HomeMy WebLinkAboutDEQ-CFW_00087449Vemon L Blizzard/CL/DuPont To Lewis R Goodwin/CL/DuPont@DuPont 06/03/2004 03:11 PM Terry W Norton/CL/DuPont@DuPont, C Richard CC Davis/CL/DuPont@DuPont, Terry L White/CL/DuPont@DuPont, T R bee Subject HI -SPOT ESTIMATE - BOILER #1 THIS ESTIMATE IS FOR THE CONSTRUCTION SUPPORT PORTION OF THE UPCOMING NO. 1 BOILER TUBE REPLACEMENT. SITE ENGINNERING *SKETCH AND MTO AS NEEDED LABOR & IFC: $ 2,410.00 ( 60 HRS) MECHANICAL PORTION *REMOVE AND REINSTALL SOOT BLOWERS AND BOILER BREECHING *REMOVE AND REINSTALL PLATFORMS AND LADDERS *REMOVE AND REINSTALL BOILER SKIN AND SUPPORT FRAME (REPLACE DAMAGED PORTIONS AS NEEDED) *REMOVE AND REINSTALL PIPING (REPLACE DAMAGED PIPING AS NEEDED) LABOR & IFC: $ 19,605.00 (610 HRS) FIELD MAT'L: $ 5,000.00 TOTAL: $ 24,605.00 CIVIL PORTION *BUILD AND REMOVE SCAFFOLDING AS NEEDED *REMOVE AND REPLACE BATT INSULATION *INSTALL REFRACTORY @ SOOT BLOWERS *SANDBLAST AND PRIME OUTER SKIN AND FRAME *MISC TOUCH-UP PAINTING AS NEEDED *UNLOAD, COVER AND PROTECT NEW BOILER TUBES FROM DAMAGE *CRANE / OPERATOR AS NEEDED LABOR & IFC: FIELD MAT'L: TOTAL: ELECTRICAL PORTION $ 14,168.00 (440 HRS) $ 4,000.00 $ 18,168.00 *PROVIDE T / C POWER AND LIGHTS *DISCONNECT / RECONNECT POWER / SIGNAL WIRING AS NEEDED _'17 .za �7, LABOR & IFC: $ 2,876.00 (100 HRS) FIELD MAT'L: $ 1,000.00 C `T TOTAL: $ 3,876.00 �-- DEQ-CFW 00087449 ESTIMATE SUMMARY LABOR & IFC: $ 39,059.00 FIELD MAT'L: $ 10,000.00 SUB -TOTAL: $ 49,059.00 PREMIUM TIME ALLOWANCE: $ 7,500.00 CONTINGENCY (10%): $ 5,000.00 TOTAL: $ 61,559.00 DEQ-CFW 00087450