HomeMy WebLinkAboutDEQ-CFW_00022338From: TotalAccess [totalaccess@testamericainc.com]
Sent: 7/11/2017 8:36:05 PM
To: Satterwhite, Dana [/o=ExchangeLabs/ou=Exchange Administrative Group
(FYDIBOHF23SPDLT)/cn=Recipients/cn=b5cf94a2dac14220b1b5a700528745c0-dsatterwhit]
CC: Culpepper, Linda [/o=ExchangeLabs/ou=Exchange Administrative Group
(FYDIBOHF23SPDLT)/cn=Recipients/cn=73d475cbae324a29687e1711dc9a79c5-ImcuI pepper]
Subject: Report (J98886-1 STD_TAL_L4 REV(1) FINAL REPORT.PDF) available for download for Chemours Company FC, LLC The
- Newark [280-98886-1]
Job
280-98886-1
280-98886-1
Denver
Job Description: FAY-NC-DWR HFPO-DA SAMPLING Project Number:
Lab PM: Michelle Johnston Date Due: 07/17/17 23:59
Status: Reported Date Received: 06/30/17 08:50
Status Date: 07/11/17 12:39 Date Logged: 06/30/17 15:09
The report (J98886-1 Std_Tal_L4 Rev(1) Final Report.pdf) is available for download from TotalAccess.
This is an automatically generated e-mail sent to you per your request on the TotalAccess site
(https:/lsecure.testamericainc.com/totalaccess). If you do not wish to receive these emails, please change the option under the
TotalAccess Preferences page. If you receive multiple e-mails for this project, please contact your project manager.
DEQ-CFW 00022338