Loading...
HomeMy WebLinkAboutDEQ-CFW_00020746From: Culpepper, Linda [/O=EXCHANGELABS/OU=EXCHANG[ADMINISTRATIVE GROUP (FYD|BOHF2]SPDLT)/CN=REOP|ENTS/CN=73D475CBAE324A29B87E171IDC9A79C5-UNCULPEPPER] Sent: 2/10/I0I71:47:07PW1 To: Barber, Jim [/b=ExzhanXeLabs/ou=ExchangeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=4717O5c7376O4a1db3Oe%7b1]4O9fa3]'djbarber];Doby,Troy [/o=ExchangeLabs/ou=ExchangeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=]7cba414af7645O8a657b8d66IfIba8d-tdoby] CC: Thornburg, Nathaniel [/o=ExchangeLabs/ou=Exchange Administrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=5I4O96ddafOf4ab18ad5fcbhabI49Ocb-ndthornburX];Allen, Trent [/o=ExchangeLabs/ou=ExchangpAdministrative Group (FYD|BOHF2]SPDQ]/cn=Redpient$cn=2c4dabaf957c4223abc79cfefa6b462e-taUpn] Subject: RE: Chpmoursformerly DuPont Fayetteville Works Thanks for including me. Noother insight onmybehalf atthis point. Appreciate Joe looking at it from their prospective. Unda Culpepper Deputy Director Division of Water Resources North Carolina Department ofEnvironmental Quality 1611Mail Service Center pnnne�919'7079011 Sent: Thursday, February O9 201711BAM To: Doby,Troy ^troy.doby@ncdenr.Bov> Cc: Culpepper, Linda <Iinda.cul pepper@ ncdenr.gov>; Thornburg, Nathaniel <nathaniel.thornburg@ncdenr.gov>; Allen, Trentxtrent.aUen@ncdenr.gov> Subject: [hemounformerly DuPont Fayetteville Works Troy; Aavvediscussed on Tuesday; my interest in reaching out to DVVK4 —Haz.Waste Section was togive them the opportunity tomakecommentsonthepropoua|to|andapp|ythe[|ass"A"materia|vvithinthep|antsite(seeattachedmapand location labeled class "\A/,site ). Larry Stanley was the project manager with DVVM — HVVwhen the original permit was issuedforthe|andapp|icadonareaoutsideofthep|antfence(c|ass"A"area2U12).Larryxvasadamantthatthemateria| stay on DuPont property and orifitleft, that it8oto a proper disposal site ( i.e. lined landfill either in Robeson or Sampson County). There are numerous monitoring wells inside the plant site scattered amongst the different business units. The issue was the potential to introduce PFOA onto other areas of the plant site that could have monitoring wells and the well(s) detect PFOAvvhen historically they haven't. Based on your contact/correspondence with Joe Ghiold, new project manager of the Chemours site, isfine with the I'm copying Linda Culpepper with this email since she may have insight or comments related to this site. Jim Barber Environmental Engineer 910-433-3340 voice 910-486-0707 fax E-mail correspondence to and from this address may e subject to the North Carolina Public Records Law and may be disclosed to third parties. Go Green! Print this o..ai ;only Mien nK : es>ary. thank you for heiping NCDENR bo env ronmontaliy rep oon:s blc . DEQ-CFW 00020747