HomeMy WebLinkAboutDEQ-CFW_00020746From: Culpepper, Linda [/O=EXCHANGELABS/OU=EXCHANG[ADMINISTRATIVE GROUP
(FYD|BOHF2]SPDLT)/CN=REOP|ENTS/CN=73D475CBAE324A29B87E171IDC9A79C5-UNCULPEPPER]
Sent: 2/10/I0I71:47:07PW1
To: Barber, Jim [/b=ExzhanXeLabs/ou=ExchangeAdministrative Group
(FYD|8OHFZ33PDO)/cn=Redpient$cn=4717O5c7376O4a1db3Oe%7b1]4O9fa3]'djbarber];Doby,Troy
[/o=ExchangeLabs/ou=ExchangeAdministrative Group
(FYD|8OHFZ33PDO)/cn=Redpient$cn=]7cba414af7645O8a657b8d66IfIba8d-tdoby]
CC: Thornburg, Nathaniel [/o=ExchangeLabs/ou=Exchange Administrative Group
(FYD|8OHFZ33PDO)/cn=Redpient$cn=5I4O96ddafOf4ab18ad5fcbhabI49Ocb-ndthornburX];Allen, Trent
[/o=ExchangeLabs/ou=ExchangpAdministrative Group
(FYD|BOHF2]SPDQ]/cn=Redpient$cn=2c4dabaf957c4223abc79cfefa6b462e-taUpn]
Subject: RE: Chpmoursformerly DuPont Fayetteville Works
Thanks for including me. Noother insight onmybehalf atthis point.
Appreciate Joe looking at it from their prospective.
Unda Culpepper
Deputy Director
Division of Water Resources
North Carolina Department ofEnvironmental Quality
1611Mail Service Center
pnnne�919'7079011
Sent: Thursday, February O9 201711BAM
To: Doby,Troy ^troy.doby@ncdenr.Bov>
Cc: Culpepper, Linda <Iinda.cul pepper@ ncdenr.gov>; Thornburg, Nathaniel <nathaniel.thornburg@ncdenr.gov>; Allen,
Trentxtrent.aUen@ncdenr.gov>
Subject: [hemounformerly DuPont Fayetteville Works
Troy;
Aavvediscussed on Tuesday; my interest in reaching out to DVVK4 —Haz.Waste Section was togive them the opportunity
tomakecommentsonthepropoua|to|andapp|ythe[|ass"A"materia|vvithinthep|antsite(seeattachedmapand
location labeled class "\A/,site ). Larry Stanley was the project manager with DVVM — HVVwhen the original permit was
issuedforthe|andapp|icadonareaoutsideofthep|antfence(c|ass"A"area2U12).Larryxvasadamantthatthemateria|
stay on DuPont property and orifitleft, that it8oto a proper disposal site ( i.e. lined landfill either in Robeson or
Sampson County). There are numerous monitoring wells inside the plant site scattered amongst the different business
units. The issue was the potential to introduce PFOA onto other areas of the plant site that could have monitoring wells
and the well(s) detect PFOAvvhen historically they haven't.
Based on your contact/correspondence with Joe Ghiold, new project manager of the Chemours site, isfine with the
I'm copying Linda Culpepper with this email since she may have insight or comments related to this site.
Jim Barber
Environmental Engineer
910-433-3340 voice
910-486-0707 fax
E-mail correspondence to and from this address may e subject to the North Carolina Public Records Law and
may be disclosed to third parties.
Go Green! Print this o..ai ;only Mien nK : es>ary. thank you for heiping NCDENR bo env ronmontaliy rep oon:s blc .
DEQ-CFW 00020747