HomeMy WebLinkAboutDEQ-CFW_00087471•
•
CP
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 BUTACITE®
3.0 NAFION®
4.0 UTILITIES
S. 0 FACILITY -WIDE FORMS
4�
NOV 12 05
ENV. MANAGEMENT
FAYETTEVILLE REG. OFTICE.
ADDENDUMA - Supporting Documentation - Nafioe Emission Calculations
LIST OF FIGURES
1-1
Site Location Map
1-2
Plot Plan
1-3
Plant Layout and Roof Diagram
2-1
Butacite Process
BS-A
Butyraldehyde Storage Tank
BS-B
Butacite® Flake Reactors
BS-C
Butacite Flake Dryer
BS-D
Butacite® Tinting
INSIG-B8
Butacite' Extruders
3-1
Nafiori Process
3-2
Fluorocarbon Process
NS-A
HFPO Process
NS-B
No. 1 Vinyl Ethers Process
NS-C
No. 2 Vinyl Ethers Process
NS-D
RSU Process
NS-E
Liquid Waste Stabilization
NS-F
MMF Process
NS-G
Resins Process
NS-H
Naf on Membrane Process
NS-1
Membrane Coating Facilities
NS-Jl(J2
Nafiori Semiworks #1 and #2
NS-J3
Nafion® Semiworks #3
NS-K
E-2 Process
PS-1
No. l Oil -Fired Boiler
PS-2
No. 2 Oil -Fired Boiler
g Apro j ectsWay eMbutn of
DEQ-CFW 00087471
• LIST OF TABLES
•
•
1-1 DuPont Fayetteville Works - Building Heights
1-2 Emissions Summary Table
2-1 Summary of Butacite Emission Units
2-2 Summary of Applicable Requirements for Butacite Facility
2-3 Summary of Compliance Monitoring for Butacite Facility
2-4 Summary of the Old Versus New Identification Numbers for the Butacite® Process
3-1 Summary ofNafiono Emission Units
3-2 Summary of Applicable Requirements for Nafiori Facility
3-3 Summary of Compliance Monitoring for Nafiori Facility
3-4 Summary of the Old Versus New Identification Numbers for the Nafion® Process
4-1 Summary of Utility Emission Units
4-2 Summary of Utility Unit Applicable Requirements
4-3 Summary of Compliance Monitoring for Utility Operations
gAprojectsWayeMbutnaf 1 1-
DEQ-CFW 00087472