HomeMy WebLinkAboutDEQ-CFW_00086710Operating, Scenario: OS — 25
Emission Source/Group ID: SW-2
10.Operating Schedule: (Source/Operating Scenario that best characterizes Calendar Year 2007)
Hours per Day ( 24 ) Days per Week ( 7 ) Weeks per Year ( 52 )
101. Typical Start & End Times For Operating Scenario: Start: 0 End: 2359
III L, ..I Dn ..A ID .,+ A--.1 1Phrnnarhmit-
1I— 0VA3V119ll Aux IV
—Feb +Dec
"a i 1.11� AA.
Aiau ussa i
arch —May
ne—Aug.
Sept. —Nov.
°
an
007
Z5%
007
25%
F007
°
25 O
007
25 /°
13. Actual Emissioant Listed :
Attach calculations and documentation of emission factors or other estimation methods used.
GHG
Pollutants
CAS
Emissions—
GHG
Pollutants
Tons/Year
Emission
Estimation
Method Code
See Instructions
Control
Efficiency
(Net after
all controls
Emission
Factor
Ef Control
2007
Criteria
(NAAQS)
Pollutants
Pollutant
Code
Emissions—
Criteria
Pollutants
(Tons/Year)
Emission
Estimation
Method Code
(See Instructions)
Control
Efficiency
(Net after
all controls)
Emission
Factor
Ef Control
2007
CO
CO
08
NOx
NOx
08
TSP
TSP
08
PM10
PM10
08
PM2.5
PM2.5
08
S02
S02
08
VOC
VOC
08
HAP/TAP
Pollutants (In
Alphabetical Order)
CAS
(see instructions)
Emissions
HAP/TAPS
(Pounds/Year)
Emission
Estimation
Method Code
See Instructions
Control
Efficienc y
(Net after all controls)
Emission
Factor
EF Control
2007
•
DEQ-CFW 00086710