Loading...
HomeMy WebLinkAbout19920341 Ver 1_COMPLETE FILE_19920728?? cq State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor A. Preston Howard, Jr., P.E. William W. Cobey, Jr., Secretary July 29, 1992 Acting Director Mr. Jerrel J. Freeman, P.E. North Carolina Ports Authority P.O. BOX 9002 Wilmington, N.C. 28402 Dear Mr. Freeman: Subject: Proposed Fill in Waters Replacement of tide gate and rip rap New HAnover County DEM Project #92341, COE Project #199202638 Upon review of your request for Water Quality Certification to place fill material in 300 square feet of water to replace a tide gate and rip rap located at Greenfield Creek in New Hanover County, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2665 issued January 21, 1992. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 13. If you have any questions, please contact John Dorney at 919/733-1786. Sincerely, L-A? Preston Howard, Jr P GTE:JD l Attachment I cc: Wilmington Dis rict Corps of Engineers Corps of Engineers Wilmington Regional Wilmington DEM Regional Office Mr. John Dorney Central Files Division of Coastal Management, Raleigh REGIONAL OFFICES E. Office Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 9 919/946-6481 9 19/395 -3900 9 19/896 -7007 Pollution Preventlon Pays 11.0. 13oz 29535, Ralcigh, North Carolina 27626-0535 'T'elephone. 919-733-7015 An Fqual Opportunity Affirmative Action Employer -2 C- State of North Carolina Department of Environment, Health, and Natural Resources Division of Coastal Management James G. Martin, Governor William W. Cobey, Jr., Secretary June 22, 1992 NEM3RANDU14 yrtlnitn°n rt ,: o,,, TO: Dr. George T. Everett, Director Division of Environmental Management FROM: John R. Parker, Jr., Chief Major Permits Processing Section SUBJECT: CAMA/Dredge & Fill Application Review Applicant: North Carolina State Ports Authority Roger N. Schecter Director IR wire-Ington Project Location: Wilmington Facility east bank of the Cape Fear River near the east corner of the port's property along river. Proposed Project: The applicants propose to replace the existing wooden tide gate with a sheet pile gate and to stabilize the adjacent banks. Please indicate below your agency's position or viewpoint on the proposed project and return this form by July 13, 1991. If you have any questions regarding the proposed project, please contact at extension when appropriate, in-depth comments with supporting data are requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date 127 ( .irduml I)nvc ztcminn • Wilminl!tn6 Nurth (.mdimi )8.105 i815 • Irlrhhumc !0191 Oh OW • Fax (919) isO 2(M),i All I ((ual ( )1)J,(v1111)ly AIlnm.urvc A, Uirn I nt{)luycr To: John Dorney Planning Branch 1 J11 JUL 8 DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW ?-MITY WSGROUP-'? SECTION PROJECT NAME: North Carolina State Ports Authority COUNTY: New Hanover Project #: 92341 STREAM OR ADJACENT WATER BODY: Cape Fear River CLASS: SC OPEN OR CLOSED: Closed STORMWATER PLAN REQ'D: No IF YES, DATE APPROV PROJECT DESCRIPTION: T applicant proposes to replace an existing tide gate and r p. REVIEWER: Gregso DATE APP. REC'D: 2/061 RETURNED: RESUBMITTED: INITIAL REPORT FINAL REPORT: 92/07/01 NOTICE: No RECOMMENDATION: Issue (ISSUE/DENY/OTHER) WATER QUALITY CERT. (401) CERT. REQ'D: Yes IF YES, TYPE: General Certification 2665 for bank stabilization. SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOSED: N/A (EXISTING, PROPOSED, SEPTIC TANK ETC.) TO BE PERMITTED BY: N/A (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: N/A WATER/WETLAND FILL AREA OF FILL: WATER: 298 sq. ft. WETLAND: N/A IS FILL ELIMINATING A SIGNIFICANT USE? No DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? N/A IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? N/A MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A (ATTACH A MARINA USE ATTAINABILITY EVAL.) wr 92341. Jul Page Two RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: That the project be done in such a manner so as to not cause turbidity outside the immediate construction area to exceed 25 NTU. JHG:92341.Jul cc: Central Files Wilmington Regional office Files DCM-Bob Stroud NORTh CAROLINA NORTH CAROLINA STATE PORTS AUTHORITY POST OFFICE BOX 9002 I WILMINGTON, NORTH CAROLINA 284021(919) 783.1821 CHARLES T. KNIGHT, P.E. Senior Engineer Mr. Bob Stroud N. C. Department of Environment, Health and Natural Resources 127 Cardinal Drive Extension Wilmington, N. C. 28405-3845 Re: Tidal Control Gate Replacement NCSPA Project I/H-125 Dear Mr. Stroud: Enclosed for review and approval is a plan and permit application for replacing the tidal gate at the mouth of Greenfield Creek. Also enclosed is criteria for determining whether a project is a major or non-major action. N. C. State Ports Authority feels this project is non-major and therefore exempt from reporting requirements of the North Carolina ?ttvironmental Policy Act for the following reasons: - Maintenance of a nonbuilding structure. - Construction below the thresholds established for major actions. Please do not hesitate to contact me if more information is required. Thank you for your timeliness concerning this project. Sincerely, Gerald Devito P. E. Marine Engineer 'JUN 5 1992 GD:gmw enclosure DIVISION OF COASTAL MANAGEMENT SINCE 1945 + DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name North Carolina State Ports Authority 2. Location of project site Wilmington Facility east bank of the Cape Fear River near the east corner of port's property along river. PHOTO INDX: 1989: 4_179_24 Grid L-7 1984: 15 188 Grid P-12 STATE PLANE COORDINATES: X: 231620 Y: 0169800 3. Investigation type: Dredge & Fill X CAMA X 4. Investigative procedure: (A) Dates of site visit 5L5 92 (B) was applicant present ___yes 5. Processing procedure: Application received 6L/92.- Office WiRO 6. 7. Site description: (B) AEC(s) involved: (C) water dependent: (D) Intended use: (A) Local Land Use Plan Wilmington-New Hanover Land Classification from LUP Conservation Ocean Hazard Coastal Wetlands Estuarine waters yes Yes X No Other Public X Private Commercial (E) Type of waste water treatment: Existing N/A Planned N/A (F) Type of structures: Existing Failing Flood Gate Planned Install new flood gate (G) Estimated annual rate of erosion N/A Source N/A Habitat description: AREA Dredged Filled Other (A) vegetated wetlands: W_A (B) Non-vegetated wetlands: open water apex. 214 sf (C) other: Estuarine shoreline res Public Trust waters ___yes Other dppX•/298 sf (D) Total Area Disturbed: apex. 214 sf appx. 298 sf (E) PRIMARY NURSERY AREA: YES NO X (F) WATER CLASSIFICATION: SC OPEN: YES NO X 8. Project Summary The applicants propose to replace the existing wooden tide gate with a metal sheet pile gate and to stabilize the adjacent banks. '9. PROJECT DESCRIPTION - The project site is located within the mouth of Greenfield Lake Creek at the confluence of the Cape Fear River. There is an existing tide gate which was repaired by permit issued to the City of Wilmington (58-81). This existing gate was of wooden construction and has failed to the point of being non- functional. The creek at this location is approximately 21 feet wide. In addition to the failed gate the creek and river banks adjacent to the structure have also experienced varing degrees of erosion. Rip-rap had previously been used on the stream banks on the north side (upstream). As indicated on the work plats, three of these areas have washed out. There is also a portion of an existing bulkhead along the river bank on the south shore. As noted above the creek and river are classified as SC and the river is a designated nursery area. The applicants propose to remove the existing timber tidal gates, seats and apron and replace them with new sheet piling, install two metal flap gates, repair and install trash screens rip-rap banks to stabilize and place new fill landward of existing timber piling bulkheads. The new structure to hold the two gates will be lengthened to approximately 30 feet long. The two gates will be approximately 51x6'. Two trash screens located on both sides of the gate structure will be installed. These screens will be accessed by platforms originating from the pile cap as shown in the proposed site plan. Those areas requiring stabilazation are identified in the proposed site plan. In areas A and D the banks will be excevated to remove existing rip-rap and sand. The areas will be shaped as shown in section-AA where there is no existing bulkhead(4). Following this preparation these two areas will be rip rapped as per the referenced plan. The approximate dimensions of area A are 351x12'. Those of D are 301x12'. Landward of the bulkheads (locations B and C) the banks will be stabilized as shown in section-CC(1) and (3). The work will be accomplished landward of the bulkheads. In addition to these areas, rip-rap will be placed at the toes of the new apron on each side of the new structure. This toe protection is approximately 1 foot wide by 3 feet deep for each structure. Rip-rap will also be placed landward of the existing bulkhead on the south bank. The length will be approximately 21' long. 10. - Anticipated Impacts- The existing failed structure has resulted in the occasional flooding of a portion of the Ports property. The proposed structure should correct this problem. No significant adverse impacts are expected if the project is constructed as shown in the plans. Submitted By: C. Robert Stroud, Jr. Date: 06-15-92 Office: Wilmington Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 must be completed for all projects. 1 APPLICANT a. Name N. C. STATE PORTS AUTHORITY Address 2202 BURNETT BLVD. City WILMINGTON Zip 28401 Dayphone 763-1621 X Landowner or Authorized agent b. Project name (if any) TIDAL CONTROL GATE c. If the applicant??j, ve the owner's name LS V JUN -5 1992 DIVISION OF eegsTAL MANAGEMENT 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number MOUTH OF GREENFIELD CREEK AT CAPE FEAR RIVER b. City, town, community, or landmark WILMINGTON If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing pro .N C, E work, or both? MA NTT c. Will the project be for community, private, or commercial use? COMMUNTTY d. Describe the planned use of the project. REPLACE FAILING TIDAL GATES TO PREVENT TIDAL ENCROACHMENT ON BACKSIDE OF PORT PARKING AND VEHICLE STAGING AREA. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 4' - 6' d. Soil type(s) and texture(s) of tract N/A e. Vegetation on tract N/A f. Man-made features now on tract EXISTING TIDAL GATE c. County NEW HANOVER g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) d. Is proposed work within city limits or planning jurisdiction? YES e. Name of body of water nearest project 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT X Conservation Transitional Developed Community Rural Other h. How is the tract zoned b local ggovernment? HM (HEAVY MANUFAC?RING) i. How are adjacent waters classified? SC a. Describe all development activities you propose (for j. Has a professional archaeological survey been example, building a home, motel, marina, bulkhead, carried out for the tract? N/A If so, by whom? or pier). REPLACING EXISTING TIDAL GATES AND RUMP. State N . C . 12/89 1 f. Dimensions of spoil disposal area g. Location of spoil disposal area N/A h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water aAreas? k. Will the fill material be placed below mean high water? YES 1. Amount of fill in cubic yards i n n r- - v _ e r6T.40 PEA GRAVEL/ RIPRAP in. Type of fill material n. Source of fill material QUARRY o. Will fill material placed on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? -BEHIND BULKHEAD -SILT FENCES IF NEEDED, MULCH r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? PTTF DRTVFR, mnn4nF. s. Will wetlands be crossed in transporting equipment to project site? NO If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. b. Length of bulkhead or ripraap EXISTING 112 FT or Average disttance wa erH ;ward offnean hiigh CREEK) normal water level 10' -121 12/89 c. Shoreline erosion during preceding 12 months, in feet d. Type of bulkhead material EXISTING TIMBER & RIPRAP e. Amount of fill, in cubic yards- to be placed below meanhighwaterAn r- y_ CAT-r f. Type of fill material RIPRAP 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Divi i oastal Management plicant of that opportunity M JUN 5 X992 DIVISION OF COASTAL MANAGEMENT ?.tt o (3 LL, W I<n- < U F U 0 P ' IIIIIIIII-A I " c ? g b Qf Qf ?M Q } Li R W a Z S to o a S! U z g O F V \ 7 l y N D ? 000 0'o W 0 Oo°o a U ? 00 O , O 60 0 0 0 O 33a? z U vi Z z W o? Ooa J 5 ?i aF? 0 f ? L -i v C s z ?o m 3 m z 9v 01 On Ro ------------------ r 1 Lr----------- ------- 1 _____________ _______ r L----- --------------- ^ - r N V (? L---_ ---I----------- -- - - M ? r b j > L7----------- - -- ,? r ? ------------ 1 ---- g r - ---- --------------- r L ---- --------------- -------- - -- ----------- ------- L ------------ ------- A A " f P h P 7? pry LJ? z C) Vill s O 7 a ? J pC Q a 04 0 I 0 O O 1 11111 ? 0 0 0 0 O O? ?( gH? :oz H 10, ols Y? lit 10 lit Q CL at O ? la a Z MOX ;a-u 000 m D O z 1 m v z :4S L5 _z D `O OO 0cp 00 0 n 0 E/ - D O G ? r < z vo I h _ m ^ ' -n 1 yr 'Yl ' C? z Iloilo 1 Z fin Z C O (A ^5^ D i Z f O C o ? 0 0 a r r rn M c m 2i ,8 a j;j A L? ------------------- ------------------- -------------------- L i L---------------------- -- r N L'--'--'.------------- - r a> ------------ ------------- L ------------------- --- L -- (------------------- r------------------- L------------------- L------------------- 1 s v a 4 10 era ? ? ? ? ? Q? S 5 r a e S ? Q 8 „I a U ¦ z ¦ O M 14 X91 i A P j4 L ?g VIII ? oooooo? ?f cl Yq go ills 01, t lit o. ?s q ,;2 0 fix ,a \ _ 0 9P4io? .. DIVISION OF COASTAL FIELD INVESTIGATI1 1. Applicant's name North Carolina State Port 2. Location of project site Wilmington Faci nPAY rho o.Ci- nnrncr of PHOTO INDX: 1989: 4 179 34 Grid L-7 min 1984: 15 188 Grid P-12- STATE PLANE COORDINATES: X: 231620 Y: 0169800 3. Investigation type: Dredge & Fill X CAMA X- 4. Investigative procedure: (A) Dates of site visit 5/5 92 (B) Was applicant present es 5. Processing procedure: Application received §L5192 Office Wi.RO 6. Site description: (A) Local Land Use Plan Wilmington-New Hanover _ Land Classification from LUP Conservation (B) AEC(s) involved: Ocean Hazard Estuarine Shoreline _yees. Coastal Wetlands no Public Trust Waters es Estuarine Waters es other (C) Water dependent: Yes X No Other (D) Intended use: Public X Private Commercial (E) Type of waste water treatment: Existing N/A Planned N/A (F) Type of structures: Existing Failing Flood Gate Planned Install new flood ate (G) Estimated annual rate of erosion N/A Source N/A 7. Habitat description: (A) Vegetated wetlands: N/A AREA Dredged Filled Other (B) Non-vegetated wetlands: open water apex. 214 sf appx. 298 sf (C) Other: (D) Total Area Disturbed: appx. 214 sf a x. 298 sf (E) PRIMARY NURSERY AREA: YES NO X (F) WATER CLASSIFICATION: SC OPEN: YES NO X 8. Project Summary The-applicants propose to replace the existing wooden tide gate with a metal sheet pile crate and to stabilize the adiacent banks 9. PROTECT DESCRIPTION - The project site is located within the mouth of Greenfield Lake Creek at the confluence of the Cape Fear River. There is an existing tide gate which was repaired by permit issued to the City of Wilmington (58-81). This existing gate was of wooden construction and has failed to the point of being non- functional. The creek at this location is approximately 21 feet wide. In addition to the failed gate the creek and river banks adjacent to the structure have also experienced varing degrees of erosion. Rip-rap had previously been used on the stream banks on the north side (upstream). As indicated on the work plats, three of these areas have washed out. There is also a portion of an existing bulkhead along the river bank on the south shore. As noted above the creek and river are classified as SC and the river is a designated nursery area. The applicants propose to remove the existing timber tidal gates, seats and apron and replace them with new sheet piling, install two metal flap gates, repair and install trash screens rip-rap banks to stabilize and place new fill landward of existing timber piling bulkheads. The new structure to hold the two gates will be lengthened to approximately 30 feet long. The two gates will be approximately 51x6'. Two trash screens located on both sides of the gate structure will be installed. These screens will be accessed by platforms originating from the pile cap as shown in the proposed site plan. Those areas requiring stabilazation are identified in the proposed site plan. In areas A and D the banks will be excevated to remove existing rip-rap and sand. The areas will be shaped as shown in section-AA where there is no existing bulkhead(4). Following this preparation these two areas will be rip rapped as per the referenced plan. The approximate dimensions of area A are 351x12'. Those of D are 301x12'. Landward of the bulkheads (locations B and C) the banks will be stabilized as shown in section-CC(1) and (3). The work will be accomplished landward of the bulkheads. In addition to these areas, rip-rap will be placed at the toes of the new apron on each side of the new structure. This toe protection is approximately 1 foot wide by 3 feet deep for each structure. Rip-rap will also be placed landward of the existing bulkhead on the south bank. The length will be approximately 21' long. 10.- Anticipated Impacts- The existing failed structure has resulted in the occasional flooding of a portion of the Ports property. The proposed structure should correct this problem. No significant adverse impacts are expected if the project is constructed as shown in the plans. Submitted By: C. Robert Stroud, Jr. Date: 06-15-92 Office: Wilmington lv? r? r .' s Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name N. C. STATE PORTS AUTHORITY Address 2202 BURNETT BLVD. City WILMINGTON State N. C. Zip 28401 Day phone 763-1621 X Landowner or Authorized agent b. Project name (if any) TIDAL CONTROL GATE c. If the applicant , ve the owner's name u V JUN 5 1992 DIVISION OF EeOASTAI: MANAGEMENT 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number MOUTH OF GREENFIELD CREEK AT CAPE FEAR RIVER b. City, town, community, or landmark WILMINGTON c. Will the project be for community, private, or commercial use? COMMUNTTY d. Describe the planned use of the project. REPLACE FAILING TIDAL GATES TO PREVENT TIDAL ENCROACHMENT ON BACKSIDE OF PORT PARKING AND VEHICLE STAGING AREA. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 4' - 6' d. Soil type(s) and texture(s) of tract N/A e. Vegetation on tract N/A f. Man-made features now on tract EXISTING TIDAL GATE c. County NFw H4ANnyF.R g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) d. Is proposed work within city limits or planning jurisdiction? YES e. Name of body of water nearest project 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). REPLACING EXISTING TIDAL GATE AND RIPRAP. 12/89 If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex?I g pro .N CEnew work, or both? NTT _ X Conservation Transitional Developed Community Rural Other h. How is the tract zoned by local government? HM (HEAVY MANUFACTURING) i. How are adjacent waters classified? a professional archaeological survey been "ut for the tract? N/A If so, by whom? 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structuresproposed• N jA b. Number of lots or parcels N/A c. Density-(Give the number of residential units and the units per acre.) N11 A d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A E Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N/A g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N,/ n h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? N1[ n k. Describe existing treatment facilities. N/A - 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). N/n m. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, FLOOD boat ramp, GATE rock jetty) Fill placed in P? wetland or below a MHW SCE PI C D Upland fill areas Length Width Depth 30' 0.67' 35' 12' J •}%f .v BEHIND BULKHEAD 5' 3' 301 b. Amount of material to be excavated from below water level in cubic yards 40 C . Y . c. Type of material RIPRAP AND SAND d. Does the area to be excavated include marshland, swamps, or other wetlands? NO e. High ground excavation, in cubic yards 2 12/89 f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in N/A feet g. Location of spoil disposal area N/A h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? N/A If so, where? j. Does the disposal area include any marshland, swamps, or water aAreas? d. Type of bulkhead material EXISTING TIMBER & RIPRAP e. Amount of fill, in cubic yards- to be placed below meanhigh water R n r Y_ r?r.r f. Type of fill material RIPRAP 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: 11 , k. Will the fill material be placed below mean high A copy of the deed (with state water? YFS instrument under which the apI 1. Amount of fill in cubic yards 1 n n r _ v Lor,44) m. Type of fill material PEA GRAVEL/RIPRAP n. Source of fill material QUARRY o. Will fill material placed on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? -BEHIND BULKHEAD -SILT FENCES IF NEEDED, MULCH r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? PTT F Dung, mrnnFs. Will wetlands be crossed in transporting equipment to project site? NO If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead orriprap EXISTING 112 FT b. Average drsDaztce waOterHvvaTdIofinean hig wa .CREEK) normal water level 10" -121 1289 affected property. If the applic the owner of said property, the , decd or other instrument under title, plus written permission froi the project. s &njolti?ning ?o a -•e'apy1e k1ht b' wner cIai ner to ca 0111 An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Divi r oLCoastal Management ?i plicant of VvvvVV that opportunit JUN 5 19v DIVISION OF COASTAL MANAGEMENT. Name CITY OF WTT,MTNGTON Address P. O. BOX 1810 WILMINGTON, N C. 28402 Name rHPvprnt Address 12LLSTATE STREET PERTH AMBOY_ NEW JERSEY 08861 Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. SP - 58 - 81 A check for;$28umade payable to the Department of Environment , Health &. Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the ?1r day of ?J X l/ L owner or Authorized agent 4 1289 v n a ?z z m M 9 0 ---------- -------- r 1 L----------- -------- ____________ ________ r LI _________________ ___ r N < o L - g 77 'N---- q . ---- ?------------ - ---- r L7 _________________ _ --- L L----------- -------- L----------- -------- A ?o 1 8 P 1 N 4 M O o J ? i y py U fP''?1 + Qj L-? ?? Q S A Z 0 ?v a m P dPE7t 4,? u II NCS?A N II x4 II P A a 0 II s II Q N II ? II II rn 4 II II ?II Nyl? ?N? "go VIII I W ?oooooorn ?[A > z tit $? maQ?yZ 4??q ,,,5 ?Cf OQ p oY q ' S?_ A. ;o =:J -° 20>0 m OM r-0 r O C) (A ? K M>rn -1 0 0 Zm v z ?+ S Ln C-) Z ?? CREE F.?' GRE r ?D . 00 00 0 0 o-P ° O a O O Q 0 0 n 00 m 00 D OQ o 000 o 0 Q O z n F C 0 O Z O n ffi D S 2 a m o 00 -D m z m •-? D -C X o ° D sgq 0 0- •p 0 ao p 0 9 o ? a n D d C- D O b C) 0 z ? Z C) AL RT h ICAROIINA NORTH CAROLINA STATE PORTS AUTHORITY PO TS POST OFFICE BOX 9002 I WILMINGTON, NORTH CAROLINA 28402 I (919) 763-1621 CHARLES T. KNIGHT, P.E. Senior Engineer July 21, 1992 M i Mr. John Dorney f? V Division of Environmental Management D LS North Carolina Department of Environment, Health and 1111_ 2 S 1992 Natural Resources P O Box 2 7 6 8 7 WETLANDS GROUP Raleigh, North Carolina 27611-7687 WATERWATER UpL?TYSECN Reference: Request for Permit Greenfield Creek Tidal Gate Wilmington, North Carolina Dear Mr. Dorney: Attached. is a copy of a letter dated June '0, 1992 from the Wilmington District, U S Army Corps of Engineers and a copy of the reply to the letter. If you have any questions please do not hesitate to call. Sincerely, Jerrel J. Freeman, P. E. Encl . SINCE 1945 .4, P40RIh ICAROUNA NORTH CAROLINA STATE PORTS AUTHORITY PORTS POST OFFICE BOX 9002 / WILMINGTON, NORTH CAROLINA 28402 / (919) 763.1621 CHARLES T. KNIGHT, P.E. Senior Engineer July 21, 1992 Department of the Army Wilmington District, Corps of Engineers P O Box 1890 Wilmington, NC 28402-1890 Reference: Regulatory Branch Action ID. 199202638 Gentlemen: Your letter of June 30, 1992 requested certain additional information to enable you to process the application for authorization to replace the wooden tide gate and perform bank stabilization work at the mouth of Greenfield Creek, off the Cape Fear River, Wilmington, New Hanover County, North Carolina. In regard to paragraph a. of your letter, the permit requested is for repair work to an existing, operating flood gate and the activities associated with this work will be limited to the immediate vicinity of the existing structure. In regard to paragraph b. of your letter, the only work associated with the permit request is for repair of the existing facility. In regard to paragraph c. of your letter, the work will be limited to repair of the existing tide gate facility. As you requested, a copy of this letter is being furnished to the North Carolina Division of Environmental Management. Meanwhile if there are any questions about the project please do not hesitate to call. Sincerely, Jerrel J. Freeman, P.E. SINCE 1945 Department of the Army July 21, 1992 Page 2 , Copy: Mr. John Dorney Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources P O Box 27687 Raleigh, North Carolina 27611-7687 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO June 30, 1992 Regulatory Branch Action ID. 199202638 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources -- Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Dorney: Enclosed is the application of the North Carolina States Ports Authority, represented by Mr. Gerald Devito, for Department of the Army authorization and a State Water Quality Certification to replace a wooden tide gate and stabilize banks at the mouth of Greenfield Creek, off the Cape Fear River, Wilmington, New Hanover County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of.our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification may be required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request by August 31, 1992, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, Regulatory Branch, telephone (919) 251-4636. Sincerely, VIG.n,e Wrig t egulat ry Branch Enclosure op r 44,100 f Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 -2- Mr. James Herstine Wilmington Regional office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 boy Please type or print. Carefully describe all anticipated development activities, including construction, excava- tiodf, filling, paving, land clearing, and stormwater con- If you plan to build a marina, also complete and trol. If the requested information is not relevant to your attach Form DCM-MP-2. project, write N/A (not applicable). Items 14 and 9 must be completed for all projects. RE I°1 E4. Is the proposed activity maintenance of an existin?gg ppro ect, new work, or both? 11U 2 1^0r MAINTENANCE 1 APPLICANT 4Q111 n-rnrnr 4-nNC11. Will the project be for community, private, or a. Name N. C. STATE PORTS AUTHORITY commercial use? COMMUNTTY Address 2202 BURNETT BLVD. City WILMINGTON State N. C. d. Describe the planned use of the project. REPLACE FAILING TIDAL GATES TO PREVENT Zip 28401 Day phone 763-1621 TIDAL ENCROACHMENT ON BACKSIDE OF PORT X PARKING AND VEHICLE STAGING AREA. Landowner or Authorized agent b. Project name (if any) TIDAL CONTROL GATE c. If the applicant$?, ve the owner's name u v JUN 15 1992 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A DIVISION OF C. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number MOUTH OF GREENFIELD CREEK AT CAPE FEAR RIVER b. City, town, community, or landmark WILMINGTON c. County NEW HANnyvp d. Is proposed work within city limits or planning jurisdiction YES e. Name of body of water nearest project 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Elevation of tract above mean sea level or National Geodetic Vertical Datum 4' - 6' d. Soil type(s) and texture(s) of tract N/A e. Vegetation on tract N/A f. Man-made features now on tract EXISTING TIDAL GATE g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) _X Conservation Transitional Developed Community Rural Other h. How* ?HEAVYcMANUFACT[JRING)vemment? i. How are adjacent waters classified? Sc a. Describe all development activities you propose (for j. Has a professional archaeological survey been example, building a home, motel, marina, bulkhead, carried out for the tract? N/A If so, by whom? or pier). REPLACING EXISTING TIDAL GATES AND RIPRAP. 12/89 r 1. Dimensions of spoil disposal area N/A g. T.ocation of spoil disposal area N/A h. Do you claim title to the disposal area? N/A If not, attach a letter granting permission from the owner. Will a disposal area be available N/A for future maintenance? If so, where? j. Does the disposal area include any marshland, swamps, or water areas? N/A k. Will the fill material be placed below mean high water? YFS 1. Amount of fill in cubic yards 1 nn r _ v L"tora4) in. Type of fill material PEA GRAVEL/ RIPRAP n. Source of fill material QUARRY o. Will fill material placed on marsh or other wetlands? p. Dimensions of the wetland to be filled q. How will excavated or fill material be kept on site and erosion controlled? -BEHIND BULKHEAD -KUJJBth WILL REMAIN DUE 1U WEIGHT -SILT FENCES IF NEEDED, MULCH r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? PTT.F. nRTVFR, RACK. i4nF. s. Will wetlands be crossed in transporting equipment to project site? NO If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap EXISTING 112 FT b. Average disttance wateerHward ofEmean »gi watEer or normal water level 101 -121 12/89 c. Shoreline erosion during preceding 12 months, in feet d. Type of bulkhead material EXISTING TIMBER & RIPRAP e. Amount of fill, in cubic vards. to be placed below mean high water 8 C) -C - Y . CALr f. Type of fill material RIPRAP 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to cant' out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule W.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Divi ' oastal Management plicant of that opportunit JUN 5 W92 DIVISION OF COASTAL MANAGEMENT 0 z Z: (? W C9 i~yy`` y ? ?i W Z W l 6 i1 - td H b ui Z ? J N p 8 OD C > ? $ g C c ? ' 2J Z V 5 vU, o c 8 qp 0 0 00 ??o '\\\\N'O??Oo 00 Wz G 41 dIC 00 ?<g z a? z 0 ri bI d 0 gig ? oo0ooo k_t u? II u a? o '3 C 0 91 -6 0 II "' II ? b? II II ? # o II a II s u q b 3 ' -------------------- -------------------; -- ------------------------ ------------------- - -- -------------i-----. b - ------------- ------------- ------------ - ------ ------------ r -------------------7 ------------------. J -------------------- M oQ z? 0 >Q 1 v. b' O I $ t !y(s yL?? ? jQY isle 112 lop $FSE ?3 j gig i? O aids tx z a ft's :9h 117 ul J 0 0 0 0 0 0 d { R? N Y II ` ? ' II ? s 1 ?tt rr- nt _ ------------------- , L 0 ¦ N N N lie R ppyE L? r ,? L MWWdD a VAON L' ,,cv undode J -------------------- ----------- -- -------------------- --, 7038 -- - ----------------- --- J -- - - ----------------- -- ZZ i o J -- -- ------------ f ? -------------------- --, N - -- ------------------- --, J ------------------- , J ------------------- 0 z 9 w b 2 10, iurasow Nor?no '4 ?a? ? - ?fLVt • r ??? Y 'JUN 2 UN- 31%%'2 .. "%wogi, "Punt? State of North Carolina Department of Environment, Health, and Natural Resources Division of Coastal Management James G. Martin, Governor Roger N. Schecter William W. Cobey, Jr., Secretary Director June 16, 1992 Mr. Gerald Devito, PE Marine Engineer North Carolina State Port Authority PO Box 9002 Wilmington, NC 28402 Dear Mr. Devito: The Division of Coastal Management hereby acknowledges receipt of your application for state approval for the replacement of an existing tidal gate located at the confluence of Greenfield Creek and the Cape Fear River. It was received on June 5, 1992, and appears to be adequate for processing at this time. The projected deadline for making a decision is August 19, 1992. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will also serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the site of your proposed project. You should post this card at a conspicuous point along your property where it can be observed from a public road. Some examples would be: nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this Notice could result in an incomplete application. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. 127 Cardinal Drive Extension • Wilmington, North Carolina 28405-3845 • Telephone (919) 395-3900 • Fax (919) 350.2004 An Equal Opportunity Affirmative Action Employer .? OPlease contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, C. Robert Stroud, Jr. Coastal Field Representative RS/ejm cc: Jim Herstine, DCM Preston Pate, DCM Ernie Jahnke, COE Ann Hines , LPO DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO July 27, 1992 Regulatory Branch Action ID. 199202638 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Reference the application of the North Carolina State Ports Authority, represented by Mr. Gerald Devito, for a Department of the Army permit to replace a wooden tide gate and stabilize banks at the mouth of Greenfield Creek, off the Cape Fear River, Wilmington, New Hanover County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. All work authorized by this permit must be performed in strict compliance with the permit plans. b. The riprap material will be positioned in strict accordance with permit plans. C. The riprap material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials or debris will not be used. d. No vegetated wetlands will be excavated or filled. e. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. f. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less are not considered significant. r A -2- Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, Regulatory Branch, telephone (919) 251-4636. Sincerely, Copies Furnished: M John Dorney ater Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Thomas Welborn, Chief U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, NE. Atlanta, Georgia 30365 G. Wayne Wright Chief, Regulatory Branch Mr. James Herstine Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 AIV? DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO August 24, 1992 Regulatory Branch Action ID. 199202638 and State Permit No. 77-92 Mr. Gerald Devito North Carolina State Ports Authority Post Office Box 9002 Wilmington, North Carolina 28402 Dear Mr. Devito: 'rE, ? M Reference your application for a Department of the Army permit to replace a wooden tide gate and stabilize banks at the mouth of Greenfield Creek, off the Cape Fear River, Wilmington, New Hanover County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives.of general permit No. CESAW-C080-N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plans. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, telephone (919) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosures ,E ( c Ip1 .A.. -2- Copies Furnished with enclosures: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 r John Dorney ater Quality Section (((((( Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Thomas Welborn, Chief U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, NE. Atlanta, Georgia 30365 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. C. Robert Stroud, Jr. Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 "o-, ,- J ORIGINAL PLANS , 0 2 3 P1 Action I.D. i 4 9e? N rtQ W LL- U 1? ? o Q O Q nn?? z > J Q p O - O O C > ?g g ? Z t ?..... --I ,... . //// g 0 000 Co ?001 F- z cW3ww N ? O J Ir O W n.Fw c? a O C H g 4 F 9 G 1 Z S? i O W zJ W 'mil / of 3 a? bj?b Sol g Ab ??? ? cl <?b s M Q as?$g MOP oft ON W 11 IV §11 J ? e 8 0 0 11111 d Ii u? II u 6 0 8 e1 _ 3 N 4 V kj,, ------------------ • -- --------------J-------, b ? - -------------------- - 01??, - -----------< <? 0 1? J is - -?^^------------------- u ? ? n J - -- --------------------', J --------------------r----? ----------------- -------------------- 41 l 0 ae of z w ww oQ v ?? g Q ? p N '1 0 .1 v. - 5ih5rr 2 or .3 It I OL b? 1 r 0 ale as 3? Egg µ 3 81 ?.a gig > HIS NO w .1,1 oooooo 66 d O A ? 0 Fxx? ¦ '? 19 8 r? e p u 0 i I a 1 b? I MI. w w U c, I? n1 _ ------------------- ------------------ --- --------------- -------- ------------------ M3? -- ---- -------------i ----J ZZ b G -- -?-------------1 < _____________. N J -- -- --------------------- "I J --------------------r -------------------7 - ------------------- -------------------, ------------------- z ? b ?JP? 13 ;po J O F`t a 45 , NCr 3 3 •saanspaw TpoTgovad pup ageTadoadde Bons due ;o eouesgp agq oq se uoTgewao;ur. apTnoad ao spuvTgem ao saagpM ;o ssoT eTgppTOAgun 'pagoaCoad agq ao; agebTgTw oq upTd anoA 84POTPUT aseaTd •paAOTdwe uaaq spy uOTgpzTwTUTw TpoTgoead pup agvTadoadde TTp aag;p buTuTvwaa sgoedwT asaanpg aTgppTOAeun TTv aO; paaTnbea aq TTTM U074p6TgTw TeOTgopad pup egeTadoaddv gegq seaTnbea VON agy •o •sgopdwT asaanpp azTwTuTw oq 'senbTugoaq uOTgonagsuoo pasodoad pup SURTd ;o uoTgeoTJTpow pup quawdoTanap buTpapbea ATTeToedsa 'auop anpg noA lvg4 TTe 94ROTpUT aseaTd •sassoT puuTgaM eziwTuTw oq sdags TeoTgopad pup agpTadoadde TTe uaXpq anpg oq nod ao; Aipssaoeu sT qI 'q 'spade pUPT49M a0 aagpM Oq bUT6pwpp gseaT agq ST uvTd pagoaTas anon gegq uotgeOTJTgsnC apTnoad pup paTTdde anpg noA goTgm jog i{aoM agq oq 'seATgpuaagTe pupTdn 6uTpnTOUT 'sanTgpuaagTe aaggo Cup buTpapbaa UOTgpwao;uT gsTuan; aspoTd •anTgpuaagTv aTgpOTgopad '6UT6ewep ATTpgUawUOaTAUa gSEaT agq sT ](aoM pasodoad agg ;T ATuo elgvTTpnp aae SagTs oTgpnbv TvToads aag40 aO SPURT49M UTggTM xaOM a0; SgTwaad 'e :UoTgpwaO;UT TpuOTgTppp 6uTMOTTo; agg apTnoad not gpgq gsanbaa am 'vow stgq ggTM eoupTTdwoo TTn; uT uOTggoTTdde anoA ssaooad oq an aTgvue oy •TeoTgoead pup agpTadoadde quaqxa agq oq sgopdwT aTgepTOApun 6UTUTpwaa AUe ao; 6UTgpsuedwoo 'ATTPUT; pup !spueTgaM pup saagvm uo sgopdwT azTwTuTw oq sdags TeoTgopad pup ageTadoadde buTXpq 'pu009s :anTgeuaagTe TPOTgoead 16UTbpwpp gspaT agq ;o UOTgoaTas agg gbnoagq SpUPT48M pup saageM og sgopdwT 6UTpTOAe 'gsaT; ao; sapTAoad VOW sTgy 'sauTTapTno (T)(q)pot uoTgoaS loll aageM ueaTO agq ggTM ATdwoO oq Aaeseaoau uoTgebTITW ;o TanaT pug ad.Cg agg auTwaagap oq saanpoooad buTgsTTgvgsa (vow) quawaaa6v ;o wnpueaowew v p8u6Ts (KdH) AOua6V UOTgOagoad TpquawuoatnvH •S•n agg PUP Ala agq '066T 19 Aagnag93 u0 •PUTTOapD ggaOH 'Aqunoo aanoueH MaH 'UO46UTwTTM 'aaATH juea advo agq ;;o 'Kaaao pTaT;uaaaO ;o ggnow agq qp sxupq ezTTTgpgs pup agpb apTq uapooM v aopjdaa oq UOTggzTaoggng (Va) AwaV agq ;o quawgapdaa ao; uOTgeoTTddu anoA aouejejeH :04TAGG 'ajj apea I'i3;;1111VI1?i131VM ?_? ZMZ eUTTOapo ggaoN 'uogbUTWITM • ';M19 SONV113M "... Z006 xog 80T330 gsod 7 AgTaoggny sgaod agpgS euTToapa ggaoH (( j? OgTnaa PTpaaO 'aW 'I' ??I n ? rl Q 8£9ZOZ66T *aI UOTIOK goupag AaogpTnbag Z66T 10£ aunt 01H3d3W kld3WNI 069VZ0b8Z VNIIOddO H1dON NOMNIWIIM 0681 XOg 'Od SH33NIJN3 d0 SdHOO `imisia NOIDNIMIM AWHV 3Hl :101N3W18dd3a r L89L-TT9LZ euTT02g0 t44-ION 'g6T9Tsg L89LZ xOg aoT330 4SOd saaanosag Tvan4eN Pug 44TV9H '4UawUO2TAUg 3o 4uewgaedea guTToapO 44aON 4u8w85eueW TggSEOO 3O uoTsTATa aaNaed ugof •JR 868£-SOb8Z eUTTOaeo 44JON IU046UTWTTM UOTSU94xg 9ATJG TEUTP3VO LZT 4u8wa6eueW TegseOO 30 UOTSTATa guTT02eo g420N 90T330 TpuoTbaN uogbuTwTTM eutgsaeH sawer •2H L89L-TT9LZ 99EOE eTbaoaO 'egueTIV •g•N '489248 pugTganoo SVE ITUn Aao4sTn69U spueTgaM 3o AI uOTbag - A3ua6V quawabsupw U0140agoad TgquawUO2TAUg •S•n goueag AaogeTnbag '3aTg0 ggbT2M auARM • 0 'ATaJ90UTS UUTTOaRD 44JON '4618Teg L89LZ xog 907330 480d saoanosag Tean4eN pug glTeaH '4u9wuoaTAug quawg2edaa euTToaeO 442ON Tsquawuo2TAU2 3O uoTsTATa Aauaoa ugor :pagsTuana saTdoo •9E9b-TSZ (6T6) eu6gdOT84 '40ue2g Aao49Tn6ag '907330 PT9T3 uog6uTwTTM 'aaggoTH 338r -aK gog4uOO 04 8494TO84 you op eseaTd 'suoT4senb aneg noA 31 •40V 2aggM UPOTO ago 30 TOV U07409S 04 quensand uOT4eoT3T4a90 AgTTEna aageM E ao3 uoxgvoTTdde anoA eggnTgn8 ATaggnbapg oq wagq aTgeua oq quawabgurN TgquawuoaTAUg 3o uoTsTATa euT102e0 ggaON agq 04 quaS eq 4snw uoTgvwao;uT sTg4 3o Adoo g 'osIV •Z66T 'OE ATnr Aq an oq papaeMao3 aq pTnogs qT pue uoTgeoTTdde anoA 3o buTsseoo2d snoTgTpedxe ano o4 TeTquesse sT uoTgewao3uT sTgy -Z- [ aansoToua goueag AaogeTnbau ';aTgO 446TJM auAEM •0 'ATaaaouTS '9£9V-TSZ (6T6) 9uogd8T84 'goueag AaogeTnbed '90T;30 PT913 uog6uTwTTm 'aaggoTu 33ar 'aW og passeappe aq Aew BquawwOO aO suoTgsana 'E66T 'ZT Aaenagea aao;aq ao uo page?oeadde aq pTnoM suoTgepuewwooaa ao/pue sguewwoo anoA 'guaweaabe buTSSeaOad/gTwaad Teaauab sdaoo-KW 0 aqg 'T6Z0-000-N-0800-MV990 oq guensand •wagsns qaC anoos 96aeq a buTen buT6peap eoueuaquTew gonpuoo oq uoTgeoT;Tpow gTwaad a ao; gsenbea s,aagq?waad aqq saATOAUT gOTgM '(pasoToua Adoo) Z66T 'TT aagwaoaa ;o wnpueaowaw quawabeueW TegsROD ;O uOTsTATa euTToaeO ggaON aouaaa;aa 'OBTV •euTToaeo ggaoN 'Agunoo aanoue$ M8N 'aogaeg uogbuTwTTM 's8?4TTTOE3 gaod agegS 'aanTU ae93 aduo aqq uo sggaaq sdTgs ;o aouEuaguTEw sazTaoggne goTgM AgTaoggnv sgaod agegS euTTOaeo ggaoN aqq oq ponseT gTwaad Away aqq ;o quawgaedau aqq aouaaa;au :uaogTeM •aW juea 99EOE eTbaoaO 'E4ueT4V •g•N 'gaeagS pueTganoo SVE gTun AaogeTnbau spueT4eM AI uOTbau - Aouabv uOTgoagoad TeguawuoaTAUS •S•n 06619 Z N, t,(' L8-Lb *ON gTwaad 94V49 PUP E Si g?li a gOUeag AaogeTnbag £66T 'TZ Aavnuer 0183:13UAld3HNI 068VF0tr8Z VNI108VO Hi80N 'N0i0NIWIIM 0681 X08 'Od SH33NIJN3 30 SdH00 'lO mild NOIDNIWIIM AWHV 3Hl 301N3WIHVd30 -11 .q. t, .. M 1? -2- Copies Furnished (without enclosure): t r. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. C. Robert Stroud, Jr. Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 J DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO January 21, 1993 r f' _ff Regulatory Branch ID S I Action ID No. 198600493 and State Permit No. 47-87 JAN 2 61993 F WETLANDS GROUP Mr. Larry Hardy WATER QUALITY SECTION National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Dear Mr. Hardy: Reference the Department of the Army permit issued to the North Carolina State Ports Authority which authorizes maintenance of ships' berths on the Cape Fear River, State Port Facilities, Wilmington Harbor, New Hanover County, North Carolina. Also, reference North Carolina Division of Coastal Management memorandum of December 11, 1992 (copy enclosed), which involves the permittee's request for a permit modification to conduct maintenance dredging using a barge scour jet sustem. Pursuant to CESAW-C080-N-000-0291, the LAMA-Corps general permit /processing agreement, your comments and/or recommendations would be appreciated on or before February 19, 1993. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, Regulatory Branch, telephone (919) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure X -2- Copies Furnished (without enclosure): r/ Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. C. Robert Stroud, Jr. Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 S DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS y P.O. BOX 1890 • .??. ? WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO January 21, 1993 0 Regulatory Branch Action ID. 198600493 and State Permit No. 47-87 I'' f JAN 2 61993 ..J GROl1P .."A Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Dear Ms. Gantt: Reference the Department of the Army permit issued to the North Carolina State Ports Authority which authorizes maintenance of ships' berths on the Cape Fear River, State Port Facilities, Wilmington Harbor, New Hanover County, North Carolina. Also, reference North Carolina Division of Coastal Management memorandum of December 11, 1992 (copy enclosed), which involves the permittee's request for a permit modification to conduct maintenance dredging using a barge scour jet sustem. Pursuant to CESAW-CO80-N-000-0291, the CAMA-Corps general permit/processing agreement, your comments and/or recommendations would be appreciated on or before February 19, 1993. Questions or comments may be addressed to Mr. Jeff Richter, Wilmington Field Office, Regulatory Branch, telephone (919) 251-4636. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure Y 5' ? Y -2- Copies Furnished (without enclosure): ,,Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. C. Robert Stroud, Jr. Wilmington Regional Office North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845