Loop Project
Cell: 919-524-3275
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,