Loading...
HomeMy WebLinkAboutDEQ-CFW_00087471• • CP TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 BUTACITE® 3.0 NAFION® 4.0 UTILITIES S. 0 FACILITY -WIDE FORMS 4� NOV 12 05 ENV. MANAGEMENT FAYETTEVILLE REG. OFTICE. ADDENDUMA - Supporting Documentation - Nafioe Emission Calculations LIST OF FIGURES 1-1 Site Location Map 1-2 Plot Plan 1-3 Plant Layout and Roof Diagram 2-1 Butacite Process BS-A Butyraldehyde Storage Tank BS-B Butacite® Flake Reactors BS-C Butacite Flake Dryer BS-D Butacite® Tinting INSIG-B8 Butacite' Extruders 3-1 Nafiori Process 3-2 Fluorocarbon Process NS-A HFPO Process NS-B No. 1 Vinyl Ethers Process NS-C No. 2 Vinyl Ethers Process NS-D RSU Process NS-E Liquid Waste Stabilization NS-F MMF Process NS-G Resins Process NS-H Naf on Membrane Process NS-1 Membrane Coating Facilities NS-Jl(J2 Nafiori Semiworks #1 and #2 NS-J3 Nafion® Semiworks #3 NS-K E-2 Process PS-1 No. l Oil -Fired Boiler PS-2 No. 2 Oil -Fired Boiler g Apro j ectsWay eMbutn of DEQ-CFW 00087471 • LIST OF TABLES • • 1-1 DuPont Fayetteville Works - Building Heights 1-2 Emissions Summary Table 2-1 Summary of Butacite Emission Units 2-2 Summary of Applicable Requirements for Butacite Facility 2-3 Summary of Compliance Monitoring for Butacite Facility 2-4 Summary of the Old Versus New Identification Numbers for the Butacite® Process 3-1 Summary ofNafiono Emission Units 3-2 Summary of Applicable Requirements for Nafiori Facility 3-3 Summary of Compliance Monitoring for Nafiori Facility 3-4 Summary of the Old Versus New Identification Numbers for the Nafion® Process 4-1 Summary of Utility Emission Units 4-2 Summary of Utility Unit Applicable Requirements 4-3 Summary of Compliance Monitoring for Utility Operations gAprojectsWayeMbutnaf 1 1- DEQ-CFW 00087472