HomeMy WebLinkAboutDEQ-CFW_00087866is
•
Information Inputs and Source of Inputs:
Information Inputs
Source of Inputs
Tinting Process total throughput pounds for
Line B Year-end Yield Loss Report (found
the year
on site webpage in Butacite section under
"Yield Loss Report")
Annual production run time for each
bandwidth (hours for year)
Point Source Emissions Determination:
Point source emissions for individual components are given in the following pages. A
detailed explanation of the calculations is attached.
Equipment Emissions and Fugitive Emissions Determination:
The Butacite Tinting Process is contained in a Total Permanent Enclosure, and as such there
are no non -point source (fugitive) emissions associated with this process.
DEQ-CFW 00087866